Oklahoma Department of Transportation
Progressive Estimate Summary
Created:    10/05/2011
Contract ID: 100395   Estimate Number: 0013     Contract No: 610868
Residency: CLAREMORE (08300)   Estimate Type: Progressive     Account No: 400800

Project Number(s): BRFY-058C(235), BRFY-058C(237), STPY-058C(240)
Primary Job Piece No: 08932(04)
Contract Description: GRADE, DRAIN, SURFACE, AND BRIDGE SH-10: FROM THE I-44 INTERCHANGE, EXTEND EAST. PROJECT LENGTH = 3.566 MILES.
Primary County: OTTAWA              
Name of Road: SH-10              
Prime Contractor: BECCO CONTRACTORS, INC.              
    P.O. BOX 9159              
    TULSA , OK   74157              
Surety Company: MID-CONTINENT CASUALTY COMPANY              

Date Let: 11/18/2010 NTP Effective Date: 04/04/2011 Pay Period: 09/16/2011  TO  09/30/2011
Date Awarded: 12/06/2010 Date Work Began: 04/04/2011 Original Contract Time: 650
Date Contract Executed: 12/22/2010 Date Time Stopped: Current Time Charged: 180.00
Date NTP Issued: 01/04/2011 Completion Date: Current Time Allowed: 669.00
General Liability Expires: 03/01/2012 Workman's Comp Expires: 02/01/2012 Percent Time Used: 26.91 %
Specification Year: 1999     Date Approved: 10/05/2011

Current Contract Amount: $19,698,389.93 Total to Date Prev to Date This Estimate
Bid Amount: $19,695,764.93 Participating: $5,597,200.14 $5,204,212.97 $392,987.17
Percent Complete: 29.34 % Non Participating: $0.00 $0.00 $0.00
Funds Available: $13,918,056.34 Total Earnings: $5,597,200.14 $5,204,212.97 $392,987.17
Unearned Balance: $13,915,431.34 Stockpiled Materials: $197,038.45 $232,582.16 $-35,543.71
Gross Earnings: $5,794,238.59 $5,436,795.13 $357,443.46
Other Adjustments: $-13,905.00 $-8,905.00 $-5,000.00
Liq Dam/Disincentive: $0.00 $0.00 $0.00
TOTAL: $5,780,333.59 $5,427,890.13 $352,443.46

Estimate Adjustment Detail

Contract ID: 100395   Estimate Number: 0013     Primary JP: 08932(04)



CHANGE ORDER HISTORY
Change Order Nbr. Change Order Description Status Approval Date Contract Time Adjustment Total Change Order Amount
001 Supplemental agreement to remove light pole. Approved 07/07/2011 0.0 $2,625.00


STOCKPILE PAYMENT HISTORY
Project Line Nbr Stockpile Description Adjustment Type Estimate Nbr Adjusted Amount
08932(04) 0022 dowel bar baskets Stockpiled Material Initial Payment 0005 $43,733.04
08932(04) 0022 DURO PLAIN PAD Stockpiled Material Initial Payment 0006 $20,720.00
08932(04) 0036 IN SUPPLIERS YARD (MIAMI, OK) Stockpiled Material Initial Payment 0003 $898.00
08932(04) 0037 IN SUPPLIERS YARD (MIAMI, OK) Stockpiled Material Initial Payment 0003 $1,378.00
08932(04) 0042 IN SUPPLIERS YARD (MIAMI, OK) Stockpiled Material Initial Payment 0003 $1,035.00
08932(04) 0045 IN SUPPLIERS YARD (MIAMI, OK) Stockpiled Material Initial Payment 0003 $2,217.00
08932(04) 0048 IN SUPPLIERS YARD (MIAMI, OK) Stockpiled Material Initial Payment 0003 $1,315.00
08932(04) 0049 IN SUPPLIERS YARD (MIAMI, OK) Stockpiled Material Initial Payment 0003 $7,775.00
08932(04) 0049 IN SUPPLIERS YARD (MIAMI, OK) Stockpiled Material Adjustment 0011 $-1,555.00
08932(04) 0049 IN SUPPLIERS YARD (MIAMI, OK) Stockpiled Material Adjustment 0010 $-6,220.00
08932(04) 0052 IN SUPPLIERS YARD (MIAMI, OK) Stockpiled Material Adjustment 0012 $-2,275.00
08932(04) 0052 IN SUPPLIERS YARD (MIAMI, OK) Stockpiled Material Initial Payment 0003 $2,275.00
08932(04) 0053 IN SUPPLIERS YARD (MIAMI, OK) Stockpiled Material Initial Payment 0003 $616.00
08932(04) 0054 IN SUPPLIERS YARD (MIAMI, OK) Stockpiled Material Initial Payment 0003 $616.00
08932(04) 0055 IN SUPPLIERS YARD (MIAMI, OK) Stockpiled Material Initial Payment 0003 $146.64
08932(04) 0059 IN SUPPLIERS YARD (MIAMI, OK) Stockpiled Material Initial Payment 0003 $3,473.96
08932(04) 0070 Stockpiled Material Initial Payment 0009 $7,115.72
10430(04) 0158 dowel bar baskets Stockpiled Material Initial Payment 0005 $28,932.80
10430(04) 0176 IN SUPPLIERS YARD (MIAMI, OK) Stockpiled Material Initial Payment 0003 $1,418.00
10430(04) 0176 IN SUPPLIERS YARD (MIAMI, OK) Stockpiled Material Adjustment 0007 $-1,418.00
10430(04) 0177 IN SUPPLIERS YARD (MIAMI, OK) Stockpiled Material Initial Payment 0003 $1,315.00
10430(04) 0180 IN SUPPLIERS YARD (MIAMI, OK) Stockpiled Material Initial Payment 0003 $232.05
10430(04) 0187 Stockpiled Material Initial Payment 0009 $1,084.48
10430(04) 0213 PRESTRESSED J BEAMS Stockpiled Material Initial Payment 0006 $149,657.44
10430(04) 0213 PRESTRESSED J BEAMS Stockpiled Material Adjustment 0013 $-35,096.66
10430(04) 0213 PRESTRESSED J BEAMS Stockpiled Material Adjustment 0012 $-39,732.06
10430(04) 0224 PILES, FURNISHED (10X42) Stockpiled Material Initial Payment 0001 $6,098.40
10430(04) 0224 PILES, FURNISHED (10X42) Stockpiled Material Adjustment 0005 $-6,098.40
10430(04) 0225 PILES, FURNISHED (HP 12X53) Stockpiled Material Adjustment 0005 $-33,037.20
10430(04) 0225 PILES, FURNISHED (HP 12X53) Stockpiled Material Initial Payment 0001 $33,037.20
12573(04) 0302 IN SUPPLIERS YARD (MIAMI, OK) Stockpiled Material Initial Payment 0003 $713.00
12573(04) 0305 IN SUPPLIERS YARD (MIAMI, OK) Stockpiled Material Initial Payment 0003 $2,738.00
12573(04) 0308 IN SUPPLIERS YARD (MIAMI, OK) Stockpiled Material Adjustment 0007 $-1,849.00
12573(04) 0308 IN SUPPLIERS YARD (MIAMI, OK) Stockpiled Material Initial Payment 0003 $1,849.00
12573(04) 0312 IN SUPPLIERS YARD (MIAMI, OK) Stockpiled Material Adjustment 0007 $-1,555.00
12573(04) 0312 IN SUPPLIERS YARD (MIAMI, OK) Stockpiled Material Initial Payment 0003 $1,555.00
12573(04) 0315 IN SUPPLIERS YARD (MIAMI, OK) Stockpiled Material Adjustment 0007 $-2,035.00
12573(04) 0315 IN SUPPLIERS YARD (MIAMI, OK) Stockpiled Material Initial Payment 0003 $2,035.00
12573(04) 0317 IN SUPPLIERS YARD (MIAMI, OK) Stockpiled Material Initial Payment 0003 $326.06
12573(04) 0318 IN SUPPLIERS YARD (MIAMI, OK) Stockpiled Material Initial Payment 0003 $170.20
12573(04) 0321 IN SUPPLIERS YARD (MIAMI, OK) Stockpiled Material Initial Payment 0003 $269.99
12573(04) 0322 IN SUPPLIERS YARD (MIAMI, OK) Stockpiled Material Initial Payment 0003 $1,242.42
12573(04) 0331 Stockpiled Material Adjustment 0013 $-447.05
12573(04) 0331 Stockpiled Material Adjustment 0011 $-1,597.97
12573(04) 0331 Stockpiled Material Adjustment 0010 $-808.50
12573(04) 0331 Stockpiled Material Initial Payment 0009 $4,774.89
Subtotals For Stockpile Payments $197,038.45


LIQUIDATED DAMAGES HISTORY
Adjustment Description Estimate Nbr Time Units Rate Adjustment Amount
No liquidated damages have been assessed on this contract.


