Fed/State Project Number: STPY-110B(108)SS |
Project: 20231(04) |
Category: 0100/ROADWAY |
0001 |
CLEARING AND GRUBBING |
201 0102 |
LSUM |
1.000 |
1.000 |
0.500 |
0.900 |
$26,000.00 |
$13,000.00 |
$23,400.00 |
0002 |
UNCLASSIFIED EXCAVATION |
202(A) 0183 |
CY |
169,148.920 |
169,148.920 |
30,635.100 |
151,740.100 |
$2.60 |
$79,651.26 |
$394,524.26 |
0003 |
TYPE A-SALVAGED TOPSOIL |
205 4229 |
LSUM |
1.000 |
1.000 |
0.250 |
0.600 |
$46,000.00 |
$11,500.00 |
$27,600.00 |
0004 |
TEMPORARY SILT FENCE |
223 2801 |
LF |
1,650.000 |
1,650.000 |
|
1,954.000 |
$1.80 |
$0.00 |
$3,517.20 |
0005 |
TEMPORARY SEDIMENT FILTER |
224 2803 |
EA |
2.000 |
2.000 |
|
0.000 |
$205.00 |
$0.00 |
$0.00 |
0006 |
TEMPORARY SILT DIKE |
227 0100 |
LF |
1,106.000 |
1,106.000 |
|
273.000 |
$8.24 |
$0.00 |
$2,249.52 |
0007 |
SOLID SLAB SODDING |
230(A) 2806 |
SY |
125,777.000 |
125,777.000 |
|
0.000 |
$1.32 |
$0.00 |
$0.00 |
0008 |
MULCH SODDING |
230(B) 2807 |
SY |
29,400.000 |
29,400.000 |
|
0.000 |
$1.32 |
$0.00 |
$0.00 |
0009 |
SEEDING METHOD B |
232(B) 2814 |
AC |
26.000 |
26.000 |
|
0.000 |
$455.00 |
$0.00 |
$0.00 |
0010 |
VEGETATIVE MULCHING |
233(A) 2817 |
AC |
26.000 |
26.000 |
|
6.850 |
$455.00 |
$0.00 |
$3,116.75 |
0011 |
(PL)ROCK FILTER DAM, TYPE 4 |
235(D) 0103 |
CY |
150.000 |
150.000 |
|
0.000 |
$60.00 |
$0.00 |
$0.00 |
0012 |
MOWING |
241 2832 |
AC |
120.000 |
120.000 |
|
0.000 |
$60.00 |
$0.00 |
$0.00 |
0013 |
(SP)FLY ASH |
327(A) 4200 |
TON |
7,455.000 |
7,455.000 |
25.860 |
1,154.180 |
$55.00 |
$1,422.30 |
$63,479.90 |
0014 |
(SP)LIME |
327(D) 4230 |
TON |
981.000 |
981.000 |
|
0.000 |
$155.00 |
$0.00 |
$0.00 |
0015 |
(SP)CEMENTITIOUS STABILIZED SUBGRADE |
327(E) 4240 |
SY |
171,977.000 |
171,977.000 |
1,147.960 |
50,382.640 |
$1.65 |
$1,894.13 |
$83,131.35 |
0016 |
(SP)LIME PRETREATMENT |
327(G) 4260 |
SY |
67,985.000 |
67,985.000 |
|
0.000 |
$0.90 |
$0.00 |
$0.00 |
0017 |
TRAFFIC BOUND SURFACE COURSE TYPE E |
403(E) 0225 |
TON |
3,795.870 |
3,795.870 |
148.890 |
1,641.750 |
$18.00 |
$2,680.02 |
$29,551.50 |
0018 |
TACK COAT |
407 0250 |
GAL |
26,594.000 |
26,594.000 |
1,775.000 |
3,162.500 |
$2.00 |
$3,550.00 |
$6,325.00 |
0019 |
PRIME COAT |
408 5774 |
GAL |
38,927.000 |
38,927.000 |
|
0.000 |
$3.00 |
$0.00 |
$0.00 |
0020 |
(SP)ASPHALT CONCRETE TYPE S3(PG 76-28 OK) |
