| Fed/State Project Number: NH-STIM(428) |
Project: 23132(04) |
Category: 0100/ROADWAY |
| 0001 |
CLEARING AND GRUBBING |
201 0102 |
LSUM |
1.000 |
1.000 |
|
1.000 |
$8,000.00 |
$0.00 |
$8,000.00 |
| 0002 |
UNCLASSIFIED EXCAVATION |
202(A) 0183 |
CY |
39,721.000 |
39,721.000 |
|
21,748.500 |
$4.55 |
$0.00 |
$98,955.68 |
| 0003 |
UNCLASSIFIED BORROW |
202(C) 0184 |
CY |
1,000.000 |
1,000.000 |
|
0.000 |
$4.55 |
$0.00 |
$0.00 |
| 0004 |
SELECT BORROW |
202(D) 0186 |
CY |
8,600.000 |
8,600.000 |
|
6,348.000 |
$15.00 |
$0.00 |
$95,220.00 |
| 0005 |
TYPE A-SALVAGED TOPSOIL |
205 4229 |
LSUM |
1.000 |
1.000 |
|
0.750 |
$20,250.00 |
$0.00 |
$15,187.50 |
| 0006 |
OBLITERATING ABANDONED ROAD |
210 0121 |
STA |
15.000 |
15.000 |
7.000 |
7.000 |
$1,000.00 |
$7,000.00 |
$7,000.00 |
| 0007 |
TEMPORARY SILT FENCE |
223 2801 |
LF |
4,500.000 |
4,500.000 |
|
2,097.000 |
$1.00 |
$0.00 |
$2,097.00 |
| 0008 |
TEMPORARY SILT DIKE |
227 0100 |
LF |
418.000 |
418.000 |
|
154.000 |
$10.00 |
$0.00 |
$1,540.00 |
| 0009 |
SOLID SLAB SODDING |
230(A) 2806 |
SY |
4,000.000 |
4,000.000 |
|
0.000 |
$2.80 |
$0.00 |
$0.00 |
| 0010 |
MULCH SODDING |
230(B) 2807 |
SY |
18,233.000 |
18,233.000 |
|
0.000 |
$2.40 |
$0.00 |
$0.00 |
| 0011 |
WATERING |
230(F) 2812 |
MGAL |
1,780.000 |
1,780.000 |
|
0.000 |
$12.00 |
$0.00 |
$0.00 |
| 0012 |
VEGETATIVE MULCHING |
233(A) 2817 |
AC |
38.000 |
38.000 |
|
0.000 |
$250.00 |
$0.00 |
$0.00 |
| 0013 |
MOWING |
241 2832 |
AC |
38.000 |
38.000 |
|
0.000 |
$50.00 |
$0.00 |
$0.00 |
| 0014 |
(SP)STABILIZED SUBGRADE |
327(K) 4300 |
SY |
24,384.000 |
24,384.000 |
|
16,297.150 |
$6.54 |
$0.00 |
$106,583.36 |
| 0015 |
TRAFFIC BOUND SURFACE COURSE TYPE E |
403(E) 0225 |
TON |
230.000 |
230.000 |
|
0.000 |
$45.00 |
$0.00 |
$0.00 |
| 0016 |
TACK COAT |
407 0250 |
GAL |
4,732.000 |
4,732.000 |
2,500.000 |
6,550.000 |
$3.00 |
$7,500.00 |
$19,650.00 |
| 0017 |
PRIME COAT |
408 5774 |
GAL |
4,240.000 |
4,240.000 |
|
4,260.000 |
$5.00 |
$0.00 |
$21,300.00 |
| 0018 |
(SP)ASPHALT CONCRETE TYPE S3(PG 76-28 OK) |
411(S3) 5935 |
TON |
3,002.000 |
3,002.000 |
2,102.240 |
2,102.240 |
$71.89 |
$151,130.03 |
$151,130.03 |
| 0019 |
(SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) |
411(S3) 5945 |
TON |
14,159.000 |
14,159.000 |
1,992.470 |
9,466.910 |
$61.47 |
$122,477.13 |
$581,930.96 |
| 0020 |
(SP)ASPHALT CONCRETE TYPE S4(PG 76-28 OK) |
411(S4) 5950 |
TON |
2,000.000 |
2,000.000 |
|
0.000 |
$76.29 |
$0.00 |
$0.00 |
| 0021 |
(SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) |
411(S4) 5960 |
TON |
620.000 |
620.000 |
|
0.000 |
$64.21 |
$0.00 |
$0.00 |
| 0022 |
RUMBLE STRIP-METHOD AC-CON |
413(A) 4861 |
LF |
7,980.000 |
7,980.000 |
|
0.000 |
$0.49 |
$0.00 |
$0.00 |
| 0023 |
CLASS C CONCRETE |
509(D) 0325 |
CY |
12.000 |
12.000 |
|
0.000 |
$295.00 |
$0.00 |
$0.00 |
| 0024 |
18" R.C.PIPE CLASS III |
613(B) 0491 |
LF |
110.000 |
110.000 |
0.000 |
104.000 |
$60.00 |
$0.00 |
$6,240.00 |
| 0025 |
TYPE C4 CULVERT END TREATMENT |
613(CC) 7188 |
EA |
2.000 |
2.000 |
|
0.000 |
$1,275.00 |
$0.00 |
$0.00 |
| 0026 |
