Contract ID: | 100483 | Estimate Number: | 0036 , Final | Spec Year: | 1999 | |||
Primary JP: | 25562(04) | Residency: | SAND SPRINGS (08400) | Contract No: | 610533 | |||
Date Created: | 03/25/2016 | Contractor FEI: | 731316732 | Account No: | 400800 |
Project Number(s): | BRFY-119C(176) | ||||||||
Contract Description: | BRIDGE AND APPROACHES SH-66: OVER I-44 (TURNER TURNPIKE). PROJECT LENGTH = 1.471 MILES. | ||||||||
Primary County: | CREEK | ||||||||
Name of Road: | SH-66 | ||||||||
Prime Contractor: | BECCO CONTRACTORS, INC. | Time Charged: | 1153.00 | ||||||
P.O. BOX 9159 | Time Allowed: | 1095.00 | |||||||
TULSA , OK 74157 | Percent Time: | 105.30 % |
Paid To Date: | $7,650,006.81 | Payable This Statement: | $-150.00 |
CONTRACTOR AFFIDAVIT |
STATE OF ___________________ | ) | |
) § | ||
COUNTY OF __________________ | ) |
The undersigned contractor or duly authorized agent, of lawful age, being first duly sworn, on oath say that this claim is true and correct. |
Affiant further states that the work, services or materials as shown by this claim have been completed or supplied in accordance with the plans, specifications, orders, requests and all other terms of the contract. Affiant further states that (s)he is duly authorized agent of the contractor for the purpose of certifying the facts pertaining to the giving of things of value to government personnel in order to procure the contract or obtain payment; that (s)he is fully aware of the facts and circumstances surrounding the making of the contract and has been personally and directly involved in the proceedings leading to the procurement of the contract and the filing of this claim; and, neither the contractor nor anyone subject to the contractor's direction or control has been paid, given or donated or agreed to pay, give or donate to any officer or employee of the State of Oklahoma any money or other thing of value, either directly or |
indirectly, in procuring the contract or obtaining payment. The affiant further certifies that all laborers, mechanics, apprentices and trainees employed by him/her or by any subcontractor performing work under the contract on the project have been paid wages at rates not less than those required by the contract provisions, and that the work performed by each such laborer, mechanic, apprentice or trainee conformed to the classifications set forth in the contract or training program provisions applicable to the wage rate paid. |
Affiant hereby agrees that Contractor will accept this estimate as full compensation for all money due Contractor by the Department of Transportation, and hereby relinquish all claims, either in contract or in tort, which have arisen or which might arise out of the construction of said project. That to the best of my knowledge and belief, all indebtedness for labor, materials, fuel, equipment, equipment rental, parts, supplies, insurance premiums, and claims for items not specifically mentioned, which are attributable to performance of the work on this project or which were incorporated therein in any manner, have been paid in full, and that there are not now any presently outstanding, unpaid claims for such indebtedness; that my position with the company is such, that if there were any such outstanding claims of the nature specified herein, I would ordinarily be aware of them. |
Further affiant sayeth not. |
BECCO CONTRACTORS, INC. |
_________________________________________________ |
Affiant Signature |
_________________________________________________ |
Affiant Printed Name |
PE Seal |
_________________________________________________ |
Affiant Company Position |
Subscribed and sworn to before me this ______ day of ____________, 20____ |
My Commission Number: ____________ My Commission Expires: ______________ |
_________________________________________________ |
_________________________________________________ |
Professional Engineer Signature |
Oklahoma Department of Transportation |
Corporate Seal |
Notary Seal |
Contract ID: | 100483 | Estimate Number: | 0036 | Contract No: | 610533 | |||
Residency: | SAND SPRINGS (08400) | Estimate Type: | Final | Account No: | 400800 | |||
Project Number(s): | BRFY-119C(176) | ||||||||||||
Primary Job Piece No: | 25562(04) | ||||||||||||
Contract Description: | BRIDGE AND APPROACHES SH-66: OVER I-44 (TURNER TURNPIKE). PROJECT LENGTH = 1.471 MILES. | ||||||||||||
Primary County: | CREEK | ||||||||||||
Name of Road: | SH-66 | ||||||||||||
Prime Contractor: | BECCO CONTRACTORS, INC. | ||||||||||||
P.O. BOX 9159 | |||||||||||||
TULSA , OK 74157 | |||||||||||||
Surety Company: | MID-CONTINENT CASUALTY COMPANY | ||||||||||||
Date Let: | 08/19/2010 | NTP Effective Date: | 01/03/2011 | Pay Period: | 06/13/2015 TO 11/30/2015 |
Date Awarded: | 09/07/2010 | Date Work Began: | 01/03/2011 | Original Contract Time: | 280 |
Date Contract Executed: | 09/23/2010 | Date Time Stopped: | 02/28/2014 | Current Time Charged: | 1153.00 |