411(S3) 5935 |
TON |
20,828.000 |
20,828.000 |
490.030 |
2,523.990 |
$53.00 |
$25,971.59 |
$133,771.47 |
0021 |
(SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) |
411(S3) 5945 |
TON |
74,234.000 |
74,234.000 |
9,614.500 |
16,377.890 |
$42.00 |
$403,809.00 |
$687,871.38 |
0022 |
(SP)ASPHALT CONCRETE TYPE S4(PG 76-28 OK) |
411(S4) 5950 |
TON |
13,884.000 |
13,884.000 |
|
0.000 |
$66.00 |
$0.00 |
$0.00 |
0023 |
(SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) |
411(S4) 5960 |
TON |
6,211.000 |
6,211.000 |
0.000 |
154.020 |
$58.00 |
$0.00 |
$8,933.16 |
0024 |
STRUCTURAL EXCAVATION UNCLASSIFIED |
501(A) 0313 |
CY |
50.000 |
50.000 |
|
14.440 |
$10.25 |
$0.00 |
$148.01 |
0025 |
CLASS AA CONCRETE |
509(A) 0319 |
CY |
150.000 |
150.000 |
|
143.390 |
$285.00 |
$0.00 |
$40,866.15 |
0026 |
CLASS A CONCRETE FOR SMALL STRUCTURES |
509(C) 0322 |
CY |
18.000 |
18.000 |
|
5.030 |
$285.00 |
$0.00 |
$1,433.55 |
0027 |
CLASS C CONCRETE |
509(D) 0325 |
CY |
2,520.000 |
2,520.000 |
0.000 |
200.030 |
$200.00 |
$0.00 |
$40,006.00 |
0028 |
REINFORCING STEEL |
511(A) 0332 |
LB |
24,971.830 |
24,971.830 |
|
14,465.460 |
$0.76 |
$0.00 |
$10,993.74 |
0029 |
TYPE I PLAIN RIPRAP |
601(A) 0297 |
TON |
186.390 |
186.390 |
218.630 |
218.630 |
$32.00 |
$6,996.16 |
$6,996.16 |
0030 |
TYPE I-A FILTER BLANKET |
601(A-2)1355 |
TON |
177.920 |
177.920 |
48.070 |
48.070 |
$30.00 |
$1,442.10 |
$1,442.10 |
0031 |
COMBINED CURB & GUTTER (6" BARRIER) |
609(B) 0383 |
LF |
200.000 |
200.000 |
|
0.000 |
$30.00 |
$0.00 |
$0.00 |
0032 |
INLET (SMD-TYPE 2) |
611(E) 6002 |
EA |
4.000 |
4.000 |
|
1.000 |
$2,100.00 |
$0.00 |
$2,100.00 |
0033 |
JUNCTION BOXES |
611(J) 0487 |
CF |
267.960 |
267.960 |
|
0.000 |
$41.00 |
$0.00 |
$0.00 |
0034 |
18" R.C.PIPE CLASS III |
613(B) 0491 |
LF |
215.000 |
215.000 |
|
0.000 |
$30.00 |
$0.00 |
$0.00 |
0035 |
24" R.C.PIPE CLASS III |
613(B) 0492 |
LF |
68.000 |
68.000 |
|
0.000 |
$42.00 |
$0.00 |
$0.00 |
0036 |
30" R.C.PIPE CLASS III |
613(B) 0493 |
LF |
150.000 |
150.000 |
|
150.000 |
$60.00 |
$0.00 |
$9,000.00 |
0037 |
36" R.C.PIPE CLASS III |
613(B) 0494 |
LF |
279.000 |
279.000 |
|
0.000 |
$115.00 |
$0.00 |
$0.00 |
0038 |
42" R.C.PIPE CLASS III |
613(B) 0495 |
LF |
242.000 |
242.000 |
|
0.000 |
$95.00 |
$0.00 |
$0.00 |
0039 |
