Contract ID: | 100404 | Estimate Number: | 0013 , Final | Spec Year: | 1999 | |||
Primary JP: | 27388(04) | Residency: | COBB ENGINEERING CO., INC. (08003) | Contract No: | 610168 | |||
Date Created: | 05/10/2013 | Contractor FEI: | 731079507 | Account No: | 400850 |
Project Number(s): | STP-STIM(511)IG | ||||||||
Contract Description: | PAVEMENT REHABILITATION (P.C. CONCRETE) CITY STREET (RIVERSIDE DRIVE): FROM 68TH STREET, EXTEND SOUTH TO 71ST STREET IN THE CITY OF TULSA. PROJECT LENGTH = 0.15 MILES. | ||||||||
Primary County: | TULSA | ||||||||
Name of Road: | CITY STREET | ||||||||
Prime Contractor: | KEYSTONE SERVICES, INC. | Time Charged: | 288.00 | ||||||
P.O. BOX 218 | Time Allowed: | 320.00 | |||||||
BIXBY , OK 74008 | Percent Time: | 90.00 % |
Paid To Date: | $457,856.28 | Payable This Statement: | $0.00 |
CONTRACTOR AFFIDAVIT |
STATE OF ___________________ | ) | |
) § | ||
COUNTY OF __________________ | ) |
The undersigned contractor or duly authorized agent, of lawful age, being first duly sworn, on oath say that this claim is true and correct. |
Affiant further states that the work, services or materials as shown by this claim have been completed or supplied in accordance with the plans, specifications, orders, requests and all other terms of the contract. Affiant further states that (s)he is duly authorized agent of the contractor for the purpose of certifying the facts pertaining to the giving of things of value to government personnel in order to procure the contract or obtain payment; that (s)he is fully aware of the facts and circumstances surrounding the making of the contract and has been personally and directly involved in the proceedings leading to the procurement of the contract and the filing of this claim; and, neither the contractor nor anyone subject to the contractor's direction or control has been paid, given or donated or agreed to pay, give or donate to any officer or employee of the State of Oklahoma any money or other thing of value, either directly or |
indirectly, in procuring the contract or obtaining payment. The affiant further certifies that all laborers, mechanics, apprentices and trainees employed by him/her or by any subcontractor performing work under the contract on the project have been paid wages at rates not less than those required by the contract provisions, and that the work performed by each such laborer, mechanic, apprentice or trainee conformed to the classifications set forth in the contract or training program provisions applicable to the wage rate paid. |
Affiant hereby agrees that Contractor will accept this estimate as full compensation for all money due Contractor by the Department of Transportation, and hereby relinquish all claims, either in contract or in tort, which have arisen or which might arise out of the construction of said project. That to the best of my knowledge and belief, all indebtedness for labor, materials, fuel, equipment, equipment rental, parts, supplies, insurance premiums, and claims for items not specifically mentioned, which are attributable to performance of the work on this project or which were incorporated therein in any manner, have been paid in full, and that there are not now any presently outstanding, unpaid claims for such indebtedness; that my position with the company is such, that if there were any such outstanding claims of the nature specified herein, I would ordinarily be aware of them. |