Date NTP Issued: | 11/03/2010 | Completion Date: | 02/28/2014 | Current Time Allowed: | 1095.00 |
General Liability Expires: | 03/01/2017 | Workman's Comp Expires: | 02/01/2017 | Percent Time Used: | 105.30 % |
Specification Year: | 1999 | ||||
Bid Amount: | $8,215,224.30 | Total to Date | Prev to Date | This Estimate | |||
Funds Available (Bid + Positive C/O): | $8,386,974.30 | Participating: | $7,734,010.42 | $7,734,160.42 | $-150.00 | ||
Percent Complete: | 91.21 % | Non Participating: | $0.00 | $0.00 | $0.00 | ||
Unearned Balance: | $736,967.49 | Total Earnings: | $7,734,010.42 | $7,734,160.42 | $-150.00 | ||
Stockpiled Materials: | $0.00 | $0.00 | $0.00 | ||||
Gross Earnings: | $7,734,010.42 | $7,734,160.42 | $-150.00 | ||||
Other Adjustments: | $31,996.39 | $31,996.39 | $0.00 | ||||
Liq Dam/Disincentive: | $-116,000.00 | $-116,000.00 | $0.00 | ||||
TOTAL: | $7,650,006.81 | $7,650,156.81 | $-150.00 |
Contract ID: | 100483 | Estimate Number: | 0036 | Primary JP: | 25562(04) | |||
CHANGE ORDER HISTORY | |||||
Change Order Nbr. | Change Order Description | Status | Approval Date | Contract Time Adjustment | Total Change Order Amount |
001 | B time | Approved | 08/07/2012 | 0.0 | $153,000.00 |
002 | Construction traffic stripe 4" | Approved | 04/08/2014 | 0.0 | $18,750.00 |
003 | FQCO | Approved | 11/25/2015 | 0.0 | $-652,963.92 |
STOCKPILE PAYMENT HISTORY | |||||
Project | Line Nbr | Stockpile Description | Adjustment Type | Estimate Nbr | Adjusted Amount |
25562(04) | 0058 | SSTL FABS (AML) | Stockpiled Material Adjustment | 0007 | $-123,891.39 |
25562(04) | 0058 | SSTL FABS (AML) | Stockpiled Material Initial Payment | 0005 | $688,515.94 |
25562(04) | 0058 | SSTL FABS (AML) | Stockpiled Material Adjustment | 0006 | $-440,733.16 |
25562(04) | 0058 | SSTL FABS (AML) | Stockpiled Material Adjustment | 0008 | $-123,891.39 |
25562(04) | 0060 | Stay in place deck forms | Stockpiled Material Adjustment | 0008 | $-2,655.50 |
25562(04) | 0060 | Stay in place deck forms | Stockpiled Material Initial Payment | 0006 | $35,030.00 |
25562(04) | 0060 | Stay in place deck forms | Stockpiled Material Adjustment | 0015 | $-32,374.50 |
25562(04) | 0071 | SSTL FABS (AML) | Stockpiled Material Initial Payment | 0005 | $16,200.00 |
25562(04) | 0071 | SSTL FABS (AML) | Stockpiled Material Adjustment | 0006 | $-16,200.00 |
25562(04) | 0072 | SSTL FABS (AML) | Stockpiled Material Initial Payment | 0005 | $21,600.00 |
25562(04) | 0072 | SSTL FABS (AML) | Stockpiled Material Adjustment | 0006 | $-21,600.00 | Subtotals For Stockpile Payments | $0.00 |
LIQUIDATED DAMAGES HISTORY | ||||
Adjustment Description | Estimate Nbr | Time Units | Rate | Adjustment Amount |
System Application of Liquidated Damages | 0021 | --8.0 | $2,000.00 | $-16,000.00 |
System Application of Liquidated Damages | 0022 | --9.0 | $2,000.00 | $-18,000.00 |
System Application of Liquidated Damages | 0023 | --15 | $2,000.00 | $-30,000.00 |
System Application of Liquidated Damages | 0024 | --4.0 | $2,000.00 | $-8,000.00 |
System Application of Liquidated Damages | 0025 | --15 | $2,000.00 | $-30,000.00 |
System Application of Liquidated Damages | 0026 | --1.0 | $2,000.00 | $-2,000.00 |
System Application of Liquidated Damages | 0027 | --15 | $2,000.00 | $-30,000.00 |
System Application of Liquidated Damages | 0028 | -9.0 | $2,000.00 | $18,000.00 |
System Application of Liquidated Damages | 0032 | --15 | $2,000.00 | $-30,000.00 |
System Application of Liquidated Damages | 0033 | -15.0 | $2,000.00 | $30,000.00 | Subtotals For Liquidated Damages | $-116,000.00 |
CONTRACT ADJUSTMENTS HISTORY | ||
Adjustment Description | Estimate Nbr | Adjustment Amount |
Smoothness Deduction | 0035 | $-4,417.40 | Subtotals For Contract Adjustments | $-4,417.40 |
LINE ITEM ADJUSTMENT HISTORY | |||||||
Project | Item Nbr | Line Item Description | Adjustment Type | Estimate Nbr | Adj Quantity | Unit Price | Adjusted Amount |
25562(04) | 0005 | TYPE A-SALVAGED TOPSOIL | * Material Discrepancy Adjustments | 0012 | -0.05 | $150,000.00 | $-7,500.00 |
25562(04) | 0005 | TYPE A-SALVAGED TOPSOIL | * Missing Material Certification | 0018 | -0.05 | $150,000.00 | $-7,500.00 |
25562(04) | 0005 | TYPE A-SALVAGED TOPSOIL | * Missing Material Certification | 0019 | -0.05 | $150,000.00 | $-7,500.00 |
25562(04) | 0005 | TYPE A-SALVAGED TOPSOIL | * Missing Material Certification | 0020 | -0.05 | $150,000.00 | $-7,500.00 |
25562(04) | 0005 | TYPE A-SALVAGED TOPSOIL | * Missing Material Certification | 0023 | -0.05 | $150,000.00 | $-7,500.00 |
25562(04) | 0005 | TYPE A-SALVAGED TOPSOIL | * Material Discrepancy Adjustments | 0025 | 0.05 | $150,000.00 | $7,500.00 |
25562(04) | 0005 | TYPE A-SALVAGED TOPSOIL | * Missing Material Certification | 0025 | 0.05 | $150,000.00 | $7,500.00 |
25562(04) | 0005 | TYPE A-SALVAGED TOPSOIL | * Missing Material Certification | 0025 | 0.05 | $150,000.00 | $7,500.00 |
25562(04) | 0005 | TYPE A-SALVAGED TOPSOIL | * Missing Material Certification | 0025 | 0.05 | $150,000.00 | $7,500.00 |