26" X 15" R.C.PIPE ARCH CLASS A-III |
613(B) 4404 |
LF |
898.000 |
898.000 |
288.000 |
288.000 |
$47.00 |
$13,536.00 |
$13,536.00 |
0040 |
22" X 13" R.C.PIPE ARCH CLASS A-III |
613(B) 4495 |
LF |
1,104.000 |
1,104.000 |
220.000 |
386.000 |
$40.00 |
$8,800.00 |
$15,440.00 |
0041 |
28" X 18" R.C.PIPE ARCH CLASS A-III |
613(B) 4496 |
LF |
454.000 |
454.000 |
228.000 |
228.000 |
$52.00 |
$11,856.00 |
$11,856.00 |
0042 |
36" X 22" R.C.PIPE ARCH CLASS A-III |
613(B) 4497 |
LF |
114.000 |
114.000 |
56.000 |
114.000 |
$65.00 |
$3,640.00 |
$7,410.00 |
0043 |
58" X 36" R.C.PIPE ARCH CLASS A-III |
613(B) 4500 |
LF |
56.000 |
56.000 |
-56.000 |
0.000 |
$135.00 |
$-7,560.00 |
$0.00 |
0044 |
TYPE A6 CULVERT END TREATMENT |
613(CC) 7196 |
EA |
84.000 |
84.000 |
2.000 |
30.000 |
$725.00 |
$1,450.00 |
$21,750.00 |
0045 |
TYPE B6 CULVERT END TREATMENT |
613(CC) 7197 |
EA |
45.000 |
45.000 |
4.000 |
6.000 |
$825.00 |
$3,300.00 |
$4,950.00 |
0046 |
TYPE D6 CULVERT END TREATMENT |
613(CC) 7199 |
EA |
2.000 |
2.000 |
|
2.000 |
$1,050.00 |
$0.00 |
$2,100.00 |
0047 |
TYPE AA6 CULVERT END TREATMENT |
613(CC) 7201 |
EA |
24.000 |
24.000 |
|
4.000 |
$1,525.00 |
$0.00 |
$6,100.00 |
0048 |
TYPE BB6 CULVERT END TREATMENT |
613(CC) 7202 |
EA |
22.000 |
22.000 |
|
0.000 |
$2,100.00 |
$0.00 |
$0.00 |
0049 |
18" CORR. GALV. STEEL PIPE |
613(D) 0689 |
LF |
1,794.000 |
1,794.000 |
|
740.000 |
$24.00 |
$0.00 |
$17,760.00 |
0050 |
24" CORR. GALV. STEEL PIPE |
613(D) 0690 |
LF |
422.000 |
422.000 |
|
196.000 |
$28.00 |
$0.00 |
$5,488.00 |
0051 |
30" CORR. GALV. STEEL PIPE |
613(D) 0691 |
LF |
3.000 |
3.000 |
|
0.000 |
$82.00 |
$0.00 |
$0.00 |
0052 |
21" X 15" CORR. GALV. STEEL PIPE ARCH |
613(D) 4527 |
LF |
890.000 |
890.000 |
|
392.000 |
$22.00 |
$0.00 |
$8,624.00 |
0053 |
28" X 20" CORR. GALV. STEEL PIPE ARCH |
613(D) 4528 |
LF |
664.000 |
664.000 |
|
0.000 |
$29.00 |
$0.00 |
$0.00 |
0054 |
64" X 43" CORR. GALV. STEEL PIPE ARCH |
613(D) 4533 |
LF |
84.000 |
84.000 |
|
84.000 |
$85.00 |
$0.00 |
$7,140.00 |
0055 |
24" X 18" CORR. GALV. STEEL PIPE ARCH |
613(D) 5168 |
LF |
306.000 |
306.000 |
|
0.000 |
$25.00 |
$0.00 |
$0.00 |
0056 |
58" X 36" PREFAB. CULVERT END SECTION, ARCH |
613(M) 4546 |
EA |
1.000 |
1.000 |
|
0.000 |
$2,800.00 |
$0.00 |
$0.00 |
0057 |
24" PREFAB. CULVERT END SECTION, ROUND |
