Fed/State Project Number: BRFY-176B(061)SS |
Project: 20271(04) |
Category: 0100/ROADWAY |
0001 |
CLEARING AND GRUBBING |
201 0102 |
LSUM |
1.000 |
1.000 |
|
1.000 |
$125,000.00 |
$0.00 |
$125,000.00 |
0002 |
UNCLASSIFIED EXCAVATION |
202(A) 0183 |
CY |
77,865.000 |
77,865.000 |
|
0.000 |
$4.00 |
$0.00 |
$0.00 |
0003 |
UNCLASSIFIED BORROW |
202(C) 0184 |
CY |
470,615.000 |
470,615.000 |
0.000 |
534,647.450 |
$4.50 |
$0.00 |
$2,405,913.53 |
0004 |
TYPE A-SALVAGED TOPSOIL |
205 4229 |
LSUM |
1.000 |
1.000 |
0.000 |
0.800 |
$375,000.00 |
$0.00 |
$300,000.00 |
0005 |
TEMPORARY SILT FENCE |
223 2801 |
LF |
6,800.000 |
6,800.000 |
|
5,907.400 |
$3.00 |
$0.00 |
$17,722.20 |
0006 |
TEMPORARY SILT DIKE |
227 0100 |
LF |
763.000 |
763.000 |
0.000 |
422.000 |
$9.00 |
$0.00 |
$3,798.00 |
0007 |
SOLID SLAB SODDING |
230(A) 2806 |
SY |
73,649.000 |
73,649.000 |
0.000 |
18,536.700 |
$1.50 |
$0.00 |
$27,805.05 |
0008 |
BROADCAST SPRIGGING (METHOD A) |
230(D) 2810 |
SY |
148,289.000 |
148,289.000 |
|
0.000 |
$0.50 |
$0.00 |
$0.00 |
0009 |
VEGETATIVE MULCHING |
233(A) 2817 |
AC |
45.900 |
45.900 |
|
10.850 |
$450.00 |
$0.00 |
$4,882.50 |
0010 |
FERTILIZING (10-20-10) |
234(A) 2824 |
TON |
22.200 |
22.200 |
|
0.000 |
$800.00 |
$0.00 |
$0.00 |
0011 |
FERTILIZING (0-46-0) |
234(A) 4406 |
TON |
3.500 |
3.500 |
0.000 |
0.480 |
$800.00 |
$0.00 |
$380.00 |
0012 |
MOWING |
241 2832 |
AC |
92.000 |
92.000 |
|
0.000 |
$75.00 |
$0.00 |
$0.00 |
0013 |
(SP)FLY ASH |
327(A) 4200 |
TON |
2,125.000 |
2,125.000 |
|
0.000 |
$60.00 |
$0.00 |
$0.00 |
0014 |
(SP)CEMENTITIOUS STABILIZED SUBGRADE |
327(E) 4240 |
SY |
49,171.000 |
49,171.000 |
|
0.000 |
$2.25 |
$0.00 |
$0.00 |
0015 |
TRAFFIC BOUND SURFACE COURSE TYPE A |
403(A) 0217 |
TON |
790.000 |
790.000 |
0.000 |
800.620 |
$50.00 |
$0.00 |
$40,031.00 |
0016 |
TACK COAT |
407 0250 |
GAL |
8,610.000 |
8,610.000 |
|
0.000 |
$2.00 |
$0.00 |
$0.00 |
0017 |
PRIME COAT |
408 5774 |
GAL |
14,680.000 |
14,680.000 |
|
0.000 |
$3.25 |
$0.00 |
$0.00 |
0018 |
(SP)ASPHALT CONCRETE TYPE S2(PG 64-22 OK) |
411(S2) 5930 |
TON |
16,829.000 |
16,829.000 |
0.000 |
3,918.730 |
$63.00 |
$0.00 |
$246,879.99 |
0019 |
(SP)ASPHALT CONCRETE TYPE S3(PG 70-28 OK) |
411(S3) 5940 |
TON |
4,664.000 |
4,664.000 |
|
0.000 |
$73.00 |
$0.00 |
$0.00 |
0020 |
(SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) |
