Fed/State Project Number: NH-STIM(169) |
Project: 17127(05) |
Category: 0100/ROADWAY |
0001 |
CLEARING AND GRUBBING |
201 M0102 |
LSUM |
1.000 |
1.000 |
0.100 |
0.800 |
$75,000.00 |
$7,500.00 |
$60,000.00 |
0002 |
UNCLASSIFIED EXCAVATION |
202(A) M0183 |
M3 |
259,700.000 |
259,700.000 |
12,881.470 |
270,826.944 |
$3.54 |
$45,600.40 |
$958,727.37 |
0003 |
UNCLASSIFIED BORROW |
202(C) M0184 |
M3 |
54,117.000 |
54,117.000 |
|
90,678.955 |
$4.90 |
$0.00 |
$444,326.89 |
0004 |
TYPE A-SALVAGED TOPSOIL |
205 M4229 |
LSUM |
1.000 |
1.000 |
|
0.600 |
$62,000.00 |
$0.00 |
$37,200.00 |
0005 |
TEMPORARY SLOPE DRAINS |
221 M2800 |
M |
124.000 |
124.000 |
|
0.000 |
$35.00 |
$0.00 |
$0.00 |
0006 |
TEMPORARY BALE BARRIER |
222 M2801 |
M |
722.000 |
722.000 |
|
0.000 |
$20.00 |
$0.00 |
$0.00 |
0007 |
TEMPORARY SILT FENCE |
223 M2802 |
M |
10,586.000 |
10,586.000 |
|
2,292.594 |
$5.10 |
$0.00 |
$11,692.24 |
0008 |
TEMPORARY SEDIMENT FILTER |
224 M2803 |
EA |
12.000 |
12.000 |
|
0.000 |
$200.00 |
$0.00 |
$0.00 |
0009 |
TEMPORARY SEDIMENT BASIN |
225 M2804 |
EA |
4.000 |
4.000 |
|
0.000 |
$200.00 |
$0.00 |
$0.00 |
0010 |
TEMPORARY SEDIMENT REMOVAL |
226 M2805 |
M3 |
1,748.000 |
1,748.000 |
|
273.650 |
$15.00 |
$0.00 |
$4,104.75 |
0011 |
TEMPORARY SILT DIKE |
227 M0100 |
M |
1,068.000 |
1,068.000 |
|
247.508 |
$20.00 |
$0.00 |
$4,950.16 |
0012 |
DITCH LINER PROTECTION |
229 M4318 |
M |
1,913.000 |
1,913.000 |
|
0.000 |
$6.00 |
$0.00 |
$0.00 |
0013 |
SOLID SLAB SODDING |
230(A) M2806 |
M2 |
436,810.000 |
436,810.000 |
|
122,941.225 |
$1.42 |
$0.00 |
$174,576.54 |
0014 |
WATERING |
230(F) M2812 |
KL |
78,625.800 |
78,625.800 |
|
6,181.872 |
$1.50 |
$0.00 |
$9,272.81 |
0015 |
VEGETATIVE MULCHING |
233(A) M2817 |
HA |
41.270 |
41.270 |
|
0.662 |
$500.00 |
$0.00 |
$331.00 |
0016 |
FERTILIZING (10-20-10) |
234(A) M2824 |
T |
48.049 |
48.049 |
|
10.886 |
$550.00 |
$0.00 |
$5,987.30 |
0017 |
FERTILIZING (0-46-0) |
234(A) M4406 |
T |
7.426 |
7.426 |
|
0.317 |
$677.00 |
$0.00 |
$214.61 |
0018 |
(PL)ROCK FILTER DAM, TYPE 1 |
235(A) M0100 |
M3 |
30.000 |
30.000 |
|
0.000 |
$100.00 |
$0.00 |
$0.00 |
0019 |
(PL)ROCK FILTER DAM, TYPE 2 |
235(B) M0101 |
M3 |
30.000 |
30.000 |
|
0.000 |
$100.00 |
$0.00 |
$0.00 |
