Fed/State Project Number: STP-STIM(518)IG |
Project: 27430(04) |
Category: 0100/ROADWAY |
0001 |
UNCLASSIFIED EXCAVATION |
202(A) 0183 |
CY |
557.000 |
557.000 |
|
212.320 |
$42.16 |
$0.00 |
$8,951.41 |
0002 |
TEMPORARY SILT FENCE |
223 2801 |
LF |
1,600.000 |
1,600.000 |
|
0.000 |
$2.75 |
$0.00 |
$0.00 |
0003 |
TEMPORARY SEDIMENT FILTER |
224 2803 |
EA |
6.000 |
6.000 |
|
0.000 |
$372.74 |
$0.00 |
$0.00 |
0004 |
SOLID SLAB SODDING |
230(A) 2806 |
SY |
2,600.000 |
2,600.000 |
|
1,680.000 |
$3.18 |
$0.00 |
$5,342.40 |
0005 |
AGGREGATE BASE |
303 0192 |
CY |
557.000 |
557.000 |
|
125.530 |
$69.70 |
$0.00 |
$8,749.44 |
0006 |
SUBGRADE, METHOD B |
310(B) 0149 |
SY |
1,221.000 |
1,221.000 |
|
0.000 |
$2.31 |
$0.00 |
$0.00 |
0007 |
(SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) |
411(S3) 5945 |
TON |
24.000 |
24.000 |
|
0.000 |
$75.60 |
$0.00 |
$0.00 |
0008 |
(SP)ASPHALT CONCRETE TYPE S3(PATCHING)(PG 64-22 OK) |
411(S3) 6210 |
TON |
392.000 |
392.000 |
|
0.000 |
$99.82 |
$0.00 |
$0.00 |
0009 |
(SP)ASPHALT CONCRETE TYPE S4(PG 76-28 OK) |
411(S4) 5950 |
TON |
1,210.000 |
1,210.000 |
0.000 |
1,162.970 |
$85.13 |
$0.00 |
$99,003.64 |
0010 |
(SP)ASPHALT CONCRETE TYPE S5(PG 76-28 OK) |
411(S5) 5965 |
TON |
120.000 |
120.000 |
|
488.770 |
$101.83 |
$0.00 |
$49,771.45 |
0011 |
COLD MILLING PAVEMENT |
417 5267 |
SY |
10,807.000 |
10,807.000 |
|
10,083.620 |
$2.54 |
$0.00 |
$25,612.39 |
0012 |
FABRIC REINFORCEMENT |
420(A) 4242 |
SY |
10,807.000 |
10,807.000 |
|
10,843.170 |
$2.46 |
$0.00 |
$26,674.20 |
0013 |
CLSM BACKFILL |
501(G) 6315 |
CY |
56.000 |
56.000 |
|
0.000 |
$112.67 |
$0.00 |
$0.00 |
0014 |
CLASS A CONCRETE FOR SMALL STRUCTURES |
509(C) 0322 |
CY |
11.000 |
11.000 |
|
10.050 |
$654.59 |
$0.00 |
$6,578.63 |
0015 |
4" CONCRETE SIDEWALK |
610(A) 0602 |
SY |
193.000 |
193.000 |
|
212.010 |
$67.11 |
$0.00 |
$14,227.99 |
0016 |
6" CONCRETE DRIVEWAY (H.E.S.) |
610(B) 0399 |
SY |
119.000 |
119.000 |
|
117.390 |
$70.95 |
$0.00 |
$8,328.82 |
0017 |
BITUMINOUS DRIVEWAY |
610(G) 0617 |
TON |
202.000 |
202.000 |
|
115.340 |
$188.23 |
$0.00 |
$21,710.45 |
0018 |
MANHOLES ADJUST TO GRADE |
612(A) 0641 |
EA |
1.000 |
1.000 |
|
0.000 |
$730.82 |
$0.00 |
$0.00 |
0019 |
VALVE BOXES ADJUST TO GRADE |
612(G) 0647 |
EA |
1.000 |
1.000 |
|
0.000 |
$463.67 |
$0.00 |
$0.00 |
0020 |
18" R.C.PIPE CLASS III |
613(B) 0491 |
LF |
125.000 |
125.000 |
|
120.000 |
$65.33 |
$0.00 |
$7,839.60 |
0021 |
SPECIAL END SECTION OF 18" RCP ROUND |
613(C) 4373 |
EA |
2.000 |
2.000 |
|
2.000 |
$982.09 |
$0.00 |
$1,964.18 |
0022 |
STANDARD VALVE BOX |
616(D) 7051 |
EA |
1.000 |
1.000 |
|
1.000 |
$704.19 |
$0.00 |
$704.19 |
0023 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS |
619(A) 0920 |
LSUM |
1.000 |
1.000 |
|
1.000 |
$6,151.10 |
$0.00 |
$6,151.10 |
0024 |
REMOVAL OF CONCRETE DRIVEWAY |
619(B) 4766 |
SY |
713.000 |
713.000 |
|
949.760 |
$12.89 |
$0.00 |
$12,242.41 |