411(S3) 5945 |
TON |
6,280.000 |
6,280.000 |
0.000 |
1,285.370 |
$73.00 |
$0.00 |
$93,832.01 |
0021 |
(SP)ASPHALT CONCRETE TYPE S4(PG 70-28 OK) |
411(S4) 5955 |
TON |
3,110.000 |
3,110.000 |
|
0.000 |
$78.00 |
$0.00 |
$0.00 |
0022 |
(SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) |
411(S4) 5960 |
TON |
3,208.000 |
3,208.000 |
|
0.000 |
$81.00 |
$0.00 |
$0.00 |
0023 |
RUMBLE STRIP-METHOD AC-CON |
413(A) 4861 |
LF |
19,809.000 |
19,809.000 |
|
0.000 |
$0.50 |
$0.00 |
$0.00 |
0024 |
STRUCTURAL EXCAVATION UNCLASSIFIED |
501(A) 0313 |
CY |
110.380 |
110.380 |
|
142.820 |
$3.00 |
$0.00 |
$428.46 |
0025 |
CLASS A CONCRETE |
509(B) 0321 |
CY |
423.000 |
423.000 |
0.000 |
300.690 |
$330.00 |
$0.00 |
$99,227.70 |
0026 |
CLASS C CONCRETE |
509(D) 0325 |
CY |
92.840 |
92.840 |
27.090 |
27.090 |
$235.00 |
$6,366.15 |
$6,366.15 |
0027 |
REINFORCING STEEL |
511(A) 0332 |
LB |
76,425.000 |
76,425.000 |
|
58,377.520 |
$0.70 |
$0.00 |
$40,864.26 |
0028 |
TYPE I PLAIN RIPRAP |
601(A) 0297 |
TON |
50.000 |
50.000 |
|
0.000 |
$110.00 |
$0.00 |
$0.00 |
0029 |
INLET (SMD-TYPE 1) |
611(E) 6000 |
EA |
1.000 |
1.000 |
|
0.000 |
$1,500.00 |
$0.00 |
$0.00 |
0030 |
DROP INLET GRATE (SMD TYPE 1A) |
611(L) 7000 |
EA |
2.000 |
2.000 |
|
0.000 |
$1,600.00 |
$0.00 |
$0.00 |
0031 |
DROP INLET GRATE (SMD TYPE 1B) |
611(L) 7001 |
EA |
1.000 |
1.000 |
|
0.000 |
$1,800.00 |
$0.00 |
$0.00 |
0032 |
18" R.C.PIPE CLASS III |
613(B) 0491 |
LF |
264.000 |
264.000 |
0.000 |
257.000 |
$30.00 |
$0.00 |
$7,710.00 |
0033 |
24" R.C.PIPE CLASS III |
613(B) 0492 |
LF |
104.000 |
104.000 |
|
0.000 |
$38.00 |
$0.00 |
$0.00 |
0034 |
30" R.C.PIPE CLASS III |
613(B) 0493 |
LF |
104.000 |
104.000 |
0.000 |
52.000 |
$51.00 |
$0.00 |
$2,652.00 |
0035 |
36" R.C.PIPE CLASS III |
613(B) 0494 |
LF |
97.000 |
97.000 |
|
0.000 |
$62.00 |
$0.00 |
$0.00 |
0036 |
28 1/2" X 18" R.C.PIPE ARCH CLASS A-III |
613(B) 4410 |
LF |
106.000 |
106.000 |
|
52.000 |
$113.00 |
$0.00 |
$5,876.00 |
0037 |
TYPE A6 CULVERT END TREATMENT |
613(CC) 7196 |
EA |
22.000 |
22.000 |
5.000 |
13.000 |
$600.00 |
$3,000.00 |
$7,800.00 |
0038 |
TYPE B6 CULVERT END TREATMENT |
613(CC) 7197 |
EA |
16.000 |
16.000 |
|
0.000 |
$800.00 |
$0.00 |
$0.00 |
0039 |
TYPE C6 CULVERT END TREATMENT |
613(CC) 7198 |
EA |
1.000 |
1.000 |
1.000 |
1.000 |
$950.00 |
$950.00 |
$950.00 |
0040 |
