Contract ID: | 090398 | Estimate Number: | 0015 , Final | Spec Year: | 1999 | |||
Primary JP: | 22776(04) | Residency: | ADA (03100) | Contract No: | 510085 | |||
Date Created: | 02/14/2011 | Contractor FEI: | 731394406 | Account No: | 432300 |
Project Number(s): | BRO-STIM(205)CO, BRO-STIM(206)CO | ||||||||
Contract Description: | BRIDGE AND APPROACHES CO. RD.: OVER GRAYSON CRK., 2 MI. S. & 6.7 MI. E. OF SH-59A/SH-3W JCT. OVER MILL CRK., 0.5 MI. N. AND 2.0 MI. E. OF FITTSTOWN. PROJECT LENGTH = 0.462 MILES. | ||||||||
Primary County: | PONTOTOC | ||||||||
Name of Road: | COUNTY ROAD | ||||||||
Prime Contractor: | OBC, INC. | Time Charged: | 267.00 | ||||||
P.O. BOX 3817 | Time Allowed: | 280.00 | |||||||
EDMOND , OK 73083 | Percent Time: | 95.36 % |
Paid To Date: | $1,004,786.91 | Payable This Statement: | $-2,053.12 |
CONTRACTOR AFFIDAVIT |
STATE OF ___________________ | ) | |
) § | ||
COUNTY OF __________________ | ) |
The undersigned contractor or duly authorized agent, of lawful age, being first duly sworn, on oath say that this claim is true and correct. |
Affiant further states that the work, services or materials as shown by this claim have been completed or supplied in accordance with the plans, specifications, orders, requests and all other terms of the contract. Affiant further states that (s)he is duly authorized agent of the contractor for the purpose of certifying the facts pertaining to the giving of things of value to government personnel in order to procure the contract or obtain payment; that (s)he is fully aware of the facts and circumstances surrounding the making of the contract and has been personally and directly involved in the proceedings leading to the procurement of the contract and the filing of this claim; and, neither the contractor nor anyone subject to the contractor's direction or control has been paid, given or donated or agreed to pay, give or donate to any officer or employee of the State of Oklahoma any money or other thing of value, either directly or |
indirectly, in procuring the contract or obtaining payment. The affiant further certifies that all laborers, mechanics, apprentices and trainees employed by him/her or by any subcontractor performing work under the contract on the project have been paid wages at rates not less than those required by the contract provisions, and that the work performed by each such laborer, mechanic, apprentice or trainee conformed to the classifications set forth in the contract or training program provisions applicable to the wage rate paid. |
