Contract ID: | 090329 | Estimate Number: | 0052 , Final | Spec Year: | 1999 | |||
Primary JP: | 26362(05) | Residency: | TULSA (08100) | Contract No: | 411237 | |||
Date Created: | 07/16/2014 | Contractor FEI: | 730764097C | Account No: | 400800 |
Project Number(s): | IM-STIM(049), IM-STIM(050), IM-STIM(047), IM-STIM(048) | ||||||||
Contract Description: | PAVEMENT REHABILITATION, BRIDGE, TRAFFIC LIGHTING & TRAFFIC SIGNS I-244: AT VARIOUS LOCATIONS IN DIVISION VIII (I.D.L.). PROJECT LENGTH = 5.805 MILES. | ||||||||
Primary County: | TULSA | ||||||||
Name of Road: | I-244 | ||||||||
Prime Contractor: | MANHATTAN ROAD & BRIDGE CO. & SHERWOOD CONSTRUCTION CO, INC. | Time Charged: | 1579.00 | ||||||
5601 S. 122ND E. | Time Allowed: | 1586.00 | |||||||
TULSA , OK 74146 | Percent Time: | 99.56 % |
Paid To Date: | $71,344,723.14 | Payable This Statement: | $0.00 |
CONTRACTOR AFFIDAVIT |
STATE OF ___________________ | ) | |
) § | ||
COUNTY OF __________________ | ) |
The undersigned contractor or duly authorized agent, of lawful age, being first duly sworn, on oath say that this claim is true and correct. |
Affiant further states that the work, services or materials as shown by this claim have been completed or supplied in accordance with the plans, specifications, orders, requests and all other terms of the contract. Affiant further states that (s)he is duly authorized agent of the contractor for the purpose of certifying the facts pertaining to the giving of things of value to government personnel in order to procure the contract or obtain payment; that (s)he is fully aware of the facts and circumstances surrounding the making of the contract and has been personally and directly involved in the proceedings leading to the procurement of the contract and the filing of this claim; and, neither the contractor nor anyone subject to the contractor's direction or control has been paid, given or donated or agreed to pay, give or donate to any officer or employee of the State of Oklahoma any money or other thing of value, either directly or |
indirectly, in procuring the contract or obtaining payment. The affiant further certifies that all laborers, mechanics, apprentices and trainees employed by him/her or by any subcontractor performing work under the contract on the project have been paid wages at rates not less than those required by the contract provisions, and that the work performed by each such laborer, mechanic, apprentice or trainee conformed to the classifications set forth in the contract or training program provisions applicable to the wage rate paid. |
Affiant hereby agrees that Contractor will accept this estimate as full compensation for all money due Contractor by the Department of Transportation, and hereby relinquish all claims, either in contract or in tort, which have arisen or which might arise out of the construction of said project. That to the best of my knowledge and belief, all indebtedness for labor, materials, fuel, equipment, equipment rental, parts, supplies, insurance premiums, and claims for items not specifically mentioned, which are attributable to performance of the work on this project or which were incorporated therein in any manner, have been paid in full, and that there are not now any presently outstanding, unpaid claims for such indebtedness; that my position with the company is such, that if there were any such outstanding claims of the nature specified herein, I would ordinarily be aware of them. |
Further affiant sayeth not. |
MANHATTAN ROAD & BRIDGE CO. & SHERWOOD CONSTRUCTION CO, INC. |
_________________________________________________ |
Affiant Signature |
_________________________________________________ |
Affiant Printed Name |
PE Seal |
_________________________________________________ |
Affiant Company Position |
Subscribed and sworn to before me this ______ day of ____________, 20____ |
My Commission Number: ____________ My Commission Expires: ______________ |
_________________________________________________ |
_________________________________________________ |
Professional Engineer Signature |
Oklahoma Department of Transportation |
Corporate Seal |
Notary Seal |
Contract ID: | 090329 | Estimate Number: | 0052 | Contract No: | 411237 | |||
Residency: | TULSA (08100) | Estimate Type: | Final | Account No: | 400800 | |||
Project Number(s): | IM-STIM(049), IM-STIM(050), IM-STIM(047), IM-STIM(048) | ||||||||||||
Primary Job Piece No: | 26362(05) | ||||||||||||
Contract Description: | PAVEMENT REHABILITATION, BRIDGE, TRAFFIC LIGHTING & TRAFFIC SIGNS I-244: AT VARIOUS LOCATIONS IN DIVISION VIII (I.D.L.). PROJECT LENGTH = 5.805 MILES. | ||||||||||||
Primary County: | TULSA | ||||||||||||
Name of Road: | I-244 | ||||||||||||
Prime Contractor: | MANHATTAN ROAD & BRIDGE CO. & SHERWOOD CONSTRUCTION CO, INC. | ||||||||||||
5601 S. 122ND E. | |||||||||||||
TULSA , OK 74146 | |||||||||||||
Surety Company: | FEDERAL INSURANCE COMPANY | ||||||||||||
Date Let: | 04/23/2009 | NTP Effective Date: | 06/08/2009 | Pay Period: | 07/01/2014 TO 07/15/2014 |
Date Awarded: | 04/27/2009 | Date Work Began: | 06/08/2009 | Original Contract Time: | 580 |
Date Contract Executed: | 05/13/2009 | Date Time Stopped: | 10/03/2013 | Current Time Charged: | 1579.00 |
Date NTP Issued: | 06/01/2009 | Completion Date: | 10/03/2013 | Current Time Allowed: | 1586.00 |
General Liability Expires: | 10/01/2014 | Workman's Comp Expires: | 10/01/2014 | Percent Time Used: | 99.56 % |
Specification Year: | 1999 | ||||
Bid Amount: | $67,659,720.02 | Total to Date | Prev to Date | This Estimate | |||
Funds Available (Bid + Positive C/O): | $72,355,965.66 | Participating: | $68,482,981.56 | $68,482,981.56 | $0.00 | ||
Percent Complete: | 98.60 % | Non Participating: | $0.00 | $0.00 | $0.00 | ||
Unearned Balance: | $1,011,242.52 | Non ARRA: | $2,967,027.77 | $2,967,027.77 | $0.00 | ||
Total Earnings: | $71,450,009.33 | $71,450,009.33 | $0.00 | ||||
Stockpiled Materials: | $0.00 | $0.00 | $0.00 | ||||
Gross Earnings: | $71,450,009.33 | $71,450,009.33 | $0.00 | ||||
Other Adjustments: | $-15,286.19 | $-15,286.19 | $0.00 | ||||
Liq Dam/Disincentive: | $-90,000.00 | $-90,000.00 | $0.00 | ||||
TOTAL: | $71,344,723.14 | $71,344,723.14 | $0.00 |
Contract ID: | 090329 | Estimate Number: | 0052 | Primary JP: | 26362(05) | |||
CHANGE ORDER HISTORY | |||||
Change Order Nbr. | Change Order Description | Status | Approval Date | Contract Time Adjustment | Total Change Order Amount |
001 | Lime to CKD & Flyash | Approved | 03/01/2010 | 0.0 | $-86,663.30 |
002 | Bridge 20, Pier 15 Repair | Approved | 06/07/2010 | 0.0 | $48,787.98 |
003 | Arkansas River Bridge Approach Slab | Approved | 06/07/2010 | 10.0 | $28,075.00 |
004 | Emergency asphalt repair on the IDL. | Approved | 04/12/2010 | 3.0 | $545,681.61 |
005 | Light Poles for Br. 52 & Br. 53 | Approved | 06/07/2010 | 0.0 | $150,000.00 |
006 | Bonus Change Order | Approved | 06/07/2010 | 0.0 | $160,000.00 |
007 | Correction to previous change order #04 | Approved | 06/28/2010 | 0.0 | $0.00 |
008 | Milestone days | Approved | 11/05/2010 | 14.0 | $0.00 |
009 | Shorten the (047) contract to facilitate a future project. | Approved | 07/11/2011 | 0.0 | $-813,920.68 |
