Contract ID: | 100253 | Estimate Number: | 0019 | Contract No: | 610483 | |||
Residency: | WEWOKA (03300) | Estimate Type: | Progressive | Account No: | 400300 | |||
Project Number(s): | IMY-0040-5(415)206, HSIPIG-0040-5(405)203TR | ||||||||||||
Primary Job Piece No: | 13626(07) | ||||||||||||
Contract Description: | PAVEMENT REHABILITATION AND CABLE BARRIER I-40: FROM MILE MARKER 203, EXTEND EAST TO MILE MARKER 213. PROJECT LENGTH = 6.016 MILES. | ||||||||||||
Primary County: | SEMINOLE | ||||||||||||
Name of Road: | I-40 | ||||||||||||
Prime Contractor: | DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC JV | ||||||||||||
P.O. BOX 3788 | |||||||||||||
EDMOND , OK 73083 | |||||||||||||
Surety Company: | LIBERTY MUTUAL INSURANCE COMPANY | ||||||||||||
Date Let: | 08/19/2010 | NTP Effective Date: | 01/03/2011 | Pay Period: | 09/01/2011 TO 09/15/2011 |
Date Awarded: | 09/07/2010 | Date Work Began: | 11/15/2010 | Original Contract Time: | 450 |
Date Contract Executed: | 09/20/2010 | Date Time Stopped: | Current Time Charged: | 305.00 | |
Date NTP Issued: | 09/27/2010 | Completion Date: | Current Time Allowed: | 471.00 | |
General Liability Expires: | 03/01/2012 | Workman's Comp Expires: | 03/01/2012 | Percent Time Used: | 64.76 % |
Specification Year: | 1999 | Date Approved: | 09/20/2011 | ||
Current Contract Amount: | $25,152,835.85 | Total to Date | Prev to Date | This Estimate | |||
Bid Amount: | $24,933,232.28 | Participating: | $13,364,101.28 | $13,030,048.01 | $334,053.27 | ||
Percent Complete: | 53.27 % | Non Participating: | $0.00 | $0.00 | $0.00 | ||
Funds Available: | $11,752,722.18 | Total Earnings: | $13,364,101.28 | $13,030,048.01 | $334,053.27 | ||
Unearned Balance: | $11,533,118.61 | Stockpiled Materials: | $27,509.10 | $60,846.89 | $-33,337.79 | ||
Gross Earnings: | $13,391,610.38 | $13,090,894.90 | $300,715.48 | ||||
Other Adjustments: | $8,503.29 | $8,503.29 | $0.00 | ||||
Liq Dam/Disincentive: | $0.00 | $0.00 | $0.00 | ||||
TOTAL: | $13,400,113.67 | $13,099,398.19 | $300,715.48 |
Contract ID: | 100253 | Estimate Number: | 0019 | Primary JP: | 13626(07) | |||
CHANGE ORDER HISTORY | |||||
Change Order Nbr. | Change Order Description | Status | Approval Date | Contract Time Adjustment | Total Change Order Amount |
001 | Changing excavation from measure qty.. to plan quantity. | Approved | 12/03/2010 | 0.0 | $0.00 |
003 | Adding Pavement Smoothness to the Contract | Approved | 02/24/2011 | 0.0 | $0.00 |
004 | Reduce qty. for flyash & add one revised pat item. | Approved | 04/08/2011 | 0.0 | $10,622.67 |