25562(04) | 0005 | TYPE A-SALVAGED TOPSOIL | * Material Discrepancy Adjustments | 0035 | 0.05 | $150,000.00 | $7,500.00 |
25562(04) | 0005 | TYPE A-SALVAGED TOPSOIL | * Material Discrepancy Adjustments | 0036 | -0.05 | $150,000.00 | $-7,500.00 |
25562(04) | 0005 | TYPE A-SALVAGED TOPSOIL | * Missing Material Certification | 0036 | 0.05 | $150,000.00 | $7,500.00 |
25562(04) | 0006 | TEMPORARY SILT FENCE | * Material Discrepancy Adjustments | 0001 | -1,292.00 | $2.00 | $-2,584.00 |
25562(04) | 0006 | TEMPORARY SILT FENCE | * Material Discrepancy Adjustments | 0008 | 1,292.00 | $2.00 | $2,584.00 |
25562(04) | 0007 | TEMPORARY SILT DIKE | * Material Discrepancy Adjustments | 0001 | -56.00 | $6.00 | $-336.00 |
25562(04) | 0007 | TEMPORARY SILT DIKE | * Material Discrepancy Adjustments | 0008 | -284.00 | $6.00 | $-1,704.00 |
25562(04) | 0007 | TEMPORARY SILT DIKE | * Material Discrepancy Adjustments | 0025 | 56.00 | $6.00 | $336.00 |
25562(04) | 0007 | TEMPORARY SILT DIKE | * Material Discrepancy Adjustments | 0025 | 284.00 | $6.00 | $1,704.00 |
25562(04) | 0008 | SOLID SLAB SODDING | * Material Discrepancy Adjustments | 0030 | -40,000.00 | $1.50 | $-60,000.00 |
25562(04) | 0008 | SOLID SLAB SODDING | * Material Discrepancy Adjustments | 0035 | 40,000.00 | $1.50 | $60,000.00 |
25562(04) | 0019 | (SP)ASPHALT CONCRETE TYPE S3(PG 70-28 OK) | * QAQC | 0020 | -1,418.59 | $54.00 | $-76,603.86 |
25562(04) | 0019 | (SP)ASPHALT CONCRETE TYPE S3(PG 70-28 OK) | Asphalt Binder Adjustment | 0020 | 1,418.59 | $1.92 | $2,725.82 |
25562(04) | 0019 | (SP)ASPHALT CONCRETE TYPE S3(PG 70-28 OK) | Asphalt Binder Adjustment | 0026 | 263.19 | $2.02 | $533.36 |
25562(04) | 0019 | (SP)ASPHALT CONCRETE TYPE S3(PG 70-28 OK) | * QAQC | 0035 | 1,418.59 | $54.00 | $76,603.86 |
25562(04) | 0020 | (SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) | Asphalt Binder Adjustment | 0009 | 2,608.08 | $2.86 | $7,476.06 |
25562(04) | 0020 | (SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) | Asphalt Binder Adjustment | 0012 | 642.23 | $2.86 | $1,840.95 |
25562(04) | 0020 | (SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) | Asphalt Binder Adjustment | 0020 | 4,880.23 | $1.92 | $9,377.36 |
25562(04) | 0020 | (SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) | * QAQC | 0020 | -880.23 | $47.00 | $-41,370.81 |
25562(04) | 0020 | (SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) | Asphalt Binder Adjustment | 0023 | 597.57 | $1.92 | $1,148.23 |
25562(04) | 0020 | (SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) | Asphalt Binder Adjustment | 0026 | 1,618.87 | $2.02 | $3,280.64 |
25562(04) | 0020 | (SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) | * QAQC | 0027 | -1.00 | $2,054.15 | $-2,054.15 |
25562(04) | 0020 | (SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) | * QAQC | 0035 | -1.00 | $1,661.92 | $-1,661.92 |
25562(04) | 0020 | (SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) | * QAQC | 0035 | 880.23 | $47.00 | $41,370.81 |
25562(04) | 0020 | (SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) | * QAQC | 0035 | 1.00 | $2,054.15 | $2,054.15 |
25562(04) | 0020 | (SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) | Asphalt Binder Adjustment | 0035 | 0.44 | $-0.34 | $-0.15 |
25562(04) | 0021 | (SP)ASPHALT CONCRETE TYPE S4(PG 70-28 OK) | Asphalt Binder Adjustment | 0020 | 1,000.32 | $2.19 | $2,196.70 |
25562(04) | 0021 | (SP)ASPHALT CONCRETE TYPE S4(PG 70-28 OK) | * QAQC | 0020 | -1,000.32 | $71.00 | $-71,022.72 |
25562(04) | 0021 | (SP)ASPHALT CONCRETE TYPE S4(PG 70-28 OK) | Asphalt Binder Adjustment | 0026 | 189.75 | $2.31 | $439.46 |
25562(04) | 0021 | (SP)ASPHALT CONCRETE TYPE S4(PG 70-28 OK) | * QAQC | 0027 | -1.00 | $291.92 | $-291.92 |
25562(04) | 0021 | (SP)ASPHALT CONCRETE TYPE S4(PG 70-28 OK) | * QAQC | 0034 | 1,000.32 | $71.00 | $71,022.72 |
25562(04) | 0021 | (SP)ASPHALT CONCRETE TYPE S4(PG 70-28 OK) | * QAQC | 0035 | 1.00 | $291.92 | $291.92 |
25562(04) | 0022 | (SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) | Asphalt Binder Adjustment | 0009 | 1,503.66 | $3.27 | $4,925.99 |
25562(04) | 0022 | (SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) | Asphalt Binder Adjustment | 0012 | 205.57 | $3.27 | $673.45 |
25562(04) | 0022 | (SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) | Asphalt Binder Adjustment | 0013 | 14.23 | $3.27 | $46.62 |
25562(04) | 0022 | (SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) | * QAQC | 0020 | -1,024.64 | $63.00 | $-64,552.32 |
25562(04) | 0022 | (SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) | Asphalt Binder Adjustment | 0020 | 1,024.64 | $2.19 | $2,250.11 |
25562(04) | 0022 | (SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) | Asphalt Binder Adjustment | 0023 | 176.42 | $2.19 | $387.42 |
25562(04) | 0022 | (SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) | Asphalt Binder Adjustment | 0026 | 530.08 | $2.31 | $1,227.67 |
25562(04) | 0022 | (SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) | * QAQC | 0027 | -1.00 | $650.28 | $-650.28 |
