Oklahoma Department of Transportation
Progressive Estimate Summary
Created:    09/01/2011
Contract ID: 090501   Estimate Number: 0042     Contract No: 510147
Residency: EL RENO (04200)   Estimate Type: Progressive     Account No: 400400

Project Number(s): OKCY-XTWN(003)TI
Primary Job Piece No: 17428(22)
Contract Description: GRADE, DRAIN, SURFACE, BRIDGE, AND RAILROAD I-40: FROM EAST OF WESTERN AVENUE, EXTEND EAST. PROJECT LENGTH = 1.072 MILES.
Primary County: OKLAHOMA              
Name of Road: I-40              
Prime Contractor: ALLEN CONTR., INC./SHERWOOD CONST. CO, INC./MANHATTAN RD. &              
    1100 S. EASTERN AVE.              
    OKLAHOMA CITY , OK   73101              
Surety Company: FIDELITY & DEPOSIT INSURANCE COMPANY OF MARYLAND              

Date Let: 07/23/2009 NTP Effective Date: 09/14/2009 Pay Period: 08/16/2011  TO  08/31/2011
Date Awarded: 08/03/2009 Date Work Began: 09/08/2009 Original Contract Time: 520
Date Contract Executed: 08/10/2009 Date Time Stopped: Current Time Charged: 723.00
Date NTP Issued: 08/11/2009 Completion Date: Current Time Allowed: 760.00
General Liability Expires: 09/01/2011 Workman's Comp Expires: 09/01/2011 Percent Time Used: 95.13 %
Specification Year: 1999     Date Approved:

Current Contract Amount: $63,830,016.10 Total to Date Prev to Date This Estimate
Bid Amount: $63,211,594.70 Participating: $57,427,131.34 $56,723,737.24 $703,394.10
Percent Complete: 92.39 % Non Participating: $1,259,648.30 $1,173,538.30 $86,110.00
Funds Available: $4,858,306.86 Total Earnings: $58,686,779.64 $57,897,275.54 $789,504.10
Unearned Balance: $4,239,885.46 Stockpiled Materials: $233,969.52 $233,969.52 $0.00
Gross Earnings: $58,920,749.16 $58,131,245.06 $789,504.10
Other Adjustments: $50,960.08 $52,760.08 $-1,800.00
Liq Dam/Disincentive: $0.00 $0.00 $0.00
TOTAL: $58,971,709.24 $58,184,005.14 $787,704.10

Estimate Adjustment Detail

Contract ID: 090501   Estimate Number: 0042     Primary JP: 17428(22)



CHANGE ORDER HISTORY
Change Order Nbr. Change Order Description Status Approval Date Contract Time Adjustment Total Change Order Amount
001 Reinforcing Steel correction Approved 10/27/2009 0.0 $45,028.15
002 Change Method of Measurement for Uncl. Exc. on Bridge M-O Approved 12/09/2009 0.0 $0.00
003 Salvaging Robinson St. Br. RR shields- MS-4 steel correction Approved 05/03/2010 0.0 $19,560.52
004 Additional Traffic Control Approved 11/09/2010 0.0 $42,437.80
005 P-1 modification Approved 11/09/2010 0.0 $43,474.18
007 Beam Deductions Approved 03/15/2011 0.0 $-5,619.29
008 Removal of Trolley Rail and Brick Pipe Approved 01/04/2011 0.0 $68,621.74
009 Time Credit for Project Delays Approved 05/24/2011 168.0 $0.00
010 Adding Internal Milestone for Mainline Paving Preparation Approved 06/13/2011 0.0 $0.00
011 Compensation for Project Delays Approved 07/11/2011 0.0 $404,918.30
012 Internal Milestone for the Walker Avenue Bridge Pending 0 0.0 $260,000.00