CONTRACT ADJUSTMENTS HISTORY
Adjustment Description Estimate Nbr Adjustment Amount
No general contract adjustments have been created on this contract.
Subtotals For Contract Adjustments $0.00


LINE ITEM ADJUSTMENT HISTORY
Project Item Nbr Line Item Description Adjustment Type Estimate Nbr Adj Quantity Unit Price Adjusted Amount
08932(04) 0006 TEMPORARY SILT FENCE * Material Discrepancy Adjustments 0002 -753.00 $1.50 $-1,129.50
08932(04) 0006 TEMPORARY SILT FENCE * Material Discrepancy Adjustments 0010 -351.00 $1.50 $-526.50
08932(04) 0063 18" R.C.PIPE CLASS III * Material Discrepancy Adjustments 0005 -52.00 $50.00 $-2,600.00
08932(04) 0063 18" R.C.PIPE CLASS III * Material Discrepancy Adjustments 0006 52.00 $50.00 $2,600.00
08932(04) 0068 48" R.C.PIPE CLASS III * Material Discrepancy Adjustments 0005 -84.00 $130.00 $-10,920.00
08932(04) 0068 48" R.C.PIPE CLASS III * Material Discrepancy Adjustments 0006 84.00 $130.00 $10,920.00
08932(04) 0071 18" PREFAB. CULVERT END SECTION, ROUND * Material Discrepancy Adjustments 0005 -2.00 $600.00 $-1,200.00
08932(04) 0071 18" PREFAB. CULVERT END SECTION, ROUND * Material Discrepancy Adjustments 0006 2.00 $600.00 $1,200.00
08932(04) 0075 48" PREFAB. CULVERT END SECTION, ROUND * Material Discrepancy Adjustments 0005 -2.00 $1,800.00 $-3,600.00
08932(04) 0075 48" PREFAB. CULVERT END SECTION, ROUND * Material Discrepancy Adjustments 0006 2.00 $1,800.00 $3,600.00
10430(04) 0144 TEMPORARY SILT FENCE * Material Discrepancy Adjustments 0010 -345.00 $1.50 $-517.50
10430(04) 0186 30" R.C.PIPE CLASS III * Material Discrepancy Adjustments 0005 -120.00 $55.00 $-6,600.00
10430(04) 0186 30" R.C.PIPE CLASS III * Material Discrepancy Adjustments 0006 120.00 $55.00 $6,600.00
10430(04) 0204 (SP)FENCE-STYLE SWF (5 BARBED WIRE) * Material Discrepancy Adjustments 0002 -467.00 $5.00 $-2,335.00
10430(04) 0204 (SP)FENCE-STYLE SWF (5 BARBED WIRE) * Material Discrepancy Adjustments 0004 467.00 $5.00 $2,335.00
10430(04) 0205 FENCE-STYLE CLF (6'HIGH, CLASS A) * Material Discrepancy Adjustments 0007 -125.00 $50.00 $-6,250.00
10430(04) 0213 PRESTRESSED CONCRETE BEAMS (TYPE J BT) * SUBSTANDARD ITEM 0013 1.00 $-5,000.00 $-5,000.00
12573(04) 0269 TEMPORARY SILT FENCE * Material Discrepancy Adjustments 0005 -1.50 $86.00 $-129.00
12573(04) 0269 TEMPORARY SILT FENCE * Material Discrepancy Adjustments 0011 -235.00 $1.50 $-352.50
12573(04) 0342 FENCE-STYLE WWF * Material Discrepancy Adjustments 0002 1,821.00 $9.00 $16,389.00
12573(04) 0342 FENCE-STYLE WWF * Material Discrepancy Adjustments 0006 -1,821.00 $9.00 $-16,389.00
Subtotals For Line Item Adjustments $-13,905.00
* = User applied Line Item Adjustments


MILESTONE ADJUSTMENTS
Milestone Number Milestone Description Time Allowed Time Used Rate Total
01 TIME 'B' BID 450.00 0.00 $6,000.00 $0.00

Line Item Detail

Contract ID: 100395   Estimate Number: 0013     Primary JP: 08932(04)