Affiant hereby agrees that Contractor will accept this estimate as full compensation for all money due Contractor by the Department of Transportation, and hereby relinquish all claims, either in contract or in tort, which have arisen or which might arise out of the construction of said project. That to the best of my knowledge and belief, all indebtedness for labor, materials, fuel, equipment, equipment rental, parts, supplies, insurance premiums, and claims for items not specifically mentioned, which are attributable to performance of the work on this project or which were incorporated therein in any manner, have been paid in full, and that there are not now any presently outstanding, unpaid claims for such indebtedness; that my position with the company is such, that if there were any such outstanding claims of the nature specified herein, I would ordinarily be aware of them. |
Further affiant sayeth not. |
OBC, INC. |
_________________________________________________ |
Affiant Signature |
_________________________________________________ |
Affiant Printed Name |
PE Seal |
_________________________________________________ |
Affiant Company Position |
Subscribed and sworn to before me this ______ day of ____________, 20____ |
My Commission Number: ____________ My Commission Expires: ______________ |
_________________________________________________ |
_________________________________________________ |
Professional Engineer Signature |
Oklahoma Department of Transportation |
Corporate Seal |
Notary Seal |
Contract ID: | 090398 | Estimate Number: | 0015 | Contract No: | 510085 | |||
Residency: | ADA (03100) | Estimate Type: | Final | Account No: | 432300 | |||
Project Number(s): | BRO-STIM(205)CO, BRO-STIM(206)CO | ||||||||||||
Primary Job Piece No: | 22776(04) | ||||||||||||
Contract Description: | BRIDGE AND APPROACHES CO. RD.: OVER GRAYSON CRK., 2 MI. S. & 6.7 MI. E. OF SH-59A/SH-3W JCT. OVER MILL CRK., 0.5 MI. N. AND 2.0 MI. E. OF FITTSTOWN. PROJECT LENGTH = 0.462 MILES. | ||||||||||||
Primary County: | PONTOTOC | ||||||||||||
Name of Road: | COUNTY ROAD | ||||||||||||
Prime Contractor: | OBC, INC. | ||||||||||||
P.O. BOX 3817 | |||||||||||||
EDMOND , OK 73083 | |||||||||||||
Surety Company: | LIBERTY MUTUAL INSURANCE COMPANY | ||||||||||||
Date Let: | 06/18/2009 | NTP Effective Date: | 09/08/2009 | Pay Period: | 05/26/2010 TO 05/26/2010 |
Date Awarded: | 06/22/2009 | Date Work Began: | 09/01/2009 | Original Contract Time: | 210 |
Date Contract Executed: | 06/30/2009 | Date Time Stopped: | 05/25/2010 | Current Time Charged: | 267.00 |
Date NTP Issued: | 07/06/2009 | Completion Date: | 05/25/2010 | Current Time Allowed: | 280.00 |
General Liability Expires: | 05/01/2011 | Workman's Comp Expires: | 06/30/2011 | Percent Time Used: | 95.36 % |
Specification Year: | 1999 | ||||
Current Contract Amount: | $999,980.36 | Total to Date | Prev to Date | This Estimate | |||
Bid Amount: | $1,014,494.39 | Participating: | $999,980.37 | $1,002,033.49 | $-2,053.12 | ||
Percent Complete: | 100 % | Non Participating: | $0.00 | $0.00 | $0.00 | ||
Funds Available: | $-4,806.55 | Non ARRA: | $0.00 | $0.00 | $0.00 | ||
Unearned Balance: | $9,707.48 | Total Earnings: | $999,980.37 | $1,002,033.49 | $-2,053.12 | ||
Stockpiled Materials: | $0.00 | $0.00 | $0.00 | ||||
Gross Earnings: | $999,980.37 | $1,002,033.49 | $-2,053.12 | ||||
Other Adjustments: | $4,806.54 | $4,806.54 | $0.00 | ||||