0020 |
MOWING |
241 M2832 |
HA |
20.000 |
20.000 |
|
6.140 |
$40.00 |
$0.00 |
$245.60 |
0021 |
AGGREGATE BASE |
303 M0192 |
M3 |
42,776.260 |
42,776.260 |
|
22,230.711 |
$50.00 |
$0.00 |
$1,111,535.55 |
0022 |
SUBGRADE, METHOD B |
310(B) M0149 |
M2 |
3,200.000 |
3,200.000 |
|
864.000 |
$2.99 |
$0.00 |
$2,583.36 |
0023 |
(SP)CEMENT TREATED BASE |
317(F) M4270 |
M2 |
195,721.870 |
195,721.870 |
|
96,895.624 |
$10.25 |
$0.00 |
$993,180.15 |
0024 |
SEPARATOR FABRIC |
325 M5271 |
M2 |
468,334.710 |
430,834.710 |
19,215.970 |
139,735.192 |
$0.63 |
$12,106.06 |
$88,033.18 |
0025 |
(SP)LIME |
327(D) M4230 |
T |
4,271.250 |
4,271.250 |
458.113 |
3,081.186 |
$120.00 |
$54,973.56 |
$369,742.32 |
0026 |
(SP)LIME STABILIZED SUBGRADE |
327(H) M4270 |
M2 |
222,461.050 |
222,461.050 |
9,517.509 |
150,066.857 |
$3.00 |
$28,552.53 |
$450,200.58 |
0027 |
TRAFFIC BOUND SURFACE COURSE TYPE E |
403(E) M0225 |
T |
25,663.880 |
25,663.880 |
0.000 |
17,337.120 |
$18.00 |
$0.00 |
$312,068.16 |
0028 |
TACK COAT |
407 M0250 |
L |
2,565.670 |
2,565.670 |
|
371.000 |
$1.08 |
$0.00 |
$400.68 |
0029 |
PRIME COAT |
408 M5774 |
L |
353,051.030 |
353,051.030 |
|
87,922.310 |
$0.80 |
$0.00 |
$70,337.85 |
0030 |
(SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) |
411(S3)M5945 |
T |
2,679.750 |
2,679.750 |
|
848.820 |
$90.99 |
$0.00 |
$77,234.13 |
0031 |
(SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) |
411(S4)M5960 |
T |
1,506.070 |
1,506.070 |
|
705.950 |
$99.11 |
$0.00 |
$69,966.70 |
0032 |
175MM P.C. CONCRETE PAVEMENT |
414(A) M0259 |
M2 |
64,658.100 |
64,658.100 |
|
27,595.739 |
$31.00 |
$0.00 |
$855,467.92 |
0033 |
225MM P.C. DOWEL JOINTED CONCRETE PAVEMENT |
414(A1)M5754 |
M2 |
117,104.320 |
117,104.320 |
|
62,170.994 |
$34.00 |
$0.00 |
$2,113,813.79 |
0034 |
COLD MILLING PAVEMENT |
417 M5267 |
M2 |
154.030 |
154.030 |
|
160.248 |
$40.00 |
$0.00 |
$6,409.92 |
0035 |
STRUCTURAL EXCAVATION UNCLASSIFIED |
501(A) M1306 |
M3 |
602.000 |
602.000 |
|
330.489 |
$34.00 |
$0.00 |
$11,236.62 |
0036 |
CLASS A CONCRETE |
509(B) M0321 |
M3 |
2,673.000 |
2,664.053 |
|
1,115.052 |
$440.00 |
$0.00 |
$490,622.88 |
0037 |
CLASS C CONCRETE |
509(D) M0325 |
M3 |
399.000 |
399.000 |
|
207.209 |
$297.50 |
$0.00 |