005 | Add additional depth & increase qty for 4 items. | Approved | 06/03/2011 | 0.0 | $153,980.90 |
006 | Adding new item (Patching Reclassified) to the contractor. | Approved | 07/11/2011 | 0.0 | $55,000.00 |
007 | add retaining wall, cl.a conc, reinf.stl., rem. hdwl.,remob. | Pending | 0 | 0.0 | $43,759.50 |
008 | Add two new items to the contract & reduce the qty for two | Pending | 0 | 0.0 | $-10,927.00 |
STOCKPILE PAYMENT HISTORY | |||||
Project | Line Nbr | Stockpile Description | Adjustment Type | Estimate Nbr | Adjusted Amount |
13626(07) | 0010 | FABRIC-BASE SEP | Stockpiled Material Adjustment | 0018 | $-9,469.61 |
13626(07) | 0010 | FABRIC-BASE SEP | Stockpiled Material Adjustment | 0014 | $-2,502.94 |
13626(07) | 0010 | FABRIC-BASE SEP | Stockpiled Material Adjustment | 0009 | $-46,004.57 |
13626(07) | 0010 | FABRIC-BASE SEP | Stockpiled Material Adjustment | 0008 | $-34,801.96 |
13626(07) | 0010 | FABRIC-BASE SEP | Stockpiled Material Initial Payment | 0008 | $216,608.16 |
13626(07) | 0010 | FABRIC-BASE SEP | Stockpiled Material Adjustment | 0010 | $-60,547.59 |
13626(07) | 0010 | FABRIC-BASE SEP | Stockpiled Material Adjustment | 0019 | $-33,337.79 |
13626(07) | 0010 | FABRIC-BASE SEP | Stockpiled Material Adjustment | 0012 | $-2,434.60 |
13626(07) | 0022 | (SP) P.C. Concrete for Pavement | Stockpiled Material Adjustment | 0012 | $-62,303.44 |
13626(07) | 0022 | (SP) P.C. Concrete for Pavement | Stockpiled Material Adjustment | 0012 | $-271,313.24 |
13626(07) | 0022 | (SP) P.C. Concrete for Pavement | Stockpiled Material Initial Payment | 0009 | $62,303.44 |
13626(07) | 0022 | (SP) P.C. Concrete for Pavement | Stockpiled Material Initial Payment | 0008 | $491,266.52 |
13626(07) | 0022 | (SP) P.C. Concrete for Pavement | Stockpiled Material Adjustment | 0011 | $-219,953.28 | Subtotals For Stockpile Payments | $27,509.10 |
LIQUIDATED DAMAGES HISTORY | |||||||||
Adjustment Description | Estimate Nbr | Time Units | Rate | Adjustment Amount | |||||
No liquidated damages have been assessed on this contract. |
CONTRACT ADJUSTMENTS HISTORY | ||
Adjustment Description | Estimate Nbr | Adjustment Amount |
No general contract adjustments have been created on this contract. | Subtotals For Contract Adjustments | $0.00 |
LINE ITEM ADJUSTMENT HISTORY | |||||||
Project | Item Nbr | Line Item Description | Adjustment Type | Estimate Nbr | Adj Quantity | Unit Price | Adjusted Amount |
13626(07) | 0017 | (SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) | Asphalt Binder Adjustment | 0011 | 17,506.74 | $0.13 | $2,389.67 |
13626(07) | 0017 | (SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) | Asphalt Binder Adjustment | 0013 | 1,208.63 | $2.86 | $3,464.54 |