STOCKPILE PAYMENT HISTORY
Project Line Nbr Stockpile Description Adjustment Type Estimate Nbr Adjusted Amount
17428(22) 0017 (SP)GEOGRID EARTH REINFORCEMENT Stockpiled Material Adjustment 0007 $-2,088.40
17428(22) 0017 (SP)GEOGRID EARTH REINFORCEMENT Stockpiled Material Initial Payment 0007 $142,747.01
17428(22) 0017 (SP)GEOGRID EARTH REINFORCEMENT Stockpiled Material Adjustment 0040 $-12,422.62
17428(22) 0017 (SP)GEOGRID EARTH REINFORCEMENT Stockpiled Material Adjustment 0039 $-49,264.12
17428(22) 0017 (SP)GEOGRID EARTH REINFORCEMENT Stockpiled Material Adjustment 0038 $-19,800.00
17428(22) 0017 (SP)GEOGRID EARTH REINFORCEMENT Stockpiled Material Adjustment 0037 $-19,800.00
17428(22) 0017 (SP)GEOGRID EARTH REINFORCEMENT Stockpiled Material Adjustment 0036 $-2,605.42
17428(22) 0017 (SP)GEOGRID EARTH REINFORCEMENT Stockpiled Material Adjustment 0035 $-352.04
17428(22) 0017 (SP)GEOGRID EARTH REINFORCEMENT Stockpiled Material Adjustment 0017 $-4,978.91
17428(22) 0017 (SP)GEOGRID EARTH REINFORCEMENT Stockpiled Material Adjustment 0019 $-2,755.86
17428(22) 0017 (SP)GEOGRID EARTH REINFORCEMENT Stockpiled Material Adjustment 0022 $-13,282.14
17428(22) 0017 (SP)GEOGRID EARTH REINFORCEMENT Stockpiled Material Adjustment 0023 $-6,599.99
17428(22) 0017 (SP)GEOGRID EARTH REINFORCEMENT Stockpiled Material Adjustment 0024 $-7,089.71
17428(22) 0017 (SP)GEOGRID EARTH REINFORCEMENT Stockpiled Material Adjustment 0026 $-1,707.79
17428(22) 0020 SEPARATOR FABRIC Stockpiled Material Adjustment 0022 $-334.22
17428(22) 0020 SEPARATOR FABRIC Stockpiled Material Adjustment 0038 $-51,000.00
17428(22) 0020 SEPARATOR FABRIC Stockpiled Material Adjustment 0023 $-8,671.95
17428(22) 0020 SEPARATOR FABRIC Stockpiled Material Adjustment 0018 $-100.30
17428(22) 0020 SEPARATOR FABRIC Stockpiled Material Initial Payment 0017 $78,378.07
17428(22) 0020 SEPARATOR FABRIC Stockpiled Material Adjustment 0037 $-4,250.00
17428(22) 0020 SEPARATOR FABRIC Stockpiled Material Adjustment 0040 $-14,021.60
17428(22) 0038 Handrail (Sleeves) Stockpiled Material Initial Payment 0004 $8,600.00
17428(22) 0038 Handrail (Sleeves) Stockpiled Material Adjustment 0016 $-241.32
17428(22) 0038 Handrail (Sleeves) Stockpiled Material Adjustment 0028 $-383.04
17428(22) 0038 Handrail (Sleeves) Stockpiled Material Adjustment 0030 $-65.88
17428(22) 0038 Handrail (Sleeves) Stockpiled Material Adjustment 0040 $-3,183.54
17428(22) 0038 Handrail (Sleeves) Stockpiled Material Adjustment 0041 $-171.41
17428(22) 0044 Retaining Wall (St. Reinf. Bars_ Stockpiled Material Adjustment 0025 $-4,798.17
17428(22) 0044 Retaining Wall (St. Reinf. Bars_ Stockpiled Material Initial Payment 0021 $55,827.72
17428(22) 0044 Retaining Wall (St. Reinf. Bars_ Stockpiled Material Adjustment 0021 $-2,808.00
17428(22) 0044 Retaining Wall (St. Reinf. Bars_ Stockpiled Material Adjustment 0024 $-20,705.26
17428(22) 0044 Retaining Wall (St. Reinf. Bars_ Stockpiled Material Adjustment 0022 $-12,699.88
17428(22) 0044 Retaining Wall (St. Reinf. Bars_ Stockpiled Material Adjustment 0023 $-14,816.41
17428(22) 0047 REINFORCING STEEL Stockpiled Material Initial Payment 0007 $17,550.00
17428(22) 0047 REINFORCING STEEL Stockpiled Material Adjustment 0007 $-17,550.00
17428(22) 0047 REINFORCING STEEL Stockpiled Material Initial Payment 0007 $239.04