Line Item Number Item Description Item Number Units Bid Qty Current Quantity Quantity Paid This Est. Quantity Paid To Date Unit Price Amount Paid This Est. Amount Paid To Date
Fed/State Project Number:    BRFY-058C(235) Project:    08932(04) Category:    0100/ROADWAY - BRFY-058C(235)
0001 CLEARING AND GRUBBING 201 0102 LSUM 1.000 1.000   0.900 $20,000.00 $0.00 $18,000.00
0002 UNCLASSIFIED EXCAVATION 202(A) 0183 CY 65,661.000 65,661.000   24,551.000 $5.00 $0.00 $122,755.00
0003 ROCK EXCAVATION 202(B) 0182 CY 9,988.000 9,988.000   38,082.000 $25.00 $0.00 $952,050.00
0004 UNCLASSIFIED BORROW 202(C) 0184 CY 215.000 215.000 738.000 1,734.870 $5.00 $3,690.00 $8,674.35
0005 TYPE A-SALVAGED TOPSOIL 205 4229 LSUM 1.000 1.000 0.000 0.600 $50,000.00 $0.00 $30,000.00
0006 TEMPORARY SILT FENCE 223 2801 LF 1,600.000 1,600.000 0.000 1,104.000 $1.50 $0.00 $1,656.00
0007 TEMPORARY SILT DIKE 227 0100 LF 1,820.000 1,820.000   0.000 $7.00 $0.00 $0.00
0008 SOLID SLAB SODDING 230(A) 2806 SY 39,607.000 39,607.000 0.000 6,080.000 $1.25 $0.00 $7,600.00
0009 SEEDING METHOD B 232(B) 2814 AC 16.300 16.300   0.000 $450.00 $0.00 $0.00
0010 VEGETATIVE MULCHING 233(A) 2817 AC 8.200 8.200   0.000 $450.00 $0.00 $0.00
0011 MOWING 241 2832 AC 16.400 16.400   0.000 $50.00 $0.00 $0.00
0012 AGGREGATE BASE 303 0192 CY 12,176.000 12,176.000   0.000 $28.00 $0.00 $0.00
0013 (SP)CEMENT TREATED BASE 317(F) 4270 SY 42,461.000 42,461.000   0.000 $14.00 $0.00 $0.00
0014 SEPARATOR FABRIC 325 5271 SY 57,517.000 57,517.000   0.000 $1.00 $0.00 $0.00
0015 (SP)MODIFIED SUBGRADE 327(J) 4290 SY 49,233.000 49,233.000   0.000 $3.00 $0.00 $0.00
0016 (SP)GEOSYNTHETIC SUBGRADE REINFORCEMENT 328 2600 SY 4,923.000 4,923.000   0.000 $4.00 $0.00 $0.00
0017 TRAFFIC BOUND SURFACE COURSE TYPE E 403(E) 0225 TON 1,073.000 1,073.000   59.480 $14.00 $0.00 $832.72
0018 (SP)ASPHALT CONCRETE TYPE S3(PG 76-28 OK) 411(S3) 5935 TON 694.000 694.000   0.000 $64.00 $0.00 $0.00
0019 (SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) 411(S3) 5945 TON 1,919.000 1,919.000   0.000 $52.00 $0.00 $0.00
0020 (SP)ASPHALT CONCRETE TYPE S4(PG 76-28 OK) 411(S4) 5950 TON 495.000 495.000   0.000 $70.00 $0.00 $0.00
0021 (SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) 411(S4) 5960 TON 128.000 128.000   0.000 $63.00 $0.00 $0.00
0022 (SP)DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) 414(A1) 5725 SY 40,198.000 40,198.000   0.000 $14.00 $0.00 $0.00
0023 (SP)P.C. CONCRETE FOR PAVEMENT 414(P) 6000 CY 9,986.000 9,986.000   0.000 $95.00 $0.00 $0.00
0024 STRUCTURAL EXCAVATION UNCLASSIFIED 501(A) 0313 CY 15.000 15.000   0.000 $25.00 $0.00 $0.00
0025 CLASS A CONCRETE 509(B) 0321 CY 24.000 24.000   0.000 $500.00 $0.00 $0.00
0026 REINFORCING STEEL 511(A) 0332 LB 3,155.000 3,155.000   0.000 $1.00 $0.00 $0.00
0027 TYPE I PLAIN RIPRAP 601(A) 0297 TON 116.000 116.000   17.150 $30.00 $0.00 $514.50
0028 CONCRETE CURB (6" BARRIER-INTEGRAL) 609(A) 0300 LF 10,223.000 10,223.000   0.000 $4.00 $0.00 $0.00
0029 2'-8" COMB. CURB & GUTTER (6" BARRIER) 609(B) 1525 LF 1,150.000 1,150.000   0.000 $17.00 $0.00 $0.00
0030 6" CONCRETE DRIVEWAY 610(B) 0604 SY 3,836.000 3,836.000   0.000 $40.00 $0.00 $0.00
0031 MANHOLE (4' DIAMETER) 611(A) 2657 EA 3.000 3.000 1.000 1.000 $2,000.00 $2,000.00 $2,000.00
0032 MANHOLE (5' DIAMETER) 611(A) 2658 EA 3.000 3.000   0.000 $2,700.00 $0.00 $0.00
0033 ADD'L.DEPTH IN MANHOLE (4' DIAMETER) 611(B) 2680 VF 5.000 5.000   0.000 $200.00 $0.00 $0.00
0034 ADD'L.DEPTH IN MANHOLE (5' DIAMETER) 611(B) 2681 VF 9.000 9.000   0.000 $300.00 $0.00 $0.00
0035 MANHOLE FRAME & COVER 611(D) 4215 EA 31.000 31.000   0.000 $350.00 $0.00 $0.00
0036 INLET CICI DES. 2 (STD) 611(E) 5112 EA 6.000 6.000   0.000 $1,800.00 $0.00 $0.00
0037 INLET CICI DES. 2 (B) 611(E) 5113 EA 5.000 5.000   0.000 $2,200.00 $0.00 $0.00
0038 INLET CICI DES. 2 (D) 611(E) 5115 EA 2.000 2.000   0.000 $2,400.00 $0.00 $0.00
0039 INLET CICI DES. 3 (STD) 611(E) 5120 EA 1.000 1.000   0.000 $2,700.00 $0.00 $0.00
0040 INLET CICI DES. 3 (2B) 611(E) 5123 EA 1.000 1.000   0.000 $3,800.00 $0.00 $0.00
0041 INLET GPI TYPE 1 (DES. 1) 611(E) 5327 EA 1.000 1.000   0.000 $1,600.00 $0.00 $0.00
0042 INLET GPI TYPE 1 (DES. 5) 611(E) 5331 EA 4.000 4.000   0.000 $1,800.00 $0.00 $0.00
0043 INLET GPI TYPE 2 (DES. 9) 611(E) 5335 EA 1.000 1.000   0.000 $2,300.00 $0.00 $0.00
0044 INLET W/LRG.JCT.BOX,CICI-JB-1,DES.2(B) 611(E) 5872 EA 1.000 1.000   0.000 $5,200.00 $0.00 $0.00
0045 INLET W/LRG.JCT.BOX,CICI-JB-1,DES.2(D) 611(E) 5874 EA 1.000 1.000   0.000 $5,600.00 $0.00 $0.00
0046 INLET W/LRG.JCT.BOX,CICI-JB-1,DES.3(D) 611(E) 5886 EA 1.000 1.000   0.000 $6,900.00 $0.00 $0.00
0047 INLET W/LRG.JCT.BOX,CICI-JB-1,DES.3(2B) 611(E) 5888 EA 1.000 1.000   0.000 $6,900.00 $0.00 $0.00
0048 INLET W/SMALL JCT.BOX,CICI-JB-1,DES.2 611(E) 5970 EA 3.000 3.000   0.000 $3,800.00 $0.00 $0.00
0049 INLET W/SMALL JCT.BOX,CICI-JB-1,DES.2(B) 611(E) 5972 EA 7.000 7.000 0.000 6.000 $4,200.00 $0.00 $25,200.00
0050 INLET W/SMALL JCT.BOX,CICI-JB-1,DES.2(D) 611(E) 5974 EA 7.000 7.000   0.000 $4,600.00 $0.00 $0.00
0051 INLET W/SMALL JCT.BOX,CICI-JB-1,DES.3(D) 611(E) 5986 EA 2.000 2.000   0.000 $5,700.00 $0.00 $0.00
0052 INLET W/SMALL JCT.BOX,CICI-JB-1,DES.3(B-D) 611(E) 5990 EA 2.000 2.000 0.000 1.000 $6,500.00 $0.00 $6,500.00
0053 INLET CICI DES. 2 (ADD'L DEPTH) 611(F) 5325 VF 43.000 43.000   0.000 $250.00 $0.00 $0.00
0054 INLET CICI DES. 3 (ADD'L DEPTH) 611(F) 5330 VF 6.000 6.000   0.000 $450.00 $0.00 $0.00
0055 INLET GPI TYPE 1 (ADD'L DEPTH) 611(F) 5374 VF 13.000 13.000   0.000 $300.00 $0.00 $0.00
0056 INLET GPI TYPE 2 (ADD'L DEPTH) 611(F) 5375 VF 1.000 1.000   0.000 $350.00 $0.00 $0.00
0057 INLET W/LJB,CICI-JB-1,DES.2(ADD'L DEPTH) 611(F) 5870 VF 7.000 7.000   0.000 $550.00 $0.00 $0.00
0058 INLET W/LJB,CICI-JB-1,DES.3(ADD'L DEPTH) 611(F) 5882 VF 8.000 8.000   0.000 $1,000.00 $0.00 $0.00
0059 INLET W/SJB,CICI-JB-1,DES.2(ADD'L DEPTH) 611(F) 5970 VF 77.000 77.000   0.000 $400.00 $0.00 $0.00
0060 INLET W/SJB,CICI-JB-1,DES.3(ADD'L DEPTH) 611(F) 5982 VF 16.000 16.000   0.000 $750.00 $0.00 $0.00
0061 INLET FRM&GRT (SSIF-FRM,CIG-GRT-VG-F) 611(G) 4488 EA 96.000 96.000   0.000 $350.00 $0.00 $0.00
0062 CAST IRON CURB INLETS 611(K) 4488 EA 194.000 194.000   0.000 $250.00 $0.00 $0.00
0063 18" R.C.PIPE CLASS III 613(B) 0491 LF 1,428.000 1,428.000   242.500 $50.00 $0.00 $12,125.00
0064 24" R.C.PIPE CLASS III 613(B) 0492 LF 2,722.000 2,722.000 280.000 590.000 $55.00 $15,400.00 $32,450.00
0065 30" R.C.PIPE CLASS III 613(B) 0493 LF 1,049.000 1,049.000 0.000 540.000 $65.00 $0.00 $35,100.00
0066 36" R.C.PIPE CLASS III 613(B) 0494 LF 545.000 545.000   0.000 $85.00 $0.00 $0.00
0067 42" R.C.PIPE CLASS III 613(B) 0495 LF 143.000 143.000   0.000 $110.00 $0.00 $0.00
0068 48" R.C.PIPE CLASS III 613(B) 0496 LF 609.000 609.000 0.000 84.000 $130.00 $0.00 $10,920.00
0069 TYPE A4 CULVERT END TREATMENT 613(CC) 7186 EA 2.000 2.000   0.000 $900.00 $0.00 $0.00
0070 18" CORR. GALV. STEEL PIPE 613(D) 0689 LF 748.000 748.000   0.000 $24.00 $0.00 $0.00
0071 18" PREFAB. CULVERT END SECTION, ROUND 613(M) 5726 EA 15.000 15.000   6.000 $600.00 $0.00 $3,600.00
0072 24" PREFAB. CULVERT END SECTION, ROUND 613(M) 5730 EA 2.000 2.000   0.000 $700.00 $0.00 $0.00
0073 30" PREFAB. CULVERT END SECTION, ROUND 613(M) 5732 EA 2.000 2.000   0.000 $900.00 $0.00 $0.00
0074 36" PREFAB. CULVERT END SECTION, ROUND 613(M) 5734 EA 7.000 7.000   0.000 $1,200.00 $0.00 $0.00
0075 48" PREFAB. CULVERT END SECTION, ROUND 613(M) 5738 EA 3.000 3.000   2.000 $1,800.00 $0.00 $3,600.00