13626(07) | 0017 | (SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) | Asphalt Binder Adjustment | 0014 | 924.15 | $2.86 | $2,649.08 | Subtotals For Line Item Adjustments | $8,503.29 |
MILESTONE ADJUSTMENTS | |||||||||
Milestone Number | Milestone Description | Time Allowed | Time Used | Rate | Total | ||||
01 | TIME 'B' BID | 375.00 | 0.00 | $8,000.00 | $0.00 |
Contract ID: | 100253 | Estimate Number: | 0019 | Primary JP: | 13626(07) | |||
Line Item Number | Item Description | Item Number | Units | Bid Qty | Current Quantity | Quantity Paid This Est. | Quantity Paid To Date | Unit Price | Amount Paid This Est. | Amount Paid To Date |
Fed/State Project Number: IMY-0040-5(415)206 | Project: 13626(07) | Category: 0100/ROADWAY - IMY-0040-5(415)206 | ||||||||
0001 | UNCLASSIFIED EXCAVATION | 202(A) 0183 | CY | 138,572.000 | 138,572.000 | 28,750.000 | 113,326.460 | $5.40 | $155,250.00 | $611,962.88 |
0002 | UNCLASSIFIED BORROW | 202(C) 0184 | CY | 8,868.000 | 8,868.000 | 15,727.430 | $5.40 | $0.00 | $84,928.12 | |
0003 | TEMPORARY SILT FENCE | 223 2801 | LF | 3,200.000 | 3,200.000 | 2,060.000 | 5,109.000 | $1.70 | $3,502.00 | $8,685.30 |
0004 | TEMPORARY SEDIMENT FILTER | 224 2803 | EA | 12.000 | 12.000 | 2.000 | 13.000 | $90.00 | $180.00 | $1,170.00 |
0005 | TEMPORARY SILT DIKE | 227 0100 | LF | 322.000 | 322.000 | 0.000 | $5.85 | $0.00 | $0.00 | |
0006 | SOLID SLAB SODDING | 230(A) 2806 | SY | 153,315.000 | 153,315.000 | 0.000 | $1.26 | $0.00 | $0.00 | |
0007 | VEGETATIVE MULCHING | 233(A) 2817 | AC | 31.680 | 31.680 | 24.860 | $426.00 | $0.00 | $10,590.36 | |
0008 | MOWING | 241 2832 | AC | 31.680 | 31.680 | 29.360 | $69.00 | $0.00 | $2,025.84 | |
0009 | AGGREGATE BASE | 303 0192 | CY | 116,145.000 | 116,145.000 | 38,839.780 | $17.68 | $0.00 | $686,687.31 | |
0010 | SEPARATOR FABRIC | 325 5271 | SY | 370,640.000 | 370,640.000 | 37,883.850 | 234,347.120 | $0.98 | $37,126.17 | $229,660.18 |
0011 | (SP)FLY ASH | 327(A) 4200 | TON | 21,852.000 | 0.000 | 0.000 | $31.00 | $0.00 | $0.00 | |
0012 | (SP)LIME | 327(D) 4230 | TON | 1,337.000 | 1,337.000 | 99.340 | 297.800 | $153.27 | $15,225.84 | $45,643.81 |
0013 | (SP)CEMENTITIOUS STABILIZED SUBGRADE | 327(E) 4240 | SY | 404,651.000 | 0.000 | 0.000 | $0.95 | $0.00 | $0.00 | |
0014 | (SP)LIME PRETREATMENT | 327(G) 4260 | SY | 75,981.000 | 75,981.000 | 10,044.670 | 24,859.610 | $1.04 | $10,446.46 | $25,854.00 |
0015 | TRAFFIC BOUND SURFACE COURSE TYPE E | 403(E) 0225 | TON | 72,253.000 | 72,253.000 | 0.000 | 20,930.820 | $24.00 | $0.00 | $502,339.68 |
