Oklahoma Department of Transportation
Progressive Estimate Summary
Created:    11/03/2009
Contract ID: 090545   Estimate Number: 0002     Contract No: 510195
Residency: ENGINEERING SERVICES & TESTING (08001)   Estimate Type: Progressive     Account No: 400800

Project Number(s): STP-STIM(281)IG
Primary Job Piece No: 26700(04)
Contract Description: PAVEMENT REHABILITATION AND TRAFFIC SIGNALS CITY STREET (MOHAWK BLVD): FROM CINCINNATI AVENUE, EXTEND EAST TO HARTFORD AVENUE IN THE CITY OF TULSA. PROJECT LENGTH = 0.532 MILES
Primary County: TULSA              
Name of Road: CITY STREET              
Prime Contractor: BECCO CONTRACTORS, INC.              
    P.O. BOX 9159              
    TULSA , OK   74157              
Surety Company: MID-CONTINENT CASUALTY COMPANY              

Date Let: 07/23/2009 NTP Effective Date: 10/05/2009 Pay Period: 10/16/2009  TO  10/31/2009
Date Awarded: 08/03/2009 Date Work Began: 10/05/2009 Original Contract Time: 120
Date Contract Executed: 08/14/2009 Date Time Stopped: Current Time Charged: 27.00
Date NTP Issued: 08/18/2009 Completion Date: Current Time Allowed: 124.00
General Liability Expires: 03/01/2010 Workman's Comp Expires: 02/01/2010 Percent Time Used: 21.77 %
Specification Year: 1999     Date Approved:

Current Contract Amount: $694,676.33 Total to Date Prev to Date This Estimate
Bid Amount: $694,676.33 Participating: $217,812.26 $62,541.01 $155,271.25
Percent Complete: 31.36 % Non Participating: $0.00 $0.00 $0.00
Funds Available: $476,838.07 Non ARRA: $0.00 $0.00 $0.00
Unearned Balance: $476,838.07 Total Earnings: $217,812.26 $62,541.01 $155,271.25
Stockpiled Materials: $0.00 $0.00 $0.00
Gross Earnings: $217,812.26 $62,541.01 $155,271.25
Other Adjustments: $26.00 $0.00 $26.00
Liq Dam/Disincentive: $0.00 $0.00 $0.00
TOTAL: $217,838.26 $62,541.01 $155,297.25

Estimate Adjustment Detail

Contract ID: 090545   Estimate Number: 0002     Primary JP: 26700(04)



CHANGE ORDER HISTORY
Change Order Nbr. Change Order Description Status Approval Date Contract Time Adjustment Total Change Order Amount
No change orders have been created for this contract.


STOCKPILE PAYMENT HISTORY
Project Line Nbr Stockpile Description Adjustment Type Estimate Nbr Adjusted Amount
No material stockpiles have been created for this contract.
Subtotals For Stockpile Payments $0.00


LIQUIDATED DAMAGES HISTORY
Adjustment Description Estimate Nbr Time Units Rate Adjustment Amount
No liquidated damages have been assessed on this contract.


CONTRACT ADJUSTMENTS HISTORY
Adjustment Description Estimate Nbr Adjustment Amount
No general contract adjustments have been created on this contract.
Subtotals For Contract Adjustments $0.00


LINE ITEM ADJUSTMENT HISTORY
Project Item Nbr Line Item Description Adjustment Type Estimate Nbr Adj Quantity Unit Price Adjusted Amount
26700(04) 0007 (SP)ASPHALT CONCRETE TYPE S3(PATCHING)(PG 64-22 OK) Asphalt Binder Adjustment 0002 0.00 $0.00 $26.00
Subtotals For Line Item Adjustments $26.00


MILESTONE ADJUSTMENTS
Milestone Number Milestone Description Time Allowed Time Used Rate Total
No milestones exist for this contract.

