Fed/State Project Number: STP-STIM(283)IG |
Project: 26702(04) |
Category: 0100/ROADWAY |
0001 |
UNCLASSIFIED EXCAVATION |
202(A) 0183 |
CY |
6,722.000 |
6,722.000 |
37.300 |
37.300 |
$8.20 |
$305.86 |
$305.86 |
0002 |
TEMPORARY BALE BARRIER |
222 2801 |
LF |
400.000 |
400.000 |
|
0.000 |
$4.60 |
$0.00 |
$0.00 |
0003 |
TEMPORARY SILT FENCE |
223 2801 |
LF |
1,000.000 |
1,000.000 |
0.000 |
439.000 |
$2.75 |
$0.00 |
$1,207.25 |
0004 |
SOLID SLAB SODDING |
230(A) 2806 |
SY |
1,500.000 |
1,500.000 |
|
0.000 |
$3.20 |
$0.00 |
$0.00 |
0005 |
AGGREGATE BASE |
303 0192 |
CY |
5,171.000 |
5,171.000 |
439.300 |
439.300 |
$35.20 |
$15,463.36 |
$15,463.36 |
0006 |
SUBGRADE, METHOD B |
310(B) 0149 |
SY |
17,229.000 |
17,229.000 |
1,320.000 |
1,320.000 |
$1.00 |
$1,320.00 |
$1,320.00 |
0007 |
SEPARATOR FABRIC |
325 5271 |
SY |
17,233.000 |
17,233.000 |
|
0.000 |
$1.00 |
$0.00 |
$0.00 |
0008 |
(SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) |
411(S4) 5960 |
TON |
200.000 |
200.000 |
31.890 |
107.050 |
$75.25 |
$2,399.72 |
$8,055.51 |
0009 |
(PL)CRACK SEALING P.C.PAVEMENT |
414 5169 |
LF |
200.000 |
200.000 |
|
0.000 |
$5.38 |
$0.00 |
$0.00 |
0010 |
9" P.C. DOWEL JOINTED CONCRETE PAVEMENT |
414(A1) 5754 |
SY |
14,135.000 |
14,135.000 |
|
0.000 |
$49.55 |
$0.00 |
$0.00 |
0011 |
(SP)FULL DEPTH P.C.C. PATCH(PLACEMENT) |
414(N) 5800 |
SY |
3,098.000 |
3,098.000 |
|
0.000 |
$63.70 |
$0.00 |
$0.00 |
0012 |
(SP)P.C. CONCRETE FOR PAVEMENT |
414(P) 6000 |
CY |
598.000 |
598.000 |
|
0.000 |
$100.00 |
$0.00 |
$0.00 |
0013 |
CLSM BACKFILL |
501(G) 6315 |
CY |
575.000 |
575.000 |
0.000 |
34.000 |
$83.09 |
$0.00 |
$2,825.06 |
0014 |
CONCRETE CURB (6" BARRIER-INTEGRAL) |
609(A) 0300 |
LF |
4,463.000 |
4,463.000 |
|
0.000 |
$5.70 |
$0.00 |
$0.00 |
0015 |
4" CONCRETE SIDEWALK |
610(A) 0602 |
SY |
1,485.000 |
1,485.000 |
|
0.000 |
$38.60 |
$0.00 |
$0.00 |
0016 |
(PL)4" DECORATIVE CONCRETE SIDEWALK |
610(A) 0650 |
SY |
1,060.000 |
1,060.000 |
82.500 |
82.500 |
$69.00 |
$5,692.50 |
$5,692.50 |
0017 |
6" CONCRETE DRIVEWAY (H.E.S.) |
610(B) 0399 |
SY |
370.000 |
370.000 |
112.000 |
112.000 |
$61.50 |
$6,888.00 |
$6,888.00 |
0018 |
MANHOLE (8' DIA.METER) |
611(A) 2661 |
EA |
1.000 |
1.000 |
|
0.000 |
$3,779.07 |
$0.00 |
$0.00 |
0019 |
INLET CICI DES. 2 (STD) |
611(E) 5112 |
EA |
24.000 |
24.000 |
0.000 |
7.000 |
$3,563.00 |
$0.00 |
$24,941.00 |
0020 |