$61,644.68 |
0038 |
REINFORCING STEEL |
511(A) M0332 |
KG |
281,969.000 |
281,969.000 |
|
102,009.140 |
$1.45 |
$0.00 |
$147,913.24 |
0039 |
TYPE I-A PLAIN RIPRAP |
601A-1 M0536 |
T |
4,109.000 |
4,109.000 |
|
2,739.880 |
$24.62 |
$0.00 |
$67,455.85 |
0040 |
TYPE I-A FILTER BLANKET |
601A-2 M0538 |
T |
2,055.000 |
2,055.000 |
|
778.180 |
$20.09 |
$0.00 |
$15,633.64 |
0041 |
150MM CONCRETE DRIVEWAY (H.E.S.) |
610(B) M0399 |
M2 |
289.380 |
289.380 |
|
0.000 |
$54.00 |
$0.00 |
$0.00 |
0042 |
INLET (SMD-TYPE 2) |
611(E) M6002 |
EA |
13.000 |
13.000 |
4.000 |
8.000 |
$1,250.00 |
$5,000.00 |
$10,000.00 |
0043 |
450MM R.C.PIPE CLASS III |
613(B) M0405 |
M |
137.000 |
137.000 |
|
116.246 |
$73.08 |
$0.00 |
$8,495.25 |
0044 |
600MM R.C.PIPE CLASS III |
613(B) M0409 |
M |
470.000 |
470.000 |
0.000 |
490.330 |
$97.20 |
$0.00 |
$47,660.08 |
0045 |
900MM R.C.PIPE CLASS III |
613(B) M0415 |
M |
66.000 |
66.000 |
|
66.000 |
$234.38 |
$0.00 |
$15,469.08 |
0046 |
TYPE A4 CULVERT END TREATMENT |
613(CC)M7186 |
EA |
26.000 |
26.000 |
7.000 |
23.000 |
$510.00 |
$3,570.00 |
$11,730.00 |
0047 |
TYPE B4 CULVERT END TREATMENT |
613(CC)M7187 |
EA |
15.000 |
15.000 |
5.000 |
14.000 |
$665.00 |
$3,325.00 |
$9,310.00 |
0048 |
TYPE C4 CULVERT END TREATMENT |
613(CC)M7188 |
EA |
9.000 |
9.000 |
3.000 |
4.000 |
$1,120.00 |
$3,360.00 |
$4,480.00 |
0049 |
TYPE D4 CULVERT END TREATMENT |
613(CC)M7189 |
EA |
3.000 |
3.000 |
1.000 |
2.000 |
$1,110.00 |
$1,110.00 |
$2,220.00 |
0050 |
TYPE A6 CULVERT END TREATMENT |
613(CC)M7196 |
EA |
25.000 |
25.000 |
7.000 |
23.000 |
$680.00 |
$4,760.00 |
$15,640.00 |
0051 |
TYPE B6 CULVERT END TREATMENT |
613(CC)M7197 |
EA |
20.000 |
20.000 |
7.000 |
17.000 |
$1,280.00 |
$8,960.00 |
$21,760.00 |
0052 |
TYPE C6 CULVERT END TREATMENT |
613(CC)M7198 |
EA |
8.000 |
8.000 |
3.000 |
4.000 |
$2,075.00 |
$6,225.00 |
$8,300.00 |
0053 |
TYPE D6 CULVERT END TREATMENT |
613(CC)M7199 |
EA |
1.000 |
1.000 |
0.000 |
0.000 |
$2,035.00 |
$0.00 |
$0.00 |
0054 |
450MM CORR. GALV. STEEL PIPE |
613(D) M0689 |
M |
1,148.000 |
1,148.000 |
18.900 |
563.145 |
$50.53 |
$955.02 |
$28,455.72 |
0055 |
600MM CORR. GALV. STEEL PIPE |
613(D) M0690 |
M |
20.000 |
20.000 |
|
0.000 |
$69.00 |
$0.00 |
$0.00 |