25562(04) | 0022 | (SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) | * QAQC | 0035 | 1,024.64 | $63.00 | $64,552.32 |
25562(04) | 0022 | (SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) | Asphalt Binder Adjustment | 0035 | 231.56 | $-0.39 | $-91.70 |
25562(04) | 0022 | (SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) | * QAQC | 0035 | 1.00 | $650.28 | $650.28 |
25562(04) | 0022 | (SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) | * QAQC | 0035 | -1.00 | $362.28 | $-362.28 |
25562(04) | 0027 | 24" R.C.PIPE CLASS III | * Material Discrepancy Adjustments | 0007 | -85.00 | $85.00 | $-7,225.00 |
25562(04) | 0027 | 24" R.C.PIPE CLASS III | * Material Discrepancy Adjustments | 0009 | 85.00 | $85.00 | $7,225.00 |
25562(04) | 0027 | 24" R.C.PIPE CLASS III | * Missing Material Certification | 0027 | -434.00 | $85.00 | $-36,890.00 |
25562(04) | 0027 | 24" R.C.PIPE CLASS III | * Missing Material Certification | 0030 | 379.00 | $85.00 | $32,215.00 |
25562(04) | 0027 | 24" R.C.PIPE CLASS III | * Missing Material Certification | 0035 | 55.00 | $85.00 | $4,675.00 |
25562(04) | 0029 | 42" R.C.PIPE CLASS III | * Material Discrepancy Adjustments | 0005 | -128.00 | $130.00 | $-16,640.00 |
25562(04) | 0029 | 42" R.C.PIPE CLASS III | * Material Discrepancy Adjustments | 0006 | -260.00 | $130.00 | $-33,800.00 |
25562(04) | 0029 | 42" R.C.PIPE CLASS III | * Material Discrepancy Adjustments | 0008 | 256.00 | $130.00 | $33,280.00 |
25562(04) | 0029 | 42" R.C.PIPE CLASS III | * Material Discrepancy Adjustments | 0035 | 132.00 | $130.00 | $17,160.00 |
25562(04) | 0035 | 24" CORR. GALV. STEEL PIPE | * Material Discrepancy Adjustments | 0005 | -112.00 | $65.00 | $-7,280.00 |
25562(04) | 0035 | 24" CORR. GALV. STEEL PIPE | * Material Discrepancy Adjustments | 0007 | 112.00 | $65.00 | $7,280.00 |
25562(04) | 0035 | 24" CORR. GALV. STEEL PIPE | * Missing Material Certification | 0027 | -30.00 | $65.00 | $-1,950.00 |
25562(04) | 0035 | 24" CORR. GALV. STEEL PIPE | * Missing Material Certification | 0035 | 30.00 | $65.00 | $1,950.00 |
25562(04) | 0036 | 24" PREFAB. CULVERT END SECTION, ROUND | * Material Discrepancy Adjustments | 0007 | -2.00 | $750.00 | $-1,500.00 |
25562(04) | 0036 | 24" PREFAB. CULVERT END SECTION, ROUND | * Material Discrepancy Adjustments | 0008 | 2.00 | $1,500.00 | $3,000.00 |
25562(04) | 0036 | 24" PREFAB. CULVERT END SECTION, ROUND | * Material Discrepancy Adjustments | 0009 | -2.00 | $1,500.00 | $-3,000.00 |
25562(04) | 0036 | 24" PREFAB. CULVERT END SECTION, ROUND | * Material Discrepancy Adjustments | 0009 | 2.00 | $750.00 | $1,500.00 |
25562(04) | 0036 | 24" PREFAB. CULVERT END SECTION, ROUND | * Missing Material Certification | 0027 | -6.00 | $750.00 | $-4,500.00 |
25562(04) | 0036 | 24" PREFAB. CULVERT END SECTION, ROUND | * Missing Material Certification | 0035 | 6.00 | $750.00 | $4,500.00 |
25562(04) | 0037 | 42" PREFAB. CULVERT END SECTION, ROUND | * Material Discrepancy Adjustments | 0006 | -2.00 | $1,500.00 | $-3,000.00 |
25562(04) | 0037 | 42" PREFAB. CULVERT END SECTION, ROUND | * Material Discrepancy Adjustments | 0009 | 2.00 | $1,500.00 | $3,000.00 |
25562(04) | 0042 | REMOVAL OF ASPHALT PAVEMENT | * Material Discrepancy Adjustments | 0007 | -7.68 | $130.00 | $-998.40 |
25562(04) | 0042 | REMOVAL OF ASPHALT PAVEMENT | * Material Discrepancy Adjustments | 0009 | 7.68 | $130.00 | $998.40 |
25562(04) | 0049 | (SP)FENCE-STYLE SWF (5 BARBED WIRE) | * Material Discrepancy Adjustments | 0024 | -2,834.00 | $9.00 | $-25,506.00 |
25562(04) | 0049 | (SP)FENCE-STYLE SWF (5 BARBED WIRE) | * Material Discrepancy Adjustments | 0025 | 2,834.00 | $9.00 | $25,506.00 |
25562(04) | 0056 | SEALED EXPANSION JOINT | * Missing Material Certification | 0016 | -154.00 | $230.00 | $-35,420.00 |
25562(04) | 0056 | SEALED EXPANSION JOINT | * Missing Material Certification | 0030 | 154.00 | $230.00 | $35,420.00 |
25562(04) | 0065 | WATER REPELLENT (VISUALLY INSPECTED) | * Missing Material Certification | 0023 | -2,112.00 | $3.50 | $-7,392.00 |
25562(04) | 0065 | WATER REPELLENT (VISUALLY INSPECTED) | * Missing Material Certification | 0030 | 2,112.00 | $3.50 | $7,392.00 |
25562(04) | 0074 | 6" P.V.C. PIPE ROUND | * Missing Material Certification | 0022 | -80.00 | $60.00 | $-4,800.00 |
25562(04) | 0074 | 6" P.V.C. PIPE ROUND | * Missing Material Certification | 0028 | 80.00 | $60.00 | $4,800.00 |
25562(04) | 0075 | 6" PERFORATED PIPE UNDERDRAIN ROUND | * Material Discrepancy Adjustments | 0010 | -85.00 | $30.00 | $-2,550.00 |
25562(04) | 0075 | 6" PERFORATED PIPE UNDERDRAIN ROUND | * Material Discrepancy Adjustments | 0011 | -85.00 | $30.00 | $-2,550.00 |
25562(04) | 0075 | 6" PERFORATED PIPE UNDERDRAIN ROUND | * Missing Material Certification | 0019 | -540.00 | $30.00 | $-16,200.00 |
25562(04) | 0075 | 6" PERFORATED PIPE UNDERDRAIN ROUND | * Material Discrepancy Adjustments | 0023 | 85.00 | $30.00 | $2,550.00 |
25562(04) | 0075 | 6" PERFORATED PIPE UNDERDRAIN ROUND | * Material Discrepancy Adjustments | 0023 | 85.00 | $30.00 | $2,550.00 |