INLET CICI DES. 2 (B) |
611(E) 5113 |
EA |
2.000 |
2.000 |
0.000 |
1.000 |
$2,958.00 |
$0.00 |
$2,958.00 |
0021 |
INLET CICI DES. 2 (2B) |
611(E) 5117 |
EA |
1.000 |
1.000 |
|
0.000 |
$4,225.00 |
$0.00 |
$0.00 |
0022 |
INLET W/SMALL JCT.BOX,CICI-JB-1,DES.2(2B) |
611(E) 5976 |
EA |
1.000 |
1.000 |
|
0.000 |
$6,400.00 |
$0.00 |
$0.00 |
0023 |
MANHOLES ADJUST TO GRADE |
612(A) 0641 |
EA |
42.000 |
42.000 |
|
0.000 |
$716.00 |
$0.00 |
$0.00 |
0024 |
18" R.C.PIPE CLASS III |
613(B) 0491 |
LF |
83.000 |
83.000 |
|
0.000 |
$41.00 |
$0.00 |
$0.00 |
0025 |
26" X 15" R.C.PIPE ARCH CLASS A-III |
613(B) 4404 |
LF |
106.000 |
106.000 |
0.000 |
0.000 |
$93.00 |
$0.00 |
$0.00 |
0026 |
REMOVAL OF CONCRETE PAVEMENT |
619(B) 4727 |
SY |
17,242.000 |
17,242.000 |
|
0.000 |
$5.00 |
$0.00 |
$0.00 |
0027 |
REMOVAL OF ASPHALT PAVEMENT |
619(B) 4728 |
SY |
400.000 |
400.000 |
|
0.000 |
$5.00 |
$0.00 |
$0.00 |
0028 |
BEAM GUARD RAIL-W-BEAM-SINGLE |
623(A) 0932 |
LF |
220.000 |
220.000 |
|
0.000 |
$20.00 |
$0.00 |
$0.00 |
0029 |
GUARD RAIL ANCHOR UNIT (TYPE A) |
623(F) 4446 |
EA |
1.000 |
1.000 |
|
0.000 |
$2,000.00 |
$0.00 |
$0.00 |
Subtotals For Category 0100/ROADWAY |
$32,069.44 |
$69,656.54 |
|
Fed/State Project Number: STP-STIM(283)IG |
Project: 26702(04) |
Category: 0300/TRAFFIC |
0030 |
1" PVC SCH.40 PLASTIC CONDUIT TRENCHED |
802(B) 8334 |
LF |
500.000 |
500.000 |
|
0.000 |
$10.68 |
$0.00 |
$0.00 |
0031 |
(PL)PULL BOX |
803 8060 |
EA |
10.000 |
10.000 |
|
0.000 |
$753.00 |
$0.00 |
$0.00 |
0032 |
(PL)PORTABLE TRAFFIC SIGNAL SYSTEM |
823 8478 |
SD |
600.000 |
600.000 |
|
0.000 |
$75.25 |
$0.00 |
$0.00 |
0033 |
(PL)DETECTION SYSTEM (VIDEO) |
828 8132 |
LSUM |
1.000 |
1.000 |
|
0.000 |
$73,100.00 |
$0.00 |
$0.00 |
0034 |
(PL)UNDERGROUND COMMUNICATION CABLE |
834 8358 |
LF |
500.000 |
500.000 |
|
0.000 |
$2.70 |
$0.00 |
$0.00 |
0035 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) |
855(A) 8812 |
LF |
12,979.000 |
12,979.000 |
|
0.000 |
$1.00 |
$0.00 |
$0.00 |
0036 |
TRAFFIC STRIPE(PLASTIC)(ARROWS) |
855(B) 8818 |
EA |
23.000 |
23.000 |
|
0.000 |
$103.00 |
$0.00 |
$0.00 |
0037 |
TRAFFIC STRIPE(PLASTIC)(SYMBOLS) |
855(B) 8824 |
EA |
24.000 |
24.000 |
|
0.000 |
$5.40 |
$0.00 |
$0.00 |
0038 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) |
856(C) 8851 |
LF |
8,650.000 |
8,650.000 |
|
1,974.000 |
$0.55 |
$0.00 |
$1,085.70 |
0039 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) |