0016 | PRIME COAT | 408 5774 | GAL | 137,987.000 | 137,987.000 | 0.000 | $1.50 | $0.00 | $0.00 | |
0017 | (SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) | 411(S3) 5945 | TON | 59,442.000 | 60,244.000 | 27,196.830 | $56.25 | $0.00 | $1,529,821.70 | |
0018 | (SP)RUMBLE STRIP-METHOD PCC-CON | 413(D) 4868 | LF | 127,075.000 | 127,075.000 | 0.000 | $0.31 | $0.00 | $0.00 | |
0019 | (SP)P.C.CONCRETE PAVEMENT(PLACEMENT) | 414(A) 0210 | SY | 147,898.000 | 147,898.000 | 97,468.440 | $4.70 | $0.00 | $458,101.66 | |
0020 | (SP)DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 414(A1) 5725 | SY | 183,552.000 | 188,324.000 | 93,722.190 | $8.10 | $0.00 | $759,149.74 | |
0021 | H.E.S. CONCRETE (FULL DEPTH PATCHING) | 414(B) 5913 | SY | 300.000 | 0.000 | 0.000 | $150.00 | $0.00 | $0.00 | |
0022 | (SP)P.C. CONCRETE FOR PAVEMENT | 414(P) 6000 | CY | 102,728.000 | 104,054.000 | 0.000 | 58,764.460 | $84.30 | $0.00 | $4,953,843.97 |
0023 | COLD MILLING PAVEMENT | 417 5267 | SY | 29,528.000 | 29,528.000 | 25,963.570 | $2.76 | $0.00 | $71,659.46 | |
0024 | INLET (SMD-TYPE 1) | 611(E) 6000 | EA | 5.000 | 5.000 | 0.000 | 2.000 | $1,597.50 | $0.00 | $3,195.00 |
0025 | 24" R.C.PIPE CLASS III | 613(B) 0492 | LF | 300.000 | 300.000 | 0.000 | $55.38 | $0.00 | $0.00 | |
0026 | TYPE B6 CULVERT END TREATMENT | 613(CC) 7197 | EA | 5.000 | 5.000 | 0.000 | $1,011.75 | $0.00 | $0.00 | |
0027 | 6" PERFORATED PIPE UNDERDRAIN ROUND | 613(P) 1091 | LF | 4,638.000 | 4,638.000 | 0.000 | $7.64 | $0.00 | $0.00 | |
0028 | 6" NON-PERF.PIPE UNDERDRAIN RND. | 613(Q) 1096 | LF | 1,548.000 | 1,548.000 | 0.000 | $7.63 | $0.00 | $0.00 | |
0029 | PIPE UNDERDRAIN COVER MAT'L. | 613(R) 1100 | CY | 557.000 | 557.000 | 0.000 | $5.00 | $0.00 | $0.00 | |
0030 | REMOVAL OF STRUCTURES & OBSTRUCTIONS | 619(A) 0920 | LSUM | 1.000 | 1.000 | 1.000 | $22,055.00 | $0.00 | $22,055.00 | |
0031 | REMOVAL OF CONCRETE PAVEMENT | 619(B) 4727 | SY | 221,835.000 | 226,607.000 | 194,909.936 | $1.27 | $0.00 | $247,535.62 | |
0032 | REMOVAL OF ASPHALT PAVEMENT | 619(B) 4728 | SY | 109,401.000 | 109,401.000 | 77,143.100 | $2.81 | $0.00 | $216,772.10 | |
0033 | SAWING PAVEMENT | 619(C) 0924 | LF | 88,745.000 | 88,745.000 | 2,935.000 | $0.10 | $0.00 | $293.50 | |
0034 | BEAM GUARD RAIL-W-BEAM-SINGLE | 623(A) 0932 | LF | 14,590.000 | 14,590.000 | 8,637.000 | $13.85 | $0.00 | $119,622.45 | |
0035 | THRIE BEAM BRIDGE CONNECTION-TYPE A | 623(E) 7114 | EA | 4.000 | 4.000 | 1.000 | $1,384.50 | $0.00 | $1,384.50 | |
0036 | GUARD RAIL ANCHOR UNIT (TYPE G) | 623(F) 4452 | EA | 8.000 | 8.000 | 2.000 | $1,235.40 | $0.00 | $2,470.80 | |
