Contract ID: | 090644 | Estimate Number: | 0011 | Contract No: | 510674 | |||
Residency: | ENGINEERING SERVICES & TESTING (08001) | Estimate Type: | Progressive | Account No: | 400800 | |||
Project Number(s): | STP-STIM(284)IG, STP-STIM(286)IG, STP-STIM(482)IG | ||||||||||||
Primary Job Piece No: | 26703(04) | ||||||||||||
Contract Description: | PAVEMENT REHABILITATION CITY STREET (SHERIDAN RD): FROM ADMIRAL BLVD EXTEND SOUTH. PROJECT LENGTH = 2.926 MILES | ||||||||||||
Primary County: | TULSA | ||||||||||||
Name of Road: | CITY STREET (SHERIDA | ||||||||||||
Prime Contractor: | BECCO CONTRACTORS, INC. | ||||||||||||
P.O. BOX 9159 | |||||||||||||
TULSA , OK 74157 | |||||||||||||
Surety Company: | MID-CONTINENT CASUALTY COMPANY | ||||||||||||
Date Let: | 11/19/2009 | NTP Effective Date: | 01/04/2010 | Pay Period: | 07/01/2010 TO 07/15/2010 |
Date Awarded: | 12/07/2009 | Date Work Began: | 02/02/2010 | Original Contract Time: | 450 |
Date Contract Executed: | 12/18/2009 | Date Time Stopped: | Current Time Charged: | 164.00 | |
Date NTP Issued: | 12/22/2009 | Completion Date: | Current Time Allowed: | 500.00 | |
General Liability Expires: | 03/01/2011 | Workman's Comp Expires: | 02/01/2011 | Percent Time Used: | 32.80 % |
Specification Year: | 1999 | Date Approved: | |||
Current Contract Amount: | $4,374,893.50 | Total to Date | Prev to Date | This Estimate | |||
Bid Amount: | $4,374,893.50 | Participating: | $1,083,284.98 | $932,619.93 | $150,665.05 | ||
Percent Complete: | 30.12 % | Non Participating: | $234,530.50 | $228,800.50 | $5,730.00 | ||
Funds Available: | $3,057,075.80 | Non ARRA: | $0.00 | $0.00 | $0.00 | ||
Unearned Balance: | $3,057,075.80 | Total Earnings: | $1,317,815.48 | $1,161,420.43 | $156,395.05 | ||
Stockpiled Materials: | $0.00 | $0.00 | $0.00 | ||||
Gross Earnings: | $1,317,815.48 | $1,161,420.43 | $156,395.05 | ||||
Other Adjustments: | $2.22 | $-3,458.85 | $3,461.07 | ||||
Liq Dam/Disincentive: | $0.00 | $0.00 | $0.00 | ||||
TOTAL: | $1,317,817.70 | $1,157,961.58 | $159,856.12 |
Contract ID: | 090644 | Estimate Number: | 0011 | Primary JP: | 26703(04) | |||
CHANGE ORDER HISTORY | |||||
Change Order Nbr. | Change Order Description | Status | Approval Date | Contract Time Adjustment | Total Change Order Amount |
001 | Change to start time | Approved | 05/07/2010 | 30.0 | $0.00 |
STOCKPILE PAYMENT HISTORY | |||||
Project | Line Nbr | Stockpile Description | Adjustment Type | Estimate Nbr | Adjusted Amount |
No material stockpiles have been created for this contract. | Subtotals For Stockpile Payments | $0.00 |
LIQUIDATED DAMAGES HISTORY | |||||||||
Adjustment Description | Estimate Nbr | Time Units | Rate | Adjustment Amount | |||||
No liquidated damages have been assessed on this contract. |
CONTRACT ADJUSTMENTS HISTORY | ||
Adjustment Description | Estimate Nbr | Adjustment Amount |
No general contract adjustments have been created on this contract. | Subtotals For Contract Adjustments | $0.00 |
LINE ITEM ADJUSTMENT HISTORY | |||||||
Project | Item Nbr | Line Item Description | Adjustment Type | Estimate Nbr | Adj Quantity | Unit Price | Adjusted Amount |
26703(04) | 0008 | (SP)ASPHALT CONCRETE TYPE S4(PG 70-28 OK) | Asphalt Binder Adjustment | 0009 | 0.00 | $0.00 | $58.54 |
26703(04) | 0009 | (SP)ASPHALT CONCRETE TYPE S5(PG 64-22 OK) | Asphalt Binder Adjustment | 0010 | 0.00 | $0.00 | $1,341.31 |
26703(04) | 0009 | (SP)ASPHALT CONCRETE TYPE S5(PG 64-22 OK) | Asphalt Binder Adjustment | 0011 | 0.00 | $0.00 | $1,261.07 |
26703(04) | 0019 | INLET FRM&GRT (SSIF-FRM,CIG-GRT-RVG-F) | * Material Discrepancy Adjustments | 0007 | -4.00 | $300.00 | $-1,200.00 |
26703(04) | 0019 | INLET FRM&GRT (SSIF-FRM,CIG-GRT-RVG-F) | * Material Discrepancy Adjustments | 0011 | 4.00 | $300.00 | $1,200.00 |
26703(04) | 0020 | CAST IRON CURB INLETS | * Material Discrepancy Adjustments | 0007 | -4.00 | $250.00 | $-1,000.00 |
26703(04) | 0020 | CAST IRON CURB INLETS | * Material Discrepancy Adjustments | 0011 | 4.00 | $250.00 | $1,000.00 |
26705(04) | 0043 | REINFORCING STEEL | * Material Discrepancy Adjustments | 0007 | -1,787.00 | $1.10 | $-1,965.70 |
26703(04) | 0047 | REINFORCING STEEL | * Material Discrepancy Adjustments | 0007 | -630.00 | $1.10 | $-693.00 | Subtotals For Line Item Adjustments | $2.22 | * = User applied Line Item Adjustments |
MILESTONE ADJUSTMENTS | |||||||||
Milestone Number | Milestone Description | Time Allowed | Time Used | Rate | Total | ||||
No milestones exist for this contract. |
Contract ID: | 090644 | Estimate Number: | 0011 | Primary JP: | 26703(04) | |||
Line Item Number | Item Description | Item Number | Units | Bid Qty | Current Quantity | Quantity Paid This Est. | Quantity Paid To Date | Unit Price | Amount Paid This Est. | Amount Paid To Date |
Fed/State Project Number: STP-STIM(284)IG | Project: 26703(04) | Category: 0100/ROADWAY - STP-STIM(284)IG | ||||||||
0001 | CLEARING AND GRUBBING | 201 0102 | LSUM | 1.000 | 1.000 | 0.000 | $2,000.00 | $0.00 | $0.00 | |
0002 | UNCLASSIFIED EXCAVATION | 202(A) 0183 | CY | 1,552.000 | 1,552.000 | 0.000 | $10.00 | $0.00 | $0.00 | |
0003 | TEMPORARY BALE BARRIER | 222 2801 | LF | 100.000 | 100.000 | 88.000 | $3.00 | $0.00 | $264.00 | |
