Oklahoma Department of Transportation
Progressive Estimate Summary
Created:    01/23/2012
Contract ID: 100503   Estimate Number: 0031     Contract No: 610459
Residency: EDMOND (04400)   Estimate Type: Progressive     Account No: 400400

Project Number(s): OKCY-XTWN(009), OKCY-XTWN(012)TI, SEC115-155N(807)SG
Primary Job Piece No: 17428(28)
Contract Description: SURFACING AND TRAFFIC CONTROL I-40: FROM JUST WEST OF MAY AVE., EXTEND EAST IN OKLAHOMA CITY. PROJECT LENGTH = 2.298 MILES.
Primary County: OKLAHOMA              
Name of Road: I-40              
Prime Contractor: DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC JV              
    P.O. BOX 3788              
    EDMOND , OK   73083              
Surety Company: LIBERTY MUTUAL INSURANCE COMPANY              

Date Let: 08/19/2010 NTP Effective Date: 11/08/2010 Pay Period: 12/16/2011  TO  01/15/2012
Date Awarded: 09/07/2010 Date Work Began: 10/20/2010 Original Contract Time: 370
Date Contract Executed: 09/20/2010 Date Time Stopped: Current Time Charged: 417.00
Date NTP Issued: 09/27/2010 Completion Date: Current Time Allowed: 526.00
General Liability Expires: 03/01/2012 Workman's Comp Expires: 03/01/2012 Percent Time Used: 79.28 %
Specification Year: 2009     Date Approved:

Current Contract Amount: $29,370,033.10 Total to Date Prev to Date This Estimate
Bid Amount: $29,346,556.72 Participating: $28,030,713.72 $27,277,774.39 $752,939.33
Percent Complete: 100 % Non Participating: $685,360.84 $660,142.70 $25,218.14
Funds Available: $993.38 Total Earnings: $28,716,074.56 $27,937,917.09 $778,157.47
Unearned Balance: $-22,483.00 Stockpiled Materials: $75,069.31 $164,951.63 $-89,882.32
Gross Earnings: $28,791,143.87 $28,102,868.72 $688,275.15
Other Adjustments: $577,895.85 $577,895.85 $0.00
Liq Dam/Disincentive: $0.00 $0.00 $0.00
TOTAL: $29,369,039.72 $28,680,764.57 $688,275.15

Estimate Adjustment Detail

Contract ID: 100503   Estimate Number: 0031     Primary JP: 17428(28)



CHANGE ORDER HISTORY
Change Order Nbr. Change Order Description Status Approval Date Contract Time Adjustment Total Change Order Amount
001 Special Provisions Approved 03/24/2011 0.0 $0.00
002 Completion Date for Internal Milestone Approved 03/24/2011 120.0 $0.00
003 Changing Item to Pay Plan Quantity, Adding New Item Approved 05/12/2011 0.0 $-60,900.00
005 Adding new pay items, Revising existing item Approved 09/19/2011 0.0 $38,543.68
006 Modifying drainage structures, adding pay items for bridges Approved 12/06/2011 0.0 $45,832.70
007 Time Extension / B Bid Approved 11/30/2011 312.0 $0.00
008 Traffic Items and Structures Pending 0 0.0 $87,848.73
010 B Bid Incentive Pending 0 0.0 $1,500,000.00