0037 | GUARD RAIL ANCHOR UNIT (TYPE B) | 623(F) 6030 | EA | 19.000 | 19.000 | 9.000 | $521.85 | $0.00 | $4,696.65 | |
0038 | (SP)G.E.T. GUARD RAIL END SECTION | 623(H) 8571 | EA | 2.000 | 2.000 | 0.000 | $2,236.50 | $0.00 | $0.00 | |
0039 | (PL)REMOVE AND RESET GUARD RAIL | 625(G) 1270 | LF | 2,000.000 | 2,000.000 | 137.500 | $6.92 | $0.00 | $951.50 | |
0040 | GUARDRAIL DELINEATORS(TYPE 1, CODE 1) | 853 9066 | EA | 50.000 | 50.000 | 176.000 | $5.86 | $0.00 | $1,031.36 | |
0041 | GUARDRAIL DELINEATORS(TYPE 1, CODE 1) | 853 9066 | EA | 50.000 | 50.000 | 0.000 | $5.86 | $0.00 | $0.00 | |
0042 | GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 853 9069 | EA | 50.000 | 50.000 | 0.000 | $5.86 | $0.00 | $0.00 | |
0043 | (PL)REMOVE & RESET G.E.T. GUARD RAIL END SECTION | 890A/B 8762 | EA | 10.000 | 10.000 | 4.000 | $585.75 | $0.00 | $2,343.00 | |
8004 | (SP)CEMENTITIOUS STABILIZED SUBGRADE | 327(E) 4240 | SY | 0.000 | 385,497.000 | 40,002.440 | 256,517.913 | $2.62 | $104,806.39 | $672,076.92 |
8005 | CONSTRUCTION MISCELLANEOUS | 104 0700 | LSUM | 0.000 | 1.000 | 0.000 | $2,000.00 | $0.00 | $0.00 | |
8006 | BEAM GUARD RAIL-W-BEAM-SINGLE | 623(A) 0932 | LF | 0.000 | 5,550.000 | 3,203.000 | $1.85 | $0.00 | $5,925.55 | |
8007 | ADDITIONAL DEPTH IN INLET | 611(F) 5196 | VF | 0.000 | 15.800 | 0.000 | $161.80 | $0.00 | $0.00 | |
8008 | H.E.S. CONCRETE (FULL DEPTH PATCHING) | 414(B) 5913 | SY | 0.000 | 1,000.000 | 0.000 | 559.000 | $100.00 | $0.00 | $55,900.00 |
Subtotals For Category 0100/ROADWAY - IMY-0040-5(415)206 | $326,536.86 | $11,338,377.96 | ||||||||
Fed/State Project Number: IMY-0040-5(415)206 | Project: 13626(07) | Category: 0300/TRAFFIC SIGNING & STRIPING - IMY-0040-5(415)206 | ||||||||
0044 | STRUCTURAL CONCRETE | 804(A) 2915 | CY | 1.940 | 1.940 | 0.000 | $303.53 | $0.00 | $0.00 | |
0045 | REINFORCING STEEL | 804(B) 2916 | LB | 308.000 | 308.000 | 0.000 | $2.13 | $0.00 | $0.00 | |
0046 | DELINEATORS(TYPE 1, CODE 1) | 853 9024 | EA | 110.000 | 110.000 | 0.000 | $26.63 | $0.00 | $0.00 | |
0047 | (SP)TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 854(C) 8530 | LF | 138,836.000 | 138,836.000 | 0.000 | $0.44 | $0.00 | $0.00 | |
0048 | (SP)TRAFFIC STRIPE(MULTI-POLYMER)(6" WIDE) | 854(C) 8535 | LF | 39,936.000 | 39,936.000 | 0.000 | $0.62 | $0.00 | $0.00 | |
0049 | (SP)TRAFFIC STRIPE(MULTI-POLYMER)(8" WIDE) | 854(C) 8540 | LF | 5,872.000 | 5,872.000 | 0.000 | $1.07 | $0.00 | $0.00 | |
0050 | (SP)TRAFFIC STRIPE(MULTI-POLYMER)(24" WIDE) | 854(C) 8555 | LF | 48.000 | 48.000 | 0.000 | $5.33 | $0.00 | $0.00 | |