Line Item Detail

Contract ID: 090545   Estimate Number: 0002     Primary JP: 26700(04)



Line Item Number Item Description Item Number Units Bid Qty Current Quantity Quantity Paid This Est. Quantity Paid To Date Unit Price Amount Paid This Est. Amount Paid To Date
Fed/State Project Number:    STP-STIM(281)IG Project:    26700(04) Category:    0100/ROADWAY
0001 CLEARING AND GRUBBING 201 0102 LSUM 1.000 1.000   0.500 $10,000.00 $0.00 $5,000.00
0002 UNCLASSIFIED EXCAVATION 202(A) 0183 CY 1,300.000 1,300.000   0.000 $15.00 $0.00 $0.00
0003 TEMPORARY BALE BARRIER 222 2801 LF 200.000 200.000   0.000 $5.00 $0.00 $0.00
0004 SOLID SLAB SODDING 230(A) 2806 SY 1,731.000 1,731.000   0.000 $3.00 $0.00 $0.00
0005 AGGREGATE BASE 303 0192 CY 1,120.000 1,120.000 490.800 698.900 $44.00 $21,595.20 $30,751.60
0006 SUBGRADE, METHOD B 310(B) 0149 SY 2,590.000 2,590.000 1,097.600 1,722.000 $0.25 $274.40 $430.50
0007 (SP)ASPHALT CONCRETE TYPE S3(PATCHING)(PG 64-22 OK) 411(S3) 6210 TON 62.000 62.000 67.830 67.830 $150.00 $10,174.50 $10,174.50
0008 (SP)ASPHALT CONCRETE TYPE S4(PG 70-28 OK) 411(S4) 5955 TON 1,196.000 1,196.000   0.000 $80.00 $0.00 $0.00
0009 (SP)ASPHALT CONCRETE TYPE S5(PG 64-22 OK) 411(S5) 5975 TON 593.000 593.000   0.000 $69.00 $0.00 $0.00
0010 (SP)FULL DEPTH P.C.C. PATCH(PLACEMENT) 414(N) 5800 SY 2,027.000 2,027.000 782.700 1,407.100 $38.00 $29,742.60 $53,469.80
0011 (SP)P.C. CONCRETE FOR PAVEMENT 414(P) 6000 CY 400.000 400.000 282.100 282.100 $135.00 $38,083.50 $38,083.50
0012 COLD MILLING PAVEMENT 417 5267 SY 10,430.000 10,430.000 4,299.700 7,356.900 $2.00 $8,599.40 $14,713.80
0013 FABRIC REINFORCEMENT 420(A) 4242 SY 10,430.000 10,430.000   0.000 $1.50 $0.00 $0.00
0014 CONCRETE CURB (6" BARRIER-INTEGRAL) 609(A) 0300 LF 59.000 59.000 45.000 63.000 $10.00 $450.00 $630.00
0015 4" CONCRETE SIDEWALK 610(A) 0602 SY 20.000 20.000   0.000 $150.00 $0.00 $0.00
0016 6" CONCRETE DRIVEWAY (H.E.S.) 610(B) 0399 SY 325.000 325.000 64.300 64.300 $74.00 $4,758.20 $4,758.20
0017 BITUMINOUS DRIVEWAY (6") 610(G) 4475 SY 1,216.000 1,216.000 681.000 681.000 $35.00 $23,835.00 $23,835.00
0018 MANHOLE FRAME & COVER 611(D) 4215 EA 2.000 2.000 0.000 1.000 $400.00 $0.00 $400.00
0019 INLET CICI DES. 2 (STD) 611(E) 5112 EA 1.000 1.000   0.000 $1,700.00 $0.00 $0.00
0020 INLET CICI DES. 2 (ADD'L DEPTH) 611(F) 5325 VF 1.000 1.000   0.000 $250.00 $0.00 $0.00
0021 INLET FRM&GRT (SSIF-FRM,CIG-GRT-VG-F) 611(G) 4488 EA 4.000 4.000   0.000 $350.00 $0.00 $0.00
0022 CAST IRON CURB INLETS 611(K) 4488 EA 4.000 4.000   0.000 $185.00 $0.00 $0.00