STOCKPILE PAYMENT HISTORY
Project Line Nbr Stockpile Description Adjustment Type Estimate Nbr Adjusted Amount
17428(28) 0028 Paint Stockpiled Material Adjustment 0031 $-14,206.99
17428(28) 0028 Paint Stockpiled Material Initial Payment 0012 $140,271.11
17428(28) 0028 Paint Stockpiled Material Adjustment 0030 $-22,914.50
17428(28) 0028 Paint Stockpiled Material Adjustment 0014 $-1,050.74
17428(28) 0028 Paint Stockpiled Material Adjustment 0025 $-23,897.53
17428(28) 0028 Paint Stockpiled Material Adjustment 0019 $-9,940.20
17428(28) 0028 Paint Stockpiled Material Adjustment 0016 $-5,131.59
17428(28) 0028 Paint Stockpiled Material Adjustment 0024 $-28,483.87
17428(28) 0028 Paint Stockpiled Material Adjustment 0018 $-10,709.21
17428(28) 0028 Paint Stockpiled Material Adjustment 0020 $-21,931.47
17428(28) 0028 Paint Stockpiled Material Adjustment 0015 $-1,970.65
17428(28) 0028 Sp. Surface Finish Stockpiled Material Adjustment 0024 $-12,800.06
17428(28) 0028 Sp. Surface Finish Stockpiled Material Adjustment 0031 $-6,384.33
17428(28) 0028 Sp. Surface Finish Stockpiled Material Adjustment 0030 $-10,297.30
17428(28) 0028 Sp. Surface Finish Stockpiled Material Adjustment 0025 $-10,739.05
17428(28) 0028 Sp. Surface Finish Stockpiled Material Initial Payment 0020 $63,034.92
17428(28) 0028 Sp. Surface Finish Stockpiled Material Adjustment 0020 $-9,855.55
17428(28) 0048 Fence Stockpiled Material Initial Payment 0009 $44,021.97
17428(28) 0048 Fence Stockpiled Material Closure 0029 $-4,932.57
17428(28) 0048 Fence Stockpiled Material Adjustment 0018 $-9,634.19
17428(28) 0048 Fence Stockpiled Material Adjustment 0028 $-3,522.09
17428(28) 0048 Fence Stockpiled Material Adjustment 0017 $-25,933.12
17428(31) 0145 Paint Stockpiled Material Adjustment 0026 $-29,131.32
17428(31) 0145 Paint Stockpiled Material Adjustment 0030 $-74,507.60
17428(31) 0145 Paint Stockpiled Material Adjustment 0020 $-10,498.68
17428(31) 0145 Paint Stockpiled Material Adjustment 0014 $-11,473.50
17428(31) 0145 Paint Stockpiled Material Adjustment 0028 $-16,158.24
17428(31) 0145 Paint Stockpiled Material Adjustment 0031 $-37,253.80
17428(31) 0145 Paint Stockpiled Material Initial Payment 0012 $201,990.10
17428(31) 0145 Sp. Surface Finish Stockpiled Material Initial Payment 0020 $45,547.51
17428(31) 0145 Sp. Surface Finish Stockpiled Material Adjustment 0028 $-3,643.58
17428(31) 0145 Sp. Surface Finish Stockpiled Material Adjustment 0020 $-2,367.39
17428(31) 0145 Sp. Surface Finish Stockpiled Material Adjustment 0031 $-8,400.50
17428(31) 0145 Sp. Surface Finish Stockpiled Material Adjustment 0030 $-16,801.00
17428(31) 0145 Sp. Surface Finish Stockpiled Material Adjustment 0026 $-6,568.93
17428(31) 0145 Sp. Surface Finish Stockpiled Material Adjustment 0030 $-33,766.80
17428(31) 0145 Sp. Surface Finish Stockpiled Material Adjustment 0026 $-13,202.29