0076 TRENCH EXCAVATION 613(S) 1180 CY 6,522.000 6,522.000 311.111 1,437.985 $15.00 $4,666.67 $21,569.78
0077 STANDARD BEDDING MATERIAL 613(T) 1181 CY 3,034.000 3,034.000 147.840 663.072 $35.00 $5,174.40 $23,207.52
0078 REMOVAL OF STRUCTURES & OBSTRUCTIONS 619(A) 0920 LSUM 1.000 1.000   0.050 $25,000.00 $0.00 $1,250.00
0079 REMOVAL OF FENCE 619(B) 4725 LF 1,288.000 1,288.000   0.000 $1.00 $0.00 $0.00
0080 REMOVAL OF ASPHALT PAVEMENT 619(B) 4728 SY 15,714.000 15,714.000   0.000 $2.00 $0.00 $0.00
0081 REMOVAL OF CONCRETE DRIVEWAY 619(B) 4766 SY 56.000 56.000   0.000 $10.00 $0.00 $0.00
0082 REMOVAL OF GUARD RAIL 619(B) 4780 LF 94.000 94.000   0.000 $3.00 $0.00 $0.00
0083 BEAM GUARD RAIL-W-BEAM-SINGLE 623(A) 0932 LF 510.000 510.000   0.000 $17.00 $0.00 $0.00
0084 THRIE BEAM BRIDGE CONNECTION-TYPE A 623(E) 7114 EA 2.000 2.000   0.000 $1,800.00 $0.00 $0.00
0085 (SP)G.E.T. GUARD RAIL END SECTION 623(H) 8571 EA 2.000 2.000   0.000 $2,500.00 $0.00 $0.00
0086 FENCE-STYLE WWF 624(A) 4281 LF 371.000 371.000   0.000 $9.00 $0.00 $0.00
0087 GATES-STYLE WWF (4.5'HIGH X 16'LONG) 624(B) 4466 EA 1.000 1.000   0.000 $500.00 $0.00 $0.00
0088 REMOVE AND RESET MAILBOX 629(E) 5048 EA 14.000 14.000   0.000 $100.00 $0.00 $0.00
0089 EDGE DRAIN CONDUIT-PERFORATED 653(A) 5915 LF 11,320.000 11,320.000   0.000 $5.00 $0.00 $0.00
0090 EDGE DRAIN OUTLET LATERAL-NONPERFORATED 653(B) 5916 LF 720.000 720.000   0.000 $5.00 $0.00 $0.00
0091 OUTLET LATERAL HEADWALL 653(C) 5946 EA 48.000 48.000   0.000 $500.00 $0.00 $0.00
Subtotals For Category     0100/ROADWAY - BRFY-058C(235)    $30,931.07 $1,319,604.87
Fed/State Project Number:    BRFY-058C(235) Project:    08932(04) Category:    0200/BRIDGE 'B' - BRFY-058C(235)
0092 SUBSTRUCTURE EXCAVATION COMMON 501(B) 1307 CY 154.000 154.000   77.000 $15.00 $0.00 $1,155.00
0093 SUBSTRUCTURE EXCAVATION ROCK 501(C) 1308 CY 334.000 334.000   167.000 $25.00 $0.00 $4,175.00
0094 CLSM BACKFILL 501(G) 6309 CY 69.600 69.600 0.000 69.600 $85.00 $0.00 $5,916.00
0095 APPROACH SLAB 504(A) 1304 SY 312.000 312.000   312.000 $135.00 $0.00 $42,120.00
0096 CONCRETE RAIL (TR4) 504(E) 6245 LF 320.000 320.000   320.000 $65.00 $0.00 $20,800.00
0097 CLASS AA CONCRETE 509(A) 1326 CY 492.800 492.800   492.800 $425.00 $0.00 $209,440.00
0098 CLASS A CONCRETE 509(B) 1328 CY 172.600 172.600   135.500 $410.00 $0.00 $55,555.00
0099 EPOXY COATED REINFORCING STEEL 511(B) 6010 LB 171,698.000 171,698.000   163,784.000 $0.80 $0.00 $131,027.20
0100 WATER REPELLENT (VISUALLY INSPECTED) 515(A) 6013 SY 436.000 436.000   0.000 $3.50 $0.00 $0.00
0101 DRILLED SHAFTS 30" DIAMETER 516(A) 6091 LF 80.000 80.000   80.000 $550.00 $0.00 $44,000.00
0102 DRILLED SHAFTS 36" DIAMETER 516(A) 6092 LF 156.000 156.000   167.000 $685.00 $0.00 $114,395.00
0103 TYPE I PLAIN RIPRAP 601(A) 1351 TON 1,513.000 1,513.000   445.910 $27.00 $0.00 $12,039.57
0104 6" PERFORATED PIPE UNDERDRAIN ROUND 613(P) 6204 LF 142.000 142.000 0.000 142.000 $27.00 $0.00 $3,834.00
0105 6" NON-PERF.PIPE UNDERDRAIN RND. 613(Q) 6207 LF 38.000 38.000   0.000 $15.00 $0.00 $0.00
0106 REMOVAL OF EXISTING BRIDGE STRUCTURE 619(D) 1397 LSUM 1.000 1.000   0.000 $20,000.00 $0.00 $0.00
Subtotals For Category     0200/BRIDGE 'B' - BRFY-058C(235)    $0.00 $644,456.77
Fed/State Project Number:    BRFY-058C(235) Project:    08932(04) Category:    0201/BRIDGE 'C' - BRFY-058C(235)
0107 UNCLASSIFIED EXCAVATION 202(A) 1301 CY 358.600 358.600 0.000 476.060 $17.00 $0.00 $8,093.02
0108 STRUCTURAL EXCAVATION UNCLASSIFIED 501(A) 1306 CY 128.300 128.300   128.300 $25.00 $0.00 $3,207.50
0109 CLASS AA CONCRETE 509(A) 1326 CY 284.800 284.800   154.130 $285.00 $0.00 $43,927.05
0110 REINFORCING STEEL 511(A) 1332 LB 43,678.000 43,678.000   36,044.860 $0.70 $0.00 $25,231.40
0111 TYPE I PLAIN RIPRAP 601(A) 1351 TON 213.900 213.900   59.130 $30.00 $0.00 $1,773.90
0112 REMOVAL OF EXISTING BRIDGE STRUCTURE 619(D) 1397 LSUM 1.000 1.000   0.000 $10,000.00 $0.00 $0.00
Subtotals For Category     0201/BRIDGE 'C' - BRFY-058C(235)    $0.00 $82,232.87
Fed/State Project Number:    BRFY-058C(235) Project:    08932(04) Category:    0300/TRAFFIC PERMANENT - BRFY-058C(235)
0113 SHEET ALUMINUM SIGNS 850(A) 8110 SF 78.180 78.180   0.000 $12.00 $0.00 $0.00
0114 2 1/4" SQUARE TUBE POST 851(C) 8327 LF 291.000 291.000   0.000 $8.00 $0.00 $0.00
0115 (SP)TRAFFIC STRIPE (MULTI-POLYMER)(SYMBOLS, WORDS. ETC.) 854(C) 8525 EA 47.000 47.000   0.000 $270.00 $0.00 $0.00
0116 (SP)TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) 854(C) 8530 LF 17,210.000 17,210.000   0.000 $0.65 $0.00 $0.00
0117 (SP)TRAFFIC STRIPE(MULTI-POLYMER)(8" WIDE) 854(C) 8540 LF 229.000 229.000   0.000 $2.15 $0.00 $0.00
0118 (SP)TRAFFIC STRIPE(MULTI-POLYMER)(24" WIDE) 854(C) 8555 LF 155.000 155.000   0.000 $13.00 $0.00 $0.00
0119 TRAFFIC STRIPE(PLASTIC)(4" WIDE) 855(A) 8812 LF 1,900.000 1,900.000   0.000 $0.65 $0.00 $0.00
0120 TRAFFIC STRIPE(PLASTIC)(8" WIDE) 855(A) 8814 LF 125.000 125.000   0.000 $2.15 $0.00 $0.00
0121 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) 859(A) 8006 LF 928.000 928.000   0.000 $1.10 $0.00 $0.00
0122 (PL)REMOVAL OF EXISTING SIGNS 890(A) 8724 EA 5.000 5.000   0.000 $55.00 $0.00 $0.00
0123 (PL)REMOVE & RESET EXISTING SIGNS 890A/B 8756 EA 14.000 14.000   0.000 $110.00 $0.00 $0.00
Subtotals For Category     0300/TRAFFIC PERMANENT - BRFY-058C(235)    $0.00 $0.00
Fed/State Project Number:    BRFY-058C(235) Project:    08932(04) Category:    0301/TRAFFIC TEMPORARY - BRFY-058C(235)
0124 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) 856(A) 8839 LF 14,051.000 14,051.000   0.000 $0.25 $0.00 $0.00
0125 (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 856(G) 8887 EA 760.000 760.000   0.000 $1.10 $0.00 $0.00
0126 (PL)CONST.ZONE IMPACT ATTEN. 871 8705 SD 180.000 180.000   0.000 $11.00 $0.00 $0.00
0127 CONSTRUCTION SIGNS 0 TO 6.25 SF 880(B) 8818 SD 8,500.000 8,500.000 90.000 920.000 $0.55 $49.50 $506.00
0128 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF 880(B) 8821 SD 4,320.000 4,320.000   0.000 $0.55 $0.00 $0.00
0129 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF 880(B) 8824 SD 6,230.000 6,230.000 90.000 982.000 $1.60 $144.00 $1,571.20
0130 BARRICADES(TYPE III) 880(C) 8842 SD 8,240.000 8,240.000 30.000 289.000 $0.30 $9.00 $86.70
0131 WING BARRICADES 880(C) 8848 SD 2,920.000 2,920.000   0.000 $0.30 $0.00 $0.00
0132 WARNING LIGHTS(TYPE A) 880(E) 8860 SD 25,770.000 25,770.000 60.000 708.000 $0.11 $6.60 $77.88
0133 WARNING LIGHTS(TYPE C) 880(E) 8872 SD 24,700.000 24,700.000 210.000 1,948.000 $0.02 $4.20 $38.96
0134 DRUMS 880(F) 8878 SD 24,700.000 24,700.000 180.000 1,476.000 $0.16 $28.80 $236.16
0135 FLAGGER 880(I) 8902 SD 8.000 8.000   0.000 $150.00 $0.00 $0.00
Subtotals For Category     0301/TRAFFIC TEMPORARY - BRFY-058C(235)    $242.10 $2,516.90
Fed/State Project Number:    BRFY-058C(235) Project:    08932(04) Category:    0600/STAKING - BRFY-058C(235)
0136 STAKING 642 0098 LSUM 1.000 1.000   0.500 $125,000.00 $0.00 $62,500.00
Subtotals For Category     0600/STAKING - BRFY-058C(235)    $0.00 $62,500.00
Fed/State Project Number:    BRFY-058C(235) Project:    08932(04) Category:    0640/CONSTRUCTION - BRFY-058C(235)
0137 (SP)SWPPP DOCUMENTATION AND MANAGEMENT 220 2800 LSUM 1.000 1.000   0.500 $5,000.00 $0.00 $2,500.00
0138 FIELD OFFICE 640 1426 EA 1.000 1.000   1.000 $10,000.00 $0.00 $10,000.00
0139 MOBILIZATION 641 1552 LSUM 1.000 1.000   1.000 $600,000.00 $0.00 $600,000.00
Subtotals For Category     0640/CONSTRUCTION - BRFY-058C(235)    $0.00 $612,500.00
Subtotals For Project BRFY-058C(235) /08932(04) $31,173.17 $2,723,811.41


