Fed/State Project Number: NHY-017N(055) |
Project: 17457(12) |
Category: 0100/ROADWAY |
0001 |
CLEARING AND GRUBBING |
201 0102 |
LSUM |
1.000 |
1.000 |
|
0.600 |
$15,225.00 |
$0.00 |
$9,135.00 |
0002 |
UNCLASSIFIED EXCAVATION |
202(A) 0183 |
CY |
242,035.000 |
242,035.000 |
|
128,186.400 |
$2.54 |
$0.00 |
$325,593.46 |
0003 |
UNCLASSIFIED BORROW |
202(C) 0184 |
CY |
23,196.000 |
23,196.000 |
0.000 |
23,196.000 |
$2.55 |
$0.00 |
$59,149.80 |
0004 |
TYPE A-SALVAGED TOPSOIL |
205 4229 |
LSUM |
1.000 |
1.000 |
0.000 |
0.600 |
$45,675.00 |
$0.00 |
$27,405.00 |
0005 |
TEMPORARY SILT FENCE |
223 2801 |
LF |
5,784.000 |
5,784.000 |
|
3,010.000 |
$2.03 |
$0.00 |
$6,110.30 |
0006 |
TEMPORARY SEDIMENT FILTER |
224 2803 |
EA |
10.000 |
10.000 |
|
0.000 |
$152.25 |
$0.00 |
$0.00 |
0007 |
TEMPORARY SEDIMENT BASIN |
225 2804 |
EA |
1.000 |
1.000 |
|
1.000 |
$812.00 |
$0.00 |
$812.00 |
0008 |
TEMPORARY SILT DIKE |
227 0100 |
LF |
1,452.000 |
1,452.000 |
|
1,302.000 |
$6.10 |
$0.00 |
$7,942.20 |
0009 |
SOLID SLAB SODDING |
230(A) 2806 |
SY |
299,936.000 |
299,936.000 |
22,139.000 |
53,573.000 |
$1.35 |
$29,887.65 |
$72,323.55 |
0010 |
WATERING |
230(F) 2812 |
MGAL |
11,997.000 |
11,997.000 |
773.000 |
1,276.000 |
$8.15 |
$6,299.95 |
$10,399.40 |
0011 |
VEGETATIVE MULCHING |
233(A) 2817 |
AC |
124.000 |
124.000 |
1.940 |
17.560 |
$101.50 |
$196.91 |
$1,782.34 |
0012 |
MOWING |
241 2832 |
AC |
124.000 |
124.000 |
|
53.990 |
$101.50 |
$0.00 |
$5,479.99 |
0013 |
(SP)FLY ASH |
327(A) 4200 |
TON |
10,139.000 |
10,139.000 |
|
3,256.590 |
$52.70 |
$0.00 |
$171,622.30 |
0014 |
(SP)CEMENTITIOUS STABILIZED SUBGRADE |
327(E) 4240 |
SY |
148,220.000 |
148,220.000 |
7,551.000 |
66,964.000 |
$2.18 |
$16,461.18 |
$145,981.52 |
0015 |
TRAFFIC BOUND SURFACE COURSE TYPE E |
403(E) 0225 |
TON |
425.000 |
425.000 |
0.000 |
721.550 |
$31.05 |
$0.00 |
$22,404.12 |
0016 |
TACK COAT |
407 0250 |
GAL |
65,994.000 |
65,994.000 |
0.000 |
4,050.000 |
$2.41 |
$0.00 |
$9,760.50 |
0017 |
PRIME COAT |
408 5774 |
GAL |
32,055.000 |
32,055.000 |
1,267.500 |
9,858.550 |
$4.95 |
$6,274.13 |
$48,799.83 |
0018 |
(SP)ASPHALT CONCRETE TYPE S3(PG 76-28 OK) |
411(S3) 5935 |
TON |
16,435.000 |
16,435.000 |
|
5,119.880 |
$63.75 |
$0.00 |
$326,392.35 |
0019 |
(SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) |
411(S3) 5945 |
TON |
52,453.000 |
52,453.000 |
|
15,318.440 |
$52.89 |
$0.00 |
$810,192.29 |
0020 |
(SP)ASPHALT CONCRETE TYPE S4(PG 76-28 OK) |
411(S4) 5950 |
TON |
12,963.000 |
12,963.000 |
|
0.000 |
$68.75 |
$0.00 |
$0.00 |
0021 |
(SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) |
411(S4) 5960 |
TON |
5,452.000 |
5,452.000 |
0.000 |
1,474.790 |
$55.37 |
$0.00 |
$81,659.12 |
0022 |
RUMBLE STRIP-METHOD AC-CON |
413(A) 4861 |
LF |
66,586.000 |
66,586.000 |
|
0.000 |
$0.10 |
$0.00 |
$0.00 |
0023 |
STRUCTURAL EXCAVATION UNCLASSIFIED |
501(A) 0313 |
CY |
1,494.000 |
1,494.000 |
|
1,134.070 |