Further affiant sayeth not. |
KEYSTONE SERVICES, INC. |
_________________________________________________ |
Affiant Signature |
_________________________________________________ |
Affiant Printed Name |
PE Seal |
_________________________________________________ |
Affiant Company Position |
Subscribed and sworn to before me this ______ day of ____________, 20____ |
My Commission Number: ____________ My Commission Expires: ______________ |
_________________________________________________ |
_________________________________________________ |
Professional Engineer Signature |
Oklahoma Department of Transportation |
Corporate Seal |
Notary Seal |
Contract ID: | 100404 | Estimate Number: | 0013 | Contract No: | 610168 | |||
Residency: | COBB ENGINEERING CO., INC. (08003) | Estimate Type: | Final | Account No: | 400850 | |||
Project Number(s): | STP-STIM(511)IG | ||||||||||||
Primary Job Piece No: | 27388(04) | ||||||||||||
Contract Description: | PAVEMENT REHABILITATION (P.C. CONCRETE) CITY STREET (RIVERSIDE DRIVE): FROM 68TH STREET, EXTEND SOUTH TO 71ST STREET IN THE CITY OF TULSA. PROJECT LENGTH = 0.15 MILES. | ||||||||||||
Primary County: | TULSA | ||||||||||||
Name of Road: | CITY STREET | ||||||||||||
Prime Contractor: | KEYSTONE SERVICES, INC. | ||||||||||||
P.O. BOX 218 | |||||||||||||
BIXBY , OK 74008 | |||||||||||||
Surety Company: | MID-CONTINENT CASUALTY COMPANY | ||||||||||||
Date Let: | 06/17/2010 | NTP Effective Date: | 10/04/2010 | Pay Period: | 05/10/2013 TO 05/10/2013 |
Date Awarded: | 07/06/2010 | Date Work Began: | 10/04/2010 | Original Contract Time: | 120 |
Date Contract Executed: | 07/26/2010 | Date Time Stopped: | 07/15/2011 | Current Time Charged: | 288.00 |
Date NTP Issued: | 07/29/2010 | Completion Date: | 07/15/2011 | Current Time Allowed: | 320.00 |
General Liability Expires: | 11/01/2013 | Workman's Comp Expires: | 11/01/2013 | Percent Time Used: | 90.00 % |
Specification Year: | 1999 | ||||
Current Contract Amount: | $458,025.72 | Total to Date | Prev to Date | This Estimate | |||
Bid Amount: | $373,341.05 | Participating: | $454,145.71 | $454,145.71 | $0.00 | ||
Percent Complete: | 99.96 % | Non Participating: | $0.00 | $0.00 | $0.00 | ||
Funds Available: | $169.44 | Non ARRA: | $3,880.00 | $3,880.00 | $0.00 | ||
Unearned Balance: | $-84,515.23 | Total Earnings: | $458,025.71 | $458,025.71 | $0.00 | ||
Stockpiled Materials: | $0.00 | $0.00 | $0.00 | ||||
Gross Earnings: | $458,025.71 | $458,025.71 | $0.00 | ||||
Other Adjustments: | $-169.43 | $-169.43 | $0.00 | ||||
Liq Dam/Disincentive: | $0.00 | $0.00 | $0.00 | ||||
TOTAL: | $457,856.28 | $457,856.28 | $0.00 |
Contract ID: | 100404 | Estimate Number: | 0013 | Primary JP: | 27388(04) | |||