0025 |
REMOVAL OF SIDEWALK |
619(B) 4792 |
SY |
40.000 |
40.000 |
|
74.410 |
$18.14 |
$0.00 |
$1,349.80 |
0026 |
REMOVE WATER METER AND METER CAN |
619(B) 7200 |
EA |
1.000 |
1.000 |
|
0.000 |
$614.15 |
$0.00 |
$0.00 |
0027 |
SAWING PAVEMENT |
619(C) 0924 |
LF |
1,300.000 |
1,300.000 |
|
395.000 |
$2.46 |
$0.00 |
$971.70 |
Subtotals For Category 0100/ROADWAY |
$0.00 |
$306,173.80 |
|
Fed/State Project Number: STP-STIM(518)IG |
Project: 27430(04) |
Category: 0300/TRAFFIC |
0028 |
SHEET ALUMINUM SIGNS |
850(A) 8110 |
SF |
10.000 |
10.000 |
|
10.000 |
$16.19 |
$0.00 |
$161.90 |
0029 |
2 1/4" SQUARE TUBE POST |
851(C) 8327 |
LF |
14.000 |
14.000 |
|
18.000 |
$16.19 |
$0.00 |
$291.42 |
0030 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) |
855(A) 8812 |
LF |
9,800.000 |
9,800.000 |
|
8,832.000 |
$0.92 |
$0.00 |
$8,125.44 |
0031 |
TRAFFIC STRIPE(PLASTIC)(ARROWS) |
855(B) 8818 |
EA |
3.000 |
3.000 |
|
3.000 |
$134.89 |
$0.00 |
$404.67 |
0032 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) |
856(C) 8851 |
LF |
1,400.000 |
1,400.000 |
|
0.000 |
$0.16 |
$0.00 |
$0.00 |
0033 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) |
859(A) 8006 |
LF |
1,400.000 |
1,400.000 |
|
0.000 |
$0.38 |
$0.00 |
$0.00 |
0034 |
ARROW DISPLAY(TYPE A) |
880(A) 8800 |
SD |
120.000 |
120.000 |
|
0.000 |
$5.40 |
$0.00 |
$0.00 |
0035 |
CONSTRUCTION SIGNS 0 TO 6.25 SF |
880(B) 8818 |
SD |
720.000 |
720.000 |
|
1,318.000 |
$0.27 |
$0.00 |
$355.86 |
0036 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF |
880(B) 8821 |
SD |
1,080.000 |
1,080.000 |
|
448.000 |
$0.27 |
$0.00 |
$120.96 |
0037 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF |
880(B) 8824 |
SD |
2,340.000 |
2,340.000 |
204.000 |
1,966.000 |
$0.27 |
$55.08 |
$530.82 |
0038 |
BARRICADES(TYPE I) |
880(C) 8830 |
SD |
360.000 |
360.000 |
|
1,222.000 |
$0.11 |
$0.00 |
$134.42 |
0039 |
BARRICADES(TYPE III) |
880(C) 8842 |
SD |
1,080.000 |
1,080.000 |
|
448.000 |
$0.11 |
$0.00 |
$49.28 |
0040 |
WARNING LIGHTS(TYPE A) |
880(E) 8860 |
SD |
3,420.000 |
3,420.000 |
254.000 |
3,751.000 |
$0.05 |
$12.70 |
$187.55 |
0041 |
WARNING LIGHTS(TYPE C) |
880(E) 8872 |
SD |
4,320.000 |
4,320.000 |
|
660.000 |
$0.02 |
$0.00 |
$13.20 |
0042 |
DRUMS |
880(F) 8878 |
SD |
4,320.000 |
4,320.000 |
367.000 |
6,193.000 |
$0.54 |
$198.18 |
$3,344.22 |
Subtotals For Category 0300/TRAFFIC |
$265.96 |
$13,719.74 |
|
Fed/State Project Number: STP-STIM(518)IG |
Project: 27430(04) |
Category: 0301/TRAFFIC SIGNALS |
0043 |
2" PVC SCH.40 PLASTIC CONDUIT TRENCHED |
802(B) 8342 |
LF |
15.000 |
15.000 |
-40.000 |
40.000 |
$10.79 |
$-431.60 |
$431.60 |
0044 |
3" PVC SCH.40 PLASTIC CONDUIT TRENCHED |
802(B) 8346 |
LF |
112.000 |
112.000 |
126.000 |
414.000 |
$11.87 |
$1,495.62 |
$4,914.18 |
0045 |
(PL)HDPE CONDUIT BORED |
802(B) 8550 |
LF |
371.000 |
371.000 |
-178.000 |
281.000 |
$25.90 |
$-4,610.20 |
$7,277.90 |
0046 |
PULL BOX(SIZE II) |