$10.15 |
$0.00 |
$11,510.81 |
0024 |
CLASS AA CONCRETE |
509(A) 0319 |
CY |
1,662.000 |
1,662.000 |
0.000 |
1,182.630 |
$345.10 |
$0.00 |
$408,125.62 |
0025 |
CLASS A CONCRETE FOR SMALL STRUCTURES |
509(C) 0322 |
CY |
1.260 |
1.260 |
|
0.000 |
$1,015.00 |
$0.00 |
$0.00 |
0026 |
CLASS C CONCRETE |
509(D) 0325 |
CY |
72.000 |
72.000 |
0.000 |
99.000 |
$208.10 |
$0.00 |
$20,601.90 |
0027 |
REINFORCING STEEL |
511(A) 0332 |
LB |
242,824.000 |
242,824.000 |
|
174,707.900 |
$0.71 |
$0.00 |
$124,042.61 |
0028 |
TYPE I PLAIN RIPRAP |
601(A) 0297 |
TON |
1,190.000 |
1,190.000 |
0.000 |
313.030 |
$41.55 |
$0.00 |
$13,006.39 |
0029 |
INLET (SMD-TYPE 2) |
611(E) 6002 |
EA |
10.000 |
10.000 |
0.000 |
2.000 |
$604.00 |
$0.00 |
$1,208.00 |
0030 |
JUNCTION BOXES |
611(J) 0487 |
CF |
40.000 |
40.000 |
|
0.000 |
$101.50 |
$0.00 |
$0.00 |
0031 |
18" R.C.PIPE CLASS III |
613(B) 0491 |
LF |
250.000 |
250.000 |
0.000 |
64.000 |
$33.55 |
$0.00 |
$2,147.20 |
0032 |
24" R.C.PIPE CLASS III |
613(B) 0492 |
LF |
348.000 |
348.000 |
0.000 |
220.000 |
$40.70 |
$0.00 |
$8,954.00 |
0033 |
36" R.C.PIPE CLASS III |
613(B) 0494 |
LF |
456.000 |
456.000 |
0.000 |
280.000 |
$66.90 |
$0.00 |
$18,732.00 |
0034 |
48" R.C.PIPE CLASS III |
613(B) 0496 |
LF |
176.000 |
176.000 |
0.000 |
88.000 |
$99.80 |
$0.00 |
$8,782.40 |
0035 |
22" X 13" R.C.PIPE ARCH CLASS A-III |
613(B) 4495 |
LF |
200.000 |
200.000 |
|
200.000 |
$55.75 |
$0.00 |
$11,150.00 |
0036 |
43" X 26" R.C.PIPE ARCH CLASS A-III |
613(B) 4498 |
LF |
204.000 |
204.000 |
0.000 |
112.000 |
$97.15 |
$0.00 |
$10,880.80 |
0037 |
TYPE A4 CULVERT END TREATMENT |
613(CC) 7186 |
EA |
2.000 |
2.000 |
|
0.000 |
$903.35 |
$0.00 |
$0.00 |
0038 |
TYPE B4 CULVERT END TREATMENT |
613(CC) 7187 |
EA |
2.000 |
2.000 |
|
0.000 |
$1,014.00 |
$0.00 |
$0.00 |
0039 |
TYPE D4 CULVERT END TREATMENT |
613(CC) 7189 |
EA |
2.000 |
2.000 |
|
0.000 |
$1,030.25 |
$0.00 |
$0.00 |
0040 |
TYPE A6 CULVERT END TREATMENT |
613(CC) 7196 |
EA |
2.000 |
2.000 |
0.000 |
1.000 |
$912.50 |
$0.00 |
$912.50 |
0041 |
TYPE B6 CULVERT END TREATMENT |
613(CC) 7197 |
EA |
6.000 |
6.000 |
0.000 |
1.000 |
$964.25 |
$0.00 |
$964.25 |
0042 |
TYPE C6 CULVERT END TREATMENT |
613(CC) 7198 |
EA |
1.000 |
1.000 |
0.000 |
1.000 |
$1,827.00 |
$0.00 |
$1,827.00 |
0043 |
TYPE D6 CULVERT END TREATMENT |
613(CC) 7199 |
EA |
2.000 |
2.000 |
|
0.000 |
$2,283.75 |
$0.00 |
$0.00 |
0044 |
24" CORR. GALV. STEEL PIPE |
613(D) 0690 |
LF |
158.000 |
158.000 |
|
0.000 |
$31.75 |
$0.00 |
$0.00 |
0045 |
36" CORR. GALV. STEEL PIPE |
613(D) 0692 |
LF |
166.000 |
166.000 |
|
0.000 |
$48.95 |
$0.00 |
$0.00 |
0046 |
21" X 15" CORR. GALV. STEEL PIPE ARCH |
613(D) 4527 |
LF |
76.000 |
76.000 |
|
0.000 |
$26.70 |
$0.00 |
$0.00 |
0047 |
48" PREFAB. CULVERT END SECTION, ROUND |
613(M) 5738 |
EA |
3.000 |
3.000 |
|
0.000 |
$1,369.30 |
$0.00 |
$0.00 |
0048 |
REMOVAL OF HEADWALL |
619(B) 0291 |
EA |
17.000 |
17.000 |
|
14.000 |