TYPE D6 CULVERT END TREATMENT |
613(CC) 7199 |
EA |
2.000 |
2.000 |
|
0.000 |
$1,350.00 |
$0.00 |
$0.00 |
0041 |
TYPE BB6 CULVERT END TREATMENT |
613(CC) 7202 |
EA |
16.000 |
16.000 |
|
0.000 |
$1,150.00 |
$0.00 |
$0.00 |
0042 |
TYPE CC6 CULVERT END TREATMENT |
613(CC) 7203 |
EA |
8.000 |
8.000 |
|
0.000 |
$1,400.00 |
$0.00 |
$0.00 |
0043 |
12" CORR. GALV. STEEL PIPE |
613(D) 0688 |
LF |
11.000 |
11.000 |
|
0.000 |
$20.00 |
$0.00 |
$0.00 |
0044 |
18" CORR. GALV. STEEL PIPE |
613(D) 0689 |
LF |
808.000 |
808.000 |
0.000 |
240.000 |
$25.00 |
$0.00 |
$6,000.00 |
0045 |
24" CORR. GALV. STEEL PIPE |
613(D) 0690 |
LF |
754.000 |
754.000 |
0.000 |
231.000 |
$30.00 |
$0.00 |
$6,930.00 |
0046 |
30" CORR. GALV. STEEL PIPE |
613(D) 0691 |
LF |
158.000 |
158.000 |
|
0.000 |
$37.00 |
$0.00 |
$0.00 |
0047 |
36" CORR. GALV. STEEL PIPE |
613(D) 0692 |
LF |
22.000 |
22.000 |
|
0.000 |
$49.00 |
$0.00 |
$0.00 |
0048 |
28" X 20" CORR. GALV. STEEL PIPE ARCH |
613(D) 4528 |
LF |
840.000 |
840.000 |
|
0.000 |
$32.00 |
$0.00 |
$0.00 |
0049 |
35" X 24" CORR. GALV. STEEL PIPE ARCH |
613(D) 4529 |
LF |
188.000 |
188.000 |
|
0.000 |
$43.00 |
$0.00 |
$0.00 |
0050 |
6" PERFORATED PIPE UNDERDRAIN ROUND |
613(P) 1091 |
LF |
774.000 |
774.000 |
|
0.000 |
$10.00 |
$0.00 |
$0.00 |
0051 |
6" NON-PERF.PIPE UNDERDRAIN RND. |
613(Q) 1096 |
LF |
258.000 |
258.000 |
|
0.000 |
$10.00 |
$0.00 |
$0.00 |
0052 |
PIPE UNDERDRAIN COVER MAT'L. |
613(R) 1100 |
CY |
300.000 |
300.000 |
|
0.000 |
$20.00 |
$0.00 |
$0.00 |
0053 |
TRENCH EXCAVATION |
613(S) 1180 |
CY |
545.000 |
545.000 |
|
239.170 |
$20.00 |
$0.00 |
$4,783.40 |
0054 |
STANDARD BEDDING MATERIAL |
613(T) 1181 |
CY |
293.000 |
293.000 |
0.000 |
96.980 |
$20.00 |
$0.00 |
$1,939.60 |
0055 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS |
619(A) 0920 |
LSUM |
1.000 |
1.000 |
|
0.000 |
$75,000.00 |
$0.00 |
$0.00 |
0056 |
REMOVAL OF HEADWALL |
619(B) 0291 |
EA |
2.000 |
2.000 |
2.000 |
4.000 |
$1,500.00 |
$3,000.00 |
$6,000.00 |
0057 |
REMOVAL OF ASPHALT PAVEMENT |
619(B) 4728 |
SY |
36,865.000 |
36,865.000 |
|
0.000 |
$5.00 |
$0.00 |
$0.00 |
0058 |
REMOVAL OF GUARD RAIL |
619(B) 4780 |
LF |
3,023.000 |
3,023.000 |
|
0.000 |
$1.50 |
$0.00 |
$0.00 |
0059 |
SAWING PAVEMENT |
619(C) 0924 |
LF |
3,290.000 |
3,290.000 |
|
2,855.000 |
$3.60 |
$0.00 |
$10,278.00 |
0060 |
BEAM GUARD RAIL-W-BEAM-SINGLE |