0056 |
680MM X 500MM CORR. GALV. STEEL PIPE ARCH |
613(D) M5214 |
M |
664.000 |
664.000 |
18.900 |
336.720 |
$74.68 |
$1,411.45 |
$25,146.25 |
0057 |
910MM X 660MM CORR. GALV. STEEL PIPE ARCH |
613(D) M5224 |
M |
170.000 |
170.000 |
|
42.100 |
$97.64 |
$0.00 |
$4,110.65 |
0058 |
1030MM X 740MM CORR. GALV. STEEL PIPE ARCH |
613(D) M5226 |
M |
38.000 |
38.000 |
|
37.800 |
$165.40 |
$0.00 |
$6,252.12 |
0059 |
TRENCH EXCAVATION |
613(S) M1180 |
M3 |
705.000 |
705.000 |
|
1,006.555 |
$5.25 |
$0.00 |
$5,284.42 |
0060 |
STANDARD BEDDING MATERIAL |
613(T) M1181 |
M3 |
377.000 |
377.000 |
|
649.074 |
$29.43 |
$0.00 |
$19,102.25 |
0061 |
REMOVAL OF CONCRETE PAVEMENT |
619(B) M4727 |
M2 |
3,388.500 |
3,388.500 |
|
0.000 |
$5.00 |
$0.00 |
$0.00 |
0062 |
REMOVAL OF ASPHALT PAVEMENT |
619(B) M4728 |
M2 |
54,394.000 |
54,394.000 |
|
64,640.449 |
$1.23 |
$0.00 |
$79,507.76 |
0063 |
SAWING PAVEMENT |
619(C) M0924 |
M |
66.000 |
66.000 |
|
65.532 |
$10.00 |
$0.00 |
$655.32 |
0064 |
BEAM GUARD RAIL-W-BEAM-SINGLE |
623(A) M0932 |
M |
1,268.000 |
1,268.000 |
|
418.000 |
$41.85 |
$0.00 |
$17,493.30 |
0065 |
(SP)G.E.T. GUARD RAIL END SECTION |
623(H) M8571 |
EA |
11.000 |
11.000 |
|
4.000 |
$1,975.00 |
$0.00 |
$7,900.00 |
0066 |
(PL)BRIDGE GUARD RAIL CONNECTION-TYPE A |
623(I) M8675 |
EA |
4.000 |
4.000 |
|
4.000 |
$1,190.00 |
$0.00 |
$4,760.00 |
0067 |
(SP)FENCE-STYLE SWF (5 BARBED WIRE) |
624(C) M4459 |
M |
6,576.000 |
6,576.000 |
|
6,562.099 |
$9.84 |
$0.00 |
$64,571.06 |
0068 |
MAILBOX INSTALLATION-SINGLE |
629(A) M4958 |
EA |
18.000 |
18.000 |
|
0.000 |
$75.00 |
$0.00 |
$0.00 |
0069 |
MAILBOX |
629(C) M4960 |
EA |
18.000 |
18.000 |
|
0.000 |
$30.00 |
$0.00 |
$0.00 |
0070 |
REMOVAL OF MAILBOX INSTALLATION |
629(D) M4961 |
EA |
18.000 |
18.000 |
|
15.000 |
$10.00 |
$0.00 |
$150.00 |
Subtotals For Category 0100/ROADWAY |
$187,409.02 |
$9,445,563.73 |
|
Fed/State Project Number: NH-STIM(169) |
Project: 17127(05) |
Category: 0200/BRIDGES 'E' - 'H' |
0071 |
UNCLASSIFIED EXCAVATION |
202(A) M1301 |
M3 |
13,029.000 |
13,029.000 |
|
13,029.000 |
$4.10 |
$0.00 |
$53,418.90 |
0072 |
SELECT BORROW |
202(D) M0186 |
M3 |
100.000 |
100.000 |
|
0.000 |
$7.15 |
$0.00 |
$0.00 |
0073 |
SOLID SLAB SODDING |