$888.15 |
$0.00 |
$12,434.10 |
0049 |
REMOVAL OF ASPHALT PAVEMENT |
619(B) 4728 |
SY |
79,069.000 |
79,069.000 |
|
11,708.600 |
$1.62 |
$0.00 |
$18,967.94 |
0050 |
REMOVAL OF EXISTING STRUCTURES |
619(B) 4778 |
EA |
5.000 |
5.000 |
|
0.000 |
$1,015.00 |
$0.00 |
$0.00 |
0051 |
REMOVAL OF GUARD RAIL |
619(B) 4780 |
LF |
880.000 |
880.000 |
|
0.000 |
$6.50 |
$0.00 |
$0.00 |
0052 |
REMOVAL OF EXISTING PIPE |
619(B) 5918 |
LF |
180.000 |
180.000 |
|
40.000 |
$4.10 |
$0.00 |
$164.00 |
0053 |
(SP)FENCE-STYLE SWF (5 BARBED WIRE) |
624(C) 4459 |
LF |
13,681.000 |
13,681.000 |
|
11,969.000 |
$3.12 |
$0.00 |
$37,343.28 |
8001 |
REMOVAL OF FENCE |
619(B) 4725 |
LF |
0.000 |
2,000.000 |
|
691.000 |
$2.80 |
$0.00 |
$1,934.80 |
Subtotals For Category 0100/ROADWAY |
$59,119.82 |
$2,856,634.67 |
|
Fed/State Project Number: NHY-017N(055) |
Project: 17457(12) |
Category: 0300/TRAFFIC TEMPORARY |
0054 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) |
856(A) 8839 |
LF |
67,000.000 |
67,000.000 |
|
25,532.000 |
$0.08 |
$0.00 |
$2,042.56 |
0055 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 |
856(G) 8887 |
EA |
4,500.000 |
4,500.000 |
|
30.000 |
$0.75 |
$0.00 |
$22.50 |
0056 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) |
859(A) 8006 |
LF |
1,000.000 |
1,000.000 |
|
3,130.000 |
$0.51 |
$0.00 |
$1,596.30 |
0057 |
CONSTRUCTION SIGNS 0 TO 6.25 SF |
880(B) 8818 |
SD |
5,760.000 |
5,760.000 |
465.000 |
3,792.000 |
$0.20 |
$93.00 |
$758.40 |
0058 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF |
880(B) 8821 |
SD |
2,640.000 |
2,640.000 |
360.000 |
2,607.000 |
$0.36 |
$129.60 |
$938.52 |
0059 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF |
880(B) 8824 |
SD |
5,760.000 |
5,760.000 |
435.000 |
5,341.000 |
$1.02 |
$443.70 |
$5,447.82 |
0060 |
BARRICADES(TYPE III) |
880(C) 8842 |
SD |
6,120.000 |
6,120.000 |
405.000 |
2,269.000 |
$0.51 |
$206.55 |
$1,157.19 |
0061 |
BARRICADES(TYPE III) |
880(C) 8845 |
EA |
3.000 |
3.000 |
|
0.000 |
$1,268.75 |
$0.00 |
$0.00 |
0062 |
WING BARRICADES |
880(C) 8848 |
SD |
600.000 |
600.000 |
60.000 |
992.000 |
$1.02 |
$61.20 |
$1,011.84 |
0063 |
WARNING LIGHTS(TYPE A) |
880(E) 8860 |
SD |
1,800.000 |
1,800.000 |
855.000 |
13,781.000 |
$0.51 |
$436.05 |
$7,028.31 |
0064 |
WARNING LIGHTS(TYPE C) |
880(E) 8872 |
SD |
12,060.000 |
12,060.000 |
2,820.000 |
6,856.000 |
$0.12 |
$338.40 |
$822.72 |
0065 |
DRUMS |
880(F) 8878 |
SD |
25,500.000 |
25,500.000 |
2,849.000 |
5,698.000 |
$0.15 |
$427.35 |
$854.70 |
0066 |
CHANNELIZER CONES |
880(G) 8890 |
SD |
37,200.000 |
37,200.000 |
|
672.000 |
$0.15 |
$0.00 |
$100.80 |
0067 |
PORTABLE CHANGEABLE MESSAGE SIGN |
882(A) 8303 |
EA |
1.000 |
1.000 |
|
0.000 |
$1,522.50 |
$0.00 |
$0.00 |
8002 |
VERTICAL PANELS |
880(D) 8854 |
SD |
0.000 |
25,500.000 |
2,820.000 |
12,502.000 |
$0.15 |
$423.00 |
$1,875.30 |
Subtotals For Category 0300/TRAFFIC TEMPORARY |
$2,558.85 |
$23,656.96 |
|