Line Item Number Item Description Item Number Units Bid Qty Current Quantity Quantity Paid This Est. Quantity Paid To Date Unit Price Amount Paid This Est. Amount Paid To Date
Fed/State Project Number:    BRFY-058C(237) Project:    10430(04) Category:    0100/ROADWAY - BRFY-058C(237)
0140 CLEARING AND GRUBBING 201 0102 LSUM 1.000 1.000   0.900 $20,000.00 $0.00 $18,000.00
0141 UNCLASSIFIED EXCAVATION 202(A) 0183 CY 13,892.000 13,892.000 0.000 227.910 $5.00 $0.00 $1,139.55
0142 UNCLASSIFIED BORROW 202(C) 0184 CY 160,807.000 160,807.000 0.000 160,807.000 $4.50 $0.00 $723,631.50
0143 TYPE A-SALVAGED TOPSOIL 205 4229 LSUM 1.000 1.000 0.000 0.500 $20,000.00 $0.00 $10,000.00
0144 TEMPORARY SILT FENCE 223 2801 LF 6,383.000 6,383.000 0.000 345.000 $1.50 $0.00 $517.50
0145 TEMPORARY SILT DIKE 227 0100 LF 370.000 370.000   0.000 $7.00 $0.00 $0.00
0146 SOLID SLAB SODDING 230(A) 2806 SY 39,868.000 39,868.000   0.000 $1.25 $0.00 $0.00
0147 SEEDING METHOD B 232(B) 2814 AC 16.600 16.600   0.000 $450.00 $0.00 $0.00
0148 VEGETATIVE MULCHING 233(A) 2817 AC 8.300 8.300   0.000 $450.00 $0.00 $0.00
0149 MOWING 241 2832 AC 16.600 16.600   0.000 $50.00 $0.00 $0.00
0150 AGGREGATE BASE 303 0192 CY 7,280.000 7,280.000   0.000 $28.00 $0.00 $0.00
0151 (SP)CEMENT TREATED BASE 317(F) 4270 SY 26,155.000 26,155.000   0.000 $14.00 $0.00 $0.00
0152 SEPARATOR FABRIC 325 5271 SY 35,014.000 35,014.000   0.000 $1.00 $0.00 $0.00
0153 (SP)MODIFIED SUBGRADE 327(J) 4290 SY 29,057.000 29,057.000   0.000 $3.00 $0.00 $0.00
0154 (SP)GEOSYNTHETIC SUBGRADE REINFORCEMENT 328 2600 SY 2,905.000 2,905.000   0.000 $4.00 $0.00 $0.00
0155 TRAFFIC BOUND SURFACE COURSE TYPE E 403(E) 0225 TON 543.000 543.000 18.990 133.700 $14.00 $265.86 $1,871.80
0156 (SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) 411(S3) 5945 TON 143.000 143.000   0.000 $75.00 $0.00 $0.00
0157 (SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) 411(S4) 5960 TON 26.000 26.000   0.000 $85.00 $0.00 $0.00
0158 (SP)DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) 414(A1) 5725 SY 24,613.000 24,613.000   0.000 $14.00 $0.00 $0.00
0159 (SP)P.C. CONCRETE FOR PAVEMENT 414(P) 6000 CY 6,057.000 6,057.000   0.000 $90.00 $0.00 $0.00
0160 STRUCTURAL EXCAVATION UNCLASSIFIED 501(A) 0313 CY 82.000 82.000   29.083 $25.00 $0.00 $727.08
0161 CLASS AA CONCRETE 509(A) 0319 CY 164.000 164.000 0.000 134.550 $330.00 $0.00 $44,402.16
0162 CLASS A CONCRETE 509(B) 0321 CY 44.000 44.000 0.000 50.250 $325.00 $0.00 $16,331.90
0163 CLASS C CONCRETE 509(D) 0325 CY 2.000 2.000   0.000 $300.00 $0.00 $0.00
0164 REINFORCING STEEL 511(A) 0332 LB 32,555.000 32,555.000   30,595.378 $1.00 $0.00 $30,595.38
0165 TYPE I PLAIN RIPRAP 601(A) 0297 TON 57.000 57.000   0.000 $30.00 $0.00 $0.00
0166 CONCRETE CURB (6" BARRIER-INTEGRAL) 609(A) 0300 LF 6,536.000 6,536.000   0.000 $4.00 $0.00 $0.00
0167 6" CONCRETE DRIVEWAY 610(B) 0604 SY 1,058.000 1,058.000   0.000 $40.00 $0.00 $0.00
0168 MANHOLE (4' DIAMETER) 611(A) 2657 EA 1.000 1.000   0.000 $2,000.00 $0.00 $0.00
0169 MANHOLE (5' DIAMETER) 611(A) 2658 EA 1.000 1.000 0.000 1.000 $2,700.00 $0.00 $2,700.00
0170 ADD'L.DEPTH IN MANHOLE (4' DIAMETER) 611(B) 2680 VF 2.000 2.000   0.000 $200.00 $0.00 $0.00
0171 ADD'L.DEPTH IN MANHOLE (5' DIAMETER) 611(B) 2681 VF 15.000 15.000   0.000 $300.00 $0.00 $0.00
0172 MANHOLE FRAME & COVER 611(D) 4215 EA 13.000 13.000 0.000 1.000 $350.00 $0.00 $350.00
0173 INLET CICI DES. 2 (STD) 611(E) 5112 EA 2.000 2.000   0.000 $1,800.00 $0.00 $0.00
0174 INLET CICI DES. 2 (B) 611(E) 5113 EA 4.000 4.000   0.000 $2,200.00 $0.00 $0.00
0175 INLET CICI DES. 2 (D) 611(E) 5115 EA 1.000 1.000   0.000 $2,400.00 $0.00 $0.00
0176 INLET GPI TYPE 2 (DES. 9) 611(E) 5335 EA 1.000 1.000 0.000 1.000 $2,300.00 $0.00 $2,300.00
0177 INLET W/SMALL JCT.BOX,CICI-JB-1,DES.2 611(E) 5970 EA 1.000 1.000   0.000 $3,800.00 $0.00 $0.00
0178 INLET W/SMALL JCT.BOX,CICI-JB-1,DES.2(B) 611(E) 5972 EA 4.000 4.000   0.000 $4,200.00 $0.00 $0.00
0179 INLET W/SMALL JCT.BOX,CICI-JB-1,DES.2(D) 611(E) 5974 EA 6.000 6.000   0.000 $4,600.00 $0.00 $0.00
0180 INLET CICI DES. 2 (ADD'L DEPTH) 611(F) 5325 VF 42.000 42.000   0.000 $250.00 $0.00 $0.00
0181 INLET W/SJB,CICI-JB-1,DES.2(ADD'L DEPTH) 611(F) 5970 VF 55.000 55.000   0.000 $400.00 $0.00 $0.00
0182 INLET FRM&GRT (SSIF-FRM,CIG-GRT-VG-F) 611(G) 4488 EA 36.000 36.000   0.000 $350.00 $0.00 $0.00
0183 CAST IRON CURB INLETS 611(K) 4488 EA 80.000 80.000   0.000 $250.00 $0.00 $0.00
0184 18" R.C.PIPE CLASS III 613(B) 0491 LF 2,497.000 2,497.000   0.000 $35.00 $0.00 $0.00
0185 24" R.C.PIPE CLASS III 613(B) 0492 LF 581.000 581.000   0.000 $45.00 $0.00 $0.00
0186 30" R.C.PIPE CLASS III 613(B) 0493 LF 171.000 171.000 0.000 168.000 $55.00 $0.00 $9,240.00
0187 18" CORR. GALV. STEEL PIPE 613(D) 0689 LF 114.000 114.000   0.000 $24.00 $0.00 $0.00
0188 18" PREFAB. CULVERT END SECTION, ROUND 613(M) 5726 EA 12.000 12.000   0.000 $600.00 $0.00 $0.00
0189 30" PREFAB. CULVERT END SECTION, ROUND 613(M) 5732 EA 1.000 1.000   0.000 $900.00 $0.00 $0.00
0190 TRENCH EXCAVATION 613(S) 1180 CY 2,441.000 2,441.000   52.980 $15.00 $0.00 $794.70
0191 STANDARD BEDDING MATERIAL 613(T) 1181 CY 977.000 977.000   80.408 $35.00 $0.00 $2,814.28
0192 REMOVAL OF STRUCTURES & OBSTRUCTIONS 619(A) 0920 LSUM 1.000 1.000   0.000 $10,000.00 $0.00 $0.00
0193 REMOVAL OF FENCE 619(B) 4725 LF 4,645.000 4,645.000   972.000 $1.00 $0.00 $972.00
0194 REMOVAL OF ASPHALT PAVEMENT 619(B) 4728 SY 17,825.000 17,825.000   0.000 $2.00 $0.00 $0.00
0195 REMOVAL OF GUARD RAIL 619(B) 4780 LF 3,409.000 3,409.000   830.000 $3.00 $0.00 $2,490.00
0196 REMOVAL OF CONCRETE MEDIAN BARRIER 619(B) 4915 LF 69.000 69.000   0.000 $15.00 $0.00 $0.00
0197 SAWING PAVEMENT 619(C) 0924 LF 405.000 405.000   0.000 $2.00 $0.00 $0.00
0198 BEAM GUARD RAIL-W-BEAM-SINGLE 623(A) 0932 LF 500.000 500.000   0.000 $17.00 $0.00 $0.00
0199 THRIE BEAM BRIDGE CONNECTION-TYPE A 623(E) 7114 EA 2.000 2.000   0.000 $1,800.00 $0.00 $0.00
0200 (SP)G.E.T. GUARD RAIL END SECTION 623(H) 8571 EA 2.000 2.000   0.000 $2,500.00 $0.00 $0.00
0201 FENCE-STYLE WWF 624(A) 4281 LF 659.000 659.000   0.000 $9.00 $0.00 $0.00
0202 GATES-STYLE WWF (4.5'HIGH X 12'LONG) 624(B) 4462 EA 1.000 1.000   0.000 $500.00 $0.00 $0.00
0203 GATES-STYLE WWF (4.5'HIGH X 16'LONG) 624(B) 4466 EA 1.000 1.000   0.000 $500.00 $0.00 $0.00
0204 (SP)FENCE-STYLE SWF (5 BARBED WIRE) 624(C) 4459 LF 1,838.000 1,838.000   467.000 $5.00 $0.00 $2,335.00
0205 FENCE-STYLE CLF (6'HIGH, CLASS A) 624(D) 4292 LF 125.000 125.000 0.000 125.000 $50.00 $0.00 $6,250.00
0206 CONCRETE MEDIAN BARRIER, DESIGN 1 627(I) 4317 LF 21.000 21.000   0.000 $100.00 $0.00 $0.00
0207 REMOVE AND RESET MAILBOX 629(E) 5048 EA 1.000 1.000   0.000 $100.00 $0.00 $0.00