230(A) M2806 |
M2 |
504.000 |
504.000 |
|
0.000 |
$1.42 |
$0.00 |
$0.00 |
0074 |
APPROACH SLABS |
414(C) M0309 |
M2 |
443.600 |
443.600 |
|
221.760 |
$290.39 |
$0.00 |
$64,396.89 |
0075 |
STRUCTURAL EXCAVATION UNCLASSIFIED |
501(A) M1306 |
M3 |
714.000 |
714.000 |
|
632.495 |
$35.75 |
$0.00 |
$22,611.69 |
0076 |
SUBSTRUCTURE EXCAVATION COMMON |
501(B) M1307 |
M3 |
320.000 |
320.000 |
|
225.562 |
$22.90 |
$0.00 |
$5,165.36 |
0077 |
CLSM BACKFILL |
501(G) M6309 |
M3 |
240.000 |
240.000 |
|
118.406 |
$137.33 |
$0.00 |
$16,260.70 |
0078 |
PRESTRESSED CONCRETE BEAMS (TYPE II) |
503(A) M1311 |
M |
345.820 |
345.820 |
|
172.910 |
$551.18 |
$0.00 |
$95,304.53 |
0079 |
(PL)SEALED EXPANSION JOINTS |
504(C) M6276 |
M |
28.800 |
28.800 |
|
14.200 |
$682.41 |
$0.00 |
$9,690.22 |
0080 |
CONCRETE PARAPET |
504(F) M1381 |
M |
250.120 |
250.120 |
|
124.000 |
$161.96 |
$0.00 |
$20,083.04 |
0081 |
STRUCTURAL STEEL |
506(A) M1322 |
KG |
1,800.000 |
1,800.000 |
|
0.000 |
$7.16 |
$0.00 |
$0.00 |
0082 |
CLASS AA CONCRETE |
509(A) M1326 |
M3 |
242.200 |
242.200 |
|
119.457 |
$654.31 |
$0.00 |
$78,161.91 |
0083 |
CLASS A CONCRETE |
509(B) M1328 |
M3 |
1,796.800 |
1,796.800 |
3.890 |
1,781.154 |
$452.00 |
$1,758.28 |
$805,081.59 |
0084 |
REINFORCING STEEL |
511(A) M1332 |
KG |
201,833.000 |
201,833.000 |
|
201,832.989 |
$1.03 |
$0.00 |
$207,887.97 |
0085 |
EPOXY COATED REINFORCING STEEL |
511(B) M6010 |
KG |
42,596.000 |
42,596.000 |
|
23,856.052 |
$1.62 |
$0.00 |
$38,646.80 |
0086 |
(PL)PILOT HOLES |
514 M6260 |
M |
180.000 |
180.000 |
|
180.000 |
$159.94 |
$0.00 |
$28,789.20 |
0087 |
PILES, FURNISHED (HP 250X62) |
514(A) M6011 |
M |
58.000 |
58.000 |
|
58.000 |
$97.74 |
$0.00 |
$5,668.92 |
0088 |
PILES, FURNISHED (HP 310X79) |
514(A) M6013 |
M |
232.700 |
232.700 |
|
234.302 |
$115.45 |
$0.00 |
$27,050.17 |
0089 |
PILES, DRIVEN (HP 250X62) |
514(B) M6292 |
M |
58.000 |
58.000 |
|
44.529 |
$53.31 |
$0.00 |
$2,373.84 |
0090 |
PILES, DRIVEN (HP 310X79) |
514(B) M6294 |
M |
232.700 |
232.700 |
|
206.060 |
$47.57 |
$0.00 |
$9,802.28 |
0091 |
PILE LOAD TEST (DYNAMIC) |
514(F) M6354 |
EA |
36.000 |
36.000 |
|
36.000 |
$200.37 |
$0.00 |
$7,213.32 |
0092 |
WATER REPELLENT (VISUALLY INSPECTED) |
515(A) M6013 |