010 | Milestone (047) | Approved | 02/08/2011 | 0.0 | $780,000.00 |
012 | Rivise B Time - Weather, Add'l Work, Dedication | Approved | 05/06/2011 | 28.0 | $0.00 |
014 | Br. 20 Pier Modification | Approved | 08/01/2011 | 0.0 | $282,555.94 |
015 | IDL Lighting | Approved | 02/07/2012 | 0.0 | $250,655.00 |
016 | Additional Funds | Approved | 02/05/2013 | 0.0 | $599,460.75 |
017 | Creating Item from Bridge 1 to Bridge 3 | Approved | 03/05/2013 | 0.0 | $18,750.00 |
018 | Water Repellant | Approved | 04/01/2013 | 0.0 | $22,114.50 |
020 | Substandard item deduction (Approach #2, Bridge 40) | Approved | 09/13/2013 | 0.0 | $-5,372.50 |
021 | Remainder of Milestone 1B | Approved | 10/08/2013 | 0.0 | $140,000.00 |
022 | Additional Appropriations | Approved | 10/08/2013 | 0.0 | $419,560.80 |
023 | Barrier Wall & Milestone 1A Payment | Approved | 02/04/2014 | 0.0 | $81,803.30 |
024 | Pavement Smoothness Incentive | Approved | 04/08/2014 | 0.0 | $72,329.43 |
025 | Final Quantity change order | Approved | 07/07/2014 | 0.0 | $1,096,471.33 |
STOCKPILE PAYMENT HISTORY | |||||
Project | Line Nbr | Stockpile Description | Adjustment Type | Estimate Nbr | Adjusted Amount |
24349(05) | 0011 | Stockpiled Material Closure | 0049 | $0.01 | |
24349(05) | 0011 | Separator Fabric | Stockpiled Material Adjustment | 0036 | $-30,830.72 |
24349(05) | 0011 | Separator Fabric | Stockpiled Material Initial Payment | 0006 | $62,838.15 |
24349(05) | 0011 | Separator Fabric | Stockpiled Material Adjustment | 0030 | $-6,179.61 |
24349(05) | 0011 | Separator Fabric | Stockpiled Material Adjustment | 0038 | $-5,418.95 |
24349(05) | 0011 | Separator Fabric | Stockpiled Material Adjustment | 0037 | $-7,093.32 |
24349(05) | 0011 | Separator Fabric | Stockpiled Material Adjustment | 0031 | $-1,295.38 |
24349(05) | 0011 | Separator Fabric | Stockpiled Material Adjustment | 0015 | $-1,217.78 |
24349(05) | 0011 | Separator Fabric | Stockpiled Material Adjustment | 0029 | $-10,802.40 |
24349(05) | 0012 | Stockpiled Material Closure | 0049 | $0.01 | |
24349(05) | 0012 | Separator Fabric | Stockpiled Material Adjustment | 0030 | $-3,677.35 |
24349(05) | 0012 | Separator Fabric | Stockpiled Material Adjustment | 0028 | $-4,561.26 |
24349(05) | 0012 | Separator Fabric | Stockpiled Material Adjustment | 0012 | $-632.16 |
24349(05) | 0012 | Separator Fabric | Stockpiled Material Initial Payment | 0006 | $23,305.98 |
24349(05) | 0012 | Separator Fabric | Stockpiled Material Adjustment | 0036 | $-1,457.10 |
24349(05) | 0012 | Separator Fabric | Stockpiled Material Adjustment | 0035 | $-10,743.12 |
24349(05) | 0012 | Separator Fabric | Stockpiled Material Adjustment | 0034 | $-2,235.00 |
24349(05) | 0018 | Stockpiled Material Closure | 0049 | $-0.20 | |
24349(05) | 0018 | 10" Paving Dowel Baskets | Stockpiled Material Adjustment | 0033 | $-1,046.60 |
24349(05) | 0018 | 10" Paving Dowel Baskets | Stockpiled Material Adjustment | 0030 | $-4,329.60 |
24349(05) | 0018 | 10" Paving Dowel Baskets | Stockpiled Material Adjustment | 0032 | $-363.63 |
24349(05) | 0018 | 10" Paving Dowel Baskets | Stockpiled Material Adjustment | 0015 | $-241.32 |
24349(05) | 0018 | 10" Paving Dowel Baskets | Stockpiled Material Adjustment | 0031 | $-3,991.50 |
24349(05) | 0018 | 10" Paving Dowel Baskets | Stockpiled Material Adjustment | 0035 | $-2,368.85 |
24349(05) | 0018 | 10" Paving Dowel Baskets | Stockpiled Material Initial Payment | 0009 | $12,341.70 |
24349(05) | 0038 | Impact Attenuator | Stockpiled Material Adjustment | 0039 | $-16,009.09 |
24349(05) | 0038 | Impact Attenuator | Stockpiled Material Initial Payment | 0015 | $16,009.09 |
24349(05) | 0052 | epoxy steel - approach 19 | Stockpiled Material Initial Payment | 0031 | $3,504.88 |
24349(05) | 0052 | epoxy steel - approach 19 | Stockpiled Material Adjustment | 0034 | $-3,504.88 |
24349(05) | 0054 | epoxy steel - fshaped parapet br. 19 | Stockpiled Material Adjustment | 0035 | $-17,707.90 |
24349(05) | 0054 | epoxy steel - fshaped parapet br. 19 | Stockpiled Material Initial Payment | 0031 | $17,707.90 |
24349(05) | 0057 | Epoxy Steel - br. 19 | Stockpiled Material Initial Payment | 0031 | $116,553.45 |
24349(05) | 0057 | Epoxy Steel - br. 19 | Stockpiled Material Adjustment | 0032 | $-76,818.49 |
24349(05) | 0057 | Epoxy Steel - br. 19 | Stockpiled Material Adjustment | 0034 | $-39,734.96 |
24349(05) | 0098 | Stockpiled Material Closure | 0049 | $0.06 | |
24349(05) | 0098 | Epoxy Steel - approach slab (br. 26) | Stockpiled Material Initial Payment | 0031 | $19,293.31 |
24349(05) | 0098 | Epoxy Steel - approach slab (br. 26) | Stockpiled Material Adjustment | 0033 | $-7,533.54 |
24349(05) | 0098 | Epoxy Steel - approach slab (br. 26) | Stockpiled Material Adjustment | 0032 | $-11,759.83 |
24349(05) | 0100 | epoxy steel concrete parapet (br. 26) | Stockpiled Material Adjustment | 0039 | $-806.97 |
24349(05) | 0100 | epoxy steel concrete parapet (br. 26) | Stockpiled Material Initial Payment | 0031 | $806.97 |
24349(05) | 0101 | epoxy steel f-shaped parapet (br. 26) | Stockpiled Material Initial Payment | 0031 | $1,393.18 |
24349(05) | 0101 | epoxy steel f-shaped parapet (br. 26) | Stockpiled Material Closure | 0041 | $-1,393.18 |
24349(05) | 0159 | Stay in Place Deck Forms | Stockpiled Material Initial Payment | 0024 | $12,540.50 |
24349(05) | 0159 | Stay in Place Deck Forms | Stockpiled Material Adjustment | 0033 | $-12,540.50 |
24349(05) | 0170 | Stay in Place Metal Decking | Stockpiled Material Adjustment | 0032 | $-12,540.50 |
24349(05) | 0170 | Stay in Place Metal Decking | Stockpiled Material Initial Payment | 0024 | $12,540.50 |
24349(05) | 0181 | Stay in Place Metal Decking | Stockpiled Material Initial Payment | 0024 | $12,540.50 |
24349(05) | 0181 | Stay in Place Metal Decking | Stockpiled Material Adjustment | 0034 | $-12,540.50 |
24349(05) | 0189 | Stockpiled Material Closure | 0049 | $-0.16 | |
24349(05) | 0189 | sealed expansion joint | Stockpiled Material Initial Payment | 0031 | $17,177.16 |
24349(05) | 0189 | sealed expansion joint | Stockpiled Material Adjustment | 0033 | $-17,177.00 |
24349(05) | 0213 | OVHD Extruded Aluminum Guide Signs | Stockpiled Material Closure | 0036 | $-9,387.63 |
24349(05) | 0213 | OVHD Extruded Aluminum Guide Signs | Stockpiled Material Adjustment | 0024 | $-10,543.64 |
24349(05) | 0213 | OVHD Extruded Aluminum Guide Signs | Stockpiled Material Initial Payment | 0015 | $19,931.27 |
24349(06) | 0230 | Separator Fabric | Stockpiled Material Adjustment | 0015 | $-808.11 |
24349(06) | 0230 | Separator Fabric | Stockpiled Material Initial Payment | 0006 | $69,287.40 |
24349(06) | 0230 | Separator Fabric | Stockpiled Material Adjustment | 0012 | $-28,351.52 |
24349(06) | 0230 | Separator Fabric | Stockpiled Material Adjustment | 0018 | $-10,854.88 |
24349(06) | 0230 | Separator Fabric | Stockpiled Material Closure | 0041 | $-8,223.48 |
24349(06) | 0230 | Separator Fabric | Stockpiled Material Adjustment | 0020 | $-4,240.19 |
24349(06) | 0230 | Separator Fabric | Stockpiled Material Adjustment | 0019 | $-16,809.22 |
24349(06) | 0231 | Stockpiled Material Closure | 0049 | $0.01 | |