Liq Dam/Disincentive: | $0.00 | $0.00 | $0.00 | ||||
TOTAL: | $1,004,786.91 | $1,006,840.03 | $-2,053.12 |
Contract ID: | 090398 | Estimate Number: | 0015 | Primary JP: | 22776(04) | |||
CHANGE ORDER HISTORY | |||||
Change Order Nbr. | Change Order Description | Status | Approval Date | Contract Time Adjustment | Total Change Order Amount |
001 | Changing RCA from field Qty to Pay Plan Qty | Approved | 10/11/2010 | 0.0 | $0.00 |
002 | CO to add Piling Splices | Approved | 11/03/2010 | 0.0 | $400.00 |
003 | Finalizing Contract Item Qtys | Approved | 01/10/2011 | 0.0 | $-14,914.03 |
STOCKPILE PAYMENT HISTORY | |||||
Project | Line Nbr | Stockpile Description | Adjustment Type | Estimate Nbr | Adjusted Amount |
22776(04) | 0032 | MOH Beams TY IV (205) | Stockpiled Material Adjustment | 0007 | $-49,101.98 |
22776(04) | 0032 | MOH Beams TY IV (205) | Stockpiled Material Initial Payment | 0005 | $49,101.98 |
22776(04) | 0038 | MOH 205 10.42 Piles | Stockpiled Material Adjustment | 0008 | $-2,660.80 |
22776(04) | 0038 | MOH 205 10.42 Piles | Stockpiled Material Initial Payment | 0001 | $2,993.40 |
22776(04) | 0038 | MOH 205 10.42 Piles | Stockpiled Material Closure | 0014 | $-332.60 |
22776(04) | 0039 | MOH 205 12.53 Piles | Stockpiled Material Initial Payment | 0001 | $11,916.64 |
22776(04) | 0039 | MOH 205 12.53 Piles | Stockpiled Material Adjustment | 0008 | $-11,916.64 |
22777(04) | 0017 | MOH Beams TY II (206) | Stockpiled Material Initial Payment | 0005 | $30,140.29 |
22777(04) | 0017 | MOH Beams TY II (206) | Stockpiled Material Adjustment | 0009 | $-30,140.29 |
22777(04) | 0018 | MOH Beams TY III (206) | Stockpiled Material Initial Payment | 0005 | $30,140.28 |
22777(04) | 0018 | MOH Beams TY III (206) | Stockpiled Material Adjustment | 0008 | $-30,140.28 |
22777(04) | 0025 | MOH 206 10.42 Piles | Stockpiled Material Adjustment | 0008 | $-5,604.31 |
22777(04) | 0025 | MOH 206 10.42 Piles | Stockpiled Material Initial Payment | 0001 | $5,604.31 | Subtotals For Stockpile Payments | $0.00 |
LIQUIDATED DAMAGES HISTORY | |||||||||
Adjustment Description | Estimate Nbr | Time Units | Rate | Adjustment Amount | |||||
No liquidated damages have been assessed on this contract. |
CONTRACT ADJUSTMENTS HISTORY | ||
Adjustment Description | Estimate Nbr | Adjustment Amount |
No general contract adjustments have been created on this contract. | Subtotals For Contract Adjustments | $0.00 |
LINE ITEM ADJUSTMENT HISTORY | |||||||
Project | Item Nbr | Line Item Description | Adjustment Type | Estimate Nbr | Adj Quantity | Unit Price | Adjusted Amount |
22776(04) | 0011 | (SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) | Asphalt Binder Adjustment | 0012 | 0.00 | $0.00 | $2,701.53 |
22776(04) | 0012 | (SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) | Asphalt Binder Adjustment | 0013 | 0.00 | $0.00 | $2,105.01 | Subtotals For Line Item Adjustments | $4,806.54 |
MILESTONE ADJUSTMENTS | |||||||||