623(A) 0932 |
LF |
1,500.000 |
1,500.000 |
|
0.000 |
$12.60 |
$0.00 |
$0.00 |
0061 |
THRIE BEAM BRIDGE CONNECTION-TYPE A |
623(E) 7114 |
EA |
8.000 |
8.000 |
|
0.000 |
$1,330.00 |
$0.00 |
$0.00 |
0062 |
(SP)G.E.T. GUARD RAIL END SECTION |
623(H) 8571 |
EA |
8.000 |
8.000 |
|
0.000 |
$2,500.00 |
$0.00 |
$0.00 |
0063 |
(SP)FENCE-STYLE SWF (5 BARBED WIRE) |
624(C) 4459 |
LF |
3,165.000 |
3,165.000 |
|
0.000 |
$5.16 |
$0.00 |
$0.00 |
0064 |
MAILBOX INSTALLATION-SINGLE |
629(A) 4958 |
EA |
4.000 |
4.000 |
|
0.000 |
$60.00 |
$0.00 |
$0.00 |
0065 |
MAILBOX INSTALLATION-MULTIPLE |
629(B) 4959 |
EA |
2.000 |
2.000 |
|
0.000 |
$90.00 |
$0.00 |
$0.00 |
0066 |
MAILBOX |
629(C) 4960 |
EA |
9.000 |
9.000 |
|
0.000 |
$20.00 |
$0.00 |
$0.00 |
0067 |
REMOVAL OF MAILBOX INSTALLATION |
629(D) 4961 |
EA |
9.000 |
9.000 |
|
0.000 |
$10.00 |
$0.00 |
$0.00 |
Subtotals For Category 0100/ROADWAY |
$13,316.15 |
$3,474,049.85 |
|
Fed/State Project Number: BRFY-176B(061)SS |
Project: 20271(04) |
Category: 0201/BRIDGE 'B' |
0083 |
SUBSTRUCTURE EXCAVATION COMMON |
501(B) 1307 |
CY |
190.000 |
190.000 |
|
190.000 |
$8.63 |
$0.00 |
$1,639.70 |
0084 |
CLSM BACKFILL |
501(G) 6309 |
CY |
154.000 |
154.000 |
|
0.000 |
$143.82 |
$0.00 |
$0.00 |
0085 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) |
503(A) 1313 |
LF |
3,990.000 |
3,990.000 |
0.000 |
3,990.000 |
$195.00 |
$0.00 |
$778,050.00 |
0086 |
APPROACH SLAB |
504(A) 1304 |
SY |
281.000 |
281.000 |
|
0.000 |
$151.89 |
$0.00 |
$0.00 |
0087 |
SEALED EXPANSION JOINT |
504(C) 6250 |
LF |
86.400 |
86.400 |
|
0.000 |
$244.42 |
$0.00 |
$0.00 |
0088 |
CONCRETE RAIL (TR4) |
504(E) 6245 |
LF |
2,122.600 |
2,122.600 |
|
0.000 |
$44.36 |
$0.00 |
$0.00 |
0089 |
STRUCTURAL STEEL |
506(A) 1322 |
LB |
4,500.000 |
4,500.000 |
|
0.000 |
$1.29 |
$0.00 |
$0.00 |
0090 |
CLASS AA CONCRETE |
509(A) 1326 |
CY |
1,188.600 |
1,188.600 |
9.000 |
9.000 |
$479.66 |
$4,316.94 |
$4,316.94 |
0091 |
CLASS A CONCRETE |
509(B) 1328 |
CY |
360.900 |
360.900 |
0.000 |
360.930 |
$449.73 |
$0.00 |
$162,321.05 |
0092 |
REINFORCING STEEL |
511(A) 1332 |
LB |
1,970.000 |
1,970.000 |
0.000 |
1,970.000 |
$0.82 |
$0.00 |
$1,615.40 |
0093 |
EPOXY COATED REINFORCING STEEL |
511(B) 6010 |
LB |
313,370.000 |
313,370.000 |
635.000 |
76,605.000 |
$0.79 |
$501.65 |
$60,517.95 |
0094 |
PILES, FURNISHED (HP 10X42) |
514(A) 6010 |