859(A) 8006 |
LF |
2,000.000 |
2,000.000 |
|
0.000 |
$0.15 |
$0.00 |
$0.00 |
0040 |
CONSTRUCTION SIGNS 0 TO 6.25 SF |
880(B) 8818 |
SD |
17,600.000 |
17,600.000 |
618.000 |
3,158.000 |
$0.30 |
$185.40 |
$947.40 |
0041 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF |
880(B) 8821 |
SD |
10,000.000 |
10,000.000 |
1,072.000 |
8,309.000 |
$0.50 |
$536.00 |
$4,154.50 |
0042 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF |
880(B) 8824 |
SD |
10,100.000 |
10,100.000 |
336.000 |
2,691.000 |
$0.80 |
$268.80 |
$2,152.80 |
0043 |
BARRICADES(TYPE III) |
880(C) 8842 |
SD |
9,900.000 |
9,900.000 |
672.000 |
5,314.000 |
$0.50 |
$336.00 |
$2,657.00 |
0044 |
WARNING LIGHTS(TYPE A) |
880(E) 8860 |
SD |
29,900.000 |
29,900.000 |
1,488.000 |
11,873.000 |
$0.15 |
$223.20 |
$1,780.95 |
0045 |
WARNING LIGHTS(TYPE C) |
880(E) 8872 |
SD |
46,500.000 |
46,500.000 |
384.000 |
2,982.000 |
$0.05 |
$19.20 |
$149.10 |
0046 |
DRUMS |
880(F) 8878 |
SD |
46,500.000 |
46,500.000 |
3,488.000 |
25,014.000 |
$0.15 |
$523.20 |
$3,752.10 |
0047 |
(PL)REMOVE & RESET EXISTING SIGNS |
890A/B 8756 |
EA |
1.000 |
1.000 |
|
0.000 |
$161.25 |
$0.00 |
$0.00 |
Subtotals For Category 0300/TRAFFIC |
$2,091.80 |
$16,679.55 |
|
Fed/State Project Number: STP-STIM(283)IG |
Project: 26702(04) |
Category: 0900/NON-PARTICIPATING (CITY) WATERLINE |
0050 |
CLEARING AND GRUBBING |
201 0102 |
LSUM |
1.000 |
1.000 |
0.250 |
1.000 |
$10,635.00 |
$2,658.75 |
$10,635.00 |
0051 |
UNCLASSIFIED EXCAVATION |
202(A) 0183 |
CY |
3,306.000 |
3,306.000 |
933.340 |
3,562.060 |
$8.50 |
$7,933.39 |
$30,277.52 |
0052 |
9" P.C. DOWEL JOINTED CONCRETE PAVEMENT |
414(A1) 5754 |
SY |
1,280.000 |
1,280.000 |
|
0.000 |
$50.00 |
$0.00 |
$0.00 |
0053 |
COMBINED CURB & GUTTER (6" BARRIER) |
609(B) 0383 |
LF |
3,318.000 |
3,318.000 |
814.000 |
814.000 |
$13.50 |
$10,989.00 |
$10,989.00 |
0054 |
4" CONCRETE SIDEWALK |
610(A) 0602 |
SY |
262.000 |
262.000 |
171.000 |
171.000 |
$41.00 |
$7,011.00 |
$7,011.00 |
0055 |
12" WATER LINE CONNECTION |
616 0135 |
EA |
2.000 |
2.000 |
1.000 |
3.000 |
$6,875.00 |
$6,875.00 |
$20,625.00 |
0056 |
10" DUCTILE IRON PIPE |
616(A) 5123 |
LF |
90.000 |
90.000 |
14.000 |
130.000 |
$59.50 |
$833.00 |
$7,735.00 |
0057 |
12" DUCTILE IRON PIPE |
616(A) 5124 |
LF |
3,595.000 |
3,595.000 |
3.000 |
3,613.500 |
$59.50 |
$178.50 |
$215,003.25 |
0058 |