17428(22) 0047 REINFORCING STEEL Stockpiled Material Adjustment 0007 $-239.04
17428(22) 0047 REINFORCING STEEL Stockpiled Material Initial Payment 0008 $16,027.58
17428(22) 0047 REINFORCING STEEL Stockpiled Material Adjustment 0013 $-16,027.58
17428(22) 0047 REINFORCING STEEL Stockpiled Material Adjustment 0013 $0.00
17428(22) 0047 REINFORCING STEEL Stockpiled Material Initial Payment 0008 $0.00
17428(22) 0047 Reinforcing Steel Stockpiled Material Adjustment 0013 $-17,675.20
17428(22) 0047 Reinforcing Steel Stockpiled Material Initial Payment 0008 $17,675.20
17428(22) 0068 INLET CICI DES. 3 (STD) Stockpiled Material Adjustment 0021 $-7,101.00
17428(22) 0068 INLET CICI DES. 3 (STD) Stockpiled Material Adjustment 0014 $-3,156.00
17428(22) 0068 INLET CICI DES. 3 (STD) Stockpiled Material Initial Payment 0007 $11,046.00
17428(22) 0068 INLET CICI DES. 3 (STD) Stockpiled Material Adjustment 0013 $-789.00
17428(22) 0076 INLET CICI DES. 3 (STD) Stockpiled Material Adjustment 0014 $-1,476.00
17428(22) 0076 INLET CICI DES. 3 (STD) Stockpiled Material Adjustment 0013 $-342.00
17428(22) 0076 INLET CICI DES. 3 (STD) Stockpiled Material Initial Payment 0007 $5,069.88
17428(22) 0076 INLET CICI DES. 3 (STD) Stockpiled Material Adjustment 0024 $-65.88
17428(22) 0076 INLET CICI DES. 3 (STD) Stockpiled Material Adjustment 0021 $-3,186.00
17428(22) 0148 SEPARATOR FABRIC Stockpiled Material Initial Payment 0017 $17,051.42
17428(22) 0148 SEPARATOR FABRIC Stockpiled Material Adjustment 0032 $-8,717.17
17428(22) 0148 SEPARATOR FABRIC Stockpiled Material Adjustment 0031 $-3,004.75
17428(22) 0148 SEPARATOR FABRIC Stockpiled Material Adjustment 0029 $-5,329.50
17428(22) 0226 12" DUCTILE IRON PIPE RESTRAINED JOINT Stockpiled Material Adjustment 0005 $-12,412.80
17428(22) 0226 12" DUCTILE IRON PIPE RESTRAINED JOINT Stockpiled Material Adjustment 0007 $-4,137.60
17428(22) 0226 12" DUCTILE IRON PIPE RESTRAINED JOINT Stockpiled Material Adjustment 0006 $-4,396.20
17428(22) 0226 12" DUCTILE IRON PIPE RESTRAINED JOINT Stockpiled Material Initial Payment 0004 $23,532.60
17428(22) 0227 30" DUCTILE IRON PIPE RESTRAINED JOINT Stockpiled Material Initial Payment 0004 $69,895.98
17428(22) 0227 30" DUCTILE IRON PIPE RESTRAINED JOINT Stockpiled Material Adjustment 0015 $-24,624.60
17428(22) 0227 30" DUCTILE IRON PIPE RESTRAINED JOINT Stockpiled Material Adjustment 0016 $-45,271.38
17428(22) 0228 6" Ductile Iron W/Polyethylene Encasement Stockpiled Material Adjustment 0008 $-53.28
17428(22) 0228 6" Ductile Iron W/Polyethylene Encasement Stockpiled Material Initial Payment 0004 $888.00
17428(22) 0228 6" Ductile Iron W/Polyethylene Encasement Stockpiled Material Adjustment 0009 $-133.20
17428(22) 0228 6" Ductile Iron W/Polyethylene Encasement Stockpiled Material Adjustment 0016 $-266.40
17428(22) 0229 12" Ductile Iron Pipe W/Polyethylene Encasement Stockpiled Material Adjustment 0015 $-6,615.21
17428(22) 0229 12" Ductile Iron Pipe W/Polyethylene Encasement Stockpiled Material Adjustment 0007 $-3,439.10
17428(22) 0229 12" Ductile Iron Pipe W/Polyethylene Encasement Stockpiled Material Adjustment 0006 $-6,473.60
17428(22) 0229 12" Ductile Iron Pipe W/Polyethylene Encasement Stockpiled Material Adjustment 0005 $-36,768.02
