| Fed/State Project Number: STP-STIM(447)EH |
Project: 27186(04) |
Category: 0100/ROADWAY |
| 0001 |
CLEARING AND GRUBBING |
201 0102 |
LSUM |
1.000 |
1.000 |
0.250 |
0.250 |
$2,500.00 |
$625.00 |
$625.00 |
| 0002 |
UNCLASSIFIED EXCAVATION |
202(A) 0183 |
CY |
289.000 |
289.000 |
60.000 |
60.000 |
$10.00 |
$600.00 |
$600.00 |
| 0003 |
UNCLASSIFIED BORROW |
202(C) 0184 |
CY |
423.000 |
423.000 |
|
0.000 |
$15.00 |
$0.00 |
$0.00 |
| 0004 |
TYPE A-SALVAGED TOPSOIL |
205 4229 |
LSUM |
1.000 |
1.000 |
|
0.000 |
$1,000.00 |
$0.00 |
$0.00 |
| 0005 |
TEMPORARY SILT FENCE |
223 2801 |
LF |
1,004.000 |
1,004.000 |
|
0.000 |
$2.35 |
$0.00 |
$0.00 |
| 0006 |
TEMPORARY SEDIMENT FILTER |
224 2803 |
EA |
13.000 |
13.000 |
|
0.000 |
$90.00 |
$0.00 |
$0.00 |
| 0007 |
TEMPORARY SEDIMENT REMOVAL |
226 2805 |
CY |
27.000 |
27.000 |
|
0.000 |
$75.00 |
$0.00 |
$0.00 |
| 0008 |
SOLID SLAB SODDING |
230(A) 2806 |
SY |
2,037.000 |
2,037.000 |
|
0.000 |
$3.00 |
$0.00 |
$0.00 |
| 0009 |
WATERING |
230(F) 2812 |
MGAL |
102.000 |
102.000 |
|
0.000 |
$5.00 |
$0.00 |
$0.00 |
| 0010 |
MOWING |
241 2832 |
AC |
1.000 |
1.000 |
|
0.000 |
$100.00 |
$0.00 |
$0.00 |
| 0011 |
TRAFFIC BOUND SURFACE COURSE TYPE E |
403(E) 0225 |
TON |
50.000 |
50.000 |
|
0.000 |
$34.00 |
$0.00 |
$0.00 |
| 0012 |
TACK COAT |
407 0250 |
GAL |
33.000 |
33.000 |
|
0.000 |
$6.00 |
$0.00 |
$0.00 |
| 0013 |
PRIME COAT |
408 5774 |
GAL |
98.000 |
98.000 |
|
0.000 |
$6.00 |
$0.00 |
$0.00 |
| 0014 |
(SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) |
411(S3) 5945 |
TON |
68.000 |
68.000 |
|
0.000 |
$135.00 |
$0.00 |
$0.00 |
| 0015 |
(SP)ASPHALT CONCRETE TYPE S3(PATCHING)(PG 64-22 OK) |
411(S3) 6210 |
TON |
31.000 |
31.000 |
|
0.000 |
$145.00 |
$0.00 |
$0.00 |
| 0016 |
(SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) |
411(S4) 5960 |
TON |
45.000 |
45.000 |
|
0.000 |
$155.00 |
$0.00 |
$0.00 |
| 0017 |
(SP)ASPHALT CONCRETE, TYPE S4(PATCHING)(PG 64-22 OK) |
411(S4) 6310 |
TON |
21.000 |
21.000 |
|
0.000 |
$165.00 |
$0.00 |
$0.00 |
| 0018 |
CLASS C CONCRETE |
509(D) 0325 |
CY |
13.000 |
13.000 |
|
0.000 |
$200.00 |
$0.00 |
$0.00 |
| 0019 |
2'-8" COMB. CURB & GUTTER (8" BARRIER) |
609(B) 1526 |
LF |
1,547.000 |
1,547.000 |
|
0.000 |
$15.00 |
$0.00 |
$0.00 |
| 0020 |
4" CONCRETE SIDEWALK |
610(A) 0602 |
SY |
746.000 |
746.000 |
|
0.000 |
$35.00 |
$0.00 |
$0.00 |
| 0021 |
6" CONCRETE DRIVEWAY |
610(B) 0604 |
SY |
275.000 |
275.000 |
|
0.000 |
$40.00 |
$0.00 |
$0.00 |
| 0022 |
(PL)TACTILE WARNING DEVICE-NEW |
610(I) 4610 |
SF |
112.000 |
112.000 |
|
0.000 |
$30.00 |
$0.00 |
$0.00 |
| 0023 |
MANHOLE (4' DIAMETER) |
611(A) 2657 |
EA |
1.000 |
1.000 |
|
0.000 |
$1,200.00 |
$0.00 |
$0.00 |
| 0024 |
ADD'L.DEPTH IN MANHOLE (4' DIAMETER) |
611(B) 2680 |