24349(06) | 0231 | Separator Fabric | Stockpiled Material Initial Payment | 0006 | $25,653.12 |
24349(06) | 0231 | Separator Fabric | Stockpiled Material Adjustment | 0013 | $-1,457.07 |
24349(06) | 0231 | Separator Fabric | Stockpiled Material Adjustment | 0011 | $-16,419.84 |
24349(06) | 0231 | Separator Fabric | Stockpiled Material Adjustment | 0018 | $-1,434.07 |
24349(06) | 0231 | Separator Fabric | Stockpiled Material Adjustment | 0015 | $-4,384.43 |
24349(06) | 0231 | Separator Fabric | Stockpiled Material Adjustment | 0016 | $-1,957.72 |
24349(06) | 0237 | 10" Paving Dowel Baskets | Stockpiled Material Adjustment | 0013 | $-8,063.95 |
24349(06) | 0237 | 10" Paving Dowel Baskets | Stockpiled Material Adjustment | 0016 | $-6,366.20 |
24349(06) | 0237 | 10" Paving Dowel Baskets | Stockpiled Material Initial Payment | 0009 | $14,430.15 |
24349(06) | 0259 | Impact Attenuator | Stockpiled Material Initial Payment | 0015 | $96,054.52 |
24349(06) | 0259 | Impact Attenuator | Stockpiled Material Adjustment | 0021 | $-20,710.32 |
24349(06) | 0259 | Impact Attenuator | Stockpiled Material Closure | 0041 | $-33,923.57 |
24349(06) | 0259 | Impact Attenuator | Stockpiled Material Adjustment | 0023 | $-41,420.63 |
24349(06) | 0418 | OVHD Extruded Aluminum Signs | Stockpiled Material Closure | 0036 | $-2,473.59 |
24349(06) | 0418 | OVHD Extruded Aluminum Signs | Stockpiled Material Adjustment | 0022 | $-7,339.70 |
24349(06) | 0418 | OVHD Extruded Aluminum Signs | Stockpiled Material Initial Payment | 0015 | $13,415.20 |
24349(06) | 0418 | OVHD Extruded Aluminum Signs | Stockpiled Material Adjustment | 0015 | $-3,601.91 |
26362(04) | 0430 | separator fabric (ctb) | Stockpiled Material Initial Payment | 0006 | $49,578.60 |
26362(04) | 0430 | separator fabric (ctb) | Stockpiled Material Closure | 0036 | $-8,052.55 |
26362(04) | 0430 | separator fabric (ctb) | Stockpiled Material Adjustment | 0031 | $-9,765.07 |
26362(04) | 0430 | separator fabric (ctb) | Stockpiled Material Adjustment | 0030 | $-13,467.74 |
26362(04) | 0430 | separator fabric (ctb) | Stockpiled Material Adjustment | 0029 | $-7,998.88 |
26362(04) | 0430 | separator fabric (ctb) | Stockpiled Material Adjustment | 0028 | $-10,294.36 |
26362(04) | 0431 | separator fabric | Stockpiled Material Initial Payment | 0006 | $23,215.50 |
26362(04) | 0431 | separator fabric | Stockpiled Material Closure | 0036 | $-4,692.54 |
26362(04) | 0431 | separator fabric | Stockpiled Material Adjustment | 0031 | $-1,441.73 |
26362(04) | 0431 | separator fabric | Stockpiled Material Adjustment | 0030 | $-3,464.21 |
26362(04) | 0431 | separator fabric | Stockpiled Material Adjustment | 0029 | $-6,334.86 |
26362(04) | 0431 | separator fabric | Stockpiled Material Adjustment | 0028 | $-7,282.16 |
26362(04) | 0439 | Stockpiled Material Closure | 0049 | $0.10 | |
26362(04) | 0439 | 10" Paving Dowel Baskets | Stockpiled Material Adjustment | 0031 | $-1,536.71 |
26362(04) | 0439 | 10" Paving Dowel Baskets | Stockpiled Material Adjustment | 0030 | $-3,025.54 |
26362(04) | 0439 | 10" Paving Dowel Baskets | Stockpiled Material Adjustment | 0029 | $-5,944.90 |
26362(04) | 0439 | 10" Paving Dowel Baskets | Stockpiled Material Initial Payment | 0009 | $10,507.05 |
26362(04) | 0485 | Stockpiled Material Closure | 0049 | $0.07 | |
26362(04) | 0485 | Reinforcing Steel - Approach Slab | Stockpiled Material Initial Payment | 0031 | $4,231.56 |
26362(04) | 0485 | Reinforcing Steel - Approach Slab | Stockpiled Material Adjustment | 0035 | $-1,286.39 |
26362(04) | 0485 | Reinforcing Steel - Approach Slab | Stockpiled Material Adjustment | 0032 | $-2,945.24 |
26362(04) | 0487 | Epoxy Coated Reinf. Steel (Br. 40) | Stockpiled Material Initial Payment | 0031 | $777.36 |
26362(04) | 0487 | Epoxy Coated Reinf. Steel (Br. 40) | Stockpiled Material Adjustment | 0037 | $-777.36 |
26362(04) | 0488 | Epoxy Steel - F-shaped parapet | Stockpiled Material Initial Payment | 0031 | $1,527.60 |
26362(04) | 0488 | Epoxy Steel - F-shaped parapet | Stockpiled Material Adjustment | 0038 | $-1,527.60 |
26362(04) | 0491 | Epoxy Steel Bridge 40 | Stockpiled Material Closure | 0041 | $-441.86 |
26362(04) | 0491 | Epoxy Steel Bridge 40 | Stockpiled Material Adjustment | 0035 | $-19,578.01 |
26362(04) | 0491 | Epoxy Steel Bridge 40 | Stockpiled Material Initial Payment | 0031 | $20,019.87 |
26362(04) | 0590 | OVHD Extruded Aluminum Signs | Stockpiled Material Adjustment | 0024 | $-10,580.25 |
26362(04) | 0590 | OVHD Extruded Aluminum Signs | Stockpiled Material Closure | 0036 | $-9,420.22 |
26362(04) | 0590 | OVHD Extruded Aluminum Signs | Stockpiled Material Initial Payment | 0015 | $20,000.47 |
26362(05) | 0602 | Stockpiled Material Closure | 0049 | $0.01 | |
26362(05) | 0602 | separator fabric (ctb) | Stockpiled Material Initial Payment | 0006 | $41,798.85 |
26362(05) | 0602 | separator fabric (ctb) | Stockpiled Material Adjustment | 0013 | $-10,387.55 |
26362(05) | 0602 | separator fabric (ctb) | Stockpiled Material Adjustment | 0009 | $-12,286.89 |
26362(05) | 0602 | separator fabric (ctb) | Stockpiled Material Adjustment | 0012 | $-5,778.23 |
26362(05) | 0602 | separator fabric (ctb) | Stockpiled Material Adjustment | 0010 | $-4,813.01 |
26362(05) | 0602 | separator fabric (ctb) | Stockpiled Material Adjustment | 0011 | $-8,533.18 |
26362(05) | 0603 | separator fabric | Stockpiled Material Adjustment | 0012 | $-3,485.39 |
26362(05) | 0603 | separator fabric | Stockpiled Material Initial Payment | 0006 | $18,965.40 |
26362(05) | 0603 | separator fabric | Stockpiled Material Adjustment | 0010 | $-4,338.75 |
26362(05) | 0603 | separator fabric | Stockpiled Material Adjustment | 0008 | $-7,570.38 |
26362(05) | 0603 | separator fabric | Stockpiled Material Adjustment | 0011 | $-3,570.88 |
26362(05) | 0612 | 10" Paving Dowel Baskets | Stockpiled Material Initial Payment | 0009 | $8,428.05 |
26362(05) | 0612 | 10" Paving Dowel Baskets | Stockpiled Material Adjustment | 0011 | $-8,428.05 |
26362(05) | 0642 | Impact Attenuator | Stockpiled Material Initial Payment | 0015 | $144,081.78 |
26362(05) | 0642 | Impact Attenuator | Stockpiled Material Adjustment | 0016 | $-72,486.10 |
26362(05) | 0642 | Impact Attenuator | Stockpiled Material Adjustment | 0015 | $-20,710.32 |
26362(05) | 0642 | Impact Attenuator | Stockpiled Material Closure | 0041 | $-50,885.36 |
26362(05) | 0782 | OVHD Extruded Aluminum Guide Signs | Stockpiled Material Initial Payment | 0015 | $37,250.25 |
26362(05) | 0782 | OVHD Extruded Aluminum Guide Signs | Stockpiled Material Adjustment | 0016 | $-4,111.45 |
26362(05) | 0782 | OVHD Extruded Aluminum Guide Signs | Stockpiled Material Adjustment | 0018 | $-3,189.01 |
26362(05) | 0782 | OVHD Extruded Aluminum Guide Signs | Stockpiled Material Adjustment | 0022 | $-157.55 |
26362(05) | 0782 | OVHD Extruded Aluminum Guide Signs | Stockpiled Material Adjustment | 0015 | $-12,404.63 |
26362(05) | 0782 | OVHD Extruded Aluminum Guide Signs | Stockpiled Material Closure | 0041 | $-17,387.61 | Subtotals For Stockpile Payments | $0.00 |
LIQUIDATED DAMAGES HISTORY | |||||||||
Adjustment Description | Estimate Nbr | Time Units | Rate | Adjustment Amount | |||||