0004 | TEMPORARY SILT FENCE | 223 2801 | LF | 1,800.000 | 1,800.000 | 0.000 | $1.00 | $0.00 | $0.00 | |
0005 | SOLID SLAB SODDING | 230(A) 2806 | SY | 2,698.000 | 2,698.000 | 301.000 | 1,903.330 | $1.50 | $451.50 | $2,855.00 |
0006 | AGGREGATE BASE | 303 0192 | CY | 1,821.000 | 1,821.000 | 55.000 | 1,117.460 | $45.00 | $2,475.00 | $50,285.70 |
0007 | SUBGRADE, METHOD B | 310(B) 0149 | SY | 6,534.000 | 6,534.000 | 126.000 | 2,300.300 | $0.20 | $25.20 | $460.06 |
0008 | (SP)ASPHALT CONCRETE TYPE S4(PG 70-28 OK) | 411(S4) 5955 | TON | 2,488.000 | 2,488.000 | 0.000 | 13.040 | $73.00 | $0.00 | $951.92 |
0009 | (SP)ASPHALT CONCRETE TYPE S5(PG 64-22 OK) | 411(S5) 5975 | TON | 1,244.000 | 1,244.000 | 261.400 | 532.000 | $60.00 | $15,684.00 | $31,920.00 |
0010 | (SP)FULL DEPTH P.C.C. PATCH(PLACEMENT) | 414(N) 5800 | SY | 5,773.000 | 5,773.000 | 126.000 | 2,300.300 | $38.00 | $4,788.00 | $87,411.40 |
0011 | (SP)P.C. CONCRETE FOR PAVEMENT | 414(P) 6000 | CY | 1,294.000 | 1,294.000 | 25.000 | 501.400 | $120.00 | $3,000.00 | $60,168.00 |
0012 | COLD MILLING PAVEMENT | 417 5267 | SY | 21,638.000 | 21,638.000 | 9,816.000 | $1.65 | $0.00 | $16,196.40 | |
0013 | FABRIC REINFORCEMENT | 420(A) 4242 | SY | 21,638.000 | 21,638.000 | 0.000 | $1.50 | $0.00 | $0.00 | |
0014 | COMBINED CURB & GUTTER (6" BARRIER) | 609(B) 0383 | LF | 3,649.000 | 3,649.000 | 139.000 | 1,573.000 | $15.00 | $2,085.00 | $23,595.00 |
0015 | 4" CONCRETE SIDEWALK | 610(A) 0602 | SY | 943.000 | 943.000 | 128.000 | 667.800 | $75.00 | $9,600.00 | $50,085.00 |
0016 | 6" CONCRETE DRIVEWAY (H.E.S.) | 610(B) 0399 | SY | 167.000 | 167.000 | 78.000 | 312.700 | $66.00 | $5,148.00 | $20,638.20 |
0017 | INLET CICI DES. 2 (STD) | 611(E) 5112 | EA | 9.000 | 9.000 | 0.000 | 7.000 | $2,700.00 | $0.00 | $18,900.00 |
0018 | INLET CICI DES. 2 (ADD'L DEPTH) | 611(F) 5325 | VF | 1.000 | 1.000 | 0.000 | $285.00 | $0.00 | $0.00 | |
0019 | INLET FRM&GRT (SSIF-FRM,CIG-GRT-RVG-F) | 611(G) 4489 | EA | 18.000 | 18.000 | 0.000 | 10.000 | $300.00 | $0.00 | $3,000.00 |
0020 | CAST IRON CURB INLETS | 611(K) 4488 | EA | 18.000 | 18.000 | 0.000 | 10.000 | $250.00 | $0.00 | $2,500.00 |
0021 | MANHOLES ADJUST TO GRADE | 612(A) 0641 | EA | 25.000 | 25.000 | 4.000 | $1,000.00 | $0.00 | $4,000.00 | |
0022 | INLETS ADJUST TO GRADE | 612(E) 0645 | EA | 5.000 | 5.000 | 0.000 | $1,500.00 | $0.00 | $0.00 | |
0023 | VALVE BOXES ADJUST TO GRADE | 612(G) 0647 | EA | 10.000 | 10.000 | 0.000 | $300.00 | $0.00 | $0.00 | |
0024 | METER BOXES ADJUST TO GRADE | 612(H) 0648 | EA | 6.000 | 6.000 | 2.000 | 2.000 | $300.00 | $600.00 | $600.00 |
0025 | REMOVAL OF CURB AND GUTTER | 619(B) 4726 | LF | 3,649.000 | 3,649.000 | 139.000 | 1,369.000 | $3.00 | $417.00 | $4,107.00 |
0026 | REMOVAL OF CONCRETE PAVEMENT | 619(B) 4727 | SY | 161.000 | 161.000 | 139.400 | $9.00 | $0.00 | $1,254.60 | |
0027 | REMOVAL OF ASPHALT PAVEMENT | 619(B) 4728 | SY | 323.000 | 323.000 | 101.400 | $9.00 | $0.00 | $912.60 | |
0028 | REMOVAL OF DRAINAGE INLETS | 619(B) 4741 | EA | 9.000 | 9.000 | 7.000 | $350.00 | $0.00 | $2,450.00 | |
0029 | REMOVAL OF CONCRETE DRIVEWAY | 619(B) 4766 | SY | 167.000 | 167.000 | 78.000 | 384.700 | $9.00 | $702.00 | $3,462.30 |
0030 | REMOVAL OF SIDEWALK | 619(B) 4792 | SY | 934.000 | 934.000 | 128.000 | 745.700 | $7.00 | $896.00 | $5,219.90 |
Subtotals For Category 0100/ROADWAY - STP-STIM(284)IG | $45,871.70 | $391,237.08 | ||||||||
Fed/State Project Number: STP-STIM(284)IG | Project: 26703(04) | Category: 0300/TRAFFIC - STP-STIM(284)IG | ||||||||
0031 | TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 855(A) 8812 | LF | 11,547.000 | 11,547.000 | 0.000 | $1.00 | $0.00 | $0.00 | |
0032 | TRAFFIC STRIPE(PLASTIC)(ARROWS) | 855(B) 8818 | EA | 2.000 | 2.000 | 0.000 | $100.00 | $0.00 | $0.00 | |
0033 | CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 856(A) 8839 | LF | 14,463.000 | 14,463.000 | 13,799.000 | $0.16 | $0.00 | $2,207.84 | |
0034 | PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 859(A) 8006 | LF | 14,463.000 | 14,463.000 | 257.000 | $0.11 | $0.00 | $28.27 | |
0035 | CONSTRUCTION SIGNS 0 TO 6.25 SF | 880(B) 8818 | SD | 5,000.000 | 5,000.000 | 510.000 | 4,531.000 | $0.50 | $255.00 | $2,265.50 |
0036 | CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 880(B) 8821 | SD | 5,000.000 | 5,000.000 | 510.000 | 4,682.000 | $0.90 | $459.00 | $4,213.80 |
0037 | CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 880(B) 8824 | SD | 10,000.000 | 10,000.000 | 675.000 | 6,652.000 | $1.10 | $742.50 | $7,317.20 |
0038 | BARRICADES(TYPE III) | 880(C) 8842 | SD | 5,000.000 | 5,000.000 | 375.000 | 3,575.000 | $1.10 | $412.50 | $3,932.50 |
0039 | WARNING LIGHTS(TYPE A) | 880(E) 8860 | SD | 20,000.000 | 20,000.000 | 1,335.000 | 12,885.000 | $0.11 | $146.85 | $1,417.35 |
0040 | WARNING LIGHTS(TYPE C) | 880(E) 8872 | SD | 12,000.000 | 12,000.000 | 360.000 | 3,522.000 | $0.02 | $7.20 | $70.44 |
0041 | DRUMS | 880(F) 8878 | SD | 12,000.000 | 12,000.000 | 2,640.000 | 19,833.000 | $0.55 | $1,452.00 | $10,908.15 |
Subtotals For Category 0300/TRAFFIC - STP-STIM(284)IG | $3,475.05 | $32,361.05 | ||||||||
Fed/State Project Number: STP-STIM(284)IG | Project: 26703(04) | Category: 0301/TRAFFIC SIGNALS - STP-STIM(284)IG | ||||||||