6" DUCTILE IRON PIPE RESTRAINED JOINT |
616(A) 5810 |
LF |
615.000 |
615.000 |
113.000 |
815.000 |
$46.65 |
$5,271.45 |
$38,019.75 |
0059 |
6" GATE VALVE |
616(D) 1070 |
EA |
24.000 |
24.000 |
1.000 |
25.000 |
$758.00 |
$758.00 |
$18,950.00 |
0060 |
12" GATE VALVE |
616(D) 1100 |
EA |
23.000 |
23.000 |
|
20.000 |
$2,920.00 |
$0.00 |
$58,400.00 |
0061 |
STANDARD VALVE BOX |
616(D) 7051 |
EA |
47.000 |
47.000 |
2.000 |
46.000 |
$217.00 |
$434.00 |
$9,982.00 |
0062 |
FIRE HYDRANTS |
616(G) 1192 |
EA |
11.000 |
11.000 |
|
11.000 |
$2,925.00 |
$0.00 |
$32,175.00 |
0063 |
FIRE HYDRANT EXTENSION |
616(G) 1193 |
EA |
13.000 |
13.000 |
|
25.000 |
$580.00 |
$0.00 |
$14,500.00 |
0064 |
2" SOLID SLEEVE |
616(I) 0010 |
EA |
3.000 |
3.000 |
|
1.000 |
$225.00 |
$0.00 |
$225.00 |
0065 |
6" SOLID SLEEVE |
616(I) 0018 |
EA |
6.000 |
6.000 |
5.000 |
12.000 |
$265.00 |
$1,325.00 |
$3,180.00 |
0066 |
10" SOLID SLEEVE |
616(I) 0022 |
EA |
3.000 |
3.000 |
1.000 |
3.000 |
$500.00 |
$500.00 |
$1,500.00 |
0067 |
12" SOLID SLEEVE |
616(I) 0024 |
EA |
1.000 |
1.000 |
|
1.000 |
$699.00 |
$0.00 |
$699.00 |
0068 |
6" X 6" X 6" TEE |
616(J) 0022 |
EA |
2.000 |
2.000 |
1.000 |
4.000 |
$433.00 |
$433.00 |
$1,732.00 |
0069 |
12" X 12" X 6" TEE |
616(J) 0030 |
EA |
10.000 |
10.000 |
|
14.000 |
$785.00 |
$0.00 |
$10,990.00 |
0070 |
12" X 12" X 10" TEE |
616(J) 0039 |
EA |
3.000 |
3.000 |
|
3.000 |
$980.00 |
$0.00 |
$2,940.00 |
0071 |
6" 11 1/4 DEGREE FITTING |
616(K) 0041 |
EA |
4.000 |
4.000 |
|
9.000 |
$255.00 |
$0.00 |
$2,295.00 |
0072 |
6" 45 DEGREE FITTING |
616(K) 0042 |
EA |
50.000 |
50.000 |
11.000 |
41.000 |
$195.00 |
$2,145.00 |
$7,995.00 |
0073 |
12" 45 DEGREE FITTING |
616(K) 0047 |
EA |
12.000 |
12.000 |
1.000 |
13.000 |
$500.00 |
$500.00 |
$6,500.00 |
0074 |
12" 22 1/2 DEGREE FITTING |
616(K) 0054 |
EA |
39.000 |
39.000 |
2.000 |
41.000 |
$556.00 |
$1,112.00 |
$22,796.00 |
0075 |
6" X 4" REDUCER |
616(L) 0070 |
EA |
3.000 |
3.000 |
1.000 |
2.000 |
$207.00 |
$207.00 |
$414.00 |
0076 |
4" X 2" REDUCER |
616(L) 0079 |
EA |
3.000 |
3.000 |
1.000 |
2.000 |
$225.00 |
$225.00 |
$450.00 |
0077 |
12" X 12" X 12" X 12" CROSS |
616(M) 0082 |
EA |
5.000 |
5.000 |
1.000 |
4.000 |
$1,155.00 |
$1,155.00 |
$4,620.00 |
0078 |
SERVICE CONNECTION (SHORT) |
616(N) 0090 |
EA |
25.000 |
25.000 |
11.000 |
31.000 |
$140.00 |
$1,540.00 |
$4,340.00 |
0079 |
SERVICE CONNECTION (LONG) |