0208 EDGE DRAIN CONDUIT-PERFORATED 653(A) 5915 LF 6,703.000 6,703.000   0.000 $5.00 $0.00 $0.00
0209 EDGE DRAIN OUTLET LATERAL-NONPERFORATED 653(B) 5916 LF 420.000 420.000   0.000 $5.00 $0.00 $0.00
0210 OUTLET LATERAL HEADWALL 653(C) 5946 EA 28.000 28.000   0.000 $500.00 $0.00 $0.00
Subtotals For Category     0100/ROADWAY - BRFY-058C(237)    $265.86 $877,462.85
Fed/State Project Number:    BRFY-058C(237) Project:    10430(04) Category:    0200/BRIDGE 'A' - BRFY-058C(237)
0211 SUBSTRUCTURE EXCAVATION COMMON 501(B) 1307 CY 376.000 376.000   97.000 $15.00 $0.00 $1,455.00
0212 CLSM BACKFILL 501(G) 6309 CY 492.200 492.200   0.000 $85.00 $0.00 $0.00
0213 PRESTRESSED CONCRETE BEAMS (TYPE J BT) 503(A) 6290 LF 1,808.000 1,808.000 424.000 904.000 $200.00 $84,800.00 $180,800.00
0214 APPROACH SLAB 504(A) 1304 SY 631.200 631.200   0.000 $135.00 $0.00 $0.00
0215 SEALED EXPANSION JOINT 504(C) 6250 LF 73.000 73.000   0.000 $200.00 $0.00 $0.00
0216 CONCRETE RAIL (TR4) 504(E) 6245 LF 621.600 621.600   0.000 $65.00 $0.00 $0.00
0217 STRUCTURAL STEEL 506(A) 1322 LB 2,250.000 2,250.000   0.000 $1.50 $0.00 $0.00
0218 (PL)SPECIAL CONCRETE FINISH 509 6152 SY 324.000 324.000   0.000 $35.00 $0.00 $0.00
0219 CLASS AA CONCRETE 509(A) 1326 CY 547.600 547.600 18.000 18.000 $355.00 $6,390.00 $6,390.00
0220 CLASS A CONCRETE 509(B) 1328 CY 398.100 398.100 0.000 174.300 $330.00 $0.00 $57,519.00
0221 SLOPE WALL (4") 510(C) 6137 SY 1,360.000 1,360.000 0.000 680.000 $55.00 $0.00 $37,400.00
0222 REINFORCING STEEL 511(A) 1332 LB 2,440.000 2,440.000   611.000 $0.70 $0.00 $427.70
0223 EPOXY COATED REINFORCING STEEL 511(B) 6010 LB 135,222.000 135,222.000   19,222.000 $0.80 $0.00 $15,377.60
0224 PILES, FURNISHED (HP 10X42) 514(A) 6010 LF 308.000 308.000   308.000 $22.00 $0.00 $6,776.00
0225 PILES, FURNISHED (HP 12X53) 514(A) 6011 LF 1,311.000 1,311.000   1,311.000 $28.00 $0.00 $36,708.00
0226 PILES, DRIVEN (HP 10X42) 514(B) 6292 LF 308.000 308.000 0.000 77.390 $10.00 $0.00 $773.90
0227 PILES, DRIVEN (HP 12X53) 514(B) 6294 LF 1,311.000 1,311.000 0.000 676.490 $10.00 $0.00 $6,764.90
0228 WATER REPELLENT (VISUALLY INSPECTED) 515(A) 6013 SY 974.000 974.000   0.000 $4.00 $0.00 $0.00
0229 DRILLED SHAFTS 66" DIAMETER 516(A) 6097 LF 124.000 124.000   62.330 $1,100.00 $0.00 $68,563.00
0230 (SP) SEALER CRACK PREPARATION 523(A) 6550 LF 230.000 230.000   0.000 $1.00 $0.00 $0.00
0231 (SP) SEALER RESIN 523(B) 6560 GAL 2.000 2.000   0.000 $110.00 $0.00 $0.00
0232 (PL)FIXED BEARING ASSEMBLY 535 6164 EA 16.000 16.000 4.000 8.000 $1,100.00 $4,400.00 $8,800.00
0233 (PL)EXPANSION BEARING ASSEMBLY 535 6165 EA 16.000 16.000 4.000 8.000 $1,100.00 $4,400.00 $8,800.00
0234 6" PERFORATED PIPE UNDERDRAIN ROUND 613(P) 6204 LF 348.000 348.000   0.000 $30.00 $0.00 $0.00
0235 6" NON-PERF.PIPE UNDERDRAIN RND. 613(Q) 6207 LF 94.000 94.000   0.000 $15.00 $0.00 $0.00
0236 REMOVAL OF EXISTING BRIDGE STRUCTURE 619(D) 1397 LSUM 1.000 1.000   0.000 $50,000.00 $0.00 $0.00
Subtotals For Category     0200/BRIDGE 'A' - BRFY-058C(237)    $99,990.00 $436,555.10
Fed/State Project Number:    BRFY-058C(237) Project:    10430(04) Category:    0300/TRAFFIC PERMANENT - BRFY-058C(237)
0237 SHEET ALUMINUM SIGNS 850(A) 8110 SF 90.500 90.500   0.000 $12.00 $0.00 $0.00
0238 2 1/4" SQUARE TUBE POST 851(C) 8327 LF 304.250 304.250   0.000 $8.00 $0.00 $0.00
0239 (SP)TRAFFIC STRIPE (MULTI-POLYMER)(SYMBOLS, WORDS. ETC.) 854(C) 8525 EA 30.000 30.000   0.000 $270.00 $0.00 $0.00
0240 (SP)TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) 854(C) 8530 LF 12,507.000 12,507.000   0.000 $0.65 $0.00 $0.00
0241 (SP)TRAFFIC STRIPE(MULTI-POLYMER)(8" WIDE) 854(C) 8540 LF 400.000 400.000   0.000 $2.15 $0.00 $0.00
0242 (SP)TRAFFIC STRIPE(MULTI-POLYMER)(24" WIDE) 854(C) 8555 LF 60.000 60.000   0.000 $13.00 $0.00 $0.00
0243 TRAFFIC STRIPE(PLASTIC)(4" WIDE) 855(A) 8812 LF 530.000 530.000   0.000 $0.65 $0.00 $0.00
0244 TRAFFIC STRIPE(PLASTIC)(6" WIDE) 855(A) 8813 LF 100.000 100.000   0.000 $1.10 $0.00 $0.00
0245 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) 859(A) 8006 LF 2,200.000 2,200.000   0.000 $1.10 $0.00 $0.00
0246 (PL)REMOVAL OF EXISTING SIGNS 890(A) 8724 EA 5.000 5.000   0.000 $55.00 $0.00 $0.00
0247 (PL)REMOVE & RESET EXISTING SIGNS 890A/B 8756 EA 25.000 25.000   0.000 $110.00 $0.00 $0.00
8000 (PL)REMOVAL OF LIGHT POLE 890(A) 8712 EA 0.000 1.000   1.000 $2,625.00 $0.00 $2,625.00
Subtotals For Category     0300/TRAFFIC PERMANENT - BRFY-058C(237)    $0.00 $2,625.00
Fed/State Project Number:    BRFY-058C(237) Project:    10430(04) Category:    0301/TRAFFIC TEMPORARY - BRFY-058C(237)
0248 RELOCATION OF RENTED PORTABLE TYPE PRECAST CONCRETE MEDIAN 627(O) 4410 LF 6,750.000 6,750.000   1,386.000 $3.00 $0.00 $4,158.00
0249 RENTED PORTABLE TYPE PRECAST CONCRETE MEDIAN BARRIER 627(P) 4425 LF 2,245.000 2,245.000   2,361.000 $20.00 $0.00 $47,220.00
0250 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) 856(A) 8839 LF 9,220.000 9,220.000   0.000 $0.25 $0.00 $0.00
0251 (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 856(G) 8887 EA 1,780.000 1,780.000   0.000 $1.10 $0.00 $0.00
0252 (PL)CONST.ZONE IMPACT ATTEN. 871 8705 SD 565.000 565.000 30.000 328.000 $11.00 $330.00 $3,608.00
0253 ARROW DISPLAY(TYPE C) 880(A) 8812 SD 214.000 214.000   26.000 $11.00 $0.00 $286.00
0254 CONSTRUCTION SIGNS 0 TO 6.25 SF 880(B) 8818 SD 12,295.000 12,295.000 345.000 3,849.000 $0.55 $189.75 $2,116.95
0255 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF 880(B) 8821 SD 9,174.000 9,174.000 135.000 1,717.000 $0.55 $74.25 $944.35
0256 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF 880(B) 8824 SD 15,246.000 15,246.000 285.000 4,557.000 $1.60 $456.00 $7,291.20
0257 BARRICADES(TYPE III) 880(C) 8842 SD 4,788.000 4,788.000 60.000 764.000 $0.30 $18.00 $229.20
0258 WING BARRICADES 880(C) 8848 SD 4,266.000 4,266.000 137.000 1,490.000 $0.30 $41.10 $447.00
0259 WARNING LIGHTS(TYPE A) 880(E) 8860 SD 23,980.000 23,980.000 285.000 4,609.000 $0.11 $31.35 $506.99
0260 WARNING LIGHTS(TYPE C) 880(E) 8872 SD 45,541.000 45,541.000 681.000 7,840.000 $0.02 $13.62 $156.80
0261 DRUMS 880(F) 8878 SD 45,541.000 45,541.000 621.000 7,838.000 $0.16 $99.36 $1,254.08
0262 FLAGGER 880(I) 8902 SD 200.000 200.000   0.000 $150.00 $0.00 $0.00
0263 TRAFFIC SURVEILLANCE, POLICE 880(L) 8911 HOUR 116.000 116.000 18.000 30.000 $60.00 $1,080.00 $1,800.00
0264 PORT.CHANGEABLE MESSAGE SIGN 882(B) 8306 SD 454.000 454.000 15.000 104.000 $22.00 $330.00 $2,288.00
Subtotals For Category     0301/TRAFFIC TEMPORARY - BRFY-058C(237)    $2,663.43 $72,306.57
Subtotals For Project BRFY-058C(237) /10430(04) $102,919.29 $1,388,949.52