613(M) 5730 |
EA |
1.000 |
1.000 |
|
0.000 |
$550.00 |
$0.00 |
$0.00 |
0058 |
30" PREFAB. CULVERT END SECTION, ROUND |
613(M) 5732 |
EA |
1.000 |
1.000 |
|
1.000 |
$620.00 |
$0.00 |
$620.00 |
0059 |
36" PREFAB. CULVERT END SECTION, ROUND |
613(M) 5734 |
EA |
3.000 |
3.000 |
|
0.000 |
$1,060.00 |
$0.00 |
$0.00 |
0060 |
42" PREFAB. CULVERT END SECTION, ROUND |
613(M) 5736 |
EA |
2.000 |
2.000 |
|
0.000 |
$1,370.00 |
$0.00 |
$0.00 |
0061 |
6" PERFORATED PIPE UNDERDRAIN ROUND |
613(P) 1091 |
LF |
64.000 |
64.000 |
|
0.000 |
$36.00 |
$0.00 |
$0.00 |
0062 |
6" NON-PERF.PIPE UNDERDRAIN RND. |
613(Q) 1096 |
LF |
10.000 |
10.000 |
|
0.000 |
$31.00 |
$0.00 |
$0.00 |
0063 |
BORE & JACK 42" CASING |
613(U) 0600 |
LF |
203.000 |
203.000 |
|
0.000 |
$490.00 |
$0.00 |
$0.00 |
0064 |
BORE AND JACK 36" CASING |
616(U) 6230 |
LF |
145.000 |
145.000 |
|
0.000 |
$440.00 |
$0.00 |
$0.00 |
0065 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS |
619(A) 0920 |
LSUM |
1.000 |
1.000 |
0.200 |
0.400 |
$30,000.00 |
$6,000.00 |
$12,000.00 |
0066 |
REMOVAL OF ASPHALT PAVEMENT |
619(B) 4728 |
SY |
37,135.000 |
37,135.000 |
2,396.680 |
5,743.680 |
$3.00 |
$7,190.04 |
$17,231.04 |
0067 |
REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY |
619(B) 4763 |
SY |
16,300.000 |
16,300.000 |
|
0.000 |
$6.00 |
$0.00 |
$0.00 |
0068 |
(PL)REMOVE AND RESET CATTLE GUARD |
619(B) 8610 |
EA |
1.000 |
1.000 |
|
1.000 |
$3,100.00 |
$0.00 |
$3,100.00 |
0069 |
SAWING PAVEMENT |
619(C) 0924 |
LF |
1,175.000 |
1,175.000 |
202.000 |
202.000 |
$3.00 |
$606.00 |
$606.00 |
0070 |
BEAM GUARD RAIL-W-BEAM-SINGLE |
623(A) 0932 |
LF |
350.000 |
350.000 |
|
0.000 |
$14.25 |
$0.00 |
$0.00 |
0071 |
THRIE BEAM BRIDGE CONNECTION-TYPE A |
623(E) 7114 |
EA |
2.000 |
2.000 |
|
0.000 |
$1,375.00 |
$0.00 |
$0.00 |
0072 |
(SP)G.E.T. GUARD RAIL END SECTION |
623(H) 8571 |
EA |
2.000 |
2.000 |
|
0.000 |
$2,100.00 |
$0.00 |
$0.00 |
0073 |
FENCE-STYLE WWF |
624(A) 4281 |
LF |
2,740.280 |
2,740.280 |
|
0.000 |
$4.10 |
$0.00 |
$0.00 |
0074 |
GATES-STYLE WWF (4.5'HIGH X 20'LONG) |
624(B) 5264 |
EA |
3.000 |
3.000 |
|
0.000 |
$475.00 |
$0.00 |
$0.00 |
0075 |
(SP)FENCE-STYLE SWF (5 BARBED WIRE) |
624(C) 4459 |
LF |
5,375.260 |
5,375.260 |
0.000 |
1,057.000 |
$4.10 |
$0.00 |
$4,333.70 |
0076 |