17428(31) 0145 Sp. Surface Finish Stockpiled Material Adjustment 0031 $-16,883.40
17428(31) 0145 Sp. Surface Finish Stockpiled Material Initial Payment 0021 $91,508.02
17428(31) 0145 Sp. Surface Finish Stockpiled Material Adjustment 0028 $-7,322.90
17428(31) 0145 Sp. Surface Finish Stockpiled Material Initial Payment 0021 $36,616.39
17428(31) 0145 Sp. Surface Finish Stockpiled Material Adjustment 0026 $-5,280.87
17428(31) 0145 Sp. Surface Finish Stockpiled Material Adjustment 0028 $-2,929.14
17428(31) 0145 Sp. Surface Finish Stockpiled Material Adjustment 0030 $-13,506.60
17428(31) 0145 Sp. Surface Finish Stockpiled Material Adjustment 0031 $-6,753.30
17428(31) 0177 Fence Stockpiled Material Adjustment 0018 $-9,146.75
17428(31) 0177 Fence Stockpiled Material Adjustment 0020 $-14,767.46
17428(31) 0177 Fence Stockpiled Material Adjustment 0025 $-20,039.06
17428(31) 0177 Fence Stockpiled Material Adjustment 0028 $-12,288.76
17428(31) 0177 Fence Stockpiled Material Initial Payment 0009 $63,747.94
17428(31) 0177 Fence Stockpiled Material Closure 0029 $-7,505.91
17428(31) 0183 Reinforcing Steel Stockpiled Material Initial Payment 0004 $10,779.16
17428(31) 0183 Reinforcing Steel Stockpiled Material Adjustment 0007 $-1,077.92
17428(31) 0183 Reinforcing Steel Stockpiled Material Adjustment 0006 $-3,788.10
17428(31) 0183 Reinforcing Steel Stockpiled Material Adjustment 0005 $-5,913.14
17428(31) 0184 Reinforcing Steel Stockpiled Material Initial Payment 0004 $4,757.92
17428(31) 0184 Reinforcing Steel Stockpiled Material Adjustment 0008 $-3,438.40
17428(31) 0184 Reinforcing Steel Stockpiled Material Adjustment 0009 $-1,319.52
17428(31) 0185 Reinforcing Steel Stockpiled Material Initial Payment 0004 $21,000.32
17428(31) 0185 Reinforcing Steel Stockpiled Material Adjustment 0012 $-21,000.32
17428(31) 0195 Reinforcing Steel Stockpiled Material Adjustment 0017 $-892.85
17428(31) 0195 Reinforcing Steel Stockpiled Material Initial Payment 0005 $1,171.86
17428(31) 0195 Reinforcing Steel Stockpiled Material Adjustment 0015 $-279.01
17428(31) 0197 Reinforcing Steel Stockpiled Material Adjustment 0012 $-5,321.02
17428(31) 0197 Reinforcing Steel Stockpiled Material Initial Payment 0005 $13,276.45
17428(31) 0197 Reinforcing Steel Stockpiled Material Adjustment 0017 $-5,091.29
22873(09) 0319 Message Sign Stockpiled Material Adjustment 0029 $-104,605.72
22873(09) 0319 Message Sign Stockpiled Material Initial Payment 0017 $104,605.72
22873(09) 0320 Support Equipment Stockpiled Material Initial Payment 0017 $13,986.88
22873(09) 0320 Support Equipment Stockpiled Material Adjustment 0029 $-13,986.88
22873(09) 0322 Lane Control Sign Stockpiled Material Adjustment 0029 $-47,663.32
22873(09) 0322 Lane Control Sign Stockpiled Material Initial Payment 0017 $47,663.32
Subtotals For Stockpile Payments $75,069.31