803 8066 |
EA |
5.000 |
5.000 |
2.000 |
5.000 |
$663.67 |
$1,327.34 |
$3,318.35 |
0047 |
PULL BOX(SIZE III) |
803 8067 |
EA |
1.000 |
1.000 |
|
1.000 |
$830.93 |
$0.00 |
$830.93 |
0048 |
STRUCTURAL CONCRETE |
804(A) 2915 |
CY |
7.830 |
7.830 |
|
11.200 |
$442.45 |
$0.00 |
$4,955.44 |
0049 |
REINFORCING STEEL |
804(B) 2916 |
LB |
1,200.000 |
1,200.000 |
0.000 |
1,608.500 |
$1.46 |
$0.00 |
$2,348.41 |
0050 |
32'MH POLE,30'TS & 10'LMA(G.STL.) |
806(A) 8350 |
EA |
3.000 |
3.000 |
|
3.000 |
$4,224.83 |
$0.00 |
$12,674.49 |
0051 |
32'MH POLE 25',TS & 10'LMA(G.STL.) |
806(A) 8351 |
EA |
1.000 |
1.000 |
|
1.000 |
$3,992.81 |
$0.00 |
$3,992.81 |
0052 |
10' MTG.HT.TS PED.POLE(G.STL.) |
806(B) 8894 |
EA |
3.000 |
3.000 |
|
3.000 |
$895.69 |
$0.00 |
$2,687.07 |
0053 |
SERVICE POLE |
810(A) 3118 |
EA |
1.000 |
1.000 |
|
1.000 |
$809.35 |
$0.00 |
$809.35 |
0054 |
1/C NO.6 ELECTRICAL CONDUCTOR |
811 8040 |
LF |
2,400.000 |
2,400.000 |
72.000 |
672.000 |
$1.51 |
$108.72 |
$1,014.72 |
0055 |
(PL)TRAFFIC SIGNAL SPAN WIRE EQUIPMENT |
823 8482 |
LSUM |
1.000 |
1.000 |
|
1.000 |
$6,205.05 |
$0.00 |
$6,205.05 |
0056 |
VEH.ACT.SOL.ST.TRAF.SIG.CON.ASM |
825 8550 |
EA |
1.000 |
1.000 |
|
1.000 |
$20,071.99 |
$0.00 |
$20,071.99 |
0057 |
(PL)DETECTION SYSTEM (VIDEO) |
828 8132 |
LSUM |
1.000 |
1.000 |
0.500 |
1.000 |
$34,532.46 |
$17,266.23 |
$34,532.46 |
0058 |
PEDESTRIAN PUSH BUTTON |
830 8000 |
EA |
8.000 |
8.000 |
8.000 |
8.000 |
$221.22 |
$1,769.76 |
$1,769.76 |
0059 |
1WAY 3SEC. ADJ. SIG. HD. S-6 |
831 8231 |
EA |
8.000 |
8.000 |
2.000 |
8.000 |
$658.28 |
$1,316.56 |
$5,266.24 |
0060 |
1WAY 5SEC. ADJ. SIG. HD. S-19 |
831 8286 |
EA |
2.000 |
2.000 |
|
2.000 |
$1,089.94 |
$0.00 |
$2,179.88 |
0061 |
1WAY 2SEC. ADJ. PED. SIG. HD. S-20 |
831 8295 |
EA |
8.000 |
8.000 |
8.000 |
8.000 |
$868.71 |
$6,949.68 |
$6,949.68 |
0062 |
BACKPLATE |
833 3030 |
EA |
18.000 |
18.000 |
10.000 |
18.000 |
$93.89 |
$938.90 |
$1,690.02 |
0063 |
5/C TRAF.SIG.ELECT.CABLE |
834(A) 8207 |
LF |
940.000 |
940.000 |
1,017.000 |
1,485.000 |
$1.27 |
$1,291.59 |
$1,885.95 |
0064 |
7/C TRAF.SIG.ELECT.CABLE |
834(A) 8208 |
LF |
175.000 |
175.000 |
155.000 |
235.000 |
$1.54 |
$238.70 |
$361.90 |
0065 |
18/C TRAF.SIG.EL.CABLE |
834(A) 8212 |
LF |
650.000 |
650.000 |
-650.000 |
0.000 |
$3.45 |
$-2,242.50 |
$0.00 |
0066 |
21/C TRAF.SIG.EL.CABLE |
834(A) 8213 |
LF |
650.000 |
650.000 |
176.000 |
826.000 |
$3.88 |
$682.88 |
$3,204.88 |
0067 |
2/C SHIELDED LOOP DETECTOR LEAD-IN CABLE |
834(B) 8220 |
LF |
100.000 |
100.000 |
64.000 |
64.000 |
$0.92 |
$58.88 |
$58.88 |
0068 |
MAST ARM MOUNTED SIGNS(ALUMINUM) |
850(C) 8118 |
SF |
58.000 |
58.000 |
58.000 |
58.000 |
$34.53 |
$2,002.74 |
$2,002.74 |
0069 |
(PL)REMOVAL OF TRAFFIC SIGNAL EQUIPMENT |
890(A) 8726 |
LSUM |
1.000 |
1.000 |
1.000 |
1.000 |
$3,776.99 |
$3,776.99 |
$3,776.99 |
Subtotals For Category 0301/TRAFFIC SIGNALS |
$31,940.29 |
$135,211.67 |
|