616(N) 0092 |
EA |
2.000 |
2.000 |
4.000 |
4.000 |
$904.00 |
$3,616.00 |
$3,616.00 |
0080 |
REMOVAL OF CURB AND GUTTER |
619(B) 4726 |
LF |
3,318.000 |
3,318.000 |
81.000 |
2,964.000 |
$2.50 |
$202.50 |
$7,410.00 |
0081 |
REMOVAL OF CONCRETE PAVEMENT |
619(B) 4727 |
SY |
1,280.000 |
1,280.000 |
1,310.600 |
1,370.100 |
$5.50 |
$7,208.30 |
$7,535.55 |
0082 |
REMOVAL OF SIDEWALK |
619(B) 4792 |
SY |
262.000 |
262.000 |
171.000 |
193.000 |
$6.00 |
$1,026.00 |
$1,158.00 |
8001 |
AGGREGATE BASE |
303 0192 |
CY |
0.000 |
427.000 |
456.600 |
456.600 |
$35.20 |
$16,072.32 |
$16,072.32 |
8002 |
SUBGRADE, METHOD B |
310(B) 0149 |
SY |
0.000 |
1,280.000 |
1,310.600 |
1,310.600 |
$1.00 |
$1,310.60 |
$1,310.60 |
8003 |
SEPARATOR FABRIC |
325 5271 |
SY |
0.000 |
1,280.000 |
1,310.600 |
1,310.600 |
$1.00 |
$1,310.60 |
$1,310.60 |
Subtotals For Category 0900/NON-PARTICIPATING (CITY) WATERLINE |
$82,830.41 |
$583,391.59 |
|
Fed/State Project Number: STP-STIM(283)IG |
Project: 26702(04) |
Category: 0903/Federal Non Participating |
8006 |
2" GALV.STEEL ELECT.COND. TRENCHED |
802(A) 8314 |
LF |
0.000 |
0.000 |
|
0.000 |
$25.20 |
$0.00 |
$0.00 |
8007 |
(PL)HDPE CONDUIT BORED |
802(B) 8550 |
LF |
0.000 |
0.000 |
|
0.000 |
$35.70 |
$0.00 |
$0.00 |
8008 |
SERVICE POLE |
810(A) 3118 |
EA |
0.000 |
0.000 |
|
0.000 |
$971.25 |
$0.00 |
$0.00 |
8009 |
VEH.ACT.SOL.ST.TRAF.SIG.CON.ASM |
825 8550 |
EA |
0.000 |
0.000 |
|
0.000 |
$21,071.19 |
$0.00 |
$0.00 |
8010 |
5/C TRAF.SIG.EL.CABLE |
834(A) 8207 |
LF |
0.000 |
0.000 |
|
0.000 |
$1.12 |
$0.00 |
$0.00 |
8011 |
21/C TRAFFIC SIGNAL ELECTRICAL CABLE |
834(A) 8213 |
LF |
0.000 |
0.000 |
|
0.000 |
$3.33 |
$0.00 |
$0.00 |
8012 |
1/C NO.12 ELECT.COND. |
811 8046 |
LF |
0.000 |
0.000 |
|
0.000 |
$0.92 |
$0.00 |
$0.00 |
8013 |
2/C SHIELDED LOOP DETECTOR LEAD-IN CABLE |
834(B) 8220 |
LF |
0.000 |
0.000 |
|
0.000 |
$0.92 |
$0.00 |
$0.00 |
8014 |
1/C NO.6 ELECT.COND. |
811 8040 |
LF |
0.000 |
0.000 |
|
0.000 |
$1.58 |
$0.00 |
$0.00 |
8015 |
(PL)REMOVAL OF TRAFFIC SIGNAL EQUIPMENT |
890(A) 8726 |
LSUM |
0.000 |
0.000 |
|
0.000 |
$4,620.00 |
$0.00 |
$0.00 |
8016 |
3" PVC SCH.40 PLASTIC CONDUIT TRENCHED |
802(B) 8346 |
LF |
0.000 |
0.000 |
|
0.000 |
$12.60 |
$0.00 |
$0.00 |
Subtotals For Category 0903/Federal Non Participating |
$0.00 |
$0.00 |
|
Subtotals For Project STP-STIM(283)IG /26702(04) |
$116,991.65 |
$715,133.72 |