0042 | (PL)HDPE CONDUIT BORED | 802(B) 8550 | LF | 407.000 | 407.000 | 407.000 | $11.00 | $0.00 | $4,477.00 | |
0043 | (PL)HDPE CONDUIT TRENCHED | 802(B) 8555 | LF | 32.000 | 32.000 | 32.000 | $5.50 | $0.00 | $176.00 | |
0044 | PULL BOX(SIZE II) | 803 8066 | EA | 3.000 | 3.000 | 3.000 | $435.00 | $0.00 | $1,305.00 | |
0045 | PULL BOX(SIZE III) | 803 8067 | EA | 1.000 | 1.000 | 1.000 | $550.00 | $0.00 | $550.00 | |
0046 | STRUCTURAL CONCRETE | 804(A) 2915 | CY | 4.200 | 4.200 | 0.000 | 4.200 | $435.00 | $0.00 | $1,827.00 |
0047 | REINFORCING STEEL | 804(B) 2916 | LB | 630.000 | 630.000 | 0.000 | 630.000 | $1.10 | $0.00 | $693.00 |
0048 | 32'MH POLE 25'TS & 8'LMA(G.STL.) | 806(A) 8286 | EA | 4.000 | 4.000 | 4.000 | $4,700.00 | $0.00 | $18,800.00 | |
0049 | SERVICE POLE | 810(A) 3118 | EA | 1.000 | 1.000 | 1.000 | $1,300.00 | $0.00 | $1,300.00 | |
0050 | 1/C NO.6 ELECTRICAL CONDUCTOR | 811 8040 | LF | 290.000 | 290.000 | 290.000 | $0.55 | $0.00 | $159.50 | |
0051 | 1/C NO.12 ELECTRICAL CONDUCTOR | 811 8046 | LF | 390.000 | 390.000 | 390.000 | $0.30 | $0.00 | $117.00 | |
0052 | VEH.ACT.SOL.ST.TRAF.SIG.CON.ASM | 825 8550 | EA | 1.000 | 1.000 | 1.000 | $16,500.00 | $0.00 | $16,500.00 | |
0053 | (PL)DETECTION SYSTEM (VIDEO) | 828 8132 | LSUM | 1.000 | 1.000 | 1.000 | $30,500.00 | $0.00 | $30,500.00 | |
0054 | PEDESTRIAN PUSH BUTTON | 830 8000 | EA | 8.000 | 8.000 | 8.000 | $165.00 | $0.00 | $1,320.00 | |
0055 | 1WAY 3SEC. ADJ. SIG. HD. S-6 | 831 8231 | EA | 8.000 | 8.000 | 8.000 | $680.00 | $0.00 | $5,440.00 | |
0056 | 1WAY 2SEC. ADJ. PED. SIG. HD. S-20 | 831 8295 | EA | 8.000 | 8.000 | 8.000 | $800.00 | $0.00 | $6,400.00 | |
0057 | 5/C TRAF.SIG.ELECT.CABLE | 834(A) 8207 | LF | 308.000 | 308.000 | 308.000 | $0.80 | $0.00 | $246.40 | |
0058 | 7/C TRAF.SIG.ELECT.CABLE | 834(A) 8208 | LF | 478.000 | 478.000 | 478.000 | $1.10 | $0.00 | $525.80 | |
0059 | 21/C TRAF.SIG.EL.CABLE | 834(A) 8213 | LF | 390.000 | 390.000 | 390.000 | $1.40 | $0.00 | $546.00 | |
0060 | 2/C SHIELDED LOOP DETECTOR LEAD-IN CABLE | 834(B) 8220 | LF | 587.000 | 587.000 | 0.000 | 587.000 | $0.55 | $0.00 | $322.85 |
0061 | (PL)E.P.S. OPTICAL DETECTOR | 840(B) 8593 | EA | 2.000 | 2.000 | 2.000 | $980.00 | $0.00 | $1,960.00 | |
0062 | (PL)E.P.S. OPTICAL DETECTOR CABLE | 840(C) 8594 | LF | 190.000 | 190.000 | 190.000 | $1.10 | $0.00 | $209.00 | |
0063 | (PL)E.P.S. 2 CHANNEL PHASE SELECTOR | 840(D) 8595 | EA | 1.000 | 1.000 | 1.000 | $2,200.00 | $0.00 | $2,200.00 | |
0064 | MAST ARM MOUNTED SIGNS(ALUMINUM) | 850(C) 8118 | SF | 42.700 | 42.700 | 42.700 | $16.00 | $0.00 | $683.20 | |
0065 | (PL)SPECIAL SIGNS | 850(D) 8121 | EA | 2.000 | 2.000 | 0.000 | $1,800.00 | $0.00 | $0.00 | |
0066 | (PL)REMOVAL OF TRAFFIC SIGNAL EQUIPMENT | 890(A) 8726 | LSUM | 1.000 | 1.000 | 0.000 | $1,100.00 | $0.00 | $0.00 | |
Subtotals For Category 0301/TRAFFIC SIGNALS - STP-STIM(284)IG | $0.00 | $96,257.75 | ||||||||
Fed/State Project Number: STP-STIM(284)IG | Project: 26703(04) | Category: 0600/STAKING - STP-STIM(284)IG | ||||||||
0067 | STAKING | 642 0098 | LSUM | 1.000 | 1.000 | 0.250 | $50,000.00 | $0.00 | $12,500.00 | |
Subtotals For Category 0600/STAKING - STP-STIM(284)IG | $0.00 | $12,500.00 | ||||||||
Fed/State Project Number: STP-STIM(284)IG | Project: 26703(04) | Category: 0640/CONSTRUCTION - STP-STIM(284)IG | ||||||||
0068 | (SP)SWPPP DOCUMENTATION AND MANAGEMENT | 220 2800 | LSUM | 1.000 | 1.000 | 0.250 | $5,000.00 | $0.00 | $1,250.00 | |
0069 | MOBILIZATION | 641 1552 | LSUM | 1.000 | 1.000 | 1.000 | $140,000.00 | $0.00 | $140,000.00 | |
Subtotals For Category 0640/CONSTRUCTION - STP-STIM(284)IG | $0.00 | $141,250.00 | ||||||||
Fed/State Project Number: STP-STIM(284)IG | Project: 26703(04) | Category: 0900/NON-PARTICIPATING (WATERLINE) - STP-STIM(284)IG | ||||||||
0070 | CLEARING AND GRUBBING | 201 0102 | LSUM | 1.000 | 1.000 | 0.000 | $2,000.00 | $0.00 | $0.00 | |
0071 | UNCLASSIFIED EXCAVATION | 202(A) 0183 | CY | 900.000 | 900.000 | 42.000 | 1,138.300 | $10.00 | $420.00 | $11,383.00 |
0072 | 6" WATER LINE CONNECTION | 616 0132 | EA | 8.000 | 8.000 | 1.000 | 6.000 | $500.00 | $500.00 | $3,000.00 |
0073 | 6" DUCTILE IRON PIPE | 616(A) 5121 | LF | 1,861.000 | 1,861.000 | 1,952.000 | $40.00 | $0.00 | $78,080.00 | |
0074 | 6" DUCTILE IRON PIPE RESTRAINED JOINT | 616(A) 5810 | LF | 174.000 | 174.000 | 50.000 | 209.000 | $46.00 | $2,300.00 | $9,614.00 |
0075 | 3/4" COPPER WATER SERVICE PIPE | 616(C) 0868 | LF | 16.000 | 16.000 | 0.000 | $9.00 | $0.00 | $0.00 | |
0076 | 1" COPPER WATER SERVICE PIPE | 616(C) 0869 | LF | 5.000 | 5.000 | 0.000 | $12.00 | $0.00 | $0.00 | |
0077 | 1 1/2" COPPER WATER SERVICE PIPE | 616(C) 0871 | LF | 6.000 | 6.000 | 0.000 | $17.00 | $0.00 | $0.00 | |
0078 | 6" GATE VALVE | 616(D) 1070 | EA | 12.000 | 12.000 | 1.000 | 14.000 | $1,100.00 | $1,100.00 | $15,400.00 |
0079 | 12" GATE VALVE | 616(D) 1100 | EA | 1.000 | 1.000 | 1.000 | $2,800.00 | $0.00 | $2,800.00 | |
0080 | STANDARD VALVE BOX | 616(D) 7051 | EA | 13.000 | 13.000 | 1.000 | 14.000 | $160.00 | $160.00 | $2,240.00 |
0081 | FIRE HYDRANTS | 616(G) 1192 | EA | 2.000 | 2.000 | 2.000 | $2,300.00 | $0.00 | $4,600.00 | |