LIQUIDATED DAMAGES HISTORY
Adjustment Description Estimate Nbr Time Units Rate Adjustment Amount
System Application of Liquidated Damages 0028 -1.0 $2,000.00 $-2,000.00
System Application of Liquidated Damages 0029 --1.0 $2,000.00 $2,000.00


CONTRACT ADJUSTMENTS HISTORY
Adjustment Description Estimate Nbr Adjustment Amount
Milestone Adjust. (Prog. Est. Only) 0010 $420,000.00
Milestone Adjust. (Prog. Est. Only) 0011 $-420,000.00
Milestone Adjust. (Prog. Est. Only) 0024 $75,000.00
Milestone Adjust. (Prog. Est. Only) 0025 $225,000.00
Milestone Adjust. (Prog. Est. Only) 0027 $240,000.00
Milestone Adjust. (Prog. Est. Only) 0027 $15,000.00
LD Adjustment (Prog. Est. Only) 0028 $2,000.00
Milestone Adjust. (Prog. Est. Only) 0028 $210,000.00
Milestone Adjust. (Prog. Est. Only) 0029 $-765,000.00
LD Adjustment (Prog. Est. Only) 0029 $-2,000.00
Milestone Adjust. (Prog. Est. Only) 0029 $750,000.00
Subtotals For Contract Adjustments $750,000.00