CHANGE ORDER HISTORY | |||||
Change Order Nbr. | Change Order Description | Status | Approval Date | Contract Time Adjustment | Total Change Order Amount |
001 | Addditional reconstruction of turn ramp | Approved | 05/02/2011 | 40.0 | $54,613.06 |
002 | Compensation for Quantity Overruns | Approved | 03/05/2012 | 0.0 | $19,372.66 |
003 | FINAL QUANTITY CHANGE ORDER | Approved | 05/06/2013 | 0.0 | $10,698.95 |
STOCKPILE PAYMENT HISTORY | |||||
Project | Line Nbr | Stockpile Description | Adjustment Type | Estimate Nbr | Adjusted Amount |
27388(04) | 0053 | VEH.ACT.SOLST.TRAF.SIGCON.ASM | Stockpiled Material Initial Payment | 0007 | $10,853.00 |
27388(04) | 0053 | VEH.ACT.SOLST.TRAF.SIGCON.ASM | Stockpiled Material Adjustment | 0011 | $-5,426.50 |
27388(04) | 0053 | VEH.ACT.SOLST.TRAF.SIGCON.ASM | Stockpiled Material Adjustment | 0008 | $-5,426.50 | Subtotals For Stockpile Payments | $0.00 |
LIQUIDATED DAMAGES HISTORY | |||||||||
Adjustment Description | Estimate Nbr | Time Units | Rate | Adjustment Amount | |||||
No liquidated damages have been assessed on this contract. | Subtotals For Liquidated Damages | $ |
CONTRACT ADJUSTMENTS HISTORY | ||
Adjustment Description | Estimate Nbr | Adjustment Amount |
No general contract adjustments have been created on this contract. | Subtotals For Contract Adjustments | $0.00 |
LINE ITEM ADJUSTMENT HISTORY | |||||||
Project | Item Nbr | Line Item Description | Adjustment Type | Estimate Nbr | Adj Quantity | Unit Price | Adjusted Amount |
27388(04) | 0012 | (SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) | Asphalt Binder Adjustment | 0008 | 77.79 | $-2.17 | $-169.43 | Subtotals For Line Item Adjustments | $-169.43 |
MILESTONE INFORMATION | |||||||||
Milestone Number | Milestone Description | Start Date | End Date | Current Time Allowed | Rate | Milestone Closed | |||
No milestones exist for this contract. |
MILESTONE ADJUSTMENTS | |||||||||
Milestone Number | Milestone Adjustment Description | Estimate Nbr | Total | ||||||
No milestones adjustments exist for this contract. | Subtotals For Milestones | $ |
Contract ID: | 100404 | Estimate Number: | 0013 | Primary JP: | 27388(04) | |||
Line Item Number | Item Description | Item Number | Units | Bid Qty | Current Quantity | Quantity Paid This Est. | Quantity Paid To Date | Unit Price | Amount Paid This Est. | Amount Paid To Date |
Fed/State Project Number: STP-STIM(511)IG | Project: 27388(04) | Category: 0100/ROADWAY | ||||||||
0001 | UNCLASSIFIED EXCAVATION | 202(A) 0183 | CY | 748.000 | 949.430 | 949.430 | $12.00 | $0.00 | $11,393.16 | |
0002 | TYPE A-SALVAGED TOPSOIL | 205 4229 | LSUM | 1.000 | 1.000 | 1.000 | $4,500.00 | $0.00 | $4,500.00 | |
0003 | TEMPORARY SILT FENCE | 223 2801 | LF | 850.000 | 870.000 | 870.000 | $1.85 | $0.00 | $1,609.50 | |
0004 | TEMPORARY SEDIMENT FILTER | 224 2803 | EA | 1.000 | 1.000 | 1.000 | $200.00 | $0.00 | $200.00 | |
0005 | TEMPORARY SILT DIKE | 227 0100 | LF | 30.000 | 30.000 | 30.000 | $22.00 | $0.00 | $660.00 | |