0023 MANHOLES ADJUST TO GRADE 612(A) 0641 EA 2.000 2.000   1.000 $500.00 $0.00 $500.00
0024 REMOVAL OF CONCRETE DRIVEWAY 619(B) 4766 SY 480.000 480.000 64.300 64.300 $8.00 $514.40 $514.40
0025 REMOVAL OF CURB 619(B) 4791 LF 59.000 59.000 45.000 63.000 $2.00 $90.00 $126.00
0026 REMOVAL OF SIDEWALK 619(B) 4792 SY 20.000 20.000   0.000 $4.00 $0.00 $0.00
Subtotals For Category     0100/ROADWAY    $138,117.20 $183,387.30
Fed/State Project Number:    STP-STIM(281)IG Project:    26700(04) Category:    0300/TRAFFIC
0027 TRAFFIC STRIPE(PLASTIC)(4" WIDE) 855(A) 8812 LF 10,610.000 10,610.000   0.000 $0.40 $0.00 $0.00
0028 TRAFFIC STRIPE(PLASTIC)(ARROWS) 855(B) 8818 EA 8.000 8.000   0.000 $90.00 $0.00 $0.00
0029 TRAFFIC STRIPE(PLASTIC)(WORDS) 855(B) 8821 EA 16.000 16.000   0.000 $100.00 $0.00 $0.00
0030 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) 856(A) 8839 LF 5,618.000 5,618.000   0.000 $0.06 $0.00 $0.00
0031 CONSTRUCTION SIGNS 0 TO 6.25 SF 880(B) 8818 SD 750.000 750.000 586.000 828.000 $0.85 $498.10 $703.80
0032 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF 880(B) 8821 SD 1,500.000 1,500.000 482.000 724.000 $0.85 $409.70 $615.40
0033 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF 880(B) 8824 SD 1,500.000 1,500.000 684.000 1,113.000 $1.10 $752.40 $1,224.30
0034 BARRICADES(TYPE III) 880(C) 8842 SD 1,500.000 1,500.000 108.000 130.000 $1.40 $151.20 $182.00
0035 WARNING LIGHTS(TYPE A) 880(E) 8860 SD 4,500.000 4,500.000 1,459.000 1,503.000 $0.11 $160.49 $165.33
0036 WARNING LIGHTS(TYPE C) 880(E) 8872 SD 5,000.000 5,000.000 -429.000 0.000 $0.06 $-25.74 $0.00
0037 DRUMS 880(F) 8878 SD 5,000.000 5,000.000   0.000 $0.11 $0.00 $0.00
0038 TUBE CHANNELIZERS 880(G) 8884 SD 5,000.000 5,000.000 1,890.000 2,583.000 $0.11 $207.90 $284.13
0039 (PL)REMOVE & RESET EXISTING SIGNS 890A/B 8756 EA 9.000 9.000   0.000 $185.00 $0.00 $0.00
Subtotals For Category     0300/TRAFFIC    $2,154.05 $3,174.96
Fed/State Project Number:    STP-STIM(281)IG Project:    26700(04) Category:    0310/TRAFFIC SIGNALS
0040 3" PVC SCH.40 PLASTIC CONDUIT TRENCHED 802(B) 8346 LF 225.000 225.000   0.000 $4.50 $0.00 $0.00
0041 (PL)HDPE CONDUIT BORED 802(B) 8550 LF 645.000 645.000   0.000 $11.00 $0.00 $0.00
0042 PULL BOX(SIZE II) 803 8066 EA 7.000 7.000   0.000 $440.00 $0.00 $0.00
0043 PULL BOX(SIZE III) 803 8067 EA 2.000 2.000   0.000 $700.00 $0.00 $0.00
0044 STRUCTURAL CONCRETE 804(A) 2915 CY 10.800 10.800   0.000 $330.00 $0.00 $0.00
0045 REINFORCING STEEL 804(B) 2916 LB 1,665.000 1,665.000   0.000 $0.85 $0.00 $0.00