17428(22) 0229 12" Ductile Iron Pipe W/Polyethylene Encasement Stockpiled Material Initial Payment 0004 $57,223.18
17428(22) 0229 12" Ductile Iron Pipe W/Polyethylene Encasement Stockpiled Material Adjustment 0016 $-3,927.25
17428(22) 0230 30" Ductile Iron Pipe w/Polyethylene Encasement Stockpiled Material Initial Payment 0004 $5,992.94
17428(22) 0254 PRESTRESSED CONCRETE BEAMS Stockpiled Material Adjustment 0039 $-103,000.34
17428(22) 0254 PRESTRESSED CONCRETE BEAMS Stockpiled Material Adjustment 0024 $-103,667.00
17428(22) 0254 PRESTRESSED CONCRETE BEAMS Stockpiled Material Adjustment 0037 $-155,114.23
17428(22) 0254 PRESTRESSED CONCRETE BEAMS Stockpiled Material Initial Payment 0017 $361,781.57
17428(22) 0278 PRESTRESSED CONCRETE BEAMS Stockpiled Material Adjustment 0036 $-241,632.63
17428(22) 0278 PRESTRESSED CONCRETE BEAMS Stockpiled Material Initial Payment 0017 $382,960.17
17428(22) 0278 PRESTRESSED CONCRETE BEAMS Stockpiled Material Adjustment 0030 $-141,327.54
17428(22) 0278 Prestressed Concrete Beams Stockpiled Material Adjustment 0030 $-177,820.20
17428(22) 0278 Prestressed Concrete Beams Stockpiled Material Initial Payment 0018 $244,728.00
17428(22) 0278 Prestressed Concrete Beams Stockpiled Material Adjustment 0036 $-66,907.80
17428(22) 0284 Sealed Expansion Joint Stockpiled Material Adjustment 0039 $-19,873.00
17428(22) 0284 Sealed Expansion Joint Stockpiled Material Initial Payment 0015 $19,873.00
17428(22) 0284 Sealed Expansion Joint(MR-1) Stockpiled Material Initial Payment 0016 $22,525.00
17428(22) 0284 Sealed Expansion Joint(MR-1) Stockpiled Material Adjustment 0039 $-22,525.00
17428(22) 0290 EPOXY COATED REINFORCING STEEL Stockpiled Material Adjustment 0023 $-6,874.50
17428(22) 0290 EPOXY COATED REINFORCING STEEL Stockpiled Material Adjustment 0019 $-8,017.76
17428(22) 0290 EPOXY COATED REINFORCING STEEL Stockpiled Material Adjustment 0018 $-3,925.00
17428(22) 0290 EPOXY COATED REINFORCING STEEL Stockpiled Material Initial Payment 0017 $46,526.16
17428(22) 0290 EPOXY COATED REINFORCING STEEL Stockpiled Material Adjustment 0017 $-17,662.50
17428(22) 0290 EPOXY COATED REINFORCING STEEL Stockpiled Material Adjustment 0024 $-10,046.40
17428(22) 0378 Sealed Expansion Joint (MS-3) Stockpiled Material Initial Payment 0016 $5,729.00
17428(22) 0378 Sealed Expansion Joint (MS-3) Stockpiled Material Adjustment 0027 $-5,729.00
17428(22) 0399 EPOXY COATED REINFORCING STEEL Stockpiled Material Adjustment 0022 $-34,650.28
17428(22) 0399 EPOXY COATED REINFORCING STEEL Stockpiled Material Adjustment 0017 $-62,441.66
17428(22) 0399 EPOXY COATED REINFORCING STEEL Stockpiled Material Initial Payment 0017 $97,091.94
17428(22) 0431 (PL)Roadway Luminaire Stockpiled Material Initial Payment 0016 $32,473.65
17428(22) 0431 (PL)Roadway Luminaire Stockpiled Material Adjustment 0034 $-3,936.20
17428(22) 0432 Service Pole Stockpiled Material Initial Payment 0016 $11,496.00
17428(22) 0436 (PL)Traffic Items(Lighting) (33 pole assembly) Stockpiled Material Initial Payment 0016 $70,749.69
17428(22) 0465 (PL)RETAINING WALL PYLON Stockpiled Material Initial Payment 0017 $71,285.00
17428(22) 0465 (PL)Retaining Wall Pylon Stockpiled Material Initial Payment 0018 $38,332.50
Subtotals For Stockpile Payments $233,969.52