0006 | SOLID SLAB SODDING | 230(A) 2806 | SY | 1,180.000 | 2,391.880 | 2,391.880 | $2.95 | $0.00 | $7,056.05 | |
0007 | (PL)TEMPORARY INLET SEDIMENT FILTER | 243 0450 | EA | 3.000 | 3.000 | 3.000 | $55.00 | $0.00 | $165.00 | |
0008 | AGGREGATE BASE | 303 0192 | CY | 584.000 | 891.900 | 891.900 | $40.00 | $0.00 | $35,676.00 | |
0009 | SUBGRADE, METHOD B | 310(B) 0149 | SY | 1,752.000 | 2,543.090 | 2,543.090 | $1.00 | $0.00 | $2,543.09 | |
0010 | SEPARATOR FABRIC | 325 5271 | SY | 2,033.000 | 3,316.760 | 3,316.760 | $1.00 | $0.00 | $3,316.76 | |
0011 | TACK COAT | 407 0250 | GAL | 14.000 | 17.500 | 17.500 | $10.00 | $0.00 | $175.00 | |
0012 | (SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) | 411(S4) 5960 | TON | 92.000 | 77.790 | 77.790 | $110.00 | $0.00 | $8,556.90 | |
0013 | 9" P.C. DOWEL JOINTED CONCRETE PAVEMENT | 414(A1) 5754 | SY | 1,307.000 | 1,987.870 | 1,987.870 | $45.00 | $0.00 | $89,454.15 | |
0014 | CONCRETE CURB (8" BARRIER-INTEGRAL) | 609(A) 0380 | LF | 403.000 | 1,010.000 | 1,010.000 | $7.00 | $0.00 | $7,070.00 | |
0015 | 4" CONCRETE SIDEWALK | 610(A) 0602 | SY | 121.000 | 232.890 | 232.890 | $40.00 | $0.00 | $9,315.60 | |
0016 | VALVE BOXES ADJUST TO GRADE | 612(G) 0647 | EA | 1.000 | 1.000 | 1.000 | $350.00 | $0.00 | $350.00 | |
0017 | 15" R.C.PIPE CLASS III | 613(B) 0403 | LF | 9.000 | 6.000 | 6.000 | $100.00 | $0.00 | $600.00 | |
0018 | 15" PREFAB. CULVERT END SECTION, ROUND | 613(M) 5724 | EA | 2.000 | 2.000 | 2.000 | $500.00 | $0.00 | $1,000.00 | |
0019 | REMOVAL OF CONCRETE PAVEMENT | 619(B) 4727 | SY | 653.000 | 1,567.200 | 1,567.200 | $8.00 | $0.00 | $12,537.60 | |
0020 | REMOVAL OF ASPHALT PAVEMENT | 619(B) 4728 | SY | 284.000 | 298.330 | 298.330 | $7.00 | $0.00 | $2,088.31 | |
0021 | REMOVAL OF CURB | 619(B) 4791 | LF | 484.000 | 1,179.000 | 1,179.000 | $2.00 | $0.00 | $2,358.00 | |
0022 | REMOVAL OF SIDEWALK | 619(B) 4792 | SY | 97.000 | 139.720 | 139.720 | $5.00 | $0.00 | $698.60 | |
Subtotals For Category 0100/ROADWAY | $0.00 | $201,323.72 | ||||||||
Fed/State Project Number: STP-STIM(511)IG | Project: 27388(04) | Category: 0300/TRAFFIC | ||||||||
0023 | RELOCATION OF RENTED PORTABLE TYPE PRECAST CONCRETE MEDIAN | 627(O) 4410 | LF | 488.000 | 495.000 | 495.000 | $12.00 | $0.00 | $5,940.00 | |
0024 | RENTED PORTABLE TYPE PRECAST CONCRETE MEDIAN BARRIER | 627(P) 4425 | LF | 526.000 | 540.000 | 540.000 | $22.00 | $0.00 | $11,880.00 | |
0025 | TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 855(A) 8812 | LF | 2,889.000 | 3,752.500 | 3,752.500 | $1.65 | $0.00 | $6,191.62 | |
0026 | TRAFFIC STRIPE(PLASTIC)(ARROWS) | 855(B) 8818 | EA | 16.000 | 16.000 | 16.000 | $125.00 | $0.00 | $2,000.00 | |
0027 | (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 | 856(G) 8890 | EA | 212.000 | 252.000 | 252.000 | $1.00 | $0.00 | $252.00 | |
0028 | PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 859(A) 8006 | LF | 1,712.000 | 1,214.000 | 1,214.000 | $0.35 | $0.00 | $424.90 | |
0029 | CONSTRUCTION SIGNS 0 TO 6.25 SF | 880(B) 8818 | SD | 1,200.000 | 180.000 | 180.000 | $0.10 | $0.00 | $18.00 | |