Line Item Number Item Description Item Number Units Bid Qty Current Quantity Quantity Paid This Est. Quantity Paid To Date Unit Price Amount Paid This Est. Amount Paid To Date
Fed/State Project Number:    STPY-058C(240) Project:    12573(04) Category:    0100/ROADWAY - STPY-058C(240)
0265 CLEARING AND GRUBBING 201 0102 LSUM 1.000 1.000   1.000 $20,000.00 $0.00 $20,000.00
0266 UNCLASSIFIED EXCAVATION 202(A) 0183 CY 134,155.000 134,155.000 3,500.670 91,049.990 $4.00 $14,002.68 $364,199.96
0267 UNCLASSIFIED BORROW 202(C) 0184 CY 245.000 245.000   0.000 $5.00 $0.00 $0.00
0268 TYPE A-SALVAGED TOPSOIL 205 4229 LSUM 1.000 1.000 0.000 0.600 $60,000.00 $0.00 $36,000.00
0269 TEMPORARY SILT FENCE 223 2801 LF 1,285.000 1,285.000 422.000 743.000 $1.50 $633.00 $1,114.50
0270 TEMPORARY SILT DIKE 227 0100 LF 2,320.000 2,320.000 154.000 154.000 $7.00 $1,078.00 $1,078.00
0271 SOLID SLAB SODDING 230(A) 2806 SY 82,510.000 82,510.000 0.000 6,186.000 $1.25 $0.00 $7,732.50
0272 SEEDING METHOD B 232(B) 2814 AC 34.100 34.100   0.000 $450.00 $0.00 $0.00
0273 VEGETATIVE MULCHING 233(A) 2817 AC 17.050 17.050 2.810 7.810 $450.00 $1,264.50 $3,514.50
0274 MOWING 241 2832 AC 34.100 34.100   0.000 $50.00 $0.00 $0.00
0275 AGGREGATE BASE 303 0192 CY 25,497.000 25,497.000 2,057.050 3,600.110 $28.00 $57,597.40 $100,803.08
0276 (SP)CEMENT TREATED BASE 317(F) 4270 SY 3,178.000 3,178.000 1,173.590 1,173.590 $14.00 $16,430.26 $16,430.26
0277 SEPARATOR FABRIC 325 5271 SY 120,392.000 120,392.000 1,295.690 8,303.490 $1.00 $1,295.69 $8,303.49
0278 (SP)MODIFIED SUBGRADE 327(J) 4290 SY 109,425.000 109,425.000 10,238.800 32,181.050 $3.00 $30,716.40 $96,543.15
0279 (SP)GEOSYNTHETIC SUBGRADE REINFORCEMENT 328 2600 SY 10,789.000 10,789.000   0.000 $4.00 $0.00 $0.00
0280 TRAFFIC BOUND SURFACE COURSE TYPE E 403(E) 0225 TON 1,548.000 1,548.000 144.520 331.490 $14.00 $2,023.28 $4,640.86
0281 (SP)ASPHALT CONCRETE TYPE S3(PG 76-28 OK) 411(S3) 5935 TON 14,126.000 14,126.000   0.000 $60.00 $0.00 $0.00
0282 (SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) 411(S3) 5945 TON 42,885.000 42,885.000   0.000 $50.00 $0.00 $0.00
0283 (SP)ASPHALT CONCRETE TYPE S4(PG 76-28 OK) 411(S4) 5950 TON 9,895.000 9,895.000   0.000 $68.00 $0.00 $0.00
0284 (SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) 411(S4) 5960 TON 833.000 833.000   0.000 $60.00 $0.00 $0.00
0285 (SP)DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) 414(A1) 5725 SY 3,054.000 3,054.000 625.220 625.220 $20.00 $12,504.40 $12,504.40
0286 (SP)P.C. CONCRETE FOR PAVEMENT 414(P) 6000 CY 765.000 765.000 129.670 129.670 $95.00 $12,318.65 $12,318.65
0287 STRUCTURAL EXCAVATION UNCLASSIFIED 501(A) 0313 CY 1,106.000 1,106.000 58.866 189.380 $25.00 $1,471.65 $4,734.51
0288 CLASS A CONCRETE 509(B) 0321 CY 618.000 618.000 158.751 489.585 $325.00 $51,594.08 $159,115.13
0289 REINFORCING STEEL 511(A) 0332 LB 104,800.000 104,800.000 25,354.419 79,471.113 $1.00 $25,354.42 $79,471.12
0290 TYPE I PLAIN RIPRAP 601(A) 0297 TON 656.000 656.000 0.000 36.580 $30.00 $0.00 $1,097.40
0291 CONCRETE CURB (6" BARRIER-INTEGRAL) 609(A) 0300 LF 505.000 505.000 157.080 157.080 $4.00 $628.32 $628.32
0292 2'-8" COMB. CURB & GUTTER (6" BARRIER) 609(B) 1525 LF 21,588.000 21,588.000   0.000 $13.00 $0.00 $0.00
0293 6" CONCRETE DRIVEWAY 610(B) 0604 SY 1,122.000 1,122.000   0.000 $40.00 $0.00 $0.00
0294 4" CONCRETE DIVIDING STRIP 610(C) 0608 SY 5.000 5.000   0.000 $40.00 $0.00 $0.00
0295 MANHOLE (5' DIAMETER) 611(A) 2658 EA 2.000 2.000 0.000 2.000 $2,700.00 $0.00 $5,400.00
0296 MANHOLE (6' DIAMETER) 611(A) 2659 EA 1.000 1.000 0.000 1.000 $4,500.00 $0.00 $4,500.00
0297 ADD'L.DEPTH IN MANHOLE (5' DIAMETER) 611(B) 2681 VF 5.000 5.000   0.000 $280.00 $0.00 $0.00
0298 ADD'L.DEPTH IN MANHOLE (6' DIAMETER) 611(B) 2682 VF 3.000 3.000   0.000 $400.00 $0.00 $0.00
0299 MANHOLE FRAME & COVER 611(D) 4215 EA 27.000 27.000   0.000 $350.00 $0.00 $0.00
0300 INLET CICI DES. 2 (STD) 611(E) 5112 EA 4.000 4.000 0.000 1.000 $1,800.00 $0.00 $1,800.00
0301 INLET CICI DES. 2 (B) 611(E) 5113 EA 8.000 8.000   0.000 $2,200.00 $0.00 $0.00
0302 INLET CICI DES. 2 (D) 611(E) 5115 EA 9.000 9.000   0.000 $2,400.00 $0.00 $0.00
0303 INLET CICI DES. 2 (2B) 611(E) 5117 EA 2.000 2.000   0.000 $2,400.00 $0.00 $0.00
0304 INLET CICI DES. 3 (B) 611(E) 5121 EA 1.000 1.000   0.000 $3,300.00 $0.00 $0.00
0305 INLET CICI DES. 3 (D) 611(E) 5122 EA 3.000 3.000   0.000 $3,800.00 $0.00 $0.00
0306 INLET CICI DES. 3 (2B) 611(E) 5123 EA 1.000 1.000   0.000 $3,800.00 $0.00 $0.00
0307 INLET CICI DES. 3 (B-D) 611(E) 5124 EA 1.000 1.000   0.000 $4,500.00 $0.00 $0.00
0308 INLET CICI DES. 3 (2D) 611(E) 5125 EA 1.000 1.000 0.000 1.000 $5,000.00 $0.00 $5,000.00
0309 INLET GPI TYPE 1 (DES. 1) 611(E) 5327 EA 3.000 3.000   0.000 $1,600.00 $0.00 $0.00
0310 INLET W/LRG.JCT.BOX,CICI-JB-1,DES.3(B-D) 611(E) 5891 EA 1.000 1.000 0.000 1.000 $7,500.00 $0.00 $7,500.00
0311 INLET W/SMALL JCT.BOX,CICI-JB-1,DES.2 611(E) 5970 EA 3.000 3.000 0.000 3.000 $3,800.00 $0.00 $11,400.00
0312 INLET W/SMALL JCT.BOX,CICI-JB-1,DES.2(B) 611(E) 5972 EA 10.000 10.000 0.000 8.000 $4,200.00 $0.00 $33,600.00
0313 INLET W/SMALL JCT.BOX,CICI-JB-1,DES.2(D) 611(E) 5974 EA 5.000 5.000 0.000 3.000 $4,600.00 $0.00 $13,800.00
0314 INLET W/SMALL JCT.BOX,CICI-JB-1,DES.3(D) 611(E) 5986 EA 1.000 1.000 0.000 1.000 $5,700.00 $0.00 $5,700.00
0315 INLET W/SMALL JCT.BOX,CICI-JB-1,DES.3(2B) 611(E) 5988 EA 2.000 2.000 0.000 1.000 $5,700.00 $0.00 $5,700.00
0316 INLET W/SMALL JCT.BOX,CICI-JB-1,DES.3(B-D) 611(E) 5990 EA 1.000 1.000 0.000 1.000 $6,500.00 $0.00 $6,500.00
0317 INLET CICI DES. 2 (ADD'L DEPTH) 611(F) 5325 VF 74.000 74.000   0.000 $250.00 $0.00 $0.00
0318 INLET CICI DES. 3 (ADD'L DEPTH) 611(F) 5330 VF 24.000 24.000   0.000 $450.00 $0.00 $0.00
0319 INLET GPI TYPE 1 (ADD'L DEPTH) 611(F) 5374 VF 1.000 1.000   0.000 $300.00 $0.00 $0.00
0320 INLET W/LJB,CICI-JB-1,DES.3(ADD'L DEPTH) 611(F) 5882 VF 4.000 4.000   0.000 $1,000.00 $0.00 $0.00
0321 INLET W/SJB,CICI-JB-1,DES.2(ADD'L DEPTH) 611(F) 5970 VF 70.000 70.000   0.000 $400.00 $0.00 $0.00
0322 INLET W/SJB,CICI-JB-1,DES.3(ADD'L DEPTH) 611(F) 5982 VF 16.000 16.000   0.000 $750.00 $0.00 $0.00
0323 INLET FRM&GRT (SSIF-FRM,CIG-GRT-VG-F) 611(G) 4488 EA 130.000 130.000   0.000 $350.00 $0.00 $0.00
0324 JUNCTION BOXES 611(J) 0487 CF 312.000 312.000   0.000 $35.00 $0.00 $0.00
0325 CAST IRON CURB INLETS 611(K) 4488 EA 286.000 286.000   0.000 $250.00 $0.00 $0.00
0326 18" R.C.PIPE CLASS III 613(B) 0491 LF 3,614.000 3,614.000 0.000 1,377.000 $35.00 $0.00 $48,195.00
0327 24" R.C.PIPE CLASS III 613(B) 0492 LF 2,153.000 2,153.000 0.000 1,265.000 $45.00 $0.00 $56,925.00
0328 30" R.C.PIPE CLASS III 613(B) 0493 LF 1,025.000 1,025.000 103.000 750.000 $55.00 $5,665.00 $41,250.00
0329 36" R.C.PIPE CLASS III 613(B) 0494 LF 1,248.000 1,248.000 0.000 883.000 $68.00 $0.00 $60,044.00