0082 | FIRE HYDRANT EXTENSION | 616(G) 1193 | EA | 1.000 | 1.000 | 1.000 | $400.00 | $0.00 | $400.00 | |
0083 | 2" SOLID SLEEVE | 616(I) 0010 | EA | 1.000 | 1.000 | 1.000 | $260.00 | $0.00 | $260.00 | |
0084 | 4" SOLID SLEEVE | 616(I) 0014 | EA | 1.000 | 1.000 | 0.000 | $370.00 | $0.00 | $0.00 | |
0085 | 6" SOLID SLEEVE | 616(I) 0018 | EA | 3.000 | 3.000 | 1.000 | 4.000 | $550.00 | $550.00 | $2,200.00 |
0086 | 12" SOLID SLEEVE | 616(I) 0024 | EA | 1.000 | 1.000 | 0.000 | $1,200.00 | $0.00 | $0.00 | |
0087 | 6" X 6" X 6" TEE | 616(J) 0022 | EA | 6.000 | 6.000 | 6.000 | $500.00 | $0.00 | $3,000.00 | |
0088 | 12" X 12" X 6" TEE | 616(J) 0030 | EA | 1.000 | 1.000 | 1.000 | $900.00 | $0.00 | $900.00 | |
0089 | 4" 45 DEGREE FITTING | 616(K) 0038 | EA | 2.000 | 2.000 | 0.000 | $250.00 | $0.00 | $0.00 | |
0090 | 6" 45 DEGREE FITTING | 616(K) 0042 | EA | 12.000 | 12.000 | 2.000 | 18.000 | $350.00 | $700.00 | $6,300.00 |
0091 | 6" X 4" REDUCER | 616(L) 0070 | EA | 2.000 | 2.000 | 1.000 | $250.00 | $0.00 | $250.00 | |
0092 | SHORT WATER SERVICE & RESET METER | 616(N) 0094 | EA | 4.000 | 4.000 | 2.000 | $1,100.00 | $0.00 | $2,200.00 | |
0093 | LONG WATER SERVICE & RESET METER | 616(N) 0096 | EA | 1.000 | 1.000 | 1.000 | $3,000.00 | $0.00 | $3,000.00 | |
Subtotals For Category 0900/NON-PARTICIPATING (WATERLINE) - STP-STIM(284)IG | $5,730.00 | $145,627.00 | ||||||||
Fed/State Project Number: STP-STIM(284)IG | Project: 26703(04) | Category: 0910/NON-PARTICIPATING (SANITARY SEWER ALTERNATE)-STP-STIM(284)IG | ||||||||
0094 | UNCLASSIFIED EXCAVATION | 202(A) 0183 | CY | 550.000 | 550.000 | 0.000 | $25.00 | $0.00 | $0.00 | |
0095 | (SP)FULL DEPTH P.C.C. PATCH(PLACEMENT) | 414(N) 5800 | SY | 348.000 | 348.000 | 0.000 | $38.00 | $0.00 | $0.00 | |
0096 | (SP)P.C. CONCRETE FOR PAVEMENT | 414(P) 6000 | CY | 78.000 | 78.000 | 0.000 | $120.00 | $0.00 | $0.00 | |
0097 | COMBINED CURB & GUTTER (6" BARRIER) | 609(B) 0383 | LF | 178.000 | 178.000 | 0.000 | $25.00 | $0.00 | $0.00 | |
0098 | 6" CONCRETE DRIVEWAY (H.E.S.) | 610(B) 0399 | SY | 77.000 | 77.000 | 0.000 | $75.00 | $0.00 | $0.00 | |
0099 | MANHOLE (4' DIAMETER) | 611(A) 2657 | EA | 1.000 | 1.000 | 0.000 | $3,000.00 | $0.00 | $0.00 | |
0100 | MANHOLE (5' DIAMETER) | 611(A) 2658 | EA | 1.000 | 1.000 | 0.000 | $5,000.00 | $0.00 | $0.00 | |
0101 | SANITARY SEWER SERVICE CONNECTION | 615(D) 0300 | EA | 9.000 | 9.000 | 0.000 | $1,500.00 | $0.00 | $0.00 | |
0102 | 8" DUCTILE IRON PIPE | 616(A) 5122 | LF | 66.000 | 66.000 | 0.000 | $75.00 | $0.00 | $0.00 | |
0103 | 12" DUCTILE IRON PIPE | 616(A) 5124 | LF | 190.000 | 190.000 | 0.000 | $100.00 | $0.00 | $0.00 | |
0104 | 18" DUCTILE IRON PIPE | 616(A) 5125 | LF | 243.000 | 243.000 | 0.000 | $175.00 | $0.00 | $0.00 | |
Subtotals For Category 0910/NON-PARTICIPATING (SANITARY SEWER ALTERNATE)-STP-STIM(284)IG | $0.00 | $0.00 | ||||||||
Subtotals For Project STP-STIM(284)IG /26703(04) | $55,076.75 | $819,232.88 |
Line Item Number | Item Description | Item Number | Units | Bid Qty | Current Quantity | Quantity Paid This Est. | Quantity Paid To Date | Unit Price | Amount Paid This Est. | Amount Paid To Date |
Fed/State Project Number: STP-STIM(286)IG | Project: 26705(04) | Category: 0100/ROADWAY - STP-STIM(286)IG | ||||||||
0001 | UNCLASSIFIED EXCAVATION | 202(A) 0183 | CY | 2,261.000 | 2,261.000 | 0.000 | $10.00 | $0.00 | $0.00 | |
0002 | TEMPORARY BALE BARRIER | 222 2801 | LF | 1,000.000 | 1,000.000 | 0.000 | $3.00 | $0.00 | $0.00 | |
0003 | SOLID SLAB SODDING | 230(A) 2806 | SY | 434.000 | 434.000 | 0.000 | $1.50 | $0.00 | $0.00 | |
0004 | AGGREGATE BASE | 303 0192 | CY | 2,261.000 | 2,261.000 | 0.000 | $45.00 | $0.00 | $0.00 | |
0005 | SUBGRADE, METHOD B | 310(B) 0149 | SY | 7,110.000 | 7,110.000 | 0.000 | $0.20 | $0.00 | $0.00 | |
0006 | (SP)ASPHALT CONCRETE TYPE S3(PATCHING)(PG 64-22 OK) | 411(S3) 6210 | TON | 616.000 | 616.000 | 0.000 | $115.00 | $0.00 | $0.00 | |
0007 | (SP)ASPHALT CONCRETE TYPE S4(PG 70-28 OK) | 411(S4) 5955 | TON | 5,761.000 | 5,761.000 | 0.000 | $73.00 | $0.00 | $0.00 | |
0008 | (SP)ASPHALT CONCRETE TYPE S5(PG 64-22 OK) | 411(S5) 5975 | TON | 1,060.000 | 1,060.000 | 0.000 | $60.00 | $0.00 | $0.00 | |
0009 | (SP)FULL DEPTH P.C.C. PATCH(PLACEMENT) | 414(N) 5800 | SY | 4,647.000 | 4,647.000 | 0.000 | $38.00 | $0.00 | $0.00 | |
0010 | (SP)P.C. CONCRETE FOR PAVEMENT | 414(P) 6000 | CY | 1,162.000 | 1,162.000 | 0.000 | $120.00 | $0.00 | $0.00 | |
0011 | COLD MILLING BITUMINOUS PAVEMENT | 417 4267 | SY | 34,291.000 | 34,291.000 | 0.000 | $1.65 | $0.00 | $0.00 | |
0012 | FABRIC REINFORCEMENT | 420(A) 4242 | SY | 34,291.000 | 34,291.000 | 0.000 | $1.50 | $0.00 | $0.00 | |
0013 | CLSM BACKFILL | 501(G) 6315 | CY | 274.000 | 274.000 | 0.000 | $60.00 | $0.00 | $0.00 | |
0014 | CONCRETE CURB (8" BARRIER-INTEGRAL) | 609(A) 0380 | LF | 1,912.000 | 1,912.000 | 0.000 | $8.00 | $0.00 | $0.00 | |
0015 | 4" CONCRETE SIDEWALK | 610(A) 0602 | SY | 258.000 | 258.000 | 0.000 | $120.00 | $0.00 | $0.00 | |
0016 | 6" CONCRETE DRIVEWAY (H.E.S.) | 610(B) 0399 | SY | 645.000 | 645.000 | 0.000 | $65.00 | $0.00 | $0.00 | |
0017 | BITUMINOUS DRIVEWAY (6") | 610(G) 4475 | SY | 57.000 | 57.000 | 0.000 | $30.00 | $0.00 | $0.00 | |