0030 | CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 880(B) 8821 | SD | 1,200.000 | 1,210.000 | 1,210.000 | $0.50 | $0.00 | $605.00 | |
0031 | CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 880(B) 8824 | SD | 2,400.000 | 2,019.000 | 2,019.000 | $0.25 | $0.00 | $504.75 | |
0032 | BARRICADES(TYPE III) | 880(C) 8842 | SD | 1,200.000 | 249.000 | 249.000 | $0.50 | $0.00 | $124.50 | |
0033 | WARNING LIGHTS(TYPE A) | 880(E) 8860 | SD | 4,800.000 | 863.000 | 863.000 | $0.05 | $0.00 | $43.15 | |
0034 | WARNING LIGHTS(TYPE C) | 880(E) 8872 | SD | 5,000.000 | 5,754.000 | 5,754.000 | $0.05 | $0.00 | $287.70 | |
0035 | DRUMS | 880(F) 8878 | SD | 5,000.000 | 5,100.000 | 5,100.000 | $0.15 | $0.00 | $765.00 | |
Subtotals For Category 0300/TRAFFIC | $0.00 | $29,036.62 | ||||||||
Fed/State Project Number: STP-STIM(511)IG | Project: 27388(04) | Category: 0310/TRAFFIC SIGNALS | ||||||||
0036 | 2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 802(B) 8342 | LF | 105.000 | 153.000 | 153.000 | $6.50 | $0.00 | $994.50 | |
0037 | 3" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 802(B) 8346 | LF | 200.000 | 761.000 | 761.000 | $12.00 | $0.00 | $9,132.00 | |
0038 | (PL)HDPE CONDUIT BORED | 802(B) 8550 | LF | 460.000 | 356.000 | 356.000 | $12.00 | $0.00 | $4,272.00 | |
0039 | (PL)HDPE CONDUIT TRENCHED | 802(B) 8555 | LF | 230.000 | 0.000 | 0.000 | $6.50 | $0.00 | $0.00 | |
0040 | PULL BOX(SIZE II) | 803 8066 | EA | 11.000 | 9.000 | 9.000 | $1,000.00 | $0.00 | $9,000.00 | |
0041 | PULL BOX(SIZE III) | 803 8067 | EA | 1.000 | 1.000 | 1.000 | $1,000.00 | $0.00 | $1,000.00 | |
0042 | STRUCTURAL CONCRETE | 804(A) 2915 | CY | 22.900 | 28.660 | 28.660 | $650.00 | $0.00 | $18,629.00 | |
0043 | REINFORCING STEEL | 804(B) 2916 | LB | 3,378.000 | 4,516.900 | 4,516.900 | $1.25 | $0.00 | $5,646.12 | |
0044 | 32'MH POLE 45'TS & 10'LMA(G.STL.) | 806(A) 8313 | EA | 1.000 | 1.000 | 1.000 | $8,000.00 | $0.00 | $8,000.00 | |
0045 | 32'MH POLE 50'TS & 10'LMA(G.STL.) | 806(A) 8314 | EA | 2.000 | 2.000 | 2.000 | $8,500.00 | $0.00 | $17,000.00 | |
0046 | 32'MH POLE 25',TS & 10'LMA(G.STL.) | 806(A) 8351 | EA | 1.000 | 1.000 | 1.000 | $6,500.00 | $0.00 | $6,500.00 | |
0047 | 32'MH POLE,55'TS & 10'LMA(G.STL.) | 806(A) 8353 | EA | 2.000 | 2.000 | 2.000 | $9,800.00 | $0.00 | $19,600.00 | |
0048 | 10' MTG.HT.TS PED.POLE(G.STL.) | 806(B) 8894 | EA | 3.000 | 3.000 | 3.000 | $1,200.00 | $0.00 | $3,600.00 | |
0049 | SERVICE POLE | 810(A) 3118 | EA | 1.000 | 1.000 | 1.000 | $1,600.00 | $0.00 | $1,600.00 | |
0050 | 1/C NO.6 ELECTRICAL CONDUCTOR | 811 8040 | LF | 835.000 | 2,434.000 | 2,434.000 | $0.65 | $0.00 | $1,582.10 | |
0051 | 1/C NO.12 ELECTRICAL CONDUCTOR | 811 8046 | LF | 2,095.000 | 2,227.000 | 2,227.000 | $0.35 | $0.00 | $779.45 | |
0052 | (PL)TRAFFIC SIGNAL SPAN WIRE EQUIPMENT | 823 8482 | LSUM | 1.000 | 1.000 | 1.000 | $9,800.00 | $0.00 | $9,800.00 | |
0053 | VEH.ACT.SOL.ST.TRAF.SIG.CON.ASM | 825 8550 | EA | 1.000 | 1.000 | 1.000 | $21,000.00 | $0.00 | $21,000.00 | |
0054 | (PL)DETECTION SYSTEM (VIDEO) | 828 8132 | LSUM | 1.000 | 1.000 | 1.000 | $3,600.00 | $0.00 | $3,600.00 | |