M2 |
12,129.200 |
12,129.200 |
|
617.536 |
$5.44 |
$0.00 |
$3,359.40 |
0093 |
DRILLED SHAFTS 1200MM DIAMETER |
516(A) M6094 |
M |
44.400 |
44.400 |
|
44.400 |
$2,280.18 |
$0.00 |
$101,240.00 |
0094 |
(PL)FIXED BEARING ASSEMBLY |
535 M6164 |
EA |
32.000 |
32.000 |
|
16.000 |
$374.00 |
$0.00 |
$5,984.00 |
0095 |
(PL)EXPANSION BEARING ASSEMBLY |
535 M6165 |
EA |
16.000 |
16.000 |
|
8.000 |
$378.00 |
$0.00 |
$3,024.00 |
0096 |
TYPE I-A PLAIN RIPRAP |
601A-1 M1353 |
T |
1,830.000 |
1,830.000 |
105.260 |
606.040 |
$51.25 |
$5,394.58 |
$31,059.56 |
0097 |
TYPE I-A FILTER BLANKET |
601A-2 M1355 |
T |
248.000 |
248.000 |
100.000 |
348.000 |
$50.14 |
$5,014.00 |
$17,448.72 |
0098 |
150MM PERFORATED PIPE UNDERDRAIN ROUND |
613(P) M1091 |
M |
57.200 |
57.200 |
|
28.400 |
$29.64 |
$0.00 |
$841.78 |
0099 |
150MM NON-PERF.PIPE UNDERDRAIN RND. |
613(Q) M1096 |
M |
48.000 |
48.000 |
|
30.480 |
$22.71 |
$0.00 |
$692.20 |
0100 |
REMOVAL OF EXISTING BRIDGE STRUCTURE |
619(D) M1397 |
LSUM |
1.000 |
1.000 |
|
1.000 |
$47,500.00 |
$0.00 |
$47,500.00 |
Subtotals For Category 0200/BRIDGES 'E' - 'H' |
$12,166.86 |
$1,708,756.99 |
|
Fed/State Project Number: NH-STIM(169) |
Project: 17127(05) |
Category: 0300/TRAFFIC |
0101 |
SHEET ALUMINUM SIGNS |
850(A) M8110 |
M2 |
66.000 |
66.000 |
|
0.000 |
$120.00 |
$0.00 |
$0.00 |
0102 |
57MM SQUARE TUBE POST |
851(C) M8327 |
M |
712.000 |
712.000 |
|
0.000 |
$26.00 |
$0.00 |
$0.00 |
0103 |
DELINEATORS (TYPE 1, CODE 2) |
853 M9027 |
EA |
19.000 |
19.000 |
|
0.000 |
$20.00 |
$0.00 |
$0.00 |
0104 |
DELINEATORS (TYPE 2, CODE 2) |
853 M9036 |
EA |
51.000 |
51.000 |
|
0.000 |
$20.00 |
$0.00 |
$0.00 |
0105 |
TRAFFIC STRIPE(PLASTIC)(100MM WIDE) |
855(A) M8812 |
M |
32,725.000 |
32,725.000 |
|
0.000 |
$1.44 |
$0.00 |
$0.00 |
0106 |
TRAFFIC STRIPE(PLASTIC)(ARROWS) |
855(B) M8818 |
EA |
29.000 |
29.000 |
|
0.000 |
$75.00 |
$0.00 |
$0.00 |
0107 |
TRAFFIC STRIPE(PLASTIC)(WORDS) |
855(B) M8821 |
EA |
15.000 |
15.000 |
|
0.000 |
$105.00 |
$0.00 |
$0.00 |
0108 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(100MM WIDE) |
856(A) M8839 |
M |
50,000.000 |
50,000.000 |
|
30,416.150 |
$0.30 |
$0.00 |
$9,124.85 |
0109 |
REMOVABLE PAVEMENT MARKING TAPE(100MM WIDE) |
856(C) M8851 |