0018 | INLET CICI DES. 2 (STD) | 611(E) 5112 | EA | 7.000 | 7.000 | 0.000 | $3,000.00 | $0.00 | $0.00 | |
0019 | INLET FRM&GRT (SSIF-FRM,CIG-GRT-VG-F) | 611(G) 4488 | EA | 16.000 | 16.000 | 0.000 | $400.00 | $0.00 | $0.00 | |
0020 | CAST IRON CURB INLETS | 611(K) 4488 | EA | 9.000 | 9.000 | 0.000 | $450.00 | $0.00 | $0.00 | |
0021 | MANHOLES ADJUST TO GRADE | 612(A) 0641 | EA | 7.000 | 7.000 | 0.000 | $1,000.00 | $0.00 | $0.00 | |
0022 | VALVE BOXES ADJUST TO GRADE | 612(G) 0647 | EA | 1.000 | 1.000 | 0.000 | $300.00 | $0.00 | $0.00 | |
0023 | REMOVAL OF CONCRETE DRIVEWAY | 619(B) 4766 | SY | 813.000 | 813.000 | 0.000 | $9.00 | $0.00 | $0.00 | |
0024 | REMOVAL OF CURB | 619(B) 4791 | LF | 1,912.000 | 1,912.000 | 0.000 | $3.00 | $0.00 | $0.00 | |
0025 | REMOVAL OF SIDEWALK | 619(B) 4792 | SY | 325.000 | 325.000 | 0.000 | $7.00 | $0.00 | $0.00 | |
0026 | REMOVAL OF CONCRETE MEDIAN BARRIER | 619(B) 4915 | LF | 682.000 | 682.000 | 0.000 | $6.00 | $0.00 | $0.00 | |
Subtotals For Category 0100/ROADWAY - STP-STIM(286)IG | $0.00 | $0.00 | ||||||||
Fed/State Project Number: STP-STIM(286)IG | Project: 26705(04) | Category: 0300/TRAFFIC - STP-STIM(286)IG | ||||||||
0027 | TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 855(A) 8812 | LF | 26,257.000 | 26,257.000 | 0.000 | $1.00 | $0.00 | $0.00 | |
0028 | TRAFFIC STRIPE(PLASTIC)(ARROWS) | 855(B) 8818 | EA | 16.000 | 16.000 | 0.000 | $90.00 | $0.00 | $0.00 | |
0029 | (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 856(G) 8887 | EA | 10,000.000 | 10,000.000 | 0.000 | $0.40 | $0.00 | $0.00 | |
0030 | PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 859(A) 8006 | LF | 3,500.000 | 3,500.000 | 0.000 | $0.11 | $0.00 | $0.00 | |
0031 | CONSTRUCTION SIGNS 0 TO 6.25 SF | 880(B) 8818 | SD | 20,000.000 | 20,000.000 | 0.000 | $0.02 | $0.00 | $0.00 | |
0032 | CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 880(B) 8821 | SD | 20,000.000 | 20,000.000 | 0.000 | $0.40 | $0.00 | $0.00 | |
0033 | CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 880(B) 8824 | SD | 40,000.000 | 40,000.000 | 0.000 | $0.02 | $0.00 | $0.00 | |
0034 | BARRICADES(TYPE III) | 880(C) 8842 | SD | 20,000.000 | 20,000.000 | 0.000 | $0.30 | $0.00 | $0.00 | |
0035 | WARNING LIGHTS(TYPE A) | 880(E) 8860 | SD | 80,000.000 | 80,000.000 | 0.000 | $0.02 | $0.00 | $0.00 | |
0036 | WARNING LIGHTS(TYPE C) | 880(E) 8872 | SD | 50,000.000 | 50,000.000 | 0.000 | $0.02 | $0.00 | $0.00 | |
0037 | DRUMS | 880(F) 8878 | SD | 50,000.000 | 50,000.000 | 0.000 | $0.16 | $0.00 | $0.00 | |
Subtotals For Category 0300/TRAFFIC - STP-STIM(286)IG | $0.00 | $0.00 | ||||||||
Fed/State Project Number: STP-STIM(286)IG | Project: 26705(04) | Category: 0301/TRAFFIC SIGNAL - STP-STIM(286)IG | ||||||||
0038 | 3" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 802(B) 8346 | LF | 115.000 | 115.000 | 115.000 | $5.50 | $0.00 | $632.50 | |
0039 | (PL)HDPE CONDUIT BORED | 802(B) 8550 | LF | 365.000 | 365.000 | 365.000 | $16.00 | $0.00 | $5,840.00 | |
0040 | PULL BOX(SIZE II) | 803 8066 | EA | 3.000 | 3.000 | 3.000 | $435.00 | $0.00 | $1,305.00 | |
0041 | PULL BOX(SIZE III) | 803 8067 | EA | 1.000 | 1.000 | 1.000 | $550.00 | $0.00 | $550.00 | |
0042 | STRUCTURAL CONCRETE | 804(A) 2915 | CY | 11.800 | 11.800 | 0.000 | 11.800 | $435.00 | $0.00 | $5,133.00 |
0043 | REINFORCING STEEL | 804(B) 2916 | LB | 1,787.000 | 1,787.000 | 0.000 | 1,787.000 | $1.10 | $0.00 | $1,965.71 |
0044 | POLE & 35' TS MST.ARM(G.STL.) | 806(A) 8730 | EA | 3.000 | 3.000 | 3.000 | $5,400.00 | $0.00 | $16,200.00 | |
0045 | POLE & 40' TS MST.ARM(G.STL.) | 806(A) 8732 | EA | 1.000 | 1.000 | 1.000 | $6,700.00 | $0.00 | $6,700.00 | |
0046 | SERVICE POLE | 810(A) 3118 | EA | 1.000 | 1.000 | 0.000 | $1,300.00 | $0.00 | $0.00 | |
0047 | 1/C NO.6 ELECTRICAL CONDUCTOR | 811 8040 | LF | 435.000 | 435.000 | 435.000 | $0.55 | $0.00 | $239.25 | |
0048 | 1/C NO.12 ELECTRICAL CONDUCTOR | 811 8046 | LF | 515.000 | 515.000 | 515.000 | $0.30 | $0.00 | $154.50 | |
0049 | (PL)TRAFFIC SIGNAL SPAN WIRE EQUIPMENT | 823 8482 | LSUM | 1.000 | 1.000 | 1.000 | $2,700.00 | $0.00 | $2,700.00 | |
0050 | VEH.ACT.SOL.ST.TRAF.SIG.CON.ASM | 825 8550 | EA | 1.000 | 1.000 | 1.000 | $16,000.00 | $0.00 | $16,000.00 | |
0051 | (PL)DETECTION SYSTEM (VIDEO) | 828 8132 | LSUM | 1.000 | 1.000 | 0.000 | $31,000.00 | $0.00 | $0.00 | |
0052 | PEDESTRIAN PUSH BUTTON | 830 8000 | EA | 8.000 | 8.000 | 8.000 | $135.00 | $0.00 | $1,080.00 | |
0053 | 1WAY 3SEC. ADJ. SIG. HD. S-6 | 831 8231 | EA | 8.000 | 8.000 | 0.000 | $680.00 | $0.00 | $0.00 | |
0054 | 1WAY 5SEC. ADJ. SIG. HD. S-19 | 831 8286 | EA | 5.000 | 5.000 | 0.000 | $980.00 | $0.00 | $0.00 | |
0055 | 1WAY 2SEC. ADJ. PED. SIG. HD. S-20 | 831 8295 | EA | 8.000 | 8.000 | 0.000 | $780.00 | $0.00 | $0.00 | |
0056 | BACKPLATE | 833 3030 | EA | 13.000 | 13.000 | 0.000 | $11.00 | $0.00 | $0.00 | |
0057 | 5/C TRAF.SIG.ELECT.CABLE | 834(A) 8207 | LF | 340.000 | 340.000 | 340.000 | $0.80 | $0.00 | $272.00 | |
0058 | 7/C TRAF.SIG.ELECT.CABLE | 834(A) 8208 | LF | 270.000 | 270.000 | 270.000 | $1.10 | $0.00 | $297.00 | |
0059 | 9/C TRAF.SIG.EL.CABLE | 834(A) 8209 | LF | 600.000 | 600.000 | 600.000 | $1.35 | $0.00 | $810.00 | |