25562(04) | 0075 | 6" PERFORATED PIPE UNDERDRAIN ROUND | * Missing Material Certification | 0023 | 540.00 | $30.00 | $16,200.00 |
25562(04) | 0075 | 6" PERFORATED PIPE UNDERDRAIN ROUND | * Missing Material Certification | 0028 | 540.00 | $30.00 | $16,200.00 |
25562(04) | 0075 | 6" PERFORATED PIPE UNDERDRAIN ROUND | * Missing Material Certification | 0035 | -540.00 | $30.00 | $-16,200.00 |
25562(04) | 0077 | 10" POLYVINYL CHLORIDE (PVC) PIPE | * Missing Material Certification | 0022 | -80.00 | $90.00 | $-7,200.00 |
25562(04) | 0077 | 10" POLYVINYL CHLORIDE (PVC) PIPE | * Missing Material Certification | 0028 | 80.00 | $90.00 | $7,200.00 |
25562(04) | 0085 | SHEET ALUMINUM SIGNS | * Missing Material Certification | 0033 | -26.00 | $15.00 | $-390.00 |
25562(04) | 0085 | SHEET ALUMINUM SIGNS | * Missing Material Certification | 0035 | 26.00 | $15.00 | $390.00 |
25562(04) | 0087 | TRAFFIC STRIPE(PLASTIC)(4" WIDE) | * Material Discrepancy Adjustments | 0009 | -13,114.00 | $0.55 | $-7,212.70 |
25562(04) | 0087 | TRAFFIC STRIPE(PLASTIC)(4" WIDE) | * Material Discrepancy Adjustments | 0016 | 13,114.00 | $0.55 | $7,212.70 |
25562(04) | 0087 | TRAFFIC STRIPE(PLASTIC)(4" WIDE) | * Missing Material Certification | 0020 | -10,616.00 | $0.55 | $-5,838.80 |
25562(04) | 0087 | TRAFFIC STRIPE(PLASTIC)(4" WIDE) | * Missing Material Certification | 0022 | 10,616.00 | $0.55 | $5,838.80 |
25562(04) | 0087 | TRAFFIC STRIPE(PLASTIC)(4" WIDE) | * Missing Material Certification | 0027 | -13,500.00 | $0.55 | $-7,425.00 |
25562(04) | 0087 | TRAFFIC STRIPE(PLASTIC)(4" WIDE) | * Missing Material Certification | 0029 | 13,500.00 | $0.55 | $7,425.00 |
25562(04) | 0089 | TRAFFIC STRIPE(PLASTIC)(24" WIDE) | * Missing Material Certification | 0027 | -63.00 | $6.60 | $-415.80 |
25562(04) | 0089 | TRAFFIC STRIPE(PLASTIC)(24" WIDE) | * Missing Material Certification | 0029 | 63.00 | $6.60 | $415.80 |
25562(04) | 0093 | (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 | * Missing Material Certification | 0022 | -3,282.00 | $0.55 | $-1,805.10 |
25562(04) | 0093 | (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 | * Missing Material Certification | 0023 | -395.00 | $0.55 | $-217.25 |
25562(04) | 0093 | (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 | * Missing Material Certification | 0025 | -700.00 | $0.55 | $-385.00 |
25562(04) | 0093 | (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 | * Missing Material Certification | 0028 | -509.00 | $0.55 | $-279.95 |
25562(04) | 0093 | (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 | * Missing Material Certification | 0035 | 3,282.00 | $0.55 | $1,805.10 |
25562(04) | 0093 | (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 | * Missing Material Certification | 0035 | 395.00 | $0.55 | $217.25 |
25562(04) | 0093 | (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 | * Missing Material Certification | 0035 | 700.00 | $0.55 | $385.00 |
25562(04) | 0093 | (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 | * Missing Material Certification | 0035 | 509.00 | $0.55 | $279.95 |
25562(04) | 0121 | (SP)CONTRACTORS QUALITY CONTROL | * Material Discrepancy Adjustments | 0022 | -0.25 | $20,000.00 | $-5,000.00 |
25562(04) | 0121 | (SP)CONTRACTORS QUALITY CONTROL | * Material Discrepancy Adjustments | 0027 | 0.25 | $20,000.00 | $5,000.00 | Subtotals For Line Item Adjustments | $36,413.79 | * = User applied Line Item Adjustments |
MILESTONE INFORMATION | |||||||||
Milestone Number | Milestone Description | Start Date | End Date | Current Time Allowed | Rate | Milestone Closed | |||
No milestones exist for this contract. |
MILESTONE ADJUSTMENTS | |||||||||
Milestone Number | Milestone Adjustment Description | Estimate Nbr | Total | ||||||
No milestones adjustments exist for this contract. | Subtotals For Milestones | $ |
Contract ID: | 100483 | Estimate Number: | 0036 | Primary JP: | 25562(04) | |||
Line Item Number | Item Description | Item Number | Units | Bid Qty | Current Quantity | Quantity Paid This Est. | Quantity Paid To Date | Unit Price | Amount Paid This Est. | Amount Paid To Date |
Fed/State Project Number: BRFY-119C(176) | Project: 25562(04) | Category: 0100/ROADWAY | ||||||||
0001 | CLEARING AND GRUBBING | 201 0102 | LSUM | 1.000 | 1.000 | 1.000 | $100,000.00 | $0.00 | $100,000.00 | |
0002 | UNCLASSIFIED EXCAVATION | 202(A) 0183 | CY | 196,033.000 | 196,033.000 | 196,033.000 | $4.50 | $0.00 | $882,148.50 | |
0003 | MUCK EXCAVATION | 202(B) 0105 | CY | 5,842.000 | 5,842.000 | 5,842.000 | $4.50 | $0.00 | $26,289.00 | |
0004 | UNCLASSIFIED BORROW | 202(C) 0184 | CY | 5,000.000 | 0.000 | 0.000 | $4.50 | $0.00 | $0.00 | |
0005 | TYPE A-SALVAGED TOPSOIL | 205 4229 | LSUM | 1.000 | 1.000 | 0.000 | 1.000 | $150,000.00 | $0.00 | $150,000.00 |
0006 | TEMPORARY SILT FENCE | 223 2801 | LF | 7,051.000 | 7,585.000 | 7,585.000 | $2.00 | $0.00 | $15,170.00 | |
0007 | TEMPORARY SILT DIKE | 227 0100 | LF | 826.000 | 399.000 | 399.000 | $6.00 | $0.00 | $2,394.00 | |