No liquidated damages have been assessed on this contract. | Subtotals For Liquidated Damages | $ |
CONTRACT ADJUSTMENTS HISTORY | ||
Adjustment Description | Estimate Nbr | Adjustment Amount |
Withhold to Funds Avail(Prog. Est. Only) | 0050 | $-85,328.81 |
Withhold to Funds Avail(Prog. Est. Only) | 0051 | $85,328.81 | Subtotals For Contract Adjustments | $0.00 |
LINE ITEM ADJUSTMENT HISTORY | |||||||
Project | Item Nbr | Line Item Description | Adjustment Type | Estimate Nbr | Adj Quantity | Unit Price | Adjusted Amount |
24349(05) | 0011 | (SP)CEMENT TREATED BASE | * Material Discrepancy Adjustments | 0029 | -7,373.40 | $15.00 | $-110,601.00 |
24349(05) | 0011 | (SP)CEMENT TREATED BASE | * Material Discrepancy Adjustments | 0031 | 0.00 | $0.00 | $110,601.00 |
24349(05) | 0018 | (SP)P.C. CONCRETE FOR PAVEMENT | * Rounding Error Correction | 0047 | -861.20 | $135.00 | $-116,262.00 |
24349(05) | 0018 | (SP)P.C. CONCRETE FOR PAVEMENT | * Material Discrepancy Adjustments | 0048 | 861.20 | $135.00 | $116,262.00 |
24349(05) | 0020 | CLSM BACKFILL | * Material Discrepancy Adjustments | 0026 | -88.45 | $150.00 | $-13,267.50 |
24349(05) | 0020 | CLSM BACKFILL | * Material Discrepancy Adjustments | 0027 | -284.67 | $150.00 | $-42,700.50 |
24349(05) | 0020 | CLSM BACKFILL | * Material Discrepancy Adjustments | 0029 | 88.45 | $150.00 | $13,267.50 |
24349(05) | 0020 | CLSM BACKFILL | * Material Discrepancy Adjustments | 0029 | 284.67 | $150.00 | $42,700.50 |
24349(05) | 0021 | CONCRETE PARAPET | * Material Discrepancy Adjustments | 0037 | 0.00 | $0.00 | $-10,835.00 |
24349(05) | 0021 | CONCRETE PARAPET | * Material Discrepancy Adjustments | 0038 | 0.00 | $0.00 | $10,835.00 |
24349(05) | 0023 | CLASS AA CONCRETE | * Rounding Error Correction | 0047 | -116.25 | $1,000.00 | $-116,250.00 |
24349(05) | 0023 | CLASS AA CONCRETE | * Material Discrepancy Adjustments | 0048 | 116.25 | $1,000.00 | $116,250.00 |
24349(05) | 0030 | REMOVAL OF CONCRETE PAVEMENT | * Material Discrepancy Adjustments | 0045 | -5,761.94 | $5.00 | $-28,809.70 |
24349(05) | 0030 | REMOVAL OF CONCRETE PAVEMENT | * Material Discrepancy Adjustments | 0046 | 5,761.94 | $5.00 | $28,809.70 |
24349(05) | 0035 | EDGE DRAIN CONDUIT-PERFORATED | * Material Discrepancy Adjustments | 0013 | -478.00 | $7.25 | $-3,465.50 |
24349(05) | 0035 | EDGE DRAIN CONDUIT-PERFORATED | * Material Discrepancy Adjustments | 0035 | 0.00 | $0.00 | $-29,348.00 |
24349(05) | 0035 | EDGE DRAIN CONDUIT-PERFORATED | * Material Discrepancy Adjustments | 0037 | 0.00 | $0.00 | $-19,451.75 |
24349(05) | 0035 | EDGE DRAIN CONDUIT-PERFORATED | * Material Discrepancy Adjustments | 0049 | 7,209.00 | $7.25 | $52,265.25 |
24349(05) | 0036 | EDGE DRAIN OUTLET LATERAL-NONPERFORATED | * Material Discrepancy Adjustments | 0037 | 0.00 | $0.00 | $-1,095.00 |
24349(05) | 0036 | EDGE DRAIN OUTLET LATERAL-NONPERFORATED | * Material Discrepancy Adjustments | 0041 | 0.00 | $0.00 | $1,095.00 |
24349(05) | 0045 | CLASS AA CONCRETE | * Material Discrepancy Adjustments | 0035 | 0.00 | $0.00 | $-89,340.00 |
24349(05) | 0045 | CLASS AA CONCRETE | * Material Discrepancy Adjustments | 0036 | 0.00 | $0.00 | $89,340.00 |
24349(05) | 0054 | 42" F-SHAPED PARAPET | * Material Discrepancy Adjustments | 0035 | 0.00 | $0.00 | $-129,570.00 |
24349(05) | 0054 | 42" F-SHAPED PARAPET | * Material Discrepancy Adjustments | 0036 | 0.00 | $0.00 | $129,570.00 |
24349(05) | 0076 | APPROACH SLAB | * Material Discrepancy Adjustments | 0035 | 0.00 | $0.00 | $-39,462.50 |
24349(05) | 0076 | APPROACH SLAB | * Material Discrepancy Adjustments | 0036 | 0.00 | $0.00 | $39,462.50 |
24349(05) | 0077 | SEALED EXPANSION JOINT | * Material Discrepancy Adjustments | 0035 | 0.00 | $0.00 | $-54,916.65 |
24349(05) | 0077 | SEALED EXPANSION JOINT | * Material Discrepancy Adjustments | 0036 | 0.00 | $0.00 | $54,916.65 |
24349(05) | 0078 | 42" F-SHAPED PARAPET | * Material Discrepancy Adjustments | 0035 | 0.00 | $0.00 | $-26,721.00 |
24349(05) | 0078 | 42" F-SHAPED PARAPET | * Material Discrepancy Adjustments | 0036 | 0.00 | $0.00 | $26,721.00 |
24349(05) | 0080 | CLASS AA CONCRETE | * Material Discrepancy Adjustments | 0035 | 0.00 | $0.00 | $-240,360.00 |
24349(05) | 0080 | CLASS AA CONCRETE | * Material Discrepancy Adjustments | 0036 | 0.00 | $0.00 | $240,360.00 |
24349(05) | 0097 | CLSM BACKFILL | * Material Discrepancy Adjustments | 0033 | 0.00 | $0.00 | $-39,847.50 |
24349(05) | 0097 | CLSM BACKFILL | * Material Discrepancy Adjustments | 0034 | 0.00 | $0.00 | $39,847.50 |
24349(05) | 0122 | APPROACH SLAB | * Material Discrepancy Adjustments | 0029 | -299.90 | $175.00 | $-52,482.50 |
24349(05) | 0122 | APPROACH SLAB | * Material Discrepancy Adjustments | 0031 | 0.00 | $0.00 | $52,482.50 |
24349(05) | 0137 | CLASS AA CONCRETE | * Material Discrepancy Adjustments | 0031 | 0.00 | $0.00 | $-77,100.00 |
24349(05) | 0137 | CLASS AA CONCRETE | * Material Discrepancy Adjustments | 0032 | 0.00 | $0.00 | $77,100.00 |
24349(05) | 0138 | EPOXY COATED REINFORCING STEEL | * Material Discrepancy Adjustments | 0031 | 0.00 | $0.00 | $-29,858.50 |
24349(05) | 0138 | EPOXY COATED REINFORCING STEEL | * Material Discrepancy Adjustments | 0032 | 0.00 | $0.00 | $29,858.50 |
24349(05) | 0148 | CLASS AA CONCRETE | * Material Discrepancy Adjustments | 0031 | 0.00 | $0.00 | $-27,060.00 |
24349(05) | 0148 | CLASS AA CONCRETE | * Material Discrepancy Adjustments | 0032 | 0.00 | $0.00 | $27,060.00 |
24349(05) | 0157 | 42" F-SHAPED PARAPET | * Material Discrepancy Adjustments | 0035 | 0.00 | $0.00 | $-33,156.00 |
24349(05) | 0157 | 42" F-SHAPED PARAPET | * Material Discrepancy Adjustments | 0036 | 0.00 | $0.00 | $33,156.00 |
24349(05) | 0159 | CLASS AA CONCRETE | * Material Discrepancy Adjustments | 0033 | 0.00 | $0.00 | $-117,920.00 |
24349(05) | 0159 | CLASS AA CONCRETE | * Material Discrepancy Adjustments | 0035 | 0.00 | $0.00 | $117,920.00 |
24349(05) | 0168 | 42" F-SHAPED PARAPET | * Material Discrepancy Adjustments | 0035 | 0.00 | $0.00 | $-16,362.00 |
24349(05) | 0168 | 42" F-SHAPED PARAPET | * Material Discrepancy Adjustments | 0038 | 0.00 | $0.00 | $16,362.00 |
24349(05) | 0188 | APPROACH SLAB | * Material Discrepancy Adjustments | 0033 | 0.00 | $0.00 | $-32,462.50 |
24349(05) | 0188 | APPROACH SLAB | * Material Discrepancy Adjustments | 0035 | 0.00 | $0.00 | $32,462.50 |
24349(05) | 0193 | CLASS AA CONCRETE | * Material Discrepancy Adjustments | 0033 | 0.00 | $0.00 | $-109,260.00 |
24349(05) | 0193 | CLASS AA CONCRETE | * Material Discrepancy Adjustments | 0035 | 0.00 | $0.00 | $109,260.00 |
24349(05) | 0201 | APPROACH SLAB | * Material Discrepancy Adjustments | 0031 | 0.00 | $0.00 | $-46,725.00 |
24349(05) | 0201 | APPROACH SLAB | * Material Discrepancy Adjustments | 0032 | 0.00 | $0.00 | $46,725.00 |
24349(06) | 0222 | TYPE A-SALVAGED TOPSOIL | * Material Discrepancy Adjustments | 0023 | -0.50 | $20,000.00 | $-10,000.00 |
24349(06) | 0222 | TYPE A-SALVAGED TOPSOIL | * Material Discrepancy Adjustments | 0048 | 0.50 | $20,000.00 | $10,000.00 |
24349(06) | 0225 | SOLID SLAB SODDING | * Material Discrepancy Adjustments | 0023 | -7,273.66 | $1.60 | $-11,637.86 |