Milestone Number | Milestone Description | Time Allowed | Time Used | Rate | Total | ||||
No milestones exist for this contract. |
Contract ID: | 090398 | Estimate Number: | 0015 | Primary JP: | 22776(04) | |||
Line Item Number | Item Description | Item Number | Units | Bid Qty | Current Quantity | Quantity Paid This Est. | Quantity Paid To Date | Unit Price | Amount Paid This Est. | Amount Paid To Date |
Fed/State Project Number: BRO-STIM(205)CO | Project: 22776(04) | Category: 0100/ROADWAY BRO-STIM(205)CO | ||||||||
0001 | CLEARING AND GRUBBING | 201 0102 | LSUM | 1.000 | 1.000 | 1.000 | $3,150.00 | $0.00 | $3,150.00 | |
0002 | EARTHWORK | 202(G) 0185 | LSUM | 1.000 | 1.000 | 1.000 | $15,225.00 | $0.00 | $15,225.00 | |
0003 | TEMPORARY SILT FENCE | 223 2801 | LF | 1,158.000 | 1,300.000 | 100.000 | 1,300.000 | $2.10 | $210.00 | $2,730.00 |
0004 | TEMPORARY SILT DIKE | 227 0100 | LF | 100.000 | 0.000 | 0.000 | $7.25 | $0.00 | $0.00 | |
0005 | SOLID SLAB SODDING | 230(A) 2806 | SY | 12,181.000 | 12,192.790 | 12,192.790 | $1.73 | $0.00 | $21,093.53 | |
0006 | VEGETATIVE MULCHING | 233(A) 2817 | AC | 5.030 | 0.000 | 0.000 | $263.00 | $0.00 | $0.00 | |
0007 | AGGREGATE BASE | 303 0192 | CY | 840.680 | 850.910 | 10.230 | 850.910 | $34.86 | $356.62 | $29,662.72 |
0008 | TRAFFIC BOUND SURFACE COURSE TYPE E | 403(E) 0225 | TON | 91.880 | 302.430 | 47.890 | 302.430 | $21.00 | $1,005.69 | $6,351.03 |
0009 | TACK COAT | 407 0250 | GAL | 377.890 | 173.250 | -0.010 | 173.250 | $2.63 | $-0.03 | $455.64 |
0010 | PRIME COAT | 408 5774 | GAL | 601.590 | 563.630 | 563.630 | $6.30 | $0.00 | $3,550.87 | |
0011 | (SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) | 411(S3) 5945 | TON | 903.600 | 843.570 | 843.570 | $77.70 | $0.00 | $65,545.39 | |
0012 | (SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) | 411(S4) 5960 | TON | 400.280 | 433.130 | 433.130 | $80.00 | $0.00 | $34,650.40 | |
0013 | CLASS A CONCRETE | 509(B) 1328 | CY | 68.520 | 68.520 | 2.390 | 68.520 | $470.00 | $1,123.30 | $32,204.40 |
0014 | CLASS C CONCRETE | 509(D) 0325 | CY | 55.330 | 48.260 | -0.720 | 48.260 | $250.00 | $-180.00 | $12,065.00 |
0015 | REINFORCING STEEL | 511(A) 0332 | LB | 4,579.360 | 4,579.360 | -85.000 | 4,579.360 | $0.88 | $-74.80 | $4,029.84 |
0016 | TYPE I PLAIN RIPRAP | 601(A) 0533 | CY | 32.790 | 139.650 | 139.650 | $40.00 | $0.00 | $5,586.00 | |
0017 | FILTER FABRIC (RIPRAP) | 601(E) 6312 | SY | 98.360 | 98.340 | -0.020 | 98.340 | $2.50 | $-0.05 | $245.85 |
0018 | 18" CORR. GALV. STEEL PIPE | 613(D) 0689 | LF | 153.000 | 153.000 | 153.000 | $22.00 | $0.00 | $3,366.00 | |
0019 | 18" PREFAB. CULVERT END SECTION, ROUND | 613(M) 5726 | EA | 8.000 | 8.000 | 8.000 | $158.00 | $0.00 | $1,264.00 | |
0020 | REMOVAL OF STRUCTURES & OBSTRUCTIONS | 619(A) 0920 | LSUM | 1.000 | 1.000 | 1.000 | $2,000.00 | $0.00 | $2,000.00 | |
0021 | REMOVAL OF ASPHALT PAVEMENT | 619(B) 4728 | SY | 1,532.980 | 1,638.000 | 110.220 | 1,638.000 | $3.67 | $404.51 | $6,011.46 |