0008 | SOLID SLAB SODDING | 230(A) 2806 | SY | 137,941.000 | 156,236.870 | -100.000 | 156,236.870 | $1.50 | $-150.00 | $234,355.31 |
0009 | SEEDING METHOD A | 232(A) 2813 | AC | 32.000 | 0.000 | 0.000 | $200.00 | $0.00 | $0.00 | |
0010 | VEGETATIVE MULCHING | 233(A) 2817 | AC | 32.000 | 0.000 | 0.000 | $300.00 | $0.00 | $0.00 | |
0011 | (PL)ROCK FILTER DAM, TYPE 2 | 235(B) 0101 | CY | 69.000 | 35.350 | 35.350 | $50.00 | $0.00 | $1,767.50 | |
0012 | MOWING | 241 2832 | AC | 128.000 | 0.000 | 0.000 | $50.00 | $0.00 | $0.00 | |
0013 | AGGREGATE BASE | 303 5912 | TON | 12,681.000 | 18,667.990 | 0.000 | 18,667.990 | $23.00 | $0.00 | $429,363.77 |
0014 | SEPARATOR FABRIC | 325 5271 | SY | 42,848.000 | 36,025.920 | 36,025.920 | $1.00 | $0.00 | $36,025.92 | |
0015 | (SP)MODIFIED SUBGRADE | 327(J) 4290 | SY | 38,430.000 | 0.000 | 0.000 | $4.00 | $0.00 | $0.00 | |
0016 | TRAFFIC BOUND SURFACE COURSE TYPE E | 403(E) 0225 | TON | 6,580.000 | 8,478.670 | 8,478.670 | $20.00 | $0.00 | $169,573.40 | |
0017 | TACK COAT | 407 0250 | GAL | 3,922.000 | 7,495.850 | 7,495.850 | $3.00 | $0.00 | $22,487.55 | |
0018 | PRIME COAT | 408 5774 | GAL | 13,892.000 | 0.000 | 0.000 | $3.00 | $0.00 | $0.00 | |
0019 | (SP)ASPHALT CONCRETE TYPE S3(PG 70-28 OK) | 411(S3) 5940 | TON | 1,750.000 | 1,681.780 | 1,681.780 | $54.00 | $0.00 | $90,816.12 | |
0020 | (SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) | 411(S3) 5945 | TON | 13,369.000 | 10,347.420 | 10,347.420 | $47.00 | $0.00 | $486,328.74 | |
0021 | (SP)ASPHALT CONCRETE TYPE S4(PG 70-28 OK) | 411(S4) 5955 | TON | 1,139.000 | 1,190.070 | 1,190.070 | $71.00 | $0.00 | $84,494.97 | |
0022 | (SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) | 411(S4) 5960 | TON | 4,807.000 | 3,686.160 | 3,686.160 | $63.00 | $0.00 | $232,228.08 | |
0023 | P.C. CONCRETE PAVEMENT(PLACEMENT ONLY) | 414(J) 5400 | SY | 934.000 | 1,879.750 | 1,879.750 | $30.00 | $0.00 | $56,392.50 | |
0024 | (SP)P.C. CONCRETE FOR PAVEMENT | 414(P) 6000 | CY | 260.000 | 548.160 | 548.160 | $80.00 | $0.00 | $43,852.80 | |
0025 | CLASS C CONCRETE | 509(D) 0325 | CY | 1,364.000 | 1,007.050 | 1,007.050 | $250.00 | $0.00 | $251,762.50 | |
0026 | TYPE I PLAIN RIPRAP | 601(A) 0297 | TON | 36.000 | 341.830 | 341.830 | $50.00 | $0.00 | $17,091.50 | |
0027 | 24" R.C.PIPE CLASS III | 613(B) 0492 | LF | 568.000 | 512.000 | 512.000 | $85.00 | $0.00 | $43,520.00 | |
0028 | 30" R.C.PIPE CLASS III | 613(B) 0493 | LF | 424.000 | 424.000 | 424.000 | $95.00 | $0.00 | $40,280.00 | |
0029 | 42" R.C.PIPE CLASS III | 613(B) 0495 | LF | 390.000 | 384.000 | 384.000 | $130.00 | $0.00 | $49,920.00 | |
0030 | TYPE B4 CULVERT END TREATMENT | 613(CC) 7187 | EA | 6.000 | 6.000 | 6.000 | $900.00 | $0.00 | $5,400.00 | |
0031 | TYPE C4 CULVERT END TREATMENT | 613(CC) 7188 | EA | 2.000 | 2.000 | 2.000 | $1,600.00 | $0.00 | $3,200.00 | |
0032 | TYPE D4 CULVERT END TREATMENT | 613(CC) 7189 | EA | 2.000 | 2.000 | 2.000 | $1,700.00 | $0.00 | $3,400.00 | |
0033 | TYPE B6 CULVERT END TREATMENT | 613(CC) 7197 | EA | 2.000 | 1.000 | 1.000 | $1,200.00 | $0.00 | $1,200.00 | |
0034 | TYPE C6 CULVERT END TREATMENT | 613(CC) 7198 | EA | 2.000 | 2.000 | 2.000 | $1,900.00 | $0.00 | $3,800.00 | |
0035 | 24" CORR. GALV. STEEL PIPE | 613(D) 0690 | LF | 226.000 | 297.000 | 297.000 | $65.00 | $0.00 | $19,305.00 | |
0036 | 24" PREFAB. CULVERT END SECTION, ROUND | 613(M) 5730 | EA | 12.000 | 14.000 | 14.000 | $750.00 | $0.00 | $10,500.00 | |
0037 | 42" PREFAB. CULVERT END SECTION, ROUND | 613(M) 5736 | EA | 2.000 | 2.000 | 2.000 | $1,500.00 | $0.00 | $3,000.00 | |
0038 | 8" PERFORATED PIPE UNDERDRAIN ROUND | 613(P) 1092 | LF | 1,000.000 | 0.000 | 0.000 | $14.00 | $0.00 | $0.00 | |
0039 | 8" NON-PERF.PIPE UNDERDRAIN RND. | 613(Q) 1097 | LF | 1,000.000 | 0.000 | 0.000 | $7.00 | $0.00 | $0.00 | |
0040 | REMOVAL OF STRUCTURES & OBSTRUCTIONS | 619(A) 0920 | LSUM | 1.000 | 1.000 | 1.000 | $60,000.00 | $0.00 | $60,000.00 | |
0041 | REMOVAL OF FENCE | 619(B) 4725 | LF | 10,171.000 | 10,396.000 | 10,396.000 | $1.00 | $0.00 | $10,396.00 | |
0042 | REMOVAL OF ASPHALT PAVEMENT | 619(B) 4728 | SY | 37,875.000 | 33,094.410 | 33,094.410 | $2.50 | $0.00 | $82,736.06 | |
0043 | REMOVAL OF CONCRETE MEDIAN BARRIER | 619(B) 4915 | LF | 266.000 | 266.000 | 266.000 | $15.00 | $0.00 | $3,990.00 | |
0044 | BEAM GUARD RAIL-W-BEAM-SINGLE | 623(A) 0932 | LF | 1,300.000 | 950.000 | 950.000 | $21.00 | $0.00 | $19,950.00 | |
0045 | THRIE BEAM BRIDGE CONNECTION-TYPE A | 623(E) 7114 | EA | 4.000 | 4.000 | 4.000 | $1,100.00 | $0.00 | $4,400.00 | |
0046 | GUARD RAIL ANCHOR UNIT (TYPE B) | 623(F) 4447 | EA | 2.000 | 0.000 | 0.000 | $900.00 | $0.00 | $0.00 | |
0047 | (SP)G.E.T. GUARD RAIL END SECTION | 623(H) 8571 | EA | 5.000 | 4.000 | 4.000 | $1,900.00 | $0.00 | $7,600.00 | |
0048 | FENCE-STYLE WWF | 624(A) 4281 | LF | 2,104.000 | 2,572.000 | 2,572.000 | $9.00 | $0.00 | $23,148.00 | |
0049 | (SP)FENCE-STYLE SWF (5 BARBED WIRE) | 624(C) 4459 | LF | 6,729.000 | 6,318.000 | 6,318.000 | $9.00 | $0.00 | $56,862.00 | |