0055 | PEDESTRIAN PUSH BUTTON | 830 8000 | EA | 9.000 | 9.000 | 9.000 | $1,000.00 | $0.00 | $9,000.00 | |
0056 | 1WAY 3SEC. ADJ. SIG. HD. S-6 | 831 8231 | EA | 15.000 | 15.000 | 15.000 | $1,000.00 | $0.00 | $15,000.00 | |
0057 | 1WAY 3SEC. ADJ. SIG. HD. S-9 | 831 8252 | EA | 6.000 | 6.000 | 6.000 | $950.00 | $0.00 | $5,700.00 | |
0058 | 1WAY 5SEC. ADJ. SIG. HD. S-19 | 831 8286 | EA | 2.000 | 2.000 | 2.000 | $1,300.00 | $0.00 | $2,600.00 | |
0059 | 1WAY 2SEC. ADJ. PED. SIG. HD. S-20 | 831 8295 | EA | 9.000 | 9.000 | 9.000 | $800.00 | $0.00 | $7,200.00 | |
0060 | BACKPLATE | 833 3030 | EA | 23.000 | 23.000 | 23.000 | $60.00 | $0.00 | $1,380.00 | |
0061 | (PL)UNDERGROUND COMMUNICATION CABLE | 834 8358 | LF | 425.000 | 950.000 | 950.000 | $2.10 | $0.00 | $1,995.00 | |
0062 | 5/C TRAF.SIG.ELECT.CABLE | 834(A) 8207 | LF | 815.000 | 908.000 | 908.000 | $0.60 | $0.00 | $544.80 | |
0063 | 7/C TRAF.SIG.ELECT.CABLE | 834(A) 8208 | LF | 575.000 | 574.000 | 574.000 | $0.75 | $0.00 | $430.50 | |
0064 | 9/C TRAF.SIG.EL.CABLE | 834(A) 8209 | LF | 1,330.000 | 456.000 | 456.000 | $1.10 | $0.00 | $501.60 | |
0065 | 12/C TRAF.SIG.ELECT.CABLE | 834(A) 8210 | LF | 750.000 | 0.000 | 0.000 | $1.25 | $0.00 | $0.00 | |
0066 | 21/C TRAF.SIG.EL.CABLE | 834(A) 8213 | LF | 1,350.000 | 1,640.000 | 1,640.000 | $2.00 | $0.00 | $3,280.00 | |
0067 | 2/C SHIELDED LOOP DETECTOR LEAD-IN CABLE | 834(B) 8220 | LF | 1,665.000 | 7,842.000 | 7,842.000 | $0.65 | $0.00 | $5,097.30 | |
0068 | (PL)E.P.S. OPTICAL DETECTOR | 840(B) 8593 | EA | 2.000 | 2.000 | 2.000 | $2,100.00 | $0.00 | $4,200.00 | |
0069 | (PL)E.P.S. OPTICAL DETECTOR CABLE | 840(C) 8594 | LF | 405.000 | 1,023.000 | 1,023.000 | $1.00 | $0.00 | $1,023.00 | |
0070 | (PL)E.P.S. 2 CHANNEL PHASE SELECTOR | 840(D) 8595 | EA | 2.000 | 2.000 | 2.000 | $3,600.00 | $0.00 | $7,200.00 | |
0071 | MAST ARM MOUNTED SIGNS(ALUMINUM) | 850(C) 8118 | SF | 25.500 | 23.000 | 23.000 | $26.00 | $0.00 | $598.00 | |
0072 | (PL)REMOVAL OF TRAFFIC SIGNAL EQUIPMENT | 890(A) 8726 | LSUM | 1.000 | 1.000 | 1.000 | $3,300.00 | $0.00 | $3,300.00 | |
Subtotals For Category 0310/TRAFFIC SIGNALS | $0.00 | $210,785.37 | ||||||||
Fed/State Project Number: STP-STIM(511)IG | Project: 27388(04) | Category: 0600/STAKING | ||||||||
0073 | STAKING | 642 0098 | LSUM | 1.000 | 1.000 | 1.000 | $6,000.00 | $0.00 | $6,000.00 | |
Subtotals For Category 0600/STAKING | $0.00 | $6,000.00 | ||||||||
Fed/State Project Number: STP-STIM(511)IG | Project: 27388(04) | Category: 0640/CONSTRUCTION | ||||||||
0074 | MOBILIZATION | 641 1552 | LSUM | 1.000 | 1.000 | 1.000 | $7,000.00 | $0.00 | $7,000.00 | |
Subtotals For Category 0640/CONSTRUCTION | $0.00 | $7,000.00 | ||||||||
Fed/State Project Number: STP-STIM(511)IG | Project: 27388(04) | Category: 0850/NON ARRA FUNDING | ||||||||
8000 | MOBILIZATION | 641 1552 | LSUM | 0.000 | 1.000 | 1.000 | $3,880.00 | $0.00 | $3,880.00 | |
Subtotals For Category 0850/NON ARRA FUNDING | $0.00 | $3,880.00 | ||||||||
Subtotals For Project STP-STIM(511)IG /27388(04) | $0.00 | $458,025.71 |