24349(06) | 0225 | SOLID SLAB SODDING | * Material Discrepancy Adjustments | 0024 | -4,213.13 | $1.60 | $-6,741.01 |
24349(06) | 0225 | SOLID SLAB SODDING | * Material Discrepancy Adjustments | 0041 | 0.00 | $0.00 | $4,213.13 |
24349(06) | 0225 | SOLID SLAB SODDING | * Missing Material Certification | 0041 | 0.00 | $0.00 | $11,637.86 |
24349(06) | 0225 | SOLID SLAB SODDING | * Material Discrepancy Adjustments | 0049 | 0.00 | $0.00 | $2,527.88 |
24349(06) | 0230 | (SP)CEMENT TREATED BASE | * Material Discrepancy Adjustments | 0012 | -23,892.07 | $15.00 | $-358,381.05 |
24349(06) | 0230 | (SP)CEMENT TREATED BASE | * Material Discrepancy Adjustments | 0013 | 23,892.07 | $15.00 | $358,381.05 |
24349(06) | 0254 | THRIE BEAM BRIDGE CONNECTION-TYPE A | * Material Discrepancy Adjustments | 0023 | -8.00 | $2,000.00 | $-16,000.00 |
24349(06) | 0254 | THRIE BEAM BRIDGE CONNECTION-TYPE A | * Material Discrepancy Adjustments | 0035 | 0.00 | $0.00 | $16,000.00 |
24349(06) | 0256 | EDGE DRAIN CONDUIT-PERFORATED | * Material Discrepancy Adjustments | 0012 | -3,742.00 | $7.25 | $-27,129.50 |
24349(06) | 0256 | EDGE DRAIN CONDUIT-PERFORATED | * Material Discrepancy Adjustments | 0013 | -1,087.00 | $7.25 | $-7,880.75 |
24349(06) | 0256 | EDGE DRAIN CONDUIT-PERFORATED | * Material Discrepancy Adjustments | 0027 | 2,860.00 | $7.25 | $20,735.00 |
24349(06) | 0256 | EDGE DRAIN CONDUIT-PERFORATED | * Material Discrepancy Adjustments | 0035 | 1,087.00 | $7.25 | $7,880.75 |
24349(06) | 0256 | EDGE DRAIN CONDUIT-PERFORATED | * Material Discrepancy Adjustments | 0041 | 0.00 | $0.00 | $6,394.50 |
24349(06) | 0325 | CONCRETE PARAPET | * Material Discrepancy Adjustments | 0021 | -129.20 | $55.00 | $-7,106.00 |
24349(06) | 0325 | CONCRETE PARAPET | * Material Discrepancy Adjustments | 0029 | 129.20 | $55.00 | $7,106.00 |
24349(06) | 0326 | 42" F-SHAPED PARAPET | * Material Discrepancy Adjustments | 0021 | -133.70 | $60.00 | $-8,022.00 |
24349(06) | 0326 | 42" F-SHAPED PARAPET | * Material Discrepancy Adjustments | 0023 | 133.70 | $60.00 | $8,022.00 |
24349(06) | 0338 | 42" F-SHAPED PARAPET | * Material Discrepancy Adjustments | 0021 | -117.60 | $60.00 | $-7,056.00 |
24349(06) | 0338 | 42" F-SHAPED PARAPET | * Material Discrepancy Adjustments | 0029 | 117.60 | $60.00 | $7,056.00 |
24349(06) | 0340 | CLASS AA CONCRETE | * Material Discrepancy Adjustments | 0017 | -102.00 | $600.00 | $-61,200.00 |
24349(06) | 0340 | CLASS AA CONCRETE | * Material Discrepancy Adjustments | 0020 | 102.00 | $600.00 | $61,200.00 |
24349(06) | 0349 | 42" F-SHAPED PARAPET | * Material Discrepancy Adjustments | 0021 | -221.40 | $60.00 | $-13,284.00 |
24349(06) | 0349 | 42" F-SHAPED PARAPET | * Material Discrepancy Adjustments | 0029 | 221.40 | $60.00 | $13,284.00 |
24349(06) | 0382 | 42" F-SHAPED PARAPET | * Material Discrepancy Adjustments | 0021 | -124.30 | $135.00 | $-16,780.50 |
24349(06) | 0382 | 42" F-SHAPED PARAPET | * Material Discrepancy Adjustments | 0023 | 221.40 | $60.00 | $13,284.00 |
24349(06) | 0382 | 42" F-SHAPED PARAPET | * Material Discrepancy Adjustments | 0029 | -221.40 | $60.00 | $-13,284.00 |
24349(06) | 0382 | 42" F-SHAPED PARAPET | * Material Discrepancy Adjustments | 0029 | 124.30 | $135.00 | $16,780.50 |
24349(06) | 0391 | APPROACH SLAB | * Material Discrepancy Adjustments | 0015 | -285.30 | $175.00 | $-49,927.50 |
24349(06) | 0391 | APPROACH SLAB | * Material Discrepancy Adjustments | 0020 | 285.30 | $175.00 | $49,927.50 |
24349(06) | 0394 | 42" F-SHAPED PARAPET | * Material Discrepancy Adjustments | 0021 | -177.70 | $60.00 | $-10,662.00 |
24349(06) | 0394 | 42" F-SHAPED PARAPET | * Material Discrepancy Adjustments | 0029 | 177.70 | $60.00 | $10,662.00 |
24349(06) | 0410 | COLLECTION & HANDLING OF WASTE | * Material Discrepancy Adjustments | 0044 | -1.00 | $1,000.00 | $-1,000.00 |
24349(06) | 0410 | COLLECTION & HANDLING OF WASTE | * Material Discrepancy Adjustments | 0048 | 1.00 | $1,000.00 | $1,000.00 |
24349(06) | 0413 | (SP)TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | * Material Discrepancy Adjustments | 0034 | 0.00 | $0.00 | $-365.75 |
24349(06) | 0413 | (SP)TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | * Material Discrepancy Adjustments | 0041 | 0.00 | $0.00 | $365.75 |
24349(06) | 0415 | (SP)TRAFFIC STRIPE(MULTI-POLYMER)(8" WIDE) | * Material Discrepancy Adjustments | 0034 | 0.00 | $0.00 | $-3,162.90 |
24349(06) | 0415 | (SP)TRAFFIC STRIPE(MULTI-POLYMER)(8" WIDE) | * Material Discrepancy Adjustments | 0041 | 0.00 | $0.00 | $3,162.90 |
26362(04) | 0423 | TYPE A-SALVAGED TOPSOIL | * Material Discrepancy Adjustments | 0043 | -1.00 | $10,000.00 | $-10,000.00 |
26362(04) | 0423 | TYPE A-SALVAGED TOPSOIL | * Material Discrepancy Adjustments | 0048 | 1.00 | $10,000.00 | $10,000.00 |
26362(04) | 0424 | TEMPORARY SILT FENCE | * Material Discrepancy Adjustments | 0027 | -790.00 | $2.90 | $-2,291.00 |
26362(04) | 0424 | TEMPORARY SILT FENCE | * Material Discrepancy Adjustments | 0043 | 790.00 | $2.90 | $2,291.00 |
26362(04) | 0425 | TEMPORARY SILT DIKE | * Material Discrepancy Adjustments | 0024 | -40.00 | $7.75 | $-310.00 |
26362(04) | 0425 | TEMPORARY SILT DIKE | * Material Discrepancy Adjustments | 0032 | 0.00 | $0.00 | $310.00 |
26362(04) | 0430 | (SP)CEMENT TREATED BASE | * Material Discrepancy Adjustments | 0028 | -7,026.63 | $15.00 | $-105,399.45 |
26362(04) | 0430 | (SP)CEMENT TREATED BASE | * Material Discrepancy Adjustments | 0029 | -5,459.80 | $15.00 | $-81,897.00 |
26362(04) | 0430 | (SP)CEMENT TREATED BASE | * Material Discrepancy Adjustments | 0031 | 0.00 | $0.00 | $81,897.00 |
26362(04) | 0430 | (SP)CEMENT TREATED BASE | * Material Discrepancy Adjustments | 0031 | 0.00 | $0.00 | $105,399.45 |
26362(04) | 0437 | (SP)P.C.CONCRETE PAVEMENT(PLACEMENT) | * Material Discrepancy Adjustments | 0045 | -1,088.87 | $15.00 | $-16,333.05 |
26362(04) | 0437 | (SP)P.C.CONCRETE PAVEMENT(PLACEMENT) | * Material Discrepancy Adjustments | 0046 | 1,088.87 | $15.00 | $16,333.05 |
26362(04) | 0438 | (SP)DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | * Material Discrepancy Adjustments | 0045 | -2,050.07 | $18.50 | $-37,926.30 |
26362(04) | 0438 | (SP)DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | * Material Discrepancy Adjustments | 0046 | 2,050.07 | $18.50 | $37,926.30 |
26362(04) | 0439 | (SP)P.C. CONCRETE FOR PAVEMENT | * Material Discrepancy Adjustments | 0045 | -748.94 | $135.00 | $-101,106.90 |
26362(04) | 0439 | (SP)P.C. CONCRETE FOR PAVEMENT | * Material Discrepancy Adjustments | 0046 | 748.94 | $135.00 | $101,106.90 |
26362(04) | 0460 | EDGE DRAIN CONDUIT-PERFORATED | * Material Discrepancy Adjustments | 0031 | 0.00 | $0.00 | $-7,518.25 |
26362(04) | 0460 | EDGE DRAIN CONDUIT-PERFORATED | * Material Discrepancy Adjustments | 0032 | 0.00 | $0.00 | $7,518.25 |
26362(04) | 0467 | CONCRETE PARAPET | * Material Discrepancy Adjustments | 0029 | -388.00 | $55.00 | $-21,340.00 |
26362(04) | 0467 | CONCRETE PARAPET | * Material Discrepancy Adjustments | 0031 | 0.00 | $0.00 | $21,340.00 |
26362(04) | 0468 | 42" F-SHAPED PARAPET | * Material Discrepancy Adjustments | 0029 | -407.60 | $60.00 | $-24,456.00 |
26362(04) | 0468 | 42" F-SHAPED PARAPET | * Material Discrepancy Adjustments | 0031 | 0.00 | $0.00 | $24,456.00 |