LINE ITEM ADJUSTMENT HISTORY
Project Item Nbr Line Item Description Adjustment Type Estimate Nbr Adj Quantity Unit Price Adjusted Amount
17428(28) 0022 P.C. CONCRETE FOR PAVEMENT * Material Discrepancy Adjustments 0029 1.00 $-189,356.00 $-189,356.00
17428(31) 0136 SUPERPAVE, TYPE S3(PG 76-28 OK) Asphalt Binder Adjustment 0010 291.07 $-0.87 $-253.67
17428(31) 0136 SUPERPAVE, TYPE S3(PG 76-28 OK) Asphalt Binder Adjustment 0020 1,662.80 $2.86 $4,766.42
17428(31) 0136 SUPERPAVE, TYPE S3(PG 76-28 OK) Asphalt Binder Adjustment 0024 237.32 $2.86 $680.28
17428(31) 0136 SUPERPAVE, TYPE S3(PG 76-28 OK) Asphalt Binder Adjustment 0026 97.30 $2.65 $258.48
17428(31) 0136 SUPERPAVE, TYPE S3(PG 76-28 OK) Asphalt Binder Adjustment 0030 476.36 $1.92 $915.33
17428(31) 0137 SUPERPAVE, TYPE S3(PG 64-22 OK) Asphalt Binder Adjustment 0007 27.95 $-1.39 $-39.03
17428(31) 0137 SUPERPAVE, TYPE S3(PG 64-22 OK) * Material Discrepancy Adjustments 0007 -27.95 $56.23 $-1,571.63
17428(31) 0137 SUPERPAVE, TYPE S3(PG 64-22 OK) Asphalt Binder Adjustment 0009 377.70 $-0.87 $-329.17
17428(31) 0137 SUPERPAVE, TYPE S3(PG 64-22 OK) Asphalt Binder Adjustment 0010 295.82 $-0.87 $-257.81
17428(31) 0137 SUPERPAVE, TYPE S3(PG 64-22 OK) Asphalt Binder Adjustment 0014 2,019.57 $0.13 $275.67
17428(31) 0137 SUPERPAVE, TYPE S3(PG 64-22 OK) Asphalt Binder Adjustment 0020 2,051.64 $2.86 $5,881.03
17428(31) 0137 SUPERPAVE, TYPE S3(PG 64-22 OK) Asphalt Binder Adjustment 0024 722.51 $2.86 $2,071.08
17428(31) 0137 SUPERPAVE, TYPE S3(PG 64-22 OK) Asphalt Binder Adjustment 0025 793.85 $2.65 $2,108.86
17428(31) 0137 SUPERPAVE, TYPE S3(PG 64-22 OK) Asphalt Binder Adjustment 0030 416.21 $1.92 $799.75
17428(31) 0138 SUPERPAVE, TYPE S4(PG 76-28 OK) Asphalt Binder Adjustment 0024 1,351.25 $3.27 $4,426.70
17428(31) 0138 SUPERPAVE, TYPE S4(PG 76-28 OK) Asphalt Binder Adjustment 0026 156.57 $3.03 $475.35
17428(31) 0138 SUPERPAVE, TYPE S4(PG 76-28 OK) Asphalt Binder Adjustment 0030 347.01 $2.19 $762.03
17428(31) 0142 P.C. CONCRETE FOR PAVEMENT * Material Discrepancy Adjustments 0029 1.00 $-2,058.44 $-2,058.44
17428(31) 0142 P.C. CONCRETE FOR PAVEMENT * Material Discrepancy Adjustments 0029 1.00 $-501.79 $-501.79
17428(31) 0178 FENCE-STYLE CLF (6'HIGH, CLASS B) * Material Discrepancy Adjustments 0029 1.00 $-1,157.59 $-1,157.59
Subtotals For Line Item Adjustments $-172,104.15
* = User applied Line Item Adjustments