0050 | CONCRETE MEDIAN BARRIER, DESIGN 1 | 627(I) 4317 | LF | 591.000 | 586.000 | 586.000 | $65.00 | $0.00 | $38,090.00 | |
0051 | MAILBOX INSTALLATION-SINGLE | 629(A) 4958 | EA | 2.000 | 2.000 | 2.000 | $55.00 | $0.00 | $110.00 | |
0052 | MAILBOX | 629(C) 4960 | EA | 2.000 | 2.000 | 2.000 | $20.00 | $0.00 | $40.00 | |
8000 | EARLY COMPLETION INCENTIVE | 108 0175 | DAY | 0.000 | 25.500 | 25.500 | $6,000.00 | $0.00 | $153,000.00 | |
8001 | CONSTRUCTION TRAFF.STR.(PAINT)(4" WIDE) | 856(A) 8839 | LF | 0.000 | 72,023.000 | 72,023.000 | $0.25 | $0.00 | $18,005.75 | |
Subtotals For Category 0100/ROADWAY | $-150.00 | $3,994,394.97 | ||||||||
Fed/State Project Number: BRFY-119C(176) | Project: 25562(04) | Category: 0200/BRIDGE 'A' | ||||||||
0053 | SUBSTRUCTURE EXCAVATION COMMON | 501(B) 1307 | CY | 565.000 | 565.000 | 565.000 | $20.00 | $0.00 | $11,300.00 | |
0054 | CLSM BACKFILL | 501(G) 6309 | CY | 279.500 | 279.500 | 279.500 | $80.00 | $0.00 | $22,360.00 | |
0055 | APPROACH SLAB | 504(A) 1304 | SY | 669.300 | 669.300 | 669.300 | $150.00 | $0.00 | $100,395.00 | |
0056 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 154.000 | 154.000 | 154.000 | $230.00 | $0.00 | $35,420.00 | |
0057 | 42" F-SHAPED PARAPET | 504(F) 6190 | LF | 1,271.400 | 1,271.400 | 1,271.400 | $55.00 | $0.00 | $69,927.00 | |
0058 | STRUCTURAL STEEL | 506(A) 1322 | LB | 743,610.000 | 743,610.000 | 743,610.000 | $1.25 | $0.00 | $929,512.50 | |
0059 | (PL)SPECIAL CONCRETE FINISH | 509 6152 | SY | 198.000 | 198.000 | 198.000 | $25.00 | $0.00 | $4,950.00 | |
0060 | CLASS AA CONCRETE | 509(A) 1326 | CY | 620.000 | 620.000 | 620.000 | $450.00 | $0.00 | $279,000.00 | |
0061 | CLASS A CONCRETE | 509(B) 1328 | CY | 631.300 | 631.300 | 631.300 | $450.00 | $0.00 | $284,085.00 | |
0062 | SLOPE WALL (5") | 510(C) 6138 | SY | 4,001.000 | 4,001.000 | 4,001.000 | $75.00 | $0.00 | $300,075.00 | |
0063 | REINFORCING STEEL | 511(A) 1332 | LB | 5,390.000 | 5,390.000 | 5,390.000 | $0.80 | $0.00 | $4,312.00 | |
0064 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 226,360.000 | 226,360.000 | 226,360.000 | $0.85 | $0.00 | $192,406.00 | |
0065 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 2,112.000 | 2,112.000 | 2,112.000 | $3.50 | $0.00 | $7,392.00 | |
0066 | DRILLED SHAFTS 30" DIAMETER | 516(A) 6091 | LF | 138.000 | 137.260 | 137.260 | $285.00 | $0.00 | $39,119.10 | |
0067 | DRILLED SHAFTS 48" DIAMETER | 516(A) 6094 | LF | 193.000 | 192.100 | 192.100 | $510.00 | $0.00 | $97,971.00 | |
0068 | DRILLED SHAFTS 66" DIAMETER | 516(A) 6097 | LF | 150.000 | 150.000 | 150.000 | $800.00 | $0.00 | $120,000.00 | |
0069 | (SP) SEALER CRACK PREPARATION | 523(A) 6550 | LF | 160.000 | 0.000 | 0.000 | $5.00 | $0.00 | $0.00 | |
0070 | (SP) SEALER RESIN | 523(B) 6560 | GAL | 2.000 | 0.000 | 0.000 | $220.00 | $0.00 | $0.00 | |
0071 | (PL)FIXED BEARING ASSEMBLY | 535 6164 | EA | 15.000 | 15.000 | 15.000 | $1,200.00 | $0.00 | $18,000.00 | |
0072 | (PL)EXPANSION BEARING ASSEMBLY | 535 6165 | EA | 20.000 | 20.000 | 20.000 | $1,200.00 | $0.00 | $24,000.00 | |
0073 | (PL)SPECIAL INLET DRAIN | 611(E) 4012 | EA | 14.000 | 14.000 | 14.000 | $3,000.00 | $0.00 | $42,000.00 | |
0074 | 6" P.V.C. PIPE ROUND | 613(O) 1080 | LF | 80.000 | 80.000 | 80.000 | $60.00 | $0.00 | $4,800.00 | |
0075 | 6" PERFORATED PIPE UNDERDRAIN ROUND | 613(P) 6204 | LF | 710.000 | 710.000 | 710.000 | $30.00 | $0.00 | $21,300.00 | |
0076 | 6" NON-PERF.PIPE UNDERDRAIN RND. | 613(Q) 6207 | LF | 170.000 | 170.000 | 170.000 | $20.00 | $0.00 | $3,400.00 | |
0077 | 10" POLYVINYL CHLORIDE (PVC) PIPE | 616(B) 5227 | LF | 440.000 | 440.000 | 440.000 | $90.00 | $0.00 | $39,600.00 | |
0078 | REMOVAL OF EXISTING BRIDGE STRUCTURE | 619(D) 1397 | LSUM | 1.000 | 1.000 | 1.000 | $85,000.00 | $0.00 | $85,000.00 | |
Subtotals For Category 0200/BRIDGE 'A' | $0.00 | $2,736,324.60 | ||||||||
Fed/State Project Number: BRFY-119C(176) | Project: 25562(04) | Category: 0201/BRIDGE 'B' | ||||||||
0079 | UNCLASSIFIED EXCAVATION | 202(A) 1301 | CY | 1,200.000 | 1,200.000 | 1,200.000 | $7.00 | $0.00 | $8,400.00 | |
0080 | STRUCTURAL EXCAVATION UNCLASSIFIED | 501(A) 1306 | CY | 71.000 | 71.000 | 71.000 | $45.00 | $0.00 | $3,195.00 | |
0081 | CLASS AA CONCRETE | 509(A) 1326 | CY | 193.500 | 193.500 | 193.500 | $400.00 | $0.00 | $77,400.00 | |
0082 | REINFORCING STEEL | 511(A) 1332 | LB | 22,530.000 | 22,530.000 | 22,530.000 | $0.80 | $0.00 | $18,024.00 | |
0083 | REMOVAL OF HEADWALL | 619(B) 0291 | EA | 1.000 | 1.000 | 1.000 | $15,000.00 | $0.00 | $15,000.00 | |
Subtotals For Category 0201/BRIDGE 'B' | $0.00 | $122,019.00 | ||||||||
Fed/State Project Number: BRFY-119C(176) | Project: 25562(04) | Category: 0300/TRAFFIC - SIGNING & STRIPING | ||||||||
0084 | STRUCTURAL CONCRETE | 804(A) 2915 | CY | 0.780 | 0.900 | 0.900 | $550.00 | $0.00 | $495.00 | |
0085 | SHEET ALUMINUM SIGNS | 850(A) 8110 | SF | 99.500 | 115.330 | 115.330 | $15.00 | $0.00 | $1,729.95 | |
0086 | 2"@3.65 GALV.STEEL PIPE POST | 851(B) 3216 | LF | 156.000 | 180.000 | 180.000 | $9.00 | $0.00 | $1,620.00 | |