FENCE-STYLE CLF (4'HIGH, CLASS A) |
624(D) 4288 |
LF |
1,438.520 |
1,438.520 |
|
0.000 |
$9.50 |
$0.00 |
$0.00 |
0077 |
GATES-STYLE CLF (4'HIGH X 18'LONG) |
624(E) 5852 |
EA |
2.000 |
2.000 |
|
0.000 |
$670.00 |
$0.00 |
$0.00 |
0078 |
DELIVER PORTABLE TYPE PRECAST CONCRETE MEDIAN BARRIER |
627(H) 5856 |
LF |
200.000 |
200.000 |
|
345.000 |
$20.00 |
$0.00 |
$6,900.00 |
0079 |
MAILBOX INSTALLATION-SINGLE |
629(A) 4958 |
EA |
23.000 |
23.000 |
|
0.000 |
$56.00 |
$0.00 |
$0.00 |
0080 |
MAILBOX INSTALLATION-MULTIPLE |
629(B) 4959 |
EA |
11.000 |
11.000 |
|
0.000 |
$157.00 |
$0.00 |
$0.00 |
0081 |
MAILBOX |
629(C) 4960 |
EA |
56.000 |
56.000 |
|
0.000 |
$15.25 |
$0.00 |
$0.00 |
0082 |
REMOVAL OF MAILBOX INSTALLATION |
629(D) 4961 |
EA |
56.000 |
56.000 |
|
0.000 |
$5.25 |
$0.00 |
$0.00 |
0083 |
(PL)IMPACT ATTENUATOR |
871 8325 |
EA |
1.000 |
1.000 |
|
0.000 |
$11,200.00 |
$0.00 |
$0.00 |
Subtotals For Category 0100/ROADWAY |
$600,734.60 |
$1,747,401.94 |
|
Fed/State Project Number: STPY-110B(108)SS |
Project: 20231(04) |
Category: 0201/BRIDGE 'B' |
0092 |
UNCLASSIFIED EXCAVATION |
202(A) 1301 |
CY |
4,500.000 |
4,500.000 |
|
2,250.000 |
$5.25 |
$0.00 |
$11,812.50 |
0093 |
SUBSTRUCTURE EXCAVATION COMMON |
501(B) 1307 |
CY |
150.000 |
150.000 |
|
75.000 |
$10.50 |
$0.00 |
$787.50 |
0094 |
CLSM BACKFILL |
501(G) 6309 |
CY |
292.000 |
292.000 |
|
115.000 |
$112.00 |
$0.00 |
$12,880.00 |
0095 |
PRESTRESSED CONCRETE BEAMS (TYPE III) |
503(A) 1312 |
LF |
1,431.000 |
1,431.000 |
|
640.000 |
$165.00 |
$0.00 |
$105,600.00 |
0096 |
APPROACH SLAB |
504(A) 1304 |
SY |
449.000 |
449.000 |
|
67.360 |
$165.00 |
$0.00 |
$11,114.40 |
0097 |
CONCRETE RAIL (TR4) |
504(E) 6245 |
LF |
417.000 |
417.000 |
|
208.500 |
$61.00 |
$0.00 |
$12,718.50 |
0098 |
STRUCTURAL STEEL |
506(A) 1322 |
LB |
2,400.000 |
2,400.000 |
|
872.000 |
$2.60 |
$0.00 |
$2,267.20 |
0099 |
CLASS AA CONCRETE |
509(A) 1326 |
CY |
440.700 |
440.700 |
|
177.820 |
$465.00 |
$0.00 |
$82,686.30 |
0100 |
CLASS A CONCRETE |
509(B) 1328 |
CY |
221.400 |
221.400 |
|
99.050 |
$465.00 |
$0.00 |
$46,058.25 |
0101 |
CLASS C CONCRETE |
509(D) 1331 |
CY |
25.000 |
25.000 |
|
0.000 |
$310.00 |
$0.00 |
$0.00 |
0102 |
(PL)MECHANICAL SPLICES |
511 6306 |
EA |
56.000 |
56.000 |
|
0.000 |
$31.00 |
$0.00 |
$0.00 |
0103 |
REINFORCING STEEL |