TYPE BB4 CULVERT END TREATMENT |
613(CC) 7192 |
EA |
2.000 |
2.000 |
|
0.000 |
$1,350.00 |
$0.00 |
$0.00 |
| 0027 |
TYPE CC4 CULVERT END TREATMENT |
613(CC) 7193 |
EA |
2.000 |
2.000 |
|
0.000 |
$1,350.00 |
$0.00 |
$0.00 |
| 0028 |
24" CORR. GALV. STEEL PIPE |
613(D) 0690 |
LF |
184.000 |
184.000 |
|
0.000 |
$41.30 |
$0.00 |
$0.00 |
| 0029 |
30" CORR. GALV. STEEL PIPE |
613(D) 0691 |
LF |
70.000 |
70.000 |
|
0.000 |
$50.85 |
$0.00 |
$0.00 |
| 0030 |
42" X 29" CORR. GALV. STEEL PIPE ARCH |
613(D) 4530 |
LF |
220.000 |
220.000 |
|
220.000 |
$65.30 |
$0.00 |
$14,366.00 |
| 0031 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS |
619(A) 0920 |
LSUM |
1.000 |
1.000 |
|
1.000 |
$26,500.00 |
$0.00 |
$26,500.00 |
| 0032 |
REMOVAL OF ASPHALT PAVEMENT |
619(B) 4728 |
SY |
14,216.000 |
14,216.000 |
11,138.030 |
18,480.260 |
$3.50 |
$38,983.11 |
$64,680.92 |
| 0033 |
REMOVAL OF CONCRETE DITCH LINER |
619(B) 5881 |
LF |
125.000 |
125.000 |
|
125.000 |
$30.00 |
$0.00 |
$3,750.00 |
| 0034 |
REMOVAL OF EXISTING PIPE |
619(B) 5918 |
LF |
318.000 |
318.000 |
|
267.000 |
$20.00 |
$0.00 |
$5,340.00 |
| 0035 |
(SP)FENCE-STYLE SWF (5 BARBED WIRE) |
624(C) 4459 |
LF |
4,621.000 |
4,621.000 |
0.000 |
4,437.000 |
$4.75 |
$0.00 |
$21,075.75 |
| Subtotals For Category 0100/ROADWAY |
$327,090.27 |
$1,250,547.20 |
|
| Fed/State Project Number: NH-STIM(428) |
Project: 23132(04) |
Category: 0300/TRAFFIC TEMPORARY |
| 0036 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) |
856(A) 8839 |
LF |
41,200.000 |
41,200.000 |
19,932.000 |
38,581.000 |
$0.34 |
$6,776.88 |
$13,117.54 |
| 0037 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 |
856(G) 8887 |
EA |
2,000.000 |
2,000.000 |
|
0.000 |
$0.75 |
$0.00 |
$0.00 |
| 0038 |
ARROW DISPLAY(TYPE C) |
880(A) 8812 |
SD |
160.000 |
160.000 |
32.000 |
142.000 |
$4.00 |
$128.00 |
$568.00 |
| 0039 |
CONSTRUCTION SIGNS 0 TO 6.25 SF |
880(B) 8818 |
SD |
2,610.000 |
2,610.000 |
192.000 |
1,896.000 |
$0.20 |
$38.40 |
$379.20 |
| 0040 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF |
880(B) 8821 |
SD |
6,280.000 |
6,280.000 |
64.000 |
572.000 |
$0.20 |
$12.80 |
$114.40 |
| 0041 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF |
880(B) 8824 |
SD |
590.000 |
590.000 |
192.000 |
1,720.000 |
$12.00 |
$2,304.00 |
$20,640.00 |
| 0042 |
BARRICADES(TYPE III) |
880(C) 8842 |
SD |
990.000 |
990.000 |
64.000 |
284.000 |
$0.20 |
$12.80 |
$56.80 |
| 0043 |
WING BARRICADES |
880(C) 8848 |
SD |
990.000 |
990.000 |
32.000 |
316.000 |
$0.20 |
$6.40 |
$63.20 |
| 0044 |
WARNING LIGHTS(TYPE A) |
880(E) 8860 |
SD |
990.000 |
990.000 |
288.000 |
1,904.000 |
$1.00 |
$288.00 |
$1,904.00 |
| 0045 |
DRUMS |
880(F) 8878 |
SD |
12,005.000 |
12,005.000 |
1,584.000 |
10,346.000 |
$0.40 |
$633.60 |
$4,138.40 |
| 0046 |
TUBE CHANNELIZERS |
880(G) 8884 |
SD |
12,005.000 |
12,005.000 |
|
0.000 |
$0.40 |
$0.00 |
$0.00 |
| 8000 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) |
859(A) 8006 |
LF |
0.000 |
0.000 |
|
0.000 |
$0.30 |
$0.00 |
$0.00 |
| Subtotals For Category 0300/TRAFFIC TEMPORARY |
$10,200.88 |
$40,981.54 |
|