26362(04) | 0475 | WATER REPELLENT (VISUALLY INSPECTED) | * Material Discrepancy Adjustments | 0034 | 0.00 | $0.00 | $-3,738.75 |
26362(04) | 0475 | WATER REPELLENT (VISUALLY INSPECTED) | * Material Discrepancy Adjustments | 0036 | 0.00 | $0.00 | $3,738.75 |
26362(04) | 0501 | 42" F-SHAPED PARAPET | * Material Discrepancy Adjustments | 0031 | 0.00 | $0.00 | $-48,234.00 |
26362(04) | 0501 | 42" F-SHAPED PARAPET | * Material Discrepancy Adjustments | 0032 | 0.00 | $0.00 | $48,234.00 |
26362(04) | 0504 | CLASS A CONCRETE | * Material Discrepancy Adjustments | 0035 | 0.00 | $0.00 | $-32,250.00 |
26362(04) | 0504 | CLASS A CONCRETE | * Material Discrepancy Adjustments | 0036 | 0.00 | $0.00 | $32,250.00 |
26362(04) | 0508 | WATER REPELLENT (VISUALLY INSPECTED) | * Material Discrepancy Adjustments | 0034 | 0.00 | $0.00 | $-4,645.88 |
26362(04) | 0508 | WATER REPELLENT (VISUALLY INSPECTED) | * Material Discrepancy Adjustments | 0036 | 0.00 | $0.00 | $4,645.88 |
26362(04) | 0517 | 42" F-SHAPED PARAPET | * Material Discrepancy Adjustments | 0031 | 0.00 | $0.00 | $-16,566.00 |
26362(04) | 0517 | 42" F-SHAPED PARAPET | * Material Discrepancy Adjustments | 0032 | 0.00 | $0.00 | $16,566.00 |
26362(04) | 0519 | CLASS AA CONCRETE | * Material Discrepancy Adjustments | 0029 | -220.60 | $600.00 | $-132,360.00 |
26362(04) | 0519 | CLASS AA CONCRETE | * Material Discrepancy Adjustments | 0031 | 0.00 | $0.00 | $132,360.00 |
26362(04) | 0530 | 42" F-SHAPED PARAPET | * Material Discrepancy Adjustments | 0031 | 0.00 | $0.00 | $-26,778.00 |
26362(04) | 0530 | 42" F-SHAPED PARAPET | * Material Discrepancy Adjustments | 0033 | 0.00 | $0.00 | $26,778.00 |
26362(04) | 0536 | WATER REPELLENT (VISUALLY INSPECTED) | * Material Discrepancy Adjustments | 0034 | 0.00 | $0.00 | $-1,711.88 |
26362(04) | 0536 | WATER REPELLENT (VISUALLY INSPECTED) | * Material Discrepancy Adjustments | 0036 | 0.00 | $0.00 | $1,711.88 |
26362(04) | 0541 | CLSM BACKFILL | * Material Discrepancy Adjustments | 0026 | -12.00 | $180.00 | $-2,160.00 |
26362(04) | 0541 | CLSM BACKFILL | * Material Discrepancy Adjustments | 0031 | 0.00 | $0.00 | $2,160.00 |
26362(04) | 0544 | 42" F-SHAPED PARAPET | * Material Discrepancy Adjustments | 0031 | 0.00 | $0.00 | $-24,900.75 |
26362(04) | 0544 | 42" F-SHAPED PARAPET | * Material Discrepancy Adjustments | 0033 | 0.00 | $0.00 | $24,900.75 |
26362(04) | 0551 | WATER REPELLENT (VISUALLY INSPECTED) | * Material Discrepancy Adjustments | 0034 | 0.00 | $0.00 | $-2,351.63 |
26362(04) | 0551 | WATER REPELLENT (VISUALLY INSPECTED) | * Material Discrepancy Adjustments | 0036 | 0.00 | $0.00 | $2,351.63 |
26362(04) | 0557 | CLSM BACKFILL | * Material Discrepancy Adjustments | 0026 | -10.00 | $180.00 | $-1,800.00 |
26362(04) | 0557 | CLSM BACKFILL | * Material Discrepancy Adjustments | 0031 | 0.00 | $0.00 | $1,800.00 |
26362(04) | 0558 | APPROACH SLAB | * Material Discrepancy Adjustments | 0031 | 0.00 | $0.00 | $-90,000.00 |
26362(04) | 0558 | APPROACH SLAB | * Material Discrepancy Adjustments | 0032 | 0.00 | $0.00 | $90,000.00 |
26362(04) | 0559 | 42" F-SHAPED PARAPET | * Material Discrepancy Adjustments | 0031 | 0.00 | $0.00 | $-47,250.00 |
26362(04) | 0559 | 42" F-SHAPED PARAPET | * Material Discrepancy Adjustments | 0032 | 0.00 | $0.00 | $47,250.00 |
26362(04) | 0566 | WATER REPELLENT (VISUALLY INSPECTED) | * Material Discrepancy Adjustments | 0034 | 0.00 | $0.00 | $-656.25 |
26362(04) | 0566 | WATER REPELLENT (VISUALLY INSPECTED) | * Material Discrepancy Adjustments | 0036 | 0.00 | $0.00 | $656.25 |
26362(04) | 0569 | CLSM BACKFILL | * Material Discrepancy Adjustments | 0028 | -20.00 | $150.00 | $-3,000.00 |
26362(04) | 0569 | CLSM BACKFILL | * Material Discrepancy Adjustments | 0031 | 0.00 | $0.00 | $3,000.00 |
26362(04) | 0570 | APPROACH SLAB | * Material Discrepancy Adjustments | 0029 | -113.14 | $175.00 | $-19,799.50 |
26362(04) | 0570 | APPROACH SLAB | * Material Discrepancy Adjustments | 0031 | 0.00 | $0.00 | $19,799.50 |
26362(04) | 0574 | CLASS AA CONCRETE | * Material Discrepancy Adjustments | 0029 | -706.50 | $500.00 | $-353,250.00 |
26362(04) | 0574 | CLASS AA CONCRETE | * Material Discrepancy Adjustments | 0031 | 0.00 | $0.00 | $353,250.00 |
26362(04) | 0579 | WATER REPELLENT (VISUALLY INSPECTED) | * Material Discrepancy Adjustments | 0034 | 0.00 | $0.00 | $-10,339.13 |
26362(04) | 0579 | WATER REPELLENT (VISUALLY INSPECTED) | * Material Discrepancy Adjustments | 0036 | 0.00 | $0.00 | $10,339.13 |
26362(04) | 0585 | (SP)TRAFFIC STRIPE (MULTI-POLYMER)(SYMBOLS, WORDS. ETC.) | * Material Discrepancy Adjustments | 0034 | 0.00 | $0.00 | $-1,062.50 |
26362(04) | 0585 | (SP)TRAFFIC STRIPE (MULTI-POLYMER)(SYMBOLS, WORDS. ETC.) | * Material Discrepancy Adjustments | 0041 | 0.00 | $0.00 | $1,062.50 |
26362(04) | 0586 | (SP)TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | * Material Discrepancy Adjustments | 0034 | 0.00 | $0.00 | $-7,906.25 |
26362(04) | 0586 | (SP)TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | * Material Discrepancy Adjustments | 0047 | 0.00 | $0.00 | $7,906.25 |
26362(04) | 0587 | (SP)TRAFFIC STRIPE(MULTI-POLYMER)(6" WIDE) | * Material Discrepancy Adjustments | 0034 | 0.00 | $0.00 | $-3,686.40 |
26362(04) | 0587 | (SP)TRAFFIC STRIPE(MULTI-POLYMER)(6" WIDE) | * Material Discrepancy Adjustments | 0041 | 0.00 | $0.00 | $7,906.25 |
26362(04) | 0587 | (SP)TRAFFIC STRIPE(MULTI-POLYMER)(6" WIDE) | * Material Discrepancy Adjustments | 0041 | 0.00 | $0.00 | $3,686.40 |
26362(04) | 0587 | (SP)TRAFFIC STRIPE(MULTI-POLYMER)(6" WIDE) | * Material Discrepancy Adjustments | 0047 | 0.00 | $0.00 | $-7,906.25 |
26362(04) | 0588 | (SP)TRAFFIC STRIPE(MULTI-POLYMER)(8" WIDE) | * Material Discrepancy Adjustments | 0034 | 0.00 | $0.00 | $-15,245.10 |
26362(04) | 0588 | (SP)TRAFFIC STRIPE(MULTI-POLYMER)(8" WIDE) | * Material Discrepancy Adjustments | 0041 | 0.00 | $0.00 | $15,245.10 |
26362(05) | 0595 | TYPE A-SALVAGED TOPSOIL | * Material Discrepancy Adjustments | 0019 | -1.00 | $10,000.00 | $-10,000.00 |
26362(05) | 0595 | TYPE A-SALVAGED TOPSOIL | * Material Discrepancy Adjustments | 0048 | 1.00 | $10,000.00 | $10,000.00 |
26362(05) | 0598 | SOLID SLAB SODDING | * Material Discrepancy Adjustments | 0019 | -1,677.09 | $1.60 | $-2,683.34 |
26362(05) | 0598 | SOLID SLAB SODDING | * Material Discrepancy Adjustments | 0041 | 0.00 | $0.00 | $2,683.34 |
26362(05) | 0602 | (SP)CEMENT TREATED BASE | * Material Discrepancy Adjustments | 0012 | -3,944.05 | $15.00 | $-59,160.75 |
26362(05) | 0602 | (SP)CEMENT TREATED BASE | * Material Discrepancy Adjustments | 0013 | 3,944.05 | $15.00 | $59,160.75 |
26362(05) | 0611 | H.E.S. CONCRETE (FULL DEPTH PATCHING) | * Material Discrepancy Adjustments | 0045 | -135.91 | $200.00 | $-27,182.00 |
26362(05) | 0611 | H.E.S. CONCRETE (FULL DEPTH PATCHING) | * Material Discrepancy Adjustments | 0048 | 135.91 | $200.00 | $27,182.00 |
26362(05) | 0635 | BEAM GUARD RAIL-W-BEAM-SINGLE | * Material Discrepancy Adjustments | 0023 | -809.00 | $25.00 | $-20,225.00 |
26362(05) | 0635 | BEAM GUARD RAIL-W-BEAM-SINGLE | * Material Discrepancy Adjustments | 0031 | 0.00 | $0.00 | $20,225.00 |