0051 | (PL)REMOVE & RESET EXISTING SIGNS | 890A/B 8756 | EA | 16.000 | 16.000 | 7.000 | $106.50 | $0.00 | $745.50 | |
0052 | (PL)REMOVE & RESET GROUND MOUNTED SIGN | 890A/B 8760 | EA | 2.000 | 2.000 | 1.000 | $106.50 | $0.00 | $106.50 | |
Subtotals For Category 0300/TRAFFIC SIGNING & STRIPING - IMY-0040-5(415)206 | $0.00 | $852.00 | ||||||||
Fed/State Project Number: IMY-0040-5(415)206 | Project: 13626(07) | Category: 0301/TRAFFIC CONTROL - IMY-0040-5(415)206 | ||||||||
0053 | RELOCATION OF RENTED PORTABLE TYPE PRECAST CONCRETE MEDIAN | 627(O) 4410 | LF | 35,100.000 | 35,100.000 | 34,100.000 | $1.35 | $0.00 | $46,035.00 | |
0054 | RENTED PORTABLE TYPE PRECAST CONCRETE MEDIAN BARRIER | 627(P) 4425 | LF | 35,100.000 | 35,100.000 | 34,320.000 | $25.00 | $0.00 | $858,000.00 | |
0055 | CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 856(A) 8839 | LF | 90,000.000 | 90,000.000 | 394,156.000 | $0.19 | $0.00 | $74,889.64 | |
0056 | (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 856(G) 8887 | EA | 17,000.000 | 17,000.000 | 14,810.000 | $0.11 | $0.00 | $1,629.10 | |
0057 | PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 859(A) 8006 | LF | 80,000.000 | 80,000.000 | 46,421.000 | $0.13 | $0.00 | $6,034.73 | |
0058 | (PL)CONST.ZONE IMPACT ATTEN. | 871 8705 | SD | 2,700.000 | 2,700.000 | 0.000 | $1.07 | $0.00 | $0.00 | |
0059 | MODULAR GLARE SCREEN | 878(C) 8487 | SD | 223,200.000 | 223,200.000 | 1,881.000 | 31,795.000 | $0.03 | $56.43 | $953.85 |
0060 | ARROW DISPLAY(TYPE C) | 880(A) 8812 | SD | 900.000 | 900.000 | 30.000 | 618.000 | $31.95 | $958.50 | $19,745.10 |
0061 | CONSTRUCTION SIGNS 0 TO 6.25 SF | 880(B) 8818 | SD | 25,200.000 | 25,200.000 | 675.000 | 15,365.000 | $0.13 | $87.75 | $1,997.45 |
0062 | CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 880(B) 8821 | SD | 17,100.000 | 17,100.000 | 1,485.000 | 31,741.000 | $2.66 | $3,950.10 | $84,431.06 |
0063 | CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 880(B) 8824 | SD | 30,600.000 | 30,600.000 | 783.000 | 15,889.000 | $0.43 | $336.69 | $6,832.27 |
0064 | BARRICADES(TYPE III) | 880(C) 8842 | SD | 13,500.000 | 13,500.000 | 690.000 | 14,580.000 | $1.01 | $696.90 | $14,725.80 |
0065 | WING BARRICADES | 880(C) 8848 | SD | 1,800.000 | 1,800.000 | 120.000 | 2,448.000 | $4.26 | $511.20 | $10,428.48 |
0066 | VERTICAL PANELS | 880(D) 8854 | SD | 308,250.000 | 308,250.000 | 150.000 | 2,510.000 | $0.02 | $3.00 | $50.20 |
0067 | WARNING LIGHTS(TYPE A) | 880(E) 8860 | SD | 35,100.000 | 35,100.000 | 2,025.000 | 40,897.000 | $0.16 | $324.00 | $6,543.52 |
0068 | WARNING LIGHTS(TYPE C) | 880(E) 8872 | SD | 450,000.000 | 450,000.000 | 0.000 | $0.02 | $0.00 | $0.00 | |