LF |
122.000 |
122.000 |
|
132.000 |
$26.67 |
$0.00 |
$3,520.44 |
0095 |
PILES, FURNISHED (HP 12X53) |
514(A) 6011 |
LF |
406.000 |
406.000 |
|
441.000 |
$34.32 |
$0.00 |
$15,135.12 |
0096 |
PILES, DRIVEN (HP 10X42) |
514(B) 6292 |
LF |
122.000 |
122.000 |
0.000 |
130.000 |
$5.75 |
$0.00 |
$747.50 |
0097 |
PILES, DRIVEN (HP 12X53) |
514(B) 6294 |
LF |
406.000 |
406.000 |
0.000 |
441.000 |
$6.80 |
$0.00 |
$2,998.80 |
0098 |
WATER REPELLENT (VISUALLY INSPECTED) |
515(A) 6013 |
SY |
4,098.000 |
4,098.000 |
|
0.000 |
$3.00 |
$0.00 |
$0.00 |
0099 |
DRILLED SHAFTS 60" DIAMETER |
516(A) 6096 |
LF |
606.000 |
606.000 |
0.000 |
627.140 |
$646.91 |
$0.00 |
$405,703.14 |
0100 |
(SP) SEALER CRACK PREPARATION |
523(A) 6550 |
LF |
285.600 |
285.600 |
|
0.000 |
$3.00 |
$0.00 |
$0.00 |
0101 |
(SP) SEALER RESIN |
523(B) 6560 |
GAL |
3.500 |
3.500 |
|
0.000 |
$100.00 |
$0.00 |
$0.00 |
0102 |
(PL)FIXED BEARING ASSEMBLY |
535 6164 |
EA |
16.000 |
16.000 |
0.000 |
16.000 |
$896.80 |
$0.00 |
$14,348.80 |
0103 |
(PL)EXPANSION BEARING ASSEMBLY |
535 6165 |
EA |
64.000 |
64.000 |
0.000 |
64.000 |
$896.30 |
$0.00 |
$57,363.20 |
0104 |
TYPE I-A PLAIN RIPRAP |
601(A-1)1353 |
TON |
1,080.000 |
1,080.000 |
0.000 |
220.610 |
$62.44 |
$0.00 |
$13,774.89 |
0105 |
TYPE I-A FILTER BLANKET |
601(A-2)1355 |
TON |
195.000 |
195.000 |
0.000 |
69.860 |
$50.89 |
$0.00 |
$3,555.18 |
0106 |
6" PERFORATED PIPE UNDERDRAIN ROUND |
613(P) 6204 |
LF |
84.000 |
84.000 |
|
0.000 |
$25.88 |
$0.00 |
$0.00 |
0107 |
6" NON-PERF.PIPE UNDERDRAIN RND. |
613(Q) 6207 |
LF |
55.000 |
55.000 |
|
0.000 |
$27.03 |
$0.00 |
$0.00 |
0108 |
REMOVAL OF EXISTING BRIDGE STRUCTURE |
619(D) 1397 |
LSUM |
1.000 |
1.000 |
|
0.000 |
$100,000.00 |
$0.00 |
$0.00 |
Subtotals For Category 0201/BRIDGE 'B' |
$4,818.59 |
$1,525,608.11 |
|
Fed/State Project Number: BRFY-176B(061)SS |
Project: 20271(04) |
Category: 0202/BRIDGE 'C' |
0109 |
SUBSTRUCTURE EXCAVATION COMMON |
501(B) 1307 |
CY |
195.000 |
195.000 |
97.500 |
97.500 |
$8.66 |
$844.35 |
$844.35 |
0110 |
CLSM BACKFILL |
501(G) 6309 |
CY |
142.400 |
142.400 |
|
0.000 |
$144.40 |
$0.00 |
$0.00 |
0111 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) |
503(A) 1313 |
LF |
637.330 |
637.330 |
|
0.000 |
$202.00 |
$0.00 |
$0.00 |
0112 |
PRESTRESSED CONCRETE BEAMS (TYPE J BT) |
503(A) 6290 |
LF |
673.330 |
673.330 |
|
0.000 |