26362(05) | 0637 | (SP)G.E.T. GUARD RAIL END SECTION | * Material Discrepancy Adjustments | 0023 | -1.00 | $2,750.00 | $-2,750.00 |
26362(05) | 0637 | (SP)G.E.T. GUARD RAIL END SECTION | * Material Discrepancy Adjustments | 0031 | 0.00 | $0.00 | $2,750.00 |
26362(05) | 0646 | CONCRETE PARAPET | * Material Discrepancy Adjustments | 0013 | -496.70 | $55.00 | $-27,318.50 |
26362(05) | 0646 | CONCRETE PARAPET | * Material Discrepancy Adjustments | 0020 | 496.70 | $55.00 | $27,318.50 |
26362(05) | 0653 | WATER REPELLENT (VISUALLY INSPECTED) | * Material Discrepancy Adjustments | 0016 | -1,212.10 | $3.75 | $-4,545.38 |
26362(05) | 0653 | WATER REPELLENT (VISUALLY INSPECTED) | * Material Discrepancy Adjustments | 0017 | 1,212.10 | $3.75 | $4,545.38 |
26362(05) | 0685 | WATER REPELLENT (VISUALLY INSPECTED) | * Material Discrepancy Adjustments | 0016 | -489.00 | $3.75 | $-1,833.75 |
26362(05) | 0685 | WATER REPELLENT (VISUALLY INSPECTED) | * Material Discrepancy Adjustments | 0017 | 489.00 | $3.75 | $1,833.75 |
26362(05) | 0700 | WATER REPELLENT (VISUALLY INSPECTED) | * Material Discrepancy Adjustments | 0016 | -555.00 | $3.75 | $-2,081.25 |
26362(05) | 0700 | WATER REPELLENT (VISUALLY INSPECTED) | * Material Discrepancy Adjustments | 0017 | 555.00 | $3.75 | $2,081.25 |
26362(05) | 0715 | WATER REPELLENT (VISUALLY INSPECTED) | * Material Discrepancy Adjustments | 0016 | -643.00 | $3.75 | $-2,411.25 |
26362(05) | 0715 | WATER REPELLENT (VISUALLY INSPECTED) | * Material Discrepancy Adjustments | 0017 | 643.00 | $3.75 | $2,411.25 |
26362(05) | 0730 | WATER REPELLENT (VISUALLY INSPECTED) | * Material Discrepancy Adjustments | 0016 | -162.80 | $3.75 | $-610.50 |
26362(05) | 0730 | WATER REPELLENT (VISUALLY INSPECTED) | * Material Discrepancy Adjustments | 0017 | 162.80 | $3.75 | $610.50 |
26362(05) | 0744 | WATER REPELLENT (VISUALLY INSPECTED) | * Material Discrepancy Adjustments | 0016 | -3,714.00 | $3.75 | $-13,927.50 |
26362(05) | 0744 | WATER REPELLENT (VISUALLY INSPECTED) | * Material Discrepancy Adjustments | 0017 | 3,714.00 | $3.75 | $13,927.50 |
26362(05) | 0755 | SHEET ALUMINUM SIGNS | * Material Discrepancy Adjustments | 0016 | -139.00 | $17.00 | $-2,363.00 |
26362(05) | 0755 | SHEET ALUMINUM SIGNS | * Material Discrepancy Adjustments | 0017 | 139.00 | $17.00 | $2,363.00 |
26362(05) | 0756 | 2 1/4" SQUARE TUBE POST | * Material Discrepancy Adjustments | 0016 | -176.00 | $10.65 | $-1,874.40 |
26362(05) | 0756 | 2 1/4" SQUARE TUBE POST | * Material Discrepancy Adjustments | 0017 | 176.00 | $10.65 | $1,874.40 |
26362(05) | 0757 | (SP)TRAFFIC STRIPE (MULTI-POLYMER)(SYMBOLS, WORDS. ETC.) | * Material Discrepancy Adjustments | 0016 | -14.00 | $212.50 | $-2,975.00 |
26362(05) | 0757 | (SP)TRAFFIC STRIPE (MULTI-POLYMER)(SYMBOLS, WORDS. ETC.) | * Material Discrepancy Adjustments | 0017 | 14.00 | $212.50 | $2,975.00 |
26362(05) | 0757 | (SP)TRAFFIC STRIPE (MULTI-POLYMER)(SYMBOLS, WORDS. ETC.) | * Material Discrepancy Adjustments | 0029 | -22.00 | $212.50 | $-4,675.00 |
26362(05) | 0757 | (SP)TRAFFIC STRIPE (MULTI-POLYMER)(SYMBOLS, WORDS. ETC.) | * Material Discrepancy Adjustments | 0041 | 0.00 | $0.00 | $4,675.00 |
26362(05) | 0758 | (SP)TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | * Material Discrepancy Adjustments | 0016 | -14,449.00 | $0.55 | $-7,946.95 |
26362(05) | 0758 | (SP)TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | * Material Discrepancy Adjustments | 0017 | 14,449.00 | $0.55 | $7,946.95 |
26362(05) | 0758 | (SP)TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | * Material Discrepancy Adjustments | 0029 | -41,785.00 | $0.55 | $-22,981.75 |
26362(05) | 0758 | (SP)TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | * Material Discrepancy Adjustments | 0041 | 0.00 | $0.00 | $22,981.75 |
26362(05) | 0759 | (SP)TRAFFIC STRIPE(MULTI-POLYMER)(6" WIDE) | * Material Discrepancy Adjustments | 0016 | -5,112.00 | $0.80 | $-4,089.60 |
26362(05) | 0759 | (SP)TRAFFIC STRIPE(MULTI-POLYMER)(6" WIDE) | * Material Discrepancy Adjustments | 0017 | 5,112.00 | $0.80 | $4,089.60 |
26362(05) | 0759 | (SP)TRAFFIC STRIPE(MULTI-POLYMER)(6" WIDE) | * Material Discrepancy Adjustments | 0029 | -13,704.00 | $0.80 | $-10,963.20 |
26362(05) | 0759 | (SP)TRAFFIC STRIPE(MULTI-POLYMER)(6" WIDE) | * Material Discrepancy Adjustments | 0041 | 0.00 | $0.00 | $10,963.20 |
26362(05) | 0760 | (SP)TRAFFIC STRIPE(MULTI-POLYMER)(8" WIDE) | * Material Discrepancy Adjustments | 0016 | -7,042.00 | $1.95 | $-13,731.90 |
26362(05) | 0760 | (SP)TRAFFIC STRIPE(MULTI-POLYMER)(8" WIDE) | * Material Discrepancy Adjustments | 0017 | 7,042.00 | $1.95 | $13,731.90 |
26362(05) | 0760 | (SP)TRAFFIC STRIPE(MULTI-POLYMER)(8" WIDE) | * Material Discrepancy Adjustments | 0028 | -6,073.00 | $1.95 | $-11,842.35 |
26362(05) | 0760 | (SP)TRAFFIC STRIPE(MULTI-POLYMER)(8" WIDE) | * Material Discrepancy Adjustments | 0029 | -16,090.00 | $1.95 | $-31,375.50 |
26362(05) | 0760 | (SP)TRAFFIC STRIPE(MULTI-POLYMER)(8" WIDE) | * Material Discrepancy Adjustments | 0041 | 0.00 | $0.00 | $11,842.35 |
26362(05) | 0760 | (SP)TRAFFIC STRIPE(MULTI-POLYMER)(8" WIDE) | * Material Discrepancy Adjustments | 0043 | 16,090.00 | $1.95 | $31,375.50 |
26362(05) | 0790 | (SP)CONTRACTORS QUALITY CONTROL | * QAQC | 0049 | 0.00 | $0.00 | $-15,123.17 |
26362(05) | 0790 | (SP)CONTRACTORS QUALITY CONTROL | * QAQC | 0050 | 0.00 | $0.00 | $-163.02 |
24349(06) | 1111 | CONSTRUCTION MISCELLANEOUS | * Material Discrepancy Adjustments | 0045 | -2,507.00 | $16.00 | $-40,112.00 |
24349(06) | 1111 | CONSTRUCTION MISCELLANEOUS | * Material Discrepancy Adjustments | 0046 | 2,507.00 | $16.00 | $40,112.00 |
24349(06) | 2222 | CONSTRUCTION MISCELLANEOUS | * Material Discrepancy Adjustments | 0045 | -298.00 | $97.50 | $-29,055.00 |
24349(06) | 2222 | CONSTRUCTION MISCELLANEOUS | * Material Discrepancy Adjustments | 0046 | 298.00 | $97.50 | $29,055.00 | Subtotals For Line Item Adjustments | $-15,286.19 | * = User applied Line Item Adjustments |
MILESTONE INFORMATION | |||||||||
Milestone Number | Milestone Description | Start Date | End Date | Current Time Allowed | Rate | Milestone Closed | |||
01 | TIME 'B' BID | 07/20/2009 | 02/24/2011 | 578.00 DYS | $15,000.00 | Y | |||
02 | Milestone 1A | 06/08/2009 | 07/10/2009 | 40.00 DYS | $5,000.00 | Y | |||
03 | Milestone 1B | 07/20/2009 | 01/27/2010 | 217.00 DYS | $20,000.00 | Y | |||
04 | Milestone II | 05/20/2010 | 10/27/2010 | 200.00 DYS | $20,000.00 | Y |
MILESTONE ADJUSTMENTS | |||
Milestone Number | Milestone Adjustment Description | Estimate Nbr | Total |
01 | System Application of Disincentive Adj | 0040 | $-90,000.00 | Subtotals For Milestones | $-90,000.00 |
Contract ID: | 090329 | Estimate Number: | 0052 | Primary JP: | 26362(05) | |||
Line Item Number | Item Description | Item Number | Units | Bid Qty | Current Quantity | Quantity Paid This Est. | Quantity Paid To Date | Unit Price | Amount Paid This Est. | Amount Paid To Date |
Fed/State Project Number: IM-STIM(049) | Project: 24349(05) | Category: 0100/ROADWAY IM-STIM(049) | ||||||||
0001 | CLEARING AND GRUBBING | 201 0102 | LSUM | 1.000 | 1.000 | 1.000 | $30,000.00 | $0.00 | $30,000.00 | |