0087 | TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 855(A) 8812 | LF | 30,940.000 | 37,807.000 | 37,807.000 | $0.55 | $0.00 | $20,793.85 | |
0088 | TRAFFIC STRIPE(PLASTIC)(6" WIDE) | 855(A) 8813 | LF | 43,100.000 | 26,803.000 | 26,803.000 | $0.80 | $0.00 | $21,442.40 | |
0089 | TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 855(A) 8825 | LF | 135.000 | 63.000 | 63.000 | $6.60 | $0.00 | $415.80 | |
Subtotals For Category 0300/TRAFFIC - SIGNING & STRIPING | $0.00 | $46,497.00 | ||||||||
Fed/State Project Number: BRFY-119C(176) | Project: 25562(04) | Category: 0301/TRAFFIC | ||||||||
0090 | RELOCATION OF RENTED PORTABLE TYPE PRECAST CONCRETE MEDIAN | 627(O) 4410 | LF | 56,690.000 | 28,350.000 | 28,350.000 | $2.50 | $0.00 | $70,875.00 | |
0091 | RENTED PORTABLE TYPE PRECAST CONCRETE MEDIAN BARRIER | 627(P) 4425 | LF | 7,350.000 | 7,708.000 | 7,708.000 | $20.00 | $0.00 | $154,160.00 | |
0092 | (PL)CONSTRUCTION ZONE PAVEMENT MARKERS | 856(G) 8881 | EA | 200.000 | 0.000 | 0.000 | $24.00 | $0.00 | $0.00 | |
0093 | (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 | 856(G) 8890 | EA | 41,160.000 | 4,886.000 | 4,886.000 | $0.55 | $0.00 | $2,687.30 | |
0094 | PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 859(A) 8006 | LF | 21,000.000 | 75,770.000 | 75,770.000 | $0.30 | $0.00 | $22,731.00 | |
0095 | (PL)CONST.ZONE IMPACT ATTEN. | 871 8705 | SD | 1,680.000 | 0.000 | 0.000 | $5.50 | $0.00 | $0.00 | |
0096 | MODULAR GLARE SCREEN | 878(C) 8487 | SD | 313,600.000 | 90.000 | 90.000 | $0.11 | $0.00 | $9.90 | |
0097 | ARROW DISPLAY(TYPE C) | 880(A) 8812 | SD | 560.000 | 53.000 | 53.000 | $11.00 | $0.00 | $583.00 | |
0098 | CONSTRUCTION SIGNS 0 TO 6.25 SF | 880(B) 8818 | SD | 6,720.000 | 8,246.000 | 8,246.000 | $2.20 | $0.00 | $18,141.20 | |
0099 | CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 880(B) 8821 | SD | 18,200.000 | 8,275.000 | 8,275.000 | $0.22 | $0.00 | $1,820.50 | |
0100 | CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 880(B) 8824 | SD | 19,600.000 | 11,791.000 | 11,791.000 | $2.20 | $0.00 | $25,940.20 | |
0101 | BARRICADES(TYPE III) | 880(C) 8842 | SD | 16,800.000 | 3,704.000 | 3,704.000 | $0.30 | $0.00 | $1,111.20 | |
0102 | WING BARRICADES | 880(C) 8848 | SD | 1,680.000 | 2,226.000 | 2,226.000 | $1.10 | $0.00 | $2,448.60 | |
0103 | VERTICAL PANELS | 880(D) 8854 | SD | 28,000.000 | 0.000 | 0.000 | $0.17 | $0.00 | $0.00 | |
0104 | WARNING LIGHTS(TYPE A) | 880(E) 8860 | SD | 38,080.000 | 13,633.000 | 13,633.000 | $0.06 | $0.00 | $817.98 | |
0105 | WARNING LIGHTS(TYPE C) | 880(E) 8872 | SD | 88,200.000 | 12,024.000 | 12,024.000 | $0.06 | $0.00 | $721.44 | |
0106 | DRUMS | 880(F) 8878 | SD | 60,200.000 | 12,244.000 | 12,244.000 | $0.11 | $0.00 | $1,346.84 | |
0107 | CHANNELIZER CONES | 880(G) 8890 | SD | 56,000.000 | 36,479.000 | 36,479.000 | $0.11 | $0.00 | $4,012.69 | |
0108 | CONES(28" MEDIUM) | 880(H) 8890 | SD | 56,000.000 | 0.000 | 0.000 | $0.01 | $0.00 | $0.00 | |
0109 | FLAGGER | 880(I) 8902 | SD | 280.000 | 18.000 | 18.000 | $95.00 | $0.00 | $1,710.00 | |
0110 | SURVEILLANCE TRAFFIC CONTROL | 880(K) 8908 | SD | 280.000 | 26.000 | 26.000 | $400.00 | $0.00 | $10,400.00 | |
0111 | TRAFFIC SURVEILLANCE, POLICE | 880(L) 8911 | HOUR | 1,120.000 | 1,425.000 | 1,425.000 | $60.00 | $0.00 | $85,500.00 | |
0112 | (SP)SMART WORK ZONE SYSTEM-PORTABLE CHANGEABLE MESSAGE SIGN | 882 8370 | SD | 3,360.000 | 2,085.000 | 2,085.000 | $26.00 | $0.00 | $54,210.00 | |
0113 | (SP)SMART WORK ZONE SYSTEM-PORTABLE TRAFFIC SENSOR (PTS) | 882 8372 | SD | 1,680.000 | 1,053.000 | 1,053.000 | $12.00 | $0.00 | $12,636.00 | |
0114 | (SP)SMART WORK ZONE SYSTEM-PAN-TILT-ZOOM CAMERA (PTZC) | 882 8374 | SD | 560.000 | 354.000 | 354.000 | $18.00 | $0.00 | $6,372.00 | |
0115 | (SP)SMART WORK ZONE SYSTEM-WEBSITE SYSTEM | 882 8376 | SD | 280.000 | 177.000 | 177.000 | $20.00 | $0.00 | $3,540.00 | |
0116 | PORT.CHANGEABLE MESSAGE SIGN | 882(B) 8306 | SD | 560.000 | 0.000 | 0.000 | $11.00 | $0.00 | $0.00 | |
Subtotals For Category 0301/TRAFFIC | $0.00 | $481,774.85 | ||||||||
Fed/State Project Number: BRFY-119C(176) | Project: 25562(04) | Category: 0600/STAKING | ||||||||
0117 | STAKING | 642 0098 | LSUM | 1.000 | 1.000 | 1.000 | $73,000.00 | $0.00 | $73,000.00 | |
Subtotals For Category 0600/STAKING | $0.00 | $73,000.00 | ||||||||
Fed/State Project Number: BRFY-119C(176) | Project: 25562(04) | Category: 0640/CONSTRUCTION | ||||||||
0118 | (SP)SWPPP DOCUMENTATION AND MANAGEMENT | 220 2800 | LSUM | 1.000 | 1.000 | 1.000 | $5,000.00 | $0.00 | $5,000.00 | |
0119 | FIELD OFFICE | 640 1426 | EA | 1.000 | 0.000 | 0.000 | $5,000.00 | $0.00 | $0.00 | |
0120 | MOBILIZATION | 641 1552 | LSUM | 1.000 | 1.000 | 1.000 | $255,000.00 | $0.00 | $255,000.00 | |
0121 | (SP)CONTRACTORS QUALITY CONTROL | 643 0087 | LSUM | 1.000 | 1.000 | 1.000 | $20,000.00 | $0.00 | $20,000.00 | |
Subtotals For Category 0640/CONSTRUCTION | $0.00 | $280,000.00 | ||||||||
Subtotals For Project BRFY-119C(176) /25562(04) | $-150.00 | $7,734,010.42 |