$255.00 |
$0.00 |
$0.00 |
0113 |
APPROACH SLAB |
504(A) 1304 |
SY |
281.000 |
281.000 |
|
0.000 |
$152.37 |
$0.00 |
$0.00 |
0114 |
SEALED EXPANSION JOINT |
504(C) 6250 |
LF |
43.880 |
43.880 |
|
0.000 |
$245.42 |
$0.00 |
$0.00 |
0115 |
CONCRETE RAIL (TR4) |
504(E) 6245 |
LF |
719.150 |
719.150 |
|
0.000 |
$45.11 |
$0.00 |
$0.00 |
0116 |
STRUCTURAL STEEL |
506(A) 1322 |
LB |
2,330.000 |
2,330.000 |
|
0.000 |
$1.59 |
$0.00 |
$0.00 |
0117 |
CLASS AA CONCRETE |
509(A) 1326 |
CY |
349.700 |
349.700 |
|
0.000 |
$470.48 |
$0.00 |
$0.00 |
0118 |
CLASS A CONCRETE |
509(B) 1328 |
CY |
224.300 |
224.300 |
26.000 |
153.100 |
$352.15 |
$9,155.90 |
$53,914.17 |
0119 |
SLOPE WALL (5") |
510(C) 6138 |
SY |
1,160.000 |
1,160.000 |
|
0.000 |
$81.14 |
$0.00 |
$0.00 |
0120 |
REINFORCING STEEL |
511(A) 1332 |
LB |
1,108.000 |
1,108.000 |
|
1,108.000 |
$0.82 |
$0.00 |
$908.56 |
0121 |
EPOXY COATED REINFORCING STEEL |
511(B) 6010 |
LB |
116,730.000 |
116,730.000 |
6,610.000 |
14,850.000 |
$0.79 |
$5,221.90 |
$11,731.50 |
0122 |
PILES, FURNISHED (HP 10X42) |
514(A) 6010 |
LF |
280.000 |
280.000 |
|
280.000 |
$26.32 |
$0.00 |
$7,369.60 |
0123 |
PILES, FURNISHED (HP 12X53) |
514(A) 6011 |
LF |
926.000 |
926.000 |
|
926.000 |
$32.03 |
$0.00 |
$29,659.78 |
0124 |
PILES, DRIVEN (HP 10X42) |
514(B) 6292 |
LF |
280.000 |
280.000 |
0.000 |
133.330 |
$5.77 |
$0.00 |
$769.31 |
0125 |
PILES, DRIVEN (HP 12X53) |
514(B) 6294 |
LF |
926.000 |
926.000 |
0.000 |
440.830 |
$6.23 |
$0.00 |
$2,746.37 |
0126 |
WATER REPELLENT (VISUALLY INSPECTED) |
515(A) 6013 |
SY |
1,781.000 |
1,781.000 |
|
0.000 |
$3.00 |
$0.00 |
$0.00 |
0127 |
DRILLED SHAFTS 60" DIAMETER |
516(A) 6096 |
LF |
186.000 |
186.000 |
0.000 |
186.000 |
$550.00 |
$0.00 |
$102,300.00 |
0128 |
(SP) SEALER CRACK PREPARATION |
523(A) 6550 |
LF |
43.000 |
43.000 |
|
0.000 |
$3.00 |
$0.00 |
$0.00 |
0129 |
(SP) SEALER RESIN |
523(B) 6560 |
GAL |
0.600 |
0.600 |
|
0.000 |
$100.00 |
$0.00 |
$0.00 |
0130 |
(PL)FIXED BEARING ASSEMBLY |
535 6164 |
EA |
17.000 |
17.000 |
|
0.000 |
$949.91 |
$0.00 |
$0.00 |
0131 |
(PL)EXPANSION BEARING ASSEMBLY |
535 6165 |
EA |
9.000 |
9.000 |
|
0.000 |
$1,079.84 |
$0.00 |
$0.00 |
0132 |
6" PERFORATED PIPE UNDERDRAIN ROUND |
613(P) 6204 |
LF |
230.000 |
230.000 |
|
0.000 |
$20.10 |
$0.00 |
$0.00 |
0133 |
6" NON-PERF.PIPE UNDERDRAIN RND. |
613(Q) 6207 |