0022 | SAWING PAVEMENT | 619(C) 0924 | LF | 22.000 | 22.000 | 22.000 | $5.00 | $0.00 | $110.00 | |
0023 | BEAM GUARD RAIL-W-BEAM-SINGLE | 623(A) 0932 | LF | 277.500 | 277.500 | -277.500 | 277.500 | $14.70 | $-4,079.25 | $4,079.25 |
0024 | GUARD RAIL ANCHOR UNIT (TYPE B) | 623(F) 4447 | EA | 2.000 | 2.000 | -2.000 | 2.000 | $473.00 | $-946.00 | $946.00 |
0025 | GUARD RAIL ANCHOR UNIT (TYPE D-BF) | 623(F) 5686 | EA | 1.000 | 1.000 | -1.000 | 1.000 | $1,365.00 | $-1,365.00 | $1,365.00 |
0026 | SHEET ALUMINUM SIGNS | 850(A) 8110 | SF | 15.540 | 15.540 | 15.540 | $20.00 | $0.00 | $310.80 | |
0027 | 2 1/4" SQUARE TUBE POST | 851(C) 8327 | LF | 28.500 | 28.500 | 28.500 | $34.65 | $0.00 | $987.53 | |
0028 | TRAFFIC STRIPE(PLASTIC)(THIN-LINE)(4" WIDE) | 855(A) 8815 | LF | 4,462.000 | 5,311.000 | -26.000 | 5,311.000 | $0.36 | $-9.36 | $1,911.96 |
0029 | CONSTRUCTION TRAFFIC CONTROL | 880(J) 8905 | LSUM | 1.000 | 1.000 | 1.000 | $2,400.00 | $0.00 | $2,400.00 | |
Subtotals For Category 0100/ROADWAY BRO-STIM(205)CO | $-3,554.37 | $261,297.67 | ||||||||
Fed/State Project Number: BRO-STIM(205)CO | Project: 22776(04) | Category: 0200/BRIDGE 'A' BRO-STIM(205)CO | ||||||||
0030 | SUBSTRUCTURE EXCAVATION COMMON | 501(B) 1307 | CY | 96.000 | 96.000 | 96.000 | $15.00 | $0.00 | $1,440.00 | |
0031 | UNCLASSIFIED BACKFILL | 501(D) 6353 | CY | 140.000 | 140.000 | 140.000 | $15.00 | $0.00 | $2,100.00 | |
0032 | PRESTRESSED CONCRETE BEAMS (TYPE IV) | 503(A) 1313 | LF | 416.170 | 416.170 | -0.006 | 416.170 | $189.40 | $-1.14 | $78,822.59 |
0033 | CONCRETE RAIL (TR1) | 504(E) 1380 | LF | 283.170 | 283.170 | 283.170 | $42.00 | $0.00 | $11,893.14 | |
0034 | STRUCTURAL STEEL | 506(A) 1322 | LB | 2,020.000 | 2,020.000 | 2,020.000 | $3.63 | $0.00 | $7,332.60 | |
0035 | CLASS AA CONCRETE | 509(A) 1326 | CY | 80.900 | 80.900 | 80.900 | $500.00 | $0.00 | $40,450.00 | |
0036 | CLASS A CONCRETE | 509(B) 1328 | CY | 63.800 | 63.800 | 63.800 | $500.00 | $0.00 | $31,900.00 | |
0037 | REINFORCING STEEL | 511(A) 1332 | LB | 25,250.000 | 25,250.000 | 25,250.000 | $0.89 | $0.00 | $22,472.50 | |
0038 | PILES, FURNISHED (HP 10X42) | 514(A) 6010 | LF | 180.000 | 160.000 | 160.000 | $25.00 | $0.00 | $4,000.00 | |
0039 | PILES, FURNISHED (HP 12X53) | 514(A) 6011 | LF | 568.000 | 583.290 | -4.210 | 583.290 | $31.00 | $-130.51 | $18,081.99 |
0040 | PILES, DRIVEN (HP 10X42) | 514(B) 6292 | LF | 180.000 | 160.000 | 160.000 | $15.00 | $0.00 | $2,400.00 | |
0041 | PILES, DRIVEN (HP 12X53) | 514(B) 6294 | LF | 568.000 | 583.290 | 583.290 | $15.00 | $0.00 | $8,749.35 | |
0042 | TYPE II-A SPECIAL PLAIN RIPRAP | 601(B-1)1359 | TON | 280.000 | 285.250 | 285.250 | $33.14 | $0.00 | $9,453.19 | |
0043 | TYPE II-A FILTER BLANKET | 601(B-2)1361 | TON | 70.000 | 72.140 | 72.140 | $26.71 | $0.00 | $1,926.86 | |
0044 | REMOVAL OF EXISTING BRIDGE STRUCTURE | 619(D) 1397 | LSUM | 1.000 | 1.000 | 1.000 | $2,500.00 | $0.00 | $2,500.00 | |
0045 | GUARD RAIL ANCHOR UNIT (TYPE II) | 623(F) 6033 | EA | 2.000 | 2.000 | 2.000 | $2,100.00 | $0.00 | $4,200.00 | |