0060 | 21/C TRAF.SIG.EL.CABLE | 834(A) 8213 | LF | 515.000 | 515.000 | 515.000 | $1.35 | $0.00 | $695.25 | |
0061 | 2/C SHIELDED LOOP DETECTOR LEAD-IN CABLE | 834(B) 8220 | LF | 45.000 | 45.000 | 0.000 | 45.000 | $0.55 | $0.00 | $24.75 |
0062 | (PL)E.P.S. OPTICAL DETECTOR | 840(B) 8593 | EA | 2.000 | 2.000 | 2.000 | $980.00 | $0.00 | $1,960.00 | |
0063 | (PL)E.P.S. OPTICAL DETECTOR CABLE | 840(C) 8594 | LF | 245.000 | 245.000 | 245.000 | $1.10 | $0.00 | $269.50 | |
0064 | (PL)E.P.S. 2 CHANNEL PHASE SELECTOR | 840(D) 8595 | EA | 2.000 | 2.000 | 2.000 | $2,200.00 | $0.00 | $4,400.00 | |
0065 | MAST ARM MOUNTED SIGNS(ALUMINUM) | 850(C) 8118 | SF | 72.000 | 72.000 | 72.000 | $16.00 | $0.00 | $1,152.00 | |
0066 | (PL)REMOVAL OF TRAFFIC SIGNAL EQUIPMENT | 890(A) 8726 | LSUM | 1.000 | 1.000 | 0.000 | $1,100.00 | $0.00 | $0.00 | |
Subtotals For Category 0301/TRAFFIC SIGNAL - STP-STIM(286)IG | $0.00 | $68,380.46 | ||||||||
Fed/State Project Number: STP-STIM(286)IG | Project: 26705(04) | Category: 0900/NON-PARTICIPATING (WATERLINE) - STP-STIM(286)IG | ||||||||
0067 | CLEARING AND GRUBBING | 201 0102 | LSUM | 1.000 | 1.000 | 0.000 | $2,000.00 | $0.00 | $0.00 | |
0068 | UNCLASSIFIED EXCAVATION | 202(A) 0183 | CY | 1,396.000 | 1,396.000 | 0.000 | $10.00 | $0.00 | $0.00 | |
0069 | SOLID SLAB SODDING | 230(A) 2806 | SY | 867.000 | 867.000 | 0.000 | $1.50 | $0.00 | $0.00 | |
0070 | (SP)ASPHALT CONCRETE TYPE S3(PATCHING)(PG 64-22 OK) | 411(S3) 6210 | TON | 54.000 | 54.000 | 0.000 | $120.00 | $0.00 | $0.00 | |
0071 | (SP)FULL DEPTH P.C.C. PATCH(PLACEMENT) | 414(N) 5800 | SY | 349.000 | 349.000 | 0.000 | $50.00 | $0.00 | $0.00 | |
0072 | (SP)P.C. CONCRETE FOR PAVEMENT | 414(P) 6000 | CY | 88.000 | 88.000 | 0.000 | $120.00 | $0.00 | $0.00 | |
0073 | 8" PLUG | 616 0110 | EA | 2.000 | 2.000 | 0.000 | $330.00 | $0.00 | $0.00 | |
0074 | 8" DUCTILE IRON PIPE | 616(A) 5122 | LF | 145.000 | 145.000 | 0.000 | $46.00 | $0.00 | $0.00 | |
0075 | 12" DUCTILE IRON PIPE | 616(A) 5124 | LF | 3,588.000 | 3,588.000 | 0.000 | $58.00 | $0.00 | $0.00 | |
0076 | 6" DUCTILE IRON PIPE RESTRAINED JOINT | 616(A) 5810 | LF | 175.000 | 175.000 | 0.000 | $46.00 | $0.00 | $0.00 | |
0077 | 3/4" COPPER WATER SERVICE PIPE | 616(C) 0868 | LF | 430.000 | 430.000 | 0.000 | $9.00 | $0.00 | $0.00 | |
0078 | 1" COPPER WATER SERVICE PIPE | 616(C) 0869 | LF | 205.000 | 205.000 | 0.000 | $12.00 | $0.00 | $0.00 | |
0079 | 1 1/2" COPPER WATER SERVICE PIPE | 616(C) 0871 | LF | 85.000 | 85.000 | 0.000 | $17.00 | $0.00 | $0.00 | |
0080 | 2" COPPER WATER SERVICE PIPE | 616(C) 0872 | LF | 80.000 | 80.000 | 0.000 | $25.00 | $0.00 | $0.00 | |
0081 | 2" AIR RELIEF VALVE ASSEMBLY & METER CAN | 616(D) 0767 | EA | 1.000 | 1.000 | 0.000 | $4,000.00 | $0.00 | $0.00 | |
0082 | 6" GATE VALVE | 616(D) 1070 | EA | 7.000 | 7.000 | 0.000 | $1,200.00 | $0.00 | $0.00 | |
0083 | 8" GATE VALVE | 616(D) 1080 | EA | 4.000 | 4.000 | 0.000 | $1,700.00 | $0.00 | $0.00 | |
0084 | 12" GATE VALVE | 616(D) 1100 | EA | 16.000 | 16.000 | 0.000 | $2,900.00 | $0.00 | $0.00 | |
0085 | 3/4" CORPORATION STOPS | 616(E) 0878 | EA | 9.000 | 9.000 | 0.000 | $100.00 | $0.00 | $0.00 | |
0086 | 1" CORPORATION STOPS | 616(E) 0879 | EA | 3.000 | 3.000 | 0.000 | $125.00 | $0.00 | $0.00 | |
0087 | 1 1/2" CORPORATION STOPS | 616(E) 0902 | EA | 2.000 | 2.000 | 0.000 | $200.00 | $0.00 | $0.00 | |
0088 | 2" CORPORATION STOPS | 616(E) 0903 | EA | 2.000 | 2.000 | 0.000 | $285.00 | $0.00 | $0.00 | |
0089 | (PL)METER INSTALLATION 1" | 616(F) 5208 | EA | 3.000 | 3.000 | 0.000 | $430.00 | $0.00 | $0.00 | |
0090 | METER INSTALLATION 1 1/2" | 616(F) 5210 | EA | 2.000 | 2.000 | 0.000 | $1,500.00 | $0.00 | $0.00 | |
0091 | METER INSTALLATION 2" | 616(F) 5211 | EA | 2.000 | 2.000 | 0.000 | $1,800.00 | $0.00 | $0.00 | |
0092 | METER INSTALLATION 3/4" | 616(F) 5948 | EA | 9.000 | 9.000 | 0.000 | $680.00 | $0.00 | $0.00 | |
0093 | FIRE HYDRANTS | 616(G) 1192 | EA | 5.000 | 5.000 | 0.000 | $2,800.00 | $0.00 | $0.00 | |
0094 | 6" SOLID SLEEVE | 616(I) 0018 | EA | 2.000 | 2.000 | 0.000 | $550.00 | $0.00 | $0.00 | |
0095 | 8" SOLID SLEEVE | 616(I) 0020 | EA | 4.000 | 4.000 | 0.000 | $725.00 | $0.00 | $0.00 | |
0096 | 12" SOLID SLEEVE | 616(I) 0024 | EA | 3.000 | 3.000 | 0.000 | $1,200.00 | $0.00 | $0.00 | |
0097 | 12" X 12" X 6" TEE | 616(J) 0030 | EA | 7.000 | 7.000 | 0.000 | $900.00 | $0.00 | $0.00 | |
0098 | 12" X 12" X 8" TEE | 616(J) 0032 | EA | 3.000 | 3.000 | 0.000 | $1,000.00 | $0.00 | $0.00 | |
0099 | 6" 45 DEGREE FITTING | 616(K) 0042 | EA | 4.000 | 4.000 | 0.000 | $350.00 | $0.00 | $0.00 | |
0100 | 8" 45 DEGREE FITTING | 616(K) 0044 | EA | 6.000 | 6.000 | 0.000 | $450.00 | $0.00 | $0.00 | |
0101 | 12" 45 DEGREE FITTING | 616(K) 0047 | EA | 30.000 | 30.000 | 0.000 | $775.00 | $0.00 | $0.00 | |
0102 | 12" X 8" REDUCER | 616(L) 0082 | EA | 2.000 | 2.000 | 0.000 | $500.00 | $0.00 | $0.00 | |
0103 | 12" X 12" X 12" X 12" CROSS | 616(M) 0082 | EA | 1.000 | 1.000 | 0.000 | $1,500.00 | $0.00 | $0.00 | |
0104 | REMOVAL OF ASPHALT PAVEMENT | 619(B) 4728 | SY | 471.000 | 471.000 | 0.000 | $9.00 | $0.00 | $0.00 | |
Subtotals For Category 0900/NON-PARTICIPATING (WATERLINE) - STP-STIM(286)IG | $0.00 | $0.00 | ||||||||