0330 TYPE A4 CULVERT END TREATMENT 613(CC) 7186 EA 18.000 18.000   0.000 $900.00 $0.00 $0.00
0331 18" CORR. GALV. STEEL PIPE 613(D) 0689 LF 502.000 502.000 47.000 300.000 $24.00 $1,128.00 $7,200.00
0332 18" PREFAB. CULVERT END SECTION, ROUND 613(M) 5726 EA 17.000 17.000 0.000 2.000 $600.00 $0.00 $1,200.00
0333 24" PREFAB. CULVERT END SECTION, ROUND 613(M) 5730 EA 2.000 2.000   0.000 $700.00 $0.00 $0.00
0334 36" PREFAB. CULVERT END SECTION, ROUND 613(M) 5734 EA 6.000 6.000   0.000 $1,200.00 $0.00 $0.00
0335 TRENCH EXCAVATION 613(S) 1180 CY 6,560.000 6,560.000 154.328 4,469.031 $15.00 $2,314.92 $67,035.47
0336 STANDARD BEDDING MATERIAL 613(T) 1181 CY 3,100.000 3,100.000 65.611 2,082.363 $35.00 $2,296.39 $72,882.71
0337 REMOVAL OF STRUCTURES & OBSTRUCTIONS 619(A) 0920 LSUM 1.000 1.000   0.000 $25,000.00 $0.00 $0.00
0338 REMOVAL OF FENCE 619(B) 4725 LF 14,708.000 14,708.000   8,427.000 $1.00 $0.00 $8,427.00
0339 REMOVAL OF ASPHALT PAVEMENT 619(B) 4728 SY 76,589.000 76,589.000 1,394.730 3,011.620 $2.00 $2,789.46 $6,023.24
0340 REMOVAL OF CONCRETE DRIVEWAY 619(B) 4766 SY 411.000 411.000   0.000 $10.00 $0.00 $0.00
0341 (PL) GATE 624 5920 EA 1.000 1.000   0.000 $5,000.00 $0.00 $0.00
0342 FENCE-STYLE WWF 624(A) 4281 LF 2,377.000 2,377.000   4,717.000 $9.00 $0.00 $42,453.00
0343 (SP)FENCE-STYLE SWF (5 BARBED WIRE) 624(C) 4459 LF 8,278.000 8,278.000   2,780.000 $5.00 $0.00 $13,900.00
0344 REMOVE AND RESET MAILBOX 629(E) 5048 EA 11.000 11.000   0.000 $100.00 $0.00 $0.00
0345 EDGE DRAIN CONDUIT-PERFORATED 653(A) 5915 LF 22,773.000 22,773.000 2,801.000 3,130.000 $5.00 $14,005.00 $15,650.00
0346 EDGE DRAIN OUTLET LATERAL-NONPERFORATED 653(B) 5916 LF 1,080.000 1,080.000 152.000 152.000 $5.00 $760.00 $760.00
0347 OUTLET LATERAL HEADWALL 653(C) 5946 EA 72.000 72.000   0.000 $500.00 $0.00 $0.00
Subtotals For Category     0100/ROADWAY - STPY-058C(240)    $257,871.50 $1,473,075.25
Fed/State Project Number:    STPY-058C(240) Project:    12573(04) Category:    0300/TRAFFIC PERMANENT - STPY-058C(240)
0348 2" PVC SCH.40 PLASTIC CONDUIT TRENCHED 802(B) 8342 LF 44.000 44.000   0.000 $5.00 $0.00 $0.00
0349 3" PVC SCH.40 PLASTIC CONDUIT BORED 802(B) 8344 LF 344.000 344.000   0.000 $19.00 $0.00 $0.00
0350 3" PVC SCH.40 PLASTIC CONDUIT TRENCHED 802(B) 8346 LF 6.000 6.000 0.000 212.000 $9.00 $0.00 $1,908.00
0351 PULL BOX(SIZE I) 803 8065 EA 3.000 3.000   0.000 $200.00 $0.00 $0.00
0352 PULL BOX(SIZE II) 803 8066 EA 1.000 1.000   0.000 $250.00 $0.00 $0.00
0353 STRUCTURAL CONCRETE 804(A) 2915 CY 11.600 11.600   0.000 $430.00 $0.00 $0.00
0354 REINFORCING STEEL 804(B) 2916 LB 1,767.000 1,767.000   0.000 $1.00 $0.00 $0.00
0355 32'MH POLE 45'TS & 15'LMA(G.STL.) 806(A) 8324 EA 1.000 1.000   0.000 $7,000.00 $0.00 $0.00
0356 32'MH POLE 40'TS & 15'LMA(G.STL.) 806(A) 8333 EA 2.000 2.000   0.000 $6,000.00 $0.00 $0.00
0357 32'MH POLE 35'TS & 15'LMA(G.STL.) 806(A) 8334 EA 1.000 1.000   0.000 $5,400.00 $0.00 $0.00
0358 1/C NO.6 ELECTRICAL CONDUCTOR 811 8040 LF 93.000 93.000   0.000 $2.00 $0.00 $0.00
0359 1/C NO.10 ELECTRICAL CONDUCTOR 811 8044 LF 1,556.000 1,556.000   0.000 $0.45 $0.00 $0.00
0360 VEH.ACT.SOL.ST.TRAF.SIG.CON.ASM 825 8550 EA 1.000 1.000   0.000 $10,000.00 $0.00 $0.00
0361 (PL)DETECTION SYSTEM (VIDEO) 828 8132 LSUM 1.000 1.000   0.000 $18,000.00 $0.00 $0.00
0362 1WAY 3SEC. ADJ. SIG. HD. S-6 831 8231 EA 8.000 8.000   0.000 $600.00 $0.00 $0.00
0363 BACKPLATE 833 3030 EA 8.000 8.000   0.000 $70.00 $0.00 $0.00
0364 5/C TRAF.SIG.ELECT.CABLE 834(A) 8207 LF 384.000 384.000   0.000 $1.30 $0.00 $0.00
0365 7/C TRAF.SIG.ELECT.CABLE 834(A) 8208 LF 260.000 260.000   0.000 $1.50 $0.00 $0.00
0366 12/C TRAF.SIG.ELECT.CABLE 834(A) 8210 LF 570.000 570.000   0.000 $2.30 $0.00 $0.00
0367 (PL)E.P.S. OPTICAL DETECTOR 840(B) 8593 EA 4.000 4.000   0.000 $550.00 $0.00 $0.00
0368 (PL)E.P.S. OPTICAL DETECTOR CABLE 840(C) 8594 LF 723.000 723.000   0.000 $1.50 $0.00 $0.00
0369 (PL)E.P.S. 4 CHANNEL PHASE SELECTOR 840(D) 8598 EA 1.000 1.000   0.000 $2,600.00 $0.00 $0.00
0370 SHEET ALUMINUM SIGNS 850(A) 8110 SF 197.320 197.320   0.000 $12.00 $0.00 $0.00
0371 MAST ARM MOUNTED SIGNS(ALUMINUM) 850(C) 8118 SF 25.500 25.500   0.000 $40.00 $0.00 $0.00
0372 2 1/4" SQUARE TUBE POST 851(C) 8327 LF 722.000 722.000   0.000 $8.00 $0.00 $0.00
0373 2 1/2" SQUARE TUBE POST 851(C) 8330 LF 156.000 156.000   0.000 $9.00 $0.00 $0.00
0374 (SP)TRAFFIC STRIPE (MULTI-POLYMER)(SYMBOLS, WORDS. ETC.) 854(C) 8525 EA 4.000 4.000   0.000 $270.00 $0.00 $0.00
0375 (SP)TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) 854(C) 8530 LF 825.000 825.000   0.000 $0.65 $0.00 $0.00
0376 (SP)TRAFFIC STRIPE(MULTI-POLYMER)(24" WIDE) 854(C) 8555 LF 380.000 380.000   0.000 $13.00 $0.00 $0.00
0377 TRAFFIC STRIPE(PLASTIC)(4" WIDE) 855(A) 8812 LF 43,111.000 43,111.000   0.000 $0.65 $0.00 $0.00
0378 TRAFFIC STRIPE(PLASTIC)(8" WIDE) 855(A) 8814 LF 1,079.000 1,079.000   0.000 $2.15 $0.00 $0.00
0379 TRAFFIC STRIPE(PLASTIC)(24" WIDE) 855(A) 8825 LF 101.000 101.000   0.000 $5.00 $0.00 $0.00
0380 TRAFFIC STRIPE(PLASTIC)(ARROWS) 855(B) 8818 EA 92.000 92.000   0.000 $70.00 $0.00 $0.00
0381 TRAFFIC STRIPE(PLASTIC)(WORDS) 855(B) 8821 EA 9.000 9.000   0.000 $130.00 $0.00 $0.00
0382 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) 859(A) 8006 LF 1,294.000 1,294.000   0.000 $1.10 $0.00 $0.00
0383 (PL)REMOVAL OF EXISTING SIGNS 890(A) 8724 EA 13.000 13.000   0.000 $55.00 $0.00 $0.00
0384 (PL)REMOVE & RESET EXISTING SIGNS 890A/B 8756 EA 73.000 73.000   0.000 $110.00 $0.00 $0.00
Subtotals For Category     0300/TRAFFIC PERMANENT - STPY-058C(240)    $0.00 $1,908.00
Fed/State Project Number:    STPY-058C(240) Project:    12573(04) Category:    0301/TRAFFIC TEMPORARY - STPY-058C(240)
0385 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) 856(A) 8839 LF 38,828.000 38,828.000   0.000 $0.25 $0.00 $0.00
0386 CONSTRUCTION SIGNS 0 TO 6.25 SF 880(B) 8818 SD 12,370.000 12,370.000 555.000 5,860.000 $0.55 $305.25 $3,223.00
0387 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF 880(B) 8821 SD 11,670.000 11,670.000 78.000 738.000 $0.55 $42.90 $405.90
0388 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF 880(B) 8824 SD 17,400.000 17,400.000 377.000 3,466.000 $1.35 $508.95 $4,679.10
0389 BARRICADES(TYPE III) 880(C) 8842 SD 8,610.000 8,610.000 198.000 1,138.000 $0.30 $59.40 $341.40
0390 WING BARRICADES 880(C) 8848 SD 4,240.000 4,240.000 60.000 720.000 $0.30 $18.00 $216.00
0391 WARNING LIGHTS(TYPE A) 880(E) 8860 SD 32,190.000 32,190.000 561.000 4,256.000 $0.11 $61.71 $468.16
0392 WARNING LIGHTS(TYPE C) 880(E) 8872 SD 85,630.000 85,630.000   0.000 $0.02 $0.00 $0.00
0393 DRUMS 880(F) 8878 SD 85,630.000 85,630.000 180.000 816.000 $0.15 $27.00 $122.40
0394 FLAGGER 880(I) 8902 SD 6.000 6.000   0.000 $150.00 $0.00 $0.00
Subtotals For Category     0301/TRAFFIC TEMPORARY - STPY-058C(240)    $1,023.21 $9,455.96
Subtotals For Project STPY-058C(240) /12573(04) $258,894.71 $1,484,439.21