LIQUIDATED DAMAGES HISTORY
Adjustment Description Estimate Nbr Time Units Rate Adjustment Amount
System Application of Liquidated Damages 0035 -13.0 $2,000.00 $-26,000.00
System Application of Liquidated Damages 0036 -14.0 $2,000.00 $-28,000.00
System Application of Liquidated Damages 0037 --13 $2,000.00 $26,000.00
System Application of Liquidated Damages 0037 --14 $2,000.00 $28,000.00


CONTRACT ADJUSTMENTS HISTORY
Adjustment Description Estimate Nbr Adjustment Amount
LD Adjustment (Prog. Est. Only) 0035 $26,000.00
LD Adjustment (Prog. Est. Only) 0036 $28,000.00
LD Adjustment (Prog. Est. Only) 0037 $-54,000.00
Subtotals For Contract Adjustments $0.00


LINE ITEM ADJUSTMENT HISTORY
Project Item Nbr Line Item Description Adjustment Type Estimate Nbr Adj Quantity Unit Price Adjusted Amount
17428(22) 0017 (SP)GEOGRID EARTH REINFORCEMENT * Material Discrepancy Adjustments 0006 -138.80 $4.30 $-596.84
17428(22) 0017 (SP)GEOGRID EARTH REINFORCEMENT * Material Discrepancy Adjustments 0012 138.80 $4.30 $596.84
17428(22) 0019 (SP)OPEN GRADED BITUMINOUN BASE (PG 64-22 OK) Asphalt Binder Adjustment 0041 8,500.00 $4.60 $39,126.61
17428(22) 0027 (SP)ASPHALT CONCRETE TYPE S3(PG 76-28 OK) Asphalt Binder Adjustment 0038 1,861.50 $7.73 $14,395.45
17428(22) 0028 (SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) Asphalt Binder Adjustment 0007 0.00 $0.00 $208.68
17428(22) 0028 (SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) Asphalt Binder Adjustment 0017 0.00 $0.00 $2,828.03
17428(22) 0028 (SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) Asphalt Binder Adjustment 0019 0.00 $0.00 $4,333.86
17428(22) 0028 (SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) Asphalt Binder Adjustment 0027 1,236.55 $2.27 $2,810.99
17428(22) 0028 (SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) Asphalt Binder Adjustment 0033 2,114.00 $2.79 $5,915.50
17428(22) 0028 (SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) Asphalt Binder Adjustment 0037 499.54 $5.00 $2,499.32
17428(22) 0029 (SP)ASPHALT CONCRETE TYPE S4(PG 76-28 OK) Asphalt Binder Adjustment 0019 0.00 $0.00 $4,141.86
17428(22) 0029 (SP)ASPHALT CONCRETE TYPE S4(PG 76-28 OK) Asphalt Binder Adjustment 0033 1,091.68 $3.19 $3,491.19
17428(22) 0029 (SP)ASPHALT CONCRETE TYPE S4(PG 76-28 OK) Asphalt Binder Adjustment 0038 500.00 $8.83 $4,419.00
17428(22) 0030 (SP)ASPHALT CONCRETE TYPE S4(PG 70-28 OK) Asphalt Binder Adjustment 0007 0.00 $0.00 $91.25
17428(22) 0030 (SP)ASPHALT CONCRETE TYPE S4(PG 70-28 OK) Asphalt Binder Adjustment 0009 0.00 $0.00 $166.42
17428(22) 0030 (SP)ASPHALT CONCRETE TYPE S4(PG 70-28 OK) Asphalt Binder Adjustment 0019 0.00 $0.00 $-797.70
17428(22) 0030 (SP)ASPHALT CONCRETE TYPE S4(PG 70-28 OK) Asphalt Binder Adjustment 0031 83.97 $3.19 $268.54
17428(22) 0038 HANDRAILING * Material Discrepancy Adjustments 0016 -126.00 $96.00 $-12,096.00