0069 | DRUMS | 880(F) 8878 | SD | 96,750.000 | 96,750.000 | 3,699.000 | 105,307.000 | $0.16 | $591.84 | $16,849.12 |
0070 | CONES(36" LARGE) | 880(H) 8896 | SD | 72,000.000 | 72,000.000 | 0.000 | $0.02 | $0.00 | $0.00 | |
0071 | TRAFFIC SURVEILLANCE, POLICE | 880(L) 8911 | HOUR | 1,400.000 | 1,400.000 | 181.000 | $56.00 | $0.00 | $10,136.00 | |
0072 | PORT.CHANGEABLE MESSAGE SIGN | 882(B) 8306 | SD | 1,800.000 | 1,800.000 | 0.000 | $3.20 | $0.00 | $0.00 | |
Subtotals For Category 0301/TRAFFIC CONTROL - IMY-0040-5(415)206 | $7,516.41 | $1,159,281.32 | ||||||||
Fed/State Project Number: IMY-0040-5(415)206 | Project: 13626(07) | Category: 0600/STAKING - IMY-0040-5(415)206 | ||||||||
0073 | STAKING | 642 0098 | LSUM | 1.000 | 1.000 | 0.500 | $125,000.00 | $0.00 | $62,500.00 | |
Subtotals For Category 0600/STAKING - IMY-0040-5(415)206 | $0.00 | $62,500.00 | ||||||||
Fed/State Project Number: IMY-0040-5(415)206 | Project: 13626(07) | Category: 0640/CONSTRUCTION - IMY-0040-5(415)206 | ||||||||
0074 | (SP)SWPPP DOCUMENTATION AND MANAGEMENT | 220 2800 | LSUM | 1.000 | 1.000 | 0.500 | $2,500.00 | $0.00 | $1,250.00 | |
0075 | FIELD OFFICE | 640 1398 | EA | 1.000 | 1.000 | 1.000 | $11,000.00 | $0.00 | $11,000.00 | |
0076 | MOBILIZATION | 641 1552 | LSUM | 1.000 | 1.000 | 1.000 | $748,340.00 | $0.00 | $748,340.00 | |
0077 | (SP)CONTRACTORS QUALITY CONTROL | 643 0087 | LSUM | 1.000 | 1.000 | 0.500 | $85,000.00 | $0.00 | $42,500.00 | |
Subtotals For Category 0640/CONSTRUCTION - IMY-0040-5(415)206 | $0.00 | $803,090.00 | ||||||||
Subtotals For Project IMY-0040-5(415)206 /13626(07) | $334,053.27 | $13,364,101.28 |
Line Item Number | Item Description | Item Number | Units | Bid Qty | Current Quantity | Quantity Paid This Est. | Quantity Paid To Date | Unit Price | Amount Paid This Est. | Amount Paid To Date |
Fed/State Project Number: HSIPIG-0040-5(405)203TR | Project: 26267(04) | Category: 0300/TRAFFIC CONTROL - HSIPIG-0040-5(405)203TR | ||||||||
0078 | (PL)TRUCK MOUNTED ATTENUATOR | 876(C) 8482 | SD | 45.000 | 45.000 | 0.000 | $47.93 | $0.00 | $0.00 | |
0079 | ARROW DISPLAY(TYPE C) | 880(A) 8812 | SD | 45.000 | 45.000 | 0.000 | $31.95 | $0.00 | $0.00 | |
0080 | CONSTRUCTION SIGNS 0 TO 6.25 SF | 880(B) 8818 | SD | 1,395.000 | 1,395.000 | 0.000 | $0.13 | $0.00 | $0.00 | |
0081 | CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 880(B) 8821 | SD | 90.000 | 90.000 | 0.000 | $2.13 | $0.00 | $0.00 | |
0082 | CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 880(B) 8824 | SD | 990.000 | 990.000 | 0.000 | $0.43 | $0.00 | $0.00 | |