511(A) 1332 |
LB |
1,300.000 |
1,300.000 |
|
520.000 |
$0.81 |
$0.00 |
$421.20 |
0104 |
EPOXY COATED REINFORCING STEEL |
511(B) 6010 |
LB |
131,080.000 |
131,080.000 |
|
18,238.180 |
$0.96 |
$0.00 |
$17,508.65 |
0105 |
PILES, FURNISHED (HP 10X42) |
514(A) 6010 |
LF |
1,540.000 |
1,540.000 |
|
1,540.000 |
$22.50 |
$0.00 |
$34,650.00 |
0106 |
PILES, DRIVEN (HP 10X42) |
514(B) 6292 |
LF |
1,540.000 |
1,540.000 |
|
631.190 |
$7.00 |
$0.00 |
$4,418.33 |
0107 |
WATER REPELLENT (VISUALLY INSPECTED) |
515(A) 6013 |
SY |
936.000 |
936.000 |
|
0.000 |
$4.00 |
$0.00 |
$0.00 |
0108 |
DRILLED SHAFTS 48" DIAMETER |
516(A) 6094 |
LF |
540.000 |
540.000 |
|
216.000 |
$545.00 |
$0.00 |
$117,720.00 |
0109 |
(SP) SEALER CRACK PREPARATION |
523(A) 6550 |
LF |
331.000 |
331.000 |
|
0.000 |
$5.00 |
$0.00 |
$0.00 |
0110 |
(SP) SEALER RESIN |
523(B) 6560 |
GAL |
3.700 |
3.700 |
|
0.000 |
$155.00 |
$0.00 |
$0.00 |
0111 |
(PL)FIXED BEARING ASSEMBLY |
535 6164 |
EA |
18.000 |
18.000 |
|
8.000 |
$260.00 |
$0.00 |
$2,080.00 |
0112 |
(PL)EXPANSION BEARING ASSEMBLY |
535 6165 |
EA |
36.000 |
36.000 |
|
16.000 |
$620.00 |
$0.00 |
$9,920.00 |
0113 |
(PL)ELASTOMERIC BEARING PADS |
535 6282 |
EA |
36.000 |
36.000 |
|
16.000 |
$320.00 |
$0.00 |
$5,120.00 |
0114 |
TYPE I-A PLAIN RIPRAP |
601(A-1)1353 |
TON |
2,470.000 |
2,470.000 |
385.920 |
1,076.960 |
$31.00 |
$11,963.52 |
$33,385.76 |
0115 |
TYPE I-A FILTER BLANKET |
601(A-2)1355 |
TON |
525.000 |
525.000 |
|
313.920 |
$30.00 |
$0.00 |
$9,417.60 |
0116 |
6" PERFORATED PIPE UNDERDRAIN ROUND |
613(P) 6204 |
LF |
172.000 |
172.000 |
0.000 |
70.000 |
$52.00 |
$0.00 |
$3,640.00 |
0117 |
6" NON-PERF.PIPE UNDERDRAIN RND. |
613(Q) 6207 |
LF |
70.000 |
70.000 |
0.000 |
70.000 |
$52.00 |
$0.00 |
$3,640.00 |
0118 |
REMOVAL OF EXISTING BRIDGE STRUCTURE |
619(D) 1397 |
LSUM |
1.000 |
1.000 |
|
0.000 |
$46,000.00 |
$0.00 |
$0.00 |
Subtotals For Category 0201/BRIDGE 'B' |
$11,963.52 |
$527,846.19 |
|
Fed/State Project Number: STPY-110B(108)SS |
Project: 20231(04) |
Category: 0300/TRAFFIC CONTROL |
0119 |
RELOCATION OF RENTED PORTABLE TYPE PRECAST CONCRETE MEDIAN |
627(O) 4410 |
LF |
2,275.000 |
2,275.000 |
345.000 |
345.000 |
$4.40 |
$1,518.00 |
$1,518.00 |
0120 |
RENTED PORTABLE TYPE PRECAST CONCRETE MEDIAN BARRIER |
627(P) 4425 |
LF |