0046 32'MH POLE 35'TS & 15'LMA(G.STL.) 806(A) 8334 EA 3.000 3.000   0.000 $5,000.00 $0.00 $0.00
0047 32'MH POLE 30'TS & 15'LMA(G.STL.) 806(A) 8338 EA 1.000 1.000   0.000 $6,000.00 $0.00 $0.00
0048 (PL)ROADWAY LUMINAIRE 809(A) 8090 EA 1.000 1.000   0.000 $550.00 $0.00 $0.00
0049 SERVICE POLE 810(A) 3118 EA 2.000 2.000   0.000 $1,300.00 $0.00 $0.00
0050 1/C NO.6 ELECTRICAL CONDUCTOR 811 8040 LF 845.000 845.000   0.000 $0.55 $0.00 $0.00
0051 1/C NO.12 ELECTRICAL CONDUCTOR 811 8046 LF 980.000 980.000   0.000 $0.30 $0.00 $0.00
0052 (PL)TRAFFIC SIGNAL SPAN WIRE EQUIPMENT 823 8482 LSUM 1.000 1.000   0.000 $2,800.00 $0.00 $0.00
0053 VEH.ACT.SOL.ST.TRAF.SIG.CON.ASM 825 8550 EA 2.000 2.000   0.000 $15,000.00 $0.00 $0.00
0054 (PL)DETECTION SYSTEM (VIDEO) 828 8132 LSUM 1.000 1.000   0.000 $55,000.00 $0.00 $0.00
0055 PEDESTRIAN PUSH BUTTON 830 8000 EA 8.000 8.000   0.000 $1,100.00 $0.00 $0.00
0056 1WAY 3SEC. ADJ. SIG. HD. S-6 831 8231 EA 8.000 8.000   0.000 $600.00 $0.00 $0.00
0057 1WAY 2SEC. ADJ. PED. SIG. HD. S-20 831 8295 EA 8.000 8.000   0.000 $500.00 $0.00 $0.00
0058 BACKPLATE 833 3030 EA 16.000 16.000   0.000 $11.00 $0.00 $0.00
0059 5/C TRAF.SIG.ELECT.CABLE 834(A) 8207 LF 415.000 415.000   0.000 $0.55 $0.00 $0.00
0060 7/C TRAF.SIG.ELECT.CABLE 834(A) 8208 LF 1,065.000 1,065.000   0.000 $0.85 $0.00 $0.00
0061 21/C TRAF.SIG.EL.CABLE 834(A) 8213 LF 980.000 980.000   0.000 $1.65 $0.00 $0.00
0062 2/C SHIELDED LOOP DETECTOR LEAD-IN CABLE 834(B) 8220 LF 395.000 395.000   0.000 $0.55 $0.00 $0.00
0063 (PL)E.P.S. OPTICAL DETECTOR 840(B) 8593 EA 4.000 4.000   0.000 $885.00 $0.00 $0.00
0064 (PL)E.P.S. OPTICAL DETECTOR CABLE 840(C) 8594 LF 470.000 470.000   0.000 $1.10 $0.00 $0.00
0065 (PL)E.P.S. 2 CHANNEL PHASE SELECTOR 840(D) 8595 EA 4.000 4.000   0.000 $1,100.00 $0.00 $0.00
0066 MAST ARM MOUNTED SIGNS(ALUMINUM) 850(C) 8118 SF 50.000 50.000   0.000 $22.00 $0.00 $0.00
0067 (PL)REMOVAL OF TRAFFIC SIGNAL EQUIPMENT 890(A) 8726 LSUM 1.000 1.000   0.000 $3,800.00 $0.00 $0.00
Subtotals For Category     0310/TRAFFIC SIGNALS    $0.00 $0.00
Fed/State Project Number:    STP-STIM(281)IG Project:    26700(04) Category:    0600/STAKING
0068 STAKING 642 0098 LSUM 1.000 1.000   0.250 $5,000.00 $0.00 $1,250.00
Subtotals For Category     0600/STAKING    $0.00 $1,250.00
Fed/State Project Number:    STP-STIM(281)IG Project:    26700(04) Category:    0640/CONSTRUCTION
0069 MOBILIZATION 641 1552 LSUM 1.000 1.000 0.500 1.000 $30,000.00 $15,000.00 $30,000.00
Subtotals For Category     0640/CONSTRUCTION    $15,000.00 $30,000.00
Subtotals For Project STP-STIM(281)IG /26700(04) $155,271.25 $217,812.26