17428(22) 0210 (SP)ASPHALT CONCRETE TYPE S4(PG 76-28 OK) Asphalt Binder Adjustment 0005 0.00 $0.00 $0.88
17428(22) 0210 (SP)ASPHALT CONCRETE TYPE S4(PG 76-28 OK) Asphalt Binder Adjustment 0006 0.00 $0.00 $4.92
17428(22) 0210 (SP)ASPHALT CONCRETE TYPE S4(PG 76-28 OK) Asphalt Binder Adjustment 0007 0.00 $0.00 $2.62
17428(22) 0210 (SP)ASPHALT CONCRETE TYPE S4(PG 76-28 OK) Asphalt Binder Adjustment 0027 68.04 $2.59 $176.77
17428(22) 0219 42" STEEL CASING PIPE * Material Discrepancy Adjustments 0016 -580.00 $280.00 $-162,400.00
17428(22) 0219 42" STEEL CASING PIPE * Material Discrepancy Adjustments 0021 580.00 $280.00 $162,400.00
17428(22) 0311 CLASS AA CONCRETE * Material Discrepancy Adjustments 0042 -1.80 $1,000.00 $-1,800.00
17428(22) 0397 CLASS AA CONCRETE * COMPRESSIVE STRENGTH 0017 0.00 $0.00 $-2,489.76
17428(22) 0397 CLASS AA CONCRETE * COMPRESSIVE STRENGTH 0018 0.00 $0.00 $-2,415.14
17428(22) 0418 SEPARATOR FABRIC * Material Discrepancy Adjustments 0006 -543.90 $3.00 $-1,631.70
17428(22) 0420 CLASS AA CONCRETE * COMPRESSIVE STRENGTH 0020 0.00 $0.00 $-1,302.91
17428(22) 0420 CLASS AA CONCRETE * COMPRESSIVE STRENGTH 0027 0.00 $0.00 $-4,877.78
17428(22) 0420 CLASS AA CONCRETE * COMPRESSIVE STRENGTH 0027 0.00 $0.00 $-6,510.82
17428(22) 0424 2" GALV. STEEL ELECTRICAL CONDUIT EXPOSED * Material Discrepancy Adjustments 0034 -710.00 $16.00 $-11,360.00
17428(22) 0424 2" GALV. STEEL ELECTRICAL CONDUIT EXPOSED * Material Discrepancy Adjustments 0041 710.00 $16.00 $11,360.00
17428(22) 0428 PULL BOX(SIZE I) * Material Discrepancy Adjustments 0034 -11.00 $310.00 $-3,410.00
17428(22) 0428 PULL BOX(SIZE I) * Material Discrepancy Adjustments 0041 11.00 $310.00 $3,410.00
17428(22) 0433 1/C NO.4 ELECTRICAL CONDUCTOR * Material Discrepancy Adjustments 0034 -750.00 $2.00 $-1,500.00
17428(22) 0433 1/C NO.4 ELECTRICAL CONDUCTOR * Material Discrepancy Adjustments 0041 750.00 $2.00 $1,500.00
Subtotals For Line Item Adjustments $50,960.08
* = User applied Line Item Adjustments


MILESTONE ADJUSTMENTS
Milestone Number Milestone Description Time Allowed Time Used Rate Total
01 Walker Avenue bridge 100.00 73.00 $10,000.00 $0.00

Line Item Detail

Contract ID: 090501   Estimate Number: 0042     Primary JP: 17428(22)



Line Item Number Item Description Item Number Units Bid Qty Current Quantity Quantity Paid This Est. Quantity Paid To Date Unit Price Amount Paid This Est. Amount Paid To Date
Fed/State Project Number:    OKCY-XTWN(003)TI Project:    17428(22) Category:    0100/ROADWAY
0001 CONSTRUCTION MISCELLANEOUS 104 0300 LF 770.000 770.000   0.000 $33.00 $0.00 $0.00
0002 CLEARING AND GRUBBING 201 0102 LSUM 1.000 1.000   1.000 $75,000.00 $0.00 $75,000.00
0003 UNCLASSIFIED EXCAVATION 202(A) 0183 CY 276,378.000 276,378.000 0.000 276,378.000 $4.50 $0.00 $1,243,701.00
0004 SELECT BORROW 202(D) 0186 CY 57,000.000 57,000.000   0.000 $2.00 $0.00 $0.00
0005 TEST ROLLING 203 7116 LSUM 1.000