LF |
160.000 |
160.000 |
|
0.000 |
$20.57 |
$0.00 |
$0.00 |
0134 |
REMOVAL OF EXISTING BRIDGE STRUCTURE |
619(D) 1397 |
LSUM |
1.000 |
1.000 |
|
0.000 |
$50,000.00 |
$0.00 |
$0.00 |
0135 |
FENCE-STYLE CLF (8'HIGH, CLASS A) |
624(D) 4294 |
LF |
268.000 |
268.000 |
|
0.000 |
$20.16 |
$0.00 |
$0.00 |
Subtotals For Category 0202/BRIDGE 'C' |
$15,222.15 |
$210,243.64 |
|
Fed/State Project Number: BRFY-176B(061)SS |
Project: 20271(04) |
Category: 0300/TRAFFIC |
0136 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) |
856(A) 8839 |
LF |
20,000.000 |
20,000.000 |
|
0.000 |
$0.35 |
$0.00 |
$0.00 |
0137 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 |
856(G) 8890 |
EA |
10,000.000 |
10,000.000 |
|
0.000 |
$0.35 |
$0.00 |
$0.00 |
0138 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) |
859(A) 8006 |
LF |
3,300.000 |
3,300.000 |
|
0.000 |
$0.25 |
$0.00 |
$0.00 |
0139 |
CONSTRUCTION SIGNS 0 TO 6.25 SF |
880(B) 8818 |
SD |
5,786.000 |
5,786.000 |
533.000 |
7,660.000 |
$1.00 |
$533.00 |
$7,660.00 |
0140 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF |
880(B) 8821 |
SD |
19,199.000 |
19,199.000 |
345.000 |
2,562.000 |
$0.25 |
$86.25 |
$640.50 |
0141 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF |
880(B) 8824 |
SD |
4,208.000 |
4,208.000 |
314.000 |
4,405.000 |
$2.00 |
$628.00 |
$8,810.00 |
0142 |
BARRICADES(TYPE III) |
880(C) 8842 |
SD |
16,043.000 |
16,043.000 |
397.000 |
2,932.000 |
$0.20 |
$79.40 |
$586.40 |
0143 |
WING BARRICADES |
880(C) 8848 |
SD |
1,052.000 |
1,052.000 |
90.000 |
1,242.000 |
$1.00 |
$90.00 |
$1,242.00 |
0144 |
VERTICAL PANELS |
880(D) 8854 |
SD |
17,095.000 |
17,095.000 |
847.000 |
5,269.000 |
$0.25 |
$211.75 |
$1,317.25 |
0145 |
WARNING LIGHTS(TYPE A) |
880(E) 8860 |
SD |
35,768.000 |
35,768.000 |
1,045.000 |
9,280.000 |
$0.02 |
$20.90 |
$185.60 |
0146 |
WARNING LIGHTS(TYPE C) |
880(E) 8872 |
SD |
19,199.000 |
19,199.000 |
1,364.000 |
9,350.000 |
$0.02 |
$27.28 |
$187.00 |
0147 |
DRUMS |
880(F) 8878 |
SD |
4,734.000 |
4,734.000 |
553.000 |
4,963.000 |
$0.25 |
$138.25 |
$1,240.75 |
0148 |
CHANNELIZER CONES |
880(G) 8890 |
SD |
12,361.000 |
12,361.000 |
|
0.000 |
$0.25 |
$0.00 |
$0.00 |
0149 |
PORT.CHANGEABLE MESSAGE SIGN |
882(B) 8306 |
SD |
30.000 |
30.000 |
|
0.000 |
$50.00 |
$0.00 |
$0.00 |
Subtotals For Category 0300/TRAFFIC |
$1,814.83 |
$21,869.50 |
|