8001 | SPLICE(12" PILE) | 514 6210 | EA | 0.000 | 2.000 | 2.000 | 2.000 | $200.00 | $400.00 | $400.00 |
Subtotals For Category 0200/BRIDGE 'A' BRO-STIM(205)CO | $268.35 | $248,122.22 | ||||||||
Fed/State Project Number: BRO-STIM(205)CO | Project: 22776(04) | Category: 0600/STAKING BRO-STIM(205)CO | ||||||||
0046 | STAKING | 642 0098 | LSUM | 1.000 | 1.000 | 0.100 | 1.000 | $4,100.00 | $410.00 | $4,100.00 |
Subtotals For Category 0600/STAKING BRO-STIM(205)CO | $410.00 | $4,100.00 | ||||||||
Fed/State Project Number: BRO-STIM(205)CO | Project: 22776(04) | Category: 0640/CONSTRUCTION BRO-STIM(205)CO | ||||||||
0047 | (SP)SWPPP DOCUMENTATION AND MANAGEMENT | 220 2800 | LSUM | 1.000 | 1.000 | 1.000 | $3,500.00 | $0.00 | $3,500.00 | |
0048 | MOBILIZATION | 641 1399 | LSUM | 1.000 | 1.000 | 1.000 | $15,000.00 | $0.00 | $15,000.00 | |
Subtotals For Category 0640/CONSTRUCTION BRO-STIM(205)CO | $0.00 | $18,500.00 | ||||||||
Subtotals For Project BRO-STIM(205)CO /22776(04) | $-2,876.02 | $532,019.89 |
Line Item Number | Item Description | Item Number | Units | Bid Qty | Current Quantity | Quantity Paid This Est. | Quantity Paid To Date | Unit Price | Amount Paid This Est. | Amount Paid To Date |
Fed/State Project Number: BRO-STIM(206)CO | Project: 22777(04) | Category: 0100/ROADWAY BRO-STIM(206)CO | ||||||||
0001 | CLEARING AND GRUBBING | 201 0102 | LSUM | 1.000 | 1.000 | 1.000 | $6,300.00 | $0.00 | $6,300.00 | |
0002 | EARTHWORK | 202(G) 0185 | LSUM | 1.000 | 1.000 | 1.000 | $42,425.00 | $0.00 | $42,425.00 | |
0003 | TEMPORARY SILT FENCE | 223 2801 | LF | 1,691.000 | 831.000 | 831.000 | $2.10 | $0.00 | $1,745.10 | |
0004 | TEMPORARY SILT DIKE | 227 0100 | LF | 58.000 | 0.000 | 0.000 | $7.25 | $0.00 | $0.00 | |
0005 | SOLID SLAB SODDING | 230(A) 2806 | SY | 14,583.000 | 7,450.670 | 44.670 | 7,450.670 | $1.74 | $77.73 | $12,964.17 |
0006 | VEGETATIVE MULCHING | 233(A) 2817 | AC | 6.020 | 0.000 | 0.000 | $263.00 | $0.00 | $0.00 | |
0007 | TRAFFIC BOUND SURFACE COURSE TYPE E | 403(E) 0225 | TON | 572.120 | 635.710 | 51.220 | 635.710 | $20.21 | $1,035.16 | $12,847.70 |
0008 | TYPE I PLAIN RIPRAP | 601(A) 0297 | TON | 66.670 | 90.340 | -13.070 | 90.340 | $22.17 | $-289.76 | $2,002.84 |
0009 | FILTER FABRIC (RIPRAP) | 601(E) 6312 | SY | 133.330 | 196.780 | 63.450 | 196.780 | $2.50 | $158.63 | $491.96 |
0010 | REMOVAL OF STRUCTURES & OBSTRUCTIONS | 619(A) 0920 | LSUM | 1.000 | 1.000 | 1.000 | $3,000.00 | $0.00 | $3,000.00 | |
0011 | BEAM GUARD RAIL-W-BEAM-SINGLE | 623(A) 0932 | LF | 110.000 | 110.000 | 110.000 | $14.70 | $0.00 | $1,617.00 | |
0012 | GUARD RAIL ANCHOR UNIT (TYPE B) | 623(F) 4447 | EA | 1.000 | 1.000 | 1.000 | $475.00 | $0.00 | $475.00 | |
0013 | GUARD RAIL ANCHOR UNIT (TYPE D-BF) | 623(F) 5686 | EA | 1.000 | 1.000 | 1.000 | $1,365.00 | $0.00 | $1,365.00 | |
0014 | CONSTRUCTION TRAFFIC CONTROL | 880(J) 8905 | LSUM | 1.000 | 1.000 | 1.000 | $2,400.00 | $0.00 | $2,400.00 | |