M |
2,000.000 |
2,000.000 |
|
0.000 |
$2.50 |
$0.00 |
$0.00 |
0110 |
(PL)C/L CONSTRUCTION ZONE PAVEMENT MARKERS(YELLOW) |
856(G) M8884 |
EA |
101.000 |
101.000 |
|
0.000 |
$25.00 |
$0.00 |
$0.00 |
0111 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 |
856(G) M8887 |
EA |
500.000 |
500.000 |
|
0.000 |
$1.00 |
$0.00 |
$0.00 |
0112 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 |
856(G) M8890 |
EA |
500.000 |
500.000 |
|
0.000 |
$1.00 |
$0.00 |
$0.00 |
0113 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) |
859(A) M8006 |
M |
50,000.000 |
50,000.000 |
|
415.747 |
$0.05 |
$0.00 |
$20.79 |
0114 |
ARROW DISPLAY (TYPE C) |
880(A) M8812 |
SD |
420.000 |
420.000 |
16.000 |
129.000 |
$1.00 |
$16.00 |
$129.00 |
0115 |
CONSTRUCTION SIGNS 0 TO 0.59 M2 |
880(B) M8818 |
SD |
78,300.000 |
78,300.000 |
336.000 |
9,972.000 |
$0.01 |
$3.36 |
$99.72 |
0116 |
CONSTRUCTION SIGNS 0.60 M2 TO 1.47 M2 |
880(B) M8821 |
SD |
7,560.000 |
7,560.000 |
1,920.000 |
25,293.000 |
$2.00 |
$3,840.00 |
$50,586.00 |
0117 |
CONSTRUCTION SIGNS 1.48 M2 TO 3.06 M2 |
880(B) M8824 |
SD |
28,080.000 |
28,080.000 |
832.000 |
23,384.000 |
$0.75 |
$624.00 |
$17,538.00 |
0118 |
BARRICADES(TYPE II) |
880(C) M8836 |
SD |
27,000.000 |
27,000.000 |
|
0.000 |
$0.02 |
$0.00 |
$0.00 |
0119 |
BARRICADES(TYPE III) |
880(C) M8842 |
SD |
78,300.000 |
78,300.000 |
528.000 |
7,693.000 |
$0.02 |
$10.56 |
$153.86 |
0120 |
WING BARRICADES |
880(C) M8848 |
SD |
1,080.000 |
1,080.000 |
96.000 |
3,363.000 |
$2.00 |
$192.00 |
$6,726.00 |
0121 |
VERTICAL PANELS |
880(D) M8854 |
SD |
34,560.000 |
34,560.000 |
1,328.000 |
32,246.000 |
$0.05 |
$66.40 |
$1,612.30 |
0122 |
WARNING LIGHTS(TYPE A) |
880(E) M8860 |
SD |
156,600.000 |
156,600.000 |
1,392.000 |
27,907.000 |
$0.01 |
$13.92 |
$279.07 |
0123 |
WARNING LIGHTS(TYPE C) |
880(E) M8872 |
SD |
14,560.000 |
14,560.000 |
2,716.000 |
37,888.000 |
$0.40 |
$1,086.40 |
$15,155.20 |
0124 |
DRUMS |
880(F) M8878 |
SD |
71,280.000 |
71,280.000 |
832.000 |
7,218.000 |
$0.02 |
$16.64 |
$144.36 |
0125 |
TUBE CHANNELIZERS |
880(G) M8884 |
SD |
6,480.000 |
6,480.000 |
2,832.000 |
26,097.000 |
$0.25 |
$708.00 |
$6,524.25 |
Subtotals For Category 0300/TRAFFIC |
$6,577.28 |
$108,093.40 |
|