0083 | BARRICADES(TYPE III) | 880(C) 8842 | SD | 90.000 | 90.000 | 0.000 | $1.01 | $0.00 | $0.00 | |
0084 | WING BARRICADES | 880(C) 8848 | SD | 90.000 | 90.000 | 0.000 | $3.20 | $0.00 | $0.00 | |
0085 | WARNING LIGHTS(TYPE A) | 880(E) 8860 | SD | 1,170.000 | 1,170.000 | 0.000 | $0.16 | $0.00 | $0.00 | |
0086 | WARNING LIGHTS(TYPE C) | 880(E) 8872 | SD | 22,250.000 | 22,250.000 | 0.000 | $0.02 | $0.00 | $0.00 | |
0087 | DRUMS | 880(F) 8878 | SD | 22,250.000 | 22,250.000 | 0.000 | $0.16 | $0.00 | $0.00 | |
0088 | CHANNELIZER CONES | 880(G) 8890 | SD | 20,340.000 | 20,340.000 | 0.000 | $0.02 | $0.00 | $0.00 | |
0089 | TRAFFIC SURVEILLANCE, POLICE | 880(L) 8911 | HOUR | 270.000 | 270.000 | 0.000 | $56.00 | $0.00 | $0.00 | |
0090 | PORT.CHANGEABLE MESSAGE SIGN | 882(B) 8306 | SD | 270.000 | 270.000 | 0.000 | $3.20 | $0.00 | $0.00 | |
Subtotals For Category 0300/TRAFFIC CONTROL - HSIPIG-0040-5(405)203TR | $0.00 | $0.00 | ||||||||
Fed/State Project Number: HSIPIG-0040-5(405)203TR | Project: 26267(04) | Category: 0304/CABLE BARRIER - HSIPIG-0040-5(405)203TR | ||||||||
0091 | UNCLASSIFIED EXCAVATION | 202(A) 0183 | CY | 865.000 | 865.000 | 0.000 | $6.00 | $0.00 | $0.00 | |
0092 | UNCLASSIFIED BORROW | 202(C) 0184 | CY | 500.000 | 500.000 | 0.000 | $10.00 | $0.00 | $0.00 | |
0093 | TEMPORARY SILT FENCE | 223 2801 | LF | 1,150.000 | 1,150.000 | 0.000 | $1.70 | $0.00 | $0.00 | |
0094 | TEMPORARY SEDIMENT FILTER | 224 2803 | EA | 5.000 | 5.000 | 0.000 | $175.73 | $0.00 | $0.00 | |
0095 | TEMPORARY SILT DIKE | 227 0100 | LF | 1,540.000 | 1,540.000 | 0.000 | $6.12 | $0.00 | $0.00 | |
0096 | SOLID SLAB SODDING | 230(A) 2806 | SY | 5,000.000 | 5,000.000 | 0.000 | $1.18 | $0.00 | $0.00 | |
0097 | TRAFFIC BOUND SURFACE COURSE TYPE E | 403(E) 0225 | TON | 4,290.000 | 4,290.000 | 0.000 | $19.15 | $0.00 | $0.00 | |
0098 | CLASS AA CONCRETE | 509(A) 0319 | CY | 430.000 | 430.000 | 0.000 | $372.75 | $0.00 | $0.00 | |
0099 | CLASS C CONCRETE | 509(D) 0325 | CY | 5.000 | 5.000 | 0.000 | $300.00 | $0.00 | $0.00 | |
0100 | INLETS ADJUST TO GRADE | 612(E) 0645 | EA | 3.000 | 3.000 | 0.000 | $1,200.00 | $0.00 | $0.00 | |
0101 | (PL)CABLE END ANCHOR UNIT | 628 5110 | EA | 30.000 | 30.000 | 0.000 | $1,011.75 | $0.00 | $0.00 | |
0102 | HIGH-TENSION CABLE BARRIER(TL-4) | 628 5125 | LF | 36,501.000 | 36,501.000 | 0.000 | $8.52 | $0.00 | $0.00 | |
0103 | CABLE BARRIER TENSION METER | 628 5175 | EA | 1.000 | 1.000 | 0.000 | $2,130.00 | $0.00 | $0.00 | |
Subtotals For Category 0304/CABLE BARRIER - HSIPIG-0040-5(405)203TR | $0.00 | $0.00 | ||||||||
Subtotals For Project HSIPIG-0040-5(405)203TR /26267(04) | $0.00 | $0.00 |