2,475.000 |
2,475.000 |
|
0.000 |
$33.00 |
$0.00 |
$0.00 |
0121 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) |
856(A) 8839 |
LF |
80,000.000 |
80,000.000 |
|
6,107.000 |
$0.08 |
$0.00 |
$488.56 |
0122 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 |
856(G) 8887 |
EA |
2,000.000 |
2,000.000 |
|
0.000 |
$1.00 |
$0.00 |
$0.00 |
0123 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) |
859(A) 8006 |
LF |
17,000.000 |
17,000.000 |
|
3,780.000 |
$0.26 |
$0.00 |
$982.80 |
0124 |
(PL)CONST.ZONE IMPACT ATTEN. |
871 8705 |
SD |
1,980.000 |
1,980.000 |
16.000 |
61.000 |
$4.00 |
$64.00 |
$244.00 |
0125 |
MODULAR GLARE SCREEN |
878(C) 8487 |
SD |
18,480.000 |
18,480.000 |
|
0.000 |
$0.26 |
$0.00 |
$0.00 |
0126 |
ARROW DISPLAY(TYPE C) |
880(A) 8812 |
SD |
660.000 |
660.000 |
16.000 |
96.000 |
$2.00 |
$32.00 |
$192.00 |
0127 |
CONSTRUCTION SIGNS 0 TO 6.25 SF |
880(B) 8818 |
SD |
6,600.000 |
6,600.000 |
144.000 |
182.000 |
$0.25 |
$36.00 |
$45.50 |
0128 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF |
880(B) 8821 |
SD |
42,230.000 |
42,230.000 |
144.000 |
1,203.000 |
$0.10 |
$14.40 |
$120.30 |
0129 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF |
880(B) 8824 |
SD |
14,520.000 |
14,520.000 |
240.000 |
2,011.000 |
$2.05 |
$492.00 |
$4,122.55 |
0130 |
BARRICADES(TYPE III) |
880(C) 8842 |
SD |
44,220.000 |
44,220.000 |
128.000 |
677.000 |
$0.10 |
$12.80 |
$67.70 |
0131 |
WING BARRICADES |
880(C) 8848 |
SD |
1,320.000 |
1,320.000 |
64.000 |
420.000 |
$2.05 |
$131.20 |
$861.00 |
0132 |
VERTICAL PANELS |
880(D) 8854 |
SD |
11,550.000 |
11,550.000 |
|
0.000 |
$0.25 |
$0.00 |
$0.00 |
0133 |
WARNING LIGHTS(TYPE A) |
880(E) 8860 |
SD |
93,390.000 |
93,390.000 |
608.000 |
3,315.000 |
$0.02 |
$12.16 |
$66.30 |
0134 |
WARNING LIGHTS(TYPE C) |
880(E) 8872 |
SD |
39,600.000 |
39,600.000 |
480.000 |
2,085.000 |
$0.05 |
$24.00 |
$104.25 |
0135 |
DRUMS |
880(F) 8878 |
SD |
28,050.000 |
28,050.000 |
480.000 |
1,989.000 |
$0.20 |
$96.00 |
$397.80 |
0136 |
TUBE CHANNELIZERS |
880(G) 8884 |
SD |
6,600.000 |
6,600.000 |
832.000 |
5,746.000 |
$0.26 |
$216.32 |
$1,493.96 |
0137 |
PORT.CHANGEABLE MESSAGE SIGN |
882(B) 8306 |
SD |
660.000 |
660.000 |
|
0.000 |
$7.50 |
$0.00 |
$0.00 |
Subtotals For Category 0300/TRAFFIC CONTROL |
$2,648.88 |
$10,704.72 |
|