Fed/State Project Number: STP-STIM(286)IG | Project: 26705(04) | Category: 0910/NON-PARTICIPATING (SANITARY SEWER) - STP-STIM(286)IG | ||||||||
0105 | 8" SEWER PIPE | 615(C) 6121 | LF | 65.000 | 65.000 | 0.000 | $200.00 | $0.00 | $0.00 | |
Subtotals For Category 0910/NON-PARTICIPATING (SANITARY SEWER) - STP-STIM(286)IG | $0.00 | $0.00 | ||||||||
Subtotals For Project STP-STIM(286)IG /26705(04) | $0.00 | $68,380.46 |
Line Item Number | Item Description | Item Number | Units | Bid Qty | Current Quantity | Quantity Paid This Est. | Quantity Paid To Date | Unit Price | Amount Paid This Est. | Amount Paid To Date |
Fed/State Project Number: STP-STIM(482)IG | Project: 26968(04) | Category: 0100/ROADWAY - STP-STIM(482)IG | ||||||||
0001 | UNCLASSIFIED EXCAVATION | 202(A) 0183 | CY | 3,332.000 | 3,332.000 | 512.000 | 1,228.000 | $10.00 | $5,120.00 | $12,280.00 |
0002 | TEMPORARY BALE BARRIER | 222 2801 | LF | 100.000 | 100.000 | 0.000 | $3.00 | $0.00 | $0.00 | |
0003 | TEMPORARY SEDIMENT FILTER | 224 2803 | EA | 25.000 | 25.000 | 0.000 | $50.00 | $0.00 | $0.00 | |
0004 | SOLID SLAB SODDING | 230(A) 2806 | SY | 620.000 | 620.000 | 0.000 | $1.50 | $0.00 | $0.00 | |
0005 | AGGREGATE BASE | 303 0192 | CY | 1,975.000 | 1,975.000 | 341.000 | 1,104.700 | $45.00 | $15,345.00 | $49,711.50 |
0006 | SUBGRADE, METHOD B | 310(B) 0149 | SY | 5,913.000 | 5,913.000 | 933.000 | 2,296.000 | $0.20 | $186.60 | $459.20 |
0007 | (SP)ASPHALT CONCRETE TYPE S4(PG 70-28 OK) | 411(S4) 5955 | TON | 275.000 | 275.000 | 0.000 | 61.130 | $90.00 | $0.00 | $5,501.70 |
0008 | (SP)ASPHALT CONCRETE TYPE S5(PG 64-22 OK) | 411(S5) 5975 | TON | 130.000 | 130.000 | 0.000 | $75.00 | $0.00 | $0.00 | |
0009 | 9" P.C. DOWEL JOINTED CONCRETE PAVEMENT | 414(A1) 5754 | SY | 4,000.000 | 4,000.000 | 877.000 | 1,584.000 | $60.00 | $52,620.00 | $95,040.00 |
0010 | H.E.S. CONCRETE (FULL DEPTH PATCHING) | 414(B) 5913 | SY | 915.000 | 915.000 | 56.000 | 712.000 | $75.00 | $4,200.00 | $53,400.00 |
0011 | COLD MILLING BITUMINOUS PAVEMENT | 417 4267 | SY | 2,365.000 | 2,365.000 | 0.000 | $1.65 | $0.00 | $0.00 | |
0012 | FABRIC REINFORCEMENT | 420(A) 4242 | SY | 3,080.000 | 3,080.000 | 0.000 | $2.00 | $0.00 | $0.00 | |
0013 | CONCRETE CURB (8" BARRIER-INTEGRAL) | 609(A) 0380 | LF | 1,410.000 | 1,410.000 | 155.000 | 644.000 | $7.00 | $1,085.00 | $4,508.00 |
0014 | 4" CONCRETE SIDEWALK | 610(A) 0602 | SY | 400.000 | 400.000 | 88.000 | 231.000 | $73.00 | $6,424.00 | $16,863.00 |
0015 | 6" CONCRETE DRIVEWAY (H.E.S.) | 610(B) 0399 | SY | 550.000 | 550.000 | 96.000 | 364.000 | $65.00 | $6,240.00 | $23,660.00 |
0016 | BITUMINOUS DRIVEWAY (6") | 610(G) 4475 | SY | 80.000 | 80.000 | 0.000 | $30.00 | $0.00 | $0.00 | |
0017 | INLET CICI DES. 2 (STD) | 611(E) 5112 | EA | 5.000 | 5.000 | 1.000 | 1.000 | $2,700.00 | $2,700.00 | $2,700.00 |
0018 | INLET CICI DES. 2 (B) | 611(E) 5113 | EA | 1.000 | 1.000 | 1.000 | 1.000 | $3,500.00 | $3,500.00 | $3,500.00 |
0019 | MANHOLES ADJUST TO GRADE | 612(A) 0641 | EA | 4.000 | 4.000 | 1.000 | $1,000.00 | $0.00 | $1,000.00 | |
0020 | VALVES RESET | 612(K) 0651 | EA | 1.000 | 1.000 | 0.000 | $300.00 | $0.00 | $0.00 | |
0021 | REMOVAL OF DRAINAGE INLETS | 619(B) 4741 | EA | 6.000 | 6.000 | 2.000 | 2.000 | $350.00 | $700.00 | $700.00 |
0022 | REMOVAL OF CONCRETE DRIVEWAY | 619(B) 4766 | SY | 630.000 | 630.000 | 245.000 | $6.00 | $0.00 | $1,470.00 | |
0023 | REMOVAL OF CURB | 619(B) 4791 | LF | 1,410.000 | 1,410.000 | 155.000 | 644.000 | $3.00 | $465.00 | $1,932.00 |
0024 | REMOVAL OF SIDEWALK | 619(B) 4792 | SY | 325.000 | 325.000 | 187.500 | $5.00 | $0.00 | $937.50 | |
0025 | REMOVAL OF CONCRETE MEDIAN BARRIER | 619(B) 4915 | LF | 480.000 | 480.000 | 272.000 | 811.000 | $6.00 | $1,632.00 | $4,866.00 |
Subtotals For Category 0100/ROADWAY - STP-STIM(482)IG | $100,217.60 | $278,528.90 | ||||||||
Fed/State Project Number: STP-STIM(482)IG | Project: 26968(04) | Category: 0300/TRAFFIC - STP-STIM(482)IG | ||||||||
0026 | TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 855(A) 8812 | LF | 5,785.000 | 5,785.000 | 0.000 | $1.00 | $0.00 | $0.00 | |
0027 | TRAFFIC STRIPE(PLASTIC)(ARROWS) | 855(B) 8818 | EA | 8.000 | 8.000 | 0.000 | $100.00 | $0.00 | $0.00 | |
0028 | CONSTRUCTION SIGNS 0 TO 6.25 SF | 880(B) 8818 | SD | 2,805.000 | 2,805.000 | 120.000 | 304.000 | $0.50 | $60.00 | $152.00 |
0029 | CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 880(B) 8821 | SD | 4,198.000 | 4,198.000 | 270.000 | 974.000 | $1.00 | $270.00 | $974.00 |
0030 | CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 880(B) 8824 | SD | 3,823.000 | 3,823.000 | 195.000 | 604.000 | $1.10 | $214.50 | $664.40 |
0031 | WARNING LIGHTS(TYPE A) | 880(E) 8860 | SD | 8,543.000 | 8,543.000 | 795.000 | 2,144.000 | $0.11 | $87.45 | $235.84 |
0032 | WARNING LIGHTS(TYPE C) | 880(E) 8872 | SD | 8,058.000 | 8,058.000 | 0.000 | $0.02 | $0.00 | $0.00 | |
0033 | DRUMS | 880(F) 8878 | SD | 8,058.000 | 8,058.000 | 0.000 | $0.55 | $0.00 | $0.00 | |
0034 | TUBE CHANNELIZERS | 880(G) 8884 | SD | 25,942.000 | 25,942.000 | 2,775.000 | 8,880.000 | $0.05 | $138.75 | $444.00 |
0035 | BARRICADES(TYPE III) | 880(J) 8021 | SD | 3,823.000 | 3,823.000 | 300.000 | 980.000 | $1.10 | $330.00 | $1,078.00 |