0002 | UNCLASSIFIED EXCAVATION | 202(A) 0183 | CY | 25,311.000 | 26,073.880 | 26,073.880 | $15.00 | $0.00 | $391,108.20 | |
0003 | TYPE A-SALVAGED TOPSOIL | 205 4229 | LSUM | 1.000 | 1.000 | 1.000 | $20,000.00 | $0.00 | $20,000.00 | |
0004 | TEMPORARY SEDIMENT FILTER | 224 2803 | EA | 35.000 | 3.000 | 3.000 | $250.00 | $0.00 | $750.00 | |
0005 | DITCH LINER PROTECTION | 229 4318 | LF | 220.000 | 0.000 | 0.000 | $10.00 | $0.00 | $0.00 | |
0006 | SOLID SLAB SODDING | 230(A) 2806 | SY | 35,984.000 | 23,420.200 | 23,420.200 | $1.60 | $0.00 | $37,472.32 | |
0007 | VEGETATIVE MULCHING | 233(A) 2817 | AC | 7.000 | 0.000 | 0.000 | $450.00 | $0.00 | $0.00 | |
0008 | MOWING | 241 2832 | AC | 14.000 | 0.000 | 0.000 | $95.00 | $0.00 | $0.00 | |
0009 | (SP)GEOGRID EARTH REINFORCEMENT | 246(A) 7041 | SY | 1,000.000 | 0.000 | 0.000 | $6.25 | $0.00 | $0.00 | |
0010 | AGGREGATE BASE | 303 0192 | CY | 9,000.000 | 8,076.310 | 8,076.310 | $50.00 | $0.00 | $403,815.50 | |
0011 | (SP)CEMENT TREATED BASE | 317(F) 4270 | SY | 47,656.000 | 42,666.770 | 42,666.770 | $15.00 | $0.00 | $640,001.55 | |
0012 | SEPARATOR FABRIC | 325 5271 | SY | 50,998.000 | 55,536.730 | 55,536.730 | $2.00 | $0.00 | $111,073.46 | |
0013 | (SP)LIME | 327(D) 4230 | TON | 1,172.000 | 0.000 | 0.000 | $175.00 | $0.00 | $0.00 | |
0014 | (SP)LIME STABILIZED SUBGRADE | 327(H) 4270 | SY | 54,274.000 | 0.000 | 0.000 | $3.00 | $0.00 | $0.00 | |
0015 | (SP)P.C.CONCRETE PAVEMENT(PLACEMENT) | 414(A) 0210 | SY | 9,870.000 | 10,334.050 | 10,334.050 | $15.00 | $0.00 | $155,010.75 | |
0016 | 6" P.C. CONCRETE PAVEMENT | 414(A) 0258 | SY | 1,368.000 | 1,612.120 | 1,612.120 | $40.00 | $0.00 | $64,484.80 | |
0017 | (SP)DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 414(A1) 5725 | SY | 32,981.000 | 32,362.710 | 32,362.710 | $18.50 | $0.00 | $598,710.15 | |
0018 | (SP)P.C. CONCRETE FOR PAVEMENT | 414(P) 6000 | CY | 11,875.000 | 12,258.790 | 12,258.790 | $135.00 | $0.00 | $1,654,936.65 | |
0019 | COLD MILLING PAVEMENT | 417 5267 | SY | 62,852.000 | 57,653.470 | 57,653.470 | $1.50 | $0.00 | $86,480.21 | |
0020 | CLSM BACKFILL | 501(G) 6309 | CY | 2,726.000 | 2,889.080 | 2,889.080 | $150.00 | $0.00 | $433,362.00 | |
0021 | CONCRETE PARAPET | 504(F) 1381 | LF | 5,159.000 | 5,041.770 | 5,041.770 | $55.00 | $0.00 | $277,297.35 | |
0022 | 42" F-SHAPED PARAPET | 504(F) 6190 | LF | 8,288.000 | 8,095.730 | 8,095.730 | $60.00 | $0.00 | $485,743.80 | |
0023 | CLASS AA CONCRETE | 509(A) 0319 | CY | 248.000 | 248.000 | 248.000 | $1,000.00 | $0.00 | $248,000.00 | |
0024 | CLASS C CONCRETE | 509(D) 0325 | CY | 9.000 | 13.970 | 13.970 | $750.00 | $0.00 | $10,477.50 | |
0025 | EPOXY COATED REINFORCING STEEL | 511(B) 4269 | LB | 391,733.000 | 391,733.000 | 391,733.000 | $0.55 | $0.00 | $215,453.15 | |
0026 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 5,726.000 | 5,700.480 | 5,700.480 | $3.75 | $0.00 | $21,376.80 | |
0027 | CONCRETE CURB (6" MNTBLE-INTEGRAL) | 609(A) 0288 | LF | 218.000 | 896.000 | 896.000 | $5.00 | $0.00 | $4,480.00 | |
0028 | REMOVAL OF STRUCTURES & OBSTRUCTIONS | 619(A) 0920 | LSUM | 1.000 | 1.000 | 1.000 | $15,000.00 | $0.00 | $15,000.00 | |
0029 | REMOVAL OF CURB AND GUTTER | 619(B) 4726 | LF | 406.000 | 6,633.440 | 6,633.440 | $3.75 | $0.00 | $24,875.41 | |
0030 | REMOVAL OF CONCRETE PAVEMENT | 619(B) 4727 | SY | 42,679.000 | 34,682.960 | 34,682.960 | $5.00 | $0.00 | $173,414.80 | |
0031 | REMOVAL OF ASPHALT PAVEMENT | 619(B) 4728 | SY | 408.000 | 15,164.900 | 15,164.900 | $2.60 | $0.00 | $39,428.74 | |
0032 | REMOVAL OF GUARD RAIL | 619(B) 4780 | LF | 8,826.000 | 8,502.000 | 8,502.000 | $4.50 | $0.00 | $38,259.00 | |
0033 | REMOVAL OF EXISTING PARAPET | 619(B) 6252 | LF | 3,210.000 | 3,261.620 | 3,261.620 | $10.00 | $0.00 | $32,616.20 | |
0034 | THRIE BEAM BRIDGE CONNECTION-TYPE A | 623(E) 7114 | EA | 9.000 | 4.000 | 4.000 | $2,000.00 | $0.00 | $8,000.00 | |
0035 | EDGE DRAIN CONDUIT-PERFORATED | 653(A) 5915 | LF | 12,064.000 | 9,302.000 | 9,302.000 | $7.25 | $0.00 | $67,439.50 | |
0036 | EDGE DRAIN OUTLET LATERAL-NONPERFORATED | 653(B) 5916 | LF | 514.000 | 207.000 | 207.000 | $15.00 | $0.00 | $3,105.00 | |
0037 | OUTLET LATERAL HEADWALL | 653(C) 5946 | EA | 22.000 | 7.000 | 7.000 | $275.00 | $0.00 | $1,925.00 | |
0038 | (PL)IMPACT ATTENUATOR | 871 8325 | EA | 7.000 | 7.000 | 7.000 | $27,500.00 | $0.00 | $192,500.00 | |
8903 | PAVEMENT/BRIDGE SMOOTHNESS ADJUSTMENT | 430 5010 | LSUM | 0.000 | 1.000 | 1.000 | $-15,421.60 | $0.00 | $-15,421.60 | |
Subtotals For Category 0100/ROADWAY IM-STIM(049) | $0.00 | $6,471,176.24 | ||||||||
Fed/State Project Number: IM-STIM(049) | Project: 24349(05) | Category: 0200/BRIDGE 16 IM-STIM(049) | ||||||||
0039 | CLSM BACKFILL | 501(G) 6309 | CY | 5.000 | 0.000 | 0.000 | $150.00 | $0.00 | $0.00 | |
0040 | APPROACH SLAB | 504(A) 1304 | SY | 110.700 | 110.700 | 110.700 | $175.00 | $0.00 | $19,372.50 | |
0041 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 63.000 | 63.000 | 63.000 | $285.00 | $0.00 | $17,955.00 | |
0042 | CONCRETE PARAPET | 504(F) 1381 | LF | 291.800 | 291.800 | 291.800 | $55.00 | $0.00 | $16,049.00 | |
0043 | 42" F-SHAPED PARAPET | 504(F) 6190 | LF | 311.400 | 311.400 | 311.400 | $60.00 | $0.00 | $18,684.00 | |
0044 | STRUCTURAL STEEL | 506(A) 1322 | LB | 500.000 | 0.000 | 0.000 | $8.00 | $0.00 | $0.00 | |
0045 | CLASS AA CONCRETE | 509(A) 1326 | CY | 148.900 | 148.900 | 148.900 | $600.00 | $0.00 | $89,340.00 | |
0046 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 37,380.000 | 37,380.000 | 37,380.000 | $0.95 | $0.00 | $35,511.00 | |
0047 | PAINTING EXISTING STRUCTURES | 512(A) 1323 | LSUM | 1.000 | 1.000 | 1.000 | $25,000.00 | $0.00 | $25,000.00 | |
0048 | COLLECTION & HANDLING OF WASTE | 512(B) 6303 | LSUM | 1.000 | 1.000 | 1.000 | $1,000.00 | $0.00 | $1,000.00 | |
0049 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 433.000 | 433.000 | 433.000 | $3.75 | $0.00 | $1,623.75 | |
0050 | REMOVAL OF EXISTING BRIDGE STRUCTURE | 619(D) 1397 | LSUM | 1.000 | 1.000 | 1.000 | $80,000.00 | $0.00 | $80,000.00 | |
Subtotals For Category 0200/BRIDGE 16 IM-STIM(049) | $0.00 | $304,535.25 | ||||||||
Fed/State Project Number: IM-STIM(049) | Project: 24349(05) | Category: 0201/BRIDGE 19 IM-STIM(049) | ||||||||
0051 | CLSM BACKFILL | 501(G) 6309 | CY | 5.000 | 0.000 | 0.000 | $150.00 | $0.00 | $0.00 | |
0052 | APPROACH SLAB | 504(A) 1304 | SY | 256.200 | 256.200 | 256.200 | $175.00 | $0.00 | $44,835.00 | |
0053 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 310.020 | 310.020 | 310.020 | $285.00 | $0.00 | $88,355.70 | |
0054 | 42" F-SHAPED PARAPET | 504(F) 6190 | LF | 2,159.500 | 2,159.500 | 2,159.500 | $60.00 | $0.00 | $129,570.00 | |
0055 | STRUCTURAL STEEL | 506(A) 1322 | LB | 500.000 | 2,320.000 | 2,320.000 | $8.00 | $0.00 | $18,560.00 | |
0056 | CLASS AA CONCRETE | 509(A) 1326 | CY | 1,050.000 | 1,050.000 | 1,050.000 | $500.00 | $0.00 | $525,000.00 | |
0057 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 298,870.000 | 298,870.000 | 298,870.000 | $0.90 | $0.00 | $268,983.00 | |
0058 | PAINTING EXISTING STRUCTURES | 512(A) 1323 | LSUM | 1.000 | 1.000 | 1.000 | $100,000.00 | $0.00 | $100,000.00 | |
0059 | COLLECTION & HANDLING OF WASTE | 512(B) 6303 | LSUM | 1.000 | 1.000 | 1.000 | $5,000.