Subtotals For Category 0100/ROADWAY BRO-STIM(206)CO | $981.76 | $87,633.77 | ||||||||
Fed/State Project Number: BRO-STIM(206)CO | Project: 22777(04) | Category: 0200/BRIDGE 'A' BRO-STIM(206)CO | ||||||||
0015 | SUBSTRUCTURE EXCAVATION COMMON | 501(B) 1307 | CY | 86.000 | 86.000 | 86.000 | $15.00 | $0.00 | $1,290.00 | |
0016 | UNCLASSIFIED BACKFILL | 501(D) 6353 | CY | 68.000 | 68.000 | 68.000 | $15.00 | $0.00 | $1,020.00 | |
0017 | PRESTRESSED CONCRETE BEAMS (TYPE II) | 503(A) 1311 | LF | 272.340 | 272.340 | 272.340 | $165.00 | $0.00 | $44,936.10 | |
0018 | PRESTRESSED CONCRETE BEAMS (TYPE III) | 503(A) 1312 | LF | 276.170 | 276.170 | 276.170 | $167.00 | $0.00 | $46,120.39 | |
0019 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 34.200 | 34.200 | 34.200 | $206.00 | $0.00 | $7,045.20 | |
0020 | CONCRETE RAIL (TR1) | 504(E) 1380 | LF | 345.170 | 345.170 | 345.170 | $42.00 | $0.00 | $14,497.14 | |
0021 | STRUCTURAL STEEL | 506(A) 1322 | LB | 4,370.000 | 4,370.000 | 4,370.000 | $3.60 | $0.00 | $15,732.00 | |
0022 | CLASS AA CONCRETE | 509(A) 1326 | CY | 106.900 | 106.900 | 106.900 | $500.00 | $0.00 | $53,450.00 | |
0023 | CLASS A CONCRETE | 509(B) 1328 | CY | 94.700 | 94.700 | 94.700 | $500.00 | $0.00 | $47,350.00 | |
0024 | REINFORCING STEEL | 511(A) 1332 | LB | 37,668.000 | 37,668.000 | 37,668.000 | $0.93 | $0.00 | $35,031.24 | |
0025 | PILES, FURNISHED (HP 10X42) | 514(A) 6010 | LF | 337.000 | 341.340 | -6.110 | 341.340 | $26.00 | $-158.86 | $8,874.84 |
0026 | PILES, DRIVEN (HP 10X42) | 514(B) 6292 | LF | 337.000 | 341.340 | 341.340 | $15.00 | $0.00 | $5,120.10 | |
0027 | DRILLED SHAFTS 48" DIAMETER | 516(A) 6094 | LF | 123.000 | 123.000 | 123.000 | $400.00 | $0.00 | $49,200.00 | |
0028 | TYPE II-A SPECIAL PLAIN RIPRAP | 601(B-1)1359 | TON | 610.000 | 475.920 | 475.920 | $34.60 | $0.00 | $16,466.83 | |
0029 | TYPE II-A FILTER BLANKET | 601(B-2)1361 | TON | 140.000 | 148.600 | 148.600 | $26.87 | $0.00 | $3,992.87 | |
0030 | REMOVAL OF EXISTING BRIDGE STRUCTURE | 619(D) 1397 | LSUM | 1.000 | 1.000 | 1.000 | $5,000.00 | $0.00 | $5,000.00 | |
0031 | GUARD RAIL ANCHOR UNIT (TYPE II) | 623(F) 6033 | EA | 3.000 | 3.000 | 3.000 | $2,100.00 | $0.00 | $6,300.00 | |
Subtotals For Category 0200/BRIDGE 'A' BRO-STIM(206)CO | $-158.86 | $361,426.71 | ||||||||
Fed/State Project Number: BRO-STIM(206)CO | Project: 22777(04) | Category: 0600/STAKING BRO-STIM(206)CO | ||||||||
0032 | STAKING | 642 0098 | LSUM | 1.000 | 1.000 | 1.000 | $3,900.00 | $0.00 | $3,900.00 | |
Subtotals For Category 0600/STAKING BRO-STIM(206)CO | $0.00 | $3,900.00 | ||||||||
Fed/State Project Number: BRO-STIM(206)CO | Project: 22777(04) | Category: 0640/CONSTRUCTION BRO-STIM(206)CO | ||||||||
0033 | (SP)SWPPP DOCUMENTATION AND MANAGEMENT | 220 2800 | LSUM | 1.000 | 1.000 | 1.000 | $15,000.00 | $0.00 | $15,000.00 | |
Subtotals For Category 0640/CONSTRUCTION BRO-STIM(206)CO | $0.00 | $15,000.00 | ||||||||
Subtotals For Project BRO-STIM(206)CO /22777(04) | $822.90 | $467,960.48 |