Subtotals For Category 0300/TRAFFIC - STP-STIM(482)IG | $1,100.70 | $3,548.24 | ||||||||
Fed/State Project Number: STP-STIM(482)IG | Project: 26968(04) | Category: 0301/TRAFFIC SIGNALS - STP-STIM(482)IG | ||||||||
0036 | 3" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 802(B) 8346 | LF | 585.000 | 585.000 | 583.000 | $5.50 | $0.00 | $3,206.50 | |
0037 | PULL BOX(SIZE I) | 803 8065 | EA | 3.000 | 3.000 | 3.000 | $435.00 | $0.00 | $1,305.00 | |
0038 | PULL BOX(SIZE II) | 803 8066 | EA | 1.000 | 1.000 | 1.000 | $550.00 | $0.00 | $550.00 | |
0039 | STRUCTURAL CONCRETE | 804(A) 2915 | CY | 1.400 | 1.400 | 0.000 | $435.00 | $0.00 | $0.00 | |
0040 | REINFORCING STEEL | 804(B) 2916 | LB | 108.000 | 108.000 | 0.000 | $1.10 | $0.00 | $0.00 | |
0041 | 10' MTG.HT.TS PED.POLE(G.STL.) | 806(B) 8894 | EA | 4.000 | 4.000 | 0.000 | $775.00 | $0.00 | $0.00 | |
0042 | SERVICE POLE | 810(A) 3118 | EA | 1.000 | 1.000 | 1.000 | $1,300.00 | $0.00 | $1,300.00 | |
0043 | 1/C NO.6 ELECTRICAL CONDUCTOR | 811 8040 | LF | 400.000 | 400.000 | 0.000 | $0.55 | $0.00 | $0.00 | |
0044 | 1/C NO.12 ELECTRICAL CONDUCTOR | 811 8046 | LF | 415.000 | 415.000 | 0.000 | $0.30 | $0.00 | $0.00 | |
0045 | (PL)TRAFFIC SIGNAL SPAN WIRE EQUIPMENT | 823 8482 | LSUM | 1.000 | 1.000 | 1.000 | $2,700.00 | $0.00 | $2,700.00 | |
0046 | VEH.ACT.SOL.ST.TRAF.SIG.CON.ASM | 825 8550 | EA | 1.000 | 1.000 | 1.000 | $16,000.00 | $0.00 | $16,000.00 | |
0047 | (PL)DETECTION SYSTEM (VIDEO) | 828 8132 | LSUM | 1.000 | 1.000 | 1.000 | $30,000.00 | $0.00 | $30,000.00 | |
0048 | PEDESTRIAN PUSH BUTTON | 830 8000 | EA | 8.000 | 8.000 | 0.000 | $135.00 | $0.00 | $0.00 | |
0049 | 1WAY 2SEC. ADJ. PED. SIG. HD. S-20 | 831 8295 | EA | 8.000 | 8.000 | 0.000 | $800.00 | $0.00 | $0.00 | |
0050 | 5/C TRAF.SIG.ELECT.CABLE | 834(A) 8207 | LF | 140.000 | 140.000 | 0.000 | $0.80 | $0.00 | $0.00 | |
0051 | 7/C TRAF.SIG.ELECT.CABLE | 834(A) 8208 | LF | 480.000 | 480.000 | 0.000 | $1.10 | $0.00 | $0.00 | |
0052 | 21/C TRAF.SIG.EL.CABLE | 834(A) 8213 | LF | 830.000 | 830.000 | 0.000 | $1.35 | $0.00 | $0.00 | |
0053 | 2/C SHIELDED LOOP DETECTOR LEAD-IN CABLE | 834(B) 8220 | LF | 540.000 | 540.000 | 0.000 | $0.55 | $0.00 | $0.00 | |
0054 | (PL)E.P.S. OPTICAL DETECTOR | 840(B) 8593 | EA | 2.000 | 2.000 | 2.000 | $980.00 | $0.00 | $1,960.00 | |
0055 | (PL)E.P.S. OPTICAL DETECTOR CABLE | 840(C) 8594 | LF | 175.000 | 175.000 | 0.000 | $1.10 | $0.00 | $0.00 | |
0056 | (PL)E.P.S. 2 CHANNEL PHASE SELECTOR | 840(D) 8595 | EA | 1.000 | 1.000 | 1.000 | $2,200.00 | $0.00 | $2,200.00 | |
0057 | (PL)REMOVAL OF TRAFFIC SIGNAL EQUIPMENT | 890(A) 8726 | LSUM | 1.000 | 1.000 | 0.000 | $1,100.00 | $0.00 | $0.00 | |
Subtotals For Category 0301/TRAFFIC SIGNALS - STP-STIM(482)IG | $0.00 | $59,221.50 | ||||||||
Fed/State Project Number: STP-STIM(482)IG | Project: 26968(04) | Category: 0900/NON PARTICIPATING (WATERLINE) - STP-STIM(482)IG | ||||||||
0058 | UNCLASSIFIED EXCAVATION | 202(A) 0183 | CY | 300.000 | 300.000 | 0.000 | 421.700 | $10.00 | $0.00 | $4,217.00 |
0059 | 6" CONCRETE DRIVEWAY (H.E.S.) | 610(B) 0399 | SY | 32.000 | 32.000 | 0.000 | $65.00 | $0.00 | $0.00 | |
0060 | 12" PLUG | 616 0118 | EA | 1.000 | 1.000 | 0.000 | $500.00 | $0.00 | $0.00 | |
0061 | 12" DUCTILE IRON PIPE | 616(A) 5124 | LF | 443.000 | 443.000 | 413.000 | $60.00 | $0.00 | $24,780.00 | |
0062 | 12" DUCTILE IRON PIPE REST. JT. W/POLYETHYLENE ENCASEMENT | 616(A) 6090 | LF | 446.000 | 446.000 | 290.500 | $75.00 | $0.00 | $21,787.50 | |
0063 | 6" GATE VALVE | 616(D) 1070 | EA | 4.000 | 4.000 | 2.000 | $1,000.00 | $0.00 | $2,000.00 | |
0064 | 12" GATE VALVE | 616(D) 1100 | EA | 9.000 | 9.000 | 7.000 | $2,700.00 | $0.00 | $18,900.00 | |
0065 | STANDARD VALVE BOX | 616(D) 7051 | EA | 13.000 | 13.000 | 9.000 | $150.00 | $0.00 | $1,350.00 | |
0066 | FIRE HYDRANTS | 616(G) 1192 | EA | 3.000 | 3.000 | 2.000 | $2,800.00 | $0.00 | $5,600.00 | |
0067 | 6" SOLID SLEEVE | 616(I) 0018 | EA | 1.000 | 1.000 | 0.000 | $550.00 | $0.00 | $0.00 | |
0068 | 12" SOLID SLEEVE | 616(I) 0024 | EA | 3.000 | 3.000 | 0.000 | $1,200.00 | $0.00 | $0.00 | |
0069 | 12" X 12" X 6" TEE | 616(J) 0030 | EA | 2.000 | 2.000 | 2.000 | $900.00 | $0.00 | $1,800.00 | |
0070 | 12" X 12" X 12" TEE | 616(J) 0035 | EA | 1.000 | 1.000 | 1.000 | $1,200.00 | $0.00 | $1,200.00 | |
0071 | 6" 45 DEGREE FITTING | 616(K) 0042 | EA | 2.000 | 2.000 | 0.000 | $350.00 | $0.00 | $0.00 | |
0072 | 12" 45 DEGREE FITTING | 616(K) 0047 | EA | 8.000 | 8.000 | 6.000 | $775.00 | $0.00 | $4,650.00 | |
0073 | 12" 22 1/2 DEGREE FITTING | 616(K) 0054 | EA | 2.000 | 2.000 | 1.000 | $750.00 | $0.00 | $750.00 | |
0074 | 12" X 6" REDUCER | 616(L) 0081 | EA | 1.000 | 1.000 | 0.000 | $500.00 | $0.00 | $0.00 | |
0075 | 12" X 12" X 12" X 12" CROSS | 616(M) 0082 | EA | 1.000 | 1.000 | 1.000 | $1,500.00 | $0.00 | $1,500.00 | |
0076 | SHORT WATER SERVICE & RESET METER | 616(N) 0094 | EA | 3.000 | 3.000 | 0.000 | $1,500.00 | $0.00 | $0.00 | |
0077 | REMOVAL OF CONCRETE DRIVEWAY | 619(B) 4766 | SY | 32.000 | 32.000 | 41.000 | $9.00 | $0.00 | $369.00 | |
Subtotals For Category 0900/NON PARTICIPATING (WATERLINE) - STP-STIM(482)IG | $0.00 | $88,903.50 | ||||||||
Subtotals For Project STP-STIM(482)IG /26968(04) | $101,318.30 | $430,202.14 |