MILESTONE ADJUSTMENTS
Milestone Number Milestone Description Time Allowed Time Used Rate Total
01 TIME 'B' BID 496.00 396.00 $15,000.00 $0.00
02 Internal Milestone/SEC115-155N(807)SG 120.00 120.00 $1,500.00 $0.00
03 Internal Milestone/OKCY-XTWN(009) 06/01/2011 05/16/2011 $10,000.00 $0.00

Line Item Detail

Contract ID: 100503   Estimate Number: 0031     Primary JP: 17428(28)



Line Item Number Item Description Item Number Units Bid Qty Current Quantity Quantity Paid This Est. Quantity Paid To Date Unit Price Amount Paid This Est. Amount Paid To Date
Fed/State Project Number:    OKCY-XTWN(009) Project:    17428(28) Category:    0100/ROADWAY - OKCY-XTWN(009)
0001 CONSTRUCTION MISCELLANEOUS 104 0300 LF 23,213.000 23,213.000 11,903.000 11,903.000 $1.87 $22,258.61 $22,258.61
0002 UNCLASSIFIED BORROW (TOPSOIL) 202(D) 4781 CY 1,000.000 1,000.000 -415.000 0.000 $8.00 $-3,320.00 $0.00
0003 EARTHWORK 202(H) 0185 LSUM 1.000 1.000   1.000 $135,000.00 $0.00 $135,000.00
0004 TEMPORARY SLOPE DRAINS 221(A) 2800 LF 162.000 162.000   0.000 $10.65 $0.00 $0.00
0005 TEMPORARY SILT FENCE 221(C) 2801 LF 4,550.000 4,550.000   8,934.000 $1.70 $0.00 $15,187.80
0006 TEMPORARY SILT DIKE 221(F) 0100 LF 315.000 315.000   0.000 $7.46 $0.00 $0.00
0007 (PL)TEMPORARY INLET SEDIMENT FILTER 221(H) 0450 EA 308.000 308.000   0.000 $47.93 $0.00 $0.00
0008 SOLID SLAB SODDING 230(A) 2806 SY 6,739.000 6,739.000   22,815.120 $1.54 $0.00 $35,135.28
0009 VEGETATIVE MULCHING 233(A) 2817 AC 1.340 1.340   2.110 $532.50 $0.00 $1,123.57
0010 FERTILIZING (10-20-10) 234(A) 2824 TON 0.650 0.650 2.180 2.280 $852.00 $1,857.36 $1,942.56
0011 MOWING 241 2832 AC 5.400 5.400   0.000 $63.90 $0.00 $0.00
0012 AGGREGATE BASE TYPE A 303(A) 2100 CY 21,944.000 21,944.000   21,944.000 $38.00 $0.00 $833,872.00
0013 STABILIZED SUBGRADE 307(K) 4300 SY 109,014.000 109,014.000   107,505.100 $4.30 $0.00 $462,271.92
0014 CEMENT TREATED BASE 317 4270 SY 14,985.000 14,985.000   14,255.230 $9.55 $0.00 $136,137.45
0015 OPEN-GRADED PORTLAND CEMENT BASE 319(B) 5254 SY 91,653.000 91,653.000   91,653.000 $8.50 $0.00 $779,050.52
0016 SEPARATOR FABRIC 325 5271 SY 276,759.000 276,759.000   276,759.000 $1.25 $0.00 $345,948.75
0017 TRAFFIC BOUND SURFACE COURSE TYPE E 402(E) 0225 TON 100.000 100.000   0.000 $35.00 $0.00 $0.00
0018 PRIME COAT 408 5774 GAL 16,220.000 16,220.000   0.000 $3.16 $0.00 $0.00
0019 P.C.CONCRETE PAVEMENT(PLACEMENT) 414(A) 0210 SY 30,429.000 30,429.000   28,167.630 $5.00 $0.00 $140,838.15
0020 DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) 414(B) 5725 SY 8,177.000 8,177.000   11,279.330 $11.00 $0.00 $124,072.63
0021 CONT. REINF. P.C.C. PAVEMENT(PLACEMENT) 414(C) 4425 SY 65,672.000 65,672.000   64,022.000 $19.00 $0.00 $1,216,418.00
0022 P.C. CONCRETE FOR PAVEMENT 414(G) 5275 CY 33,687.000 33,687.000   33,473.950 $85.00 $0.00 $2,845,285.75
0023 TYPE 1 TERMINAL JOINT 414(I) 5262 EA 2.000 2.000   0.000 $950.00 $0.00 $0.00
0024 TYPE 2 TERMINAL JOINT 414(I) 5264 EA 4.000 4.000   0.000 $1,092.46 $0.00 $0.00
0025 TERMINAL JOINT SLEEPER SLAB 414(J) 5263 SY 317.000 317.000   0.000 $51.52 $0.00 $0.00
0026 PARAPET ORNAMENT 504 6415 EA 24.000 24.000 9.000 24.000 $1,000.00 $9,000.00 $24,000.00
0027 42" F-SHAPED PARAPET 504(E) 6190 LF 5,408.000 5,408.000   5,064.000 $39.00 $0.00 $197,496.00
0028 SPECIAL CONCRETE FINISH 509 6152 SY 61,215.000 61,215.000 6,200.000 61,200.000 $10.10 $62,620.00 $618,120.02
0029 CLASS AA CONCRETE 509(A) 0319 CY 1,213.000 1,213.000   1,213.000 $145.03 $0.00 $175,921.39
0030 CLASS A CONCRETE(LONG. BAR. DES. 1-A) 509(B) 0325 CY 835.000 835.000   835.000 $175.34 $0.00 $146,408.90
0031 CLASS C CONCRETE 509(D) 0325 CY 10.000 10.000   3.420 $266.25 $0.00 $910.58
0032 REINFORCING STEEL 511(A) 0332 LB 79,756.000 79,756.000   79,756.000 $1.10 $0.00 $87,731.60
0033 EPOXY COATED REINFORCING STEEL 511(B) 4269 LB 201,700.000 201,700.000   201,700.000 $0.99 $0.00 $199,683.00
0034 CONCRETE CURB (4" MNTBLE-INTEGRAL) 609(A) 0287 LF 8,052.000 0.000   0.000 $0.48 $0.00 $0.00
0035 CONCRETE CURB (6" BARRIER-INTEGRAL) 609(A) 0300 LF 293.000 293.000   283.000 $4.23 $0.00 $1,197.09
0036 2'-8" COMB. CURB & GUTTER (6" BARRIER) 609(B) 1525 LF 113.000 113.000   135.000 $17.88 $0.00 $2,413.80
0037 6" CONCRETE DIVIDING STRIP 610(C) 0609 SY 8,984.000 8,984.000   12,491.840 $35.00 $0.00 $437,214.40
0038 INLET CI DES. 3 (STD) 611(G) 5120 EA 2.000 2.000   2.000 $4,579.50 $0.00 $9,159.00
0039 MANHOLES ADJUST TO GRADE 612(A) 0641 EA 30.000 30.000   31.000 $434.14 $0.00 $13,458.34
0040 INLET ADJUST TO GRADE 612(C) 0645 EA 102.000 102.000   102.000 $852.48 $0.00 $86,952.96
0041 18" R.C.PIPE CLASS III 613(A) 0491 LF 45.000 45.000   48.000 $56.45 $0.00 $2,709.60
0042