VF |
1.000 |
1.000 |
|
0.000 |
$300.00 |
$0.00 |
$0.00 |
| 0025 |
MANHOLE FRAME & COVER |
611(D) 4215 |
EA |
1.000 |
1.000 |
|
0.000 |
$300.00 |
$0.00 |
$0.00 |
| 0026 |
INLET (SMD-TYPE 1) |
611(E) 6000 |
EA |
10.000 |
10.000 |
|
0.000 |
$900.00 |
$0.00 |
$0.00 |
| 0027 |
18" R.C.PIPE CLASS III |
613(B) 0491 |
LF |
188.000 |
188.000 |
24.000 |
24.000 |
$53.00 |
$1,272.00 |
$1,272.00 |
| 0028 |
24" R.C.PIPE CLASS III |
613(B) 0492 |
LF |
72.000 |
72.000 |
40.000 |
40.000 |
$70.00 |
$2,800.00 |
$2,800.00 |
| 0029 |
30" R.C.PIPE CLASS III |
613(B) 0493 |
LF |
72.000 |
72.000 |
|
0.000 |
$96.00 |
$0.00 |
$0.00 |
| 0030 |
22" X 13" R.C.PIPE ARCH CLASS A-III |
613(B) 4495 |
LF |
298.000 |
298.000 |
|
0.000 |
$92.00 |
$0.00 |
$0.00 |
| 0031 |
SPECIAL END SECTION OF 22" X 13" RCP ARCH |
613(C) 4800 |
EA |
14.000 |
14.000 |
|
0.000 |
$1,150.00 |
$0.00 |
$0.00 |
| 0032 |
12" CORR. GALV. STEEL PIPE |
613(D) 0688 |
LF |
22.000 |
22.000 |
|
0.000 |
$40.00 |
$0.00 |
$0.00 |
| 0033 |
18" PREFAB. CULVERT END SECTION, ROUND |
613(M) 5726 |
EA |
1.000 |
1.000 |
|
0.000 |
$850.00 |
$0.00 |
$0.00 |
| 0034 |
24" PREFAB. CULVERT END SECTION, ROUND |
613(M) 5730 |
EA |
1.000 |
1.000 |
1.000 |
1.000 |
$950.00 |
$950.00 |
$950.00 |
| 0035 |
30" PREFAB. CULVERT END SECTION, ROUND |
613(M) 5732 |
EA |
1.000 |
1.000 |
|
0.000 |
$1,150.00 |
$0.00 |
$0.00 |
| 0036 |
TRENCH EXCAVATION |
613(S) 1180 |
CY |
496.000 |
496.000 |
49.700 |
49.700 |
$10.00 |
$497.00 |
$497.00 |
| 0037 |
STANDARD BEDDING MATERIAL |
613(T) 1181 |
CY |
316.000 |
316.000 |
|
0.000 |
$30.00 |
$0.00 |
$0.00 |
| 0038 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS |
619(A) 0920 |
LSUM |
1.000 |
1.000 |
0.250 |
0.250 |
$5,000.00 |
$1,250.00 |
$1,250.00 |
| 0039 |
REMOVAL OF ASPHALT PAVEMENT |
619(B) 4728 |
SY |
599.000 |
599.000 |
39.100 |
39.100 |
$5.00 |
$195.50 |
$195.50 |
| 0040 |
REMOVAL OF CONCRETE DRIVEWAY |
619(B) 4766 |
SY |
347.000 |
347.000 |
|
0.000 |
$5.00 |
$0.00 |
$0.00 |
| 0041 |
REMOVAL OF SIDEWALK |
619(B) 4792 |
SY |
140.000 |
140.000 |
|
0.000 |
$5.00 |
$0.00 |
$0.00 |
| 0042 |
REMOVAL OF EXISTING PIPE |
619(B) 5918 |
LF |
414.000 |
414.000 |
40.760 |
40.760 |
$6.00 |
$244.56 |
$244.56 |
| 0043 |
SAWING PAVEMENT |
619(C) 0924 |
LF |
1,915.000 |
1,915.000 |
|
400.000 |
$2.50 |
$0.00 |
$1,000.00 |
| 0044 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) |
855(A) 8812 |
LF |
2,650.000 |
2,650.000 |
|
0.000 |
$1.00 |
$0.00 |
$0.00 |
| 0045 |
CONSTRUCTION TRAFFIC CONTROL |
880(J) 8905 |
LSUM |
1.000 |
1.000 |
|
0.250 |
$2,500.00 |
$0.00 |
$625.00 |
| 0046 |
(PL)REMOVE & RESET EXISTING SIGNS |
890A/B 8756 |
EA |
7.000 |
7.000 |
|
0.000 |
$150.00 |
$0.00 |
$0.00 |
| Subtotals For Category 0100/ROADWAY |
$8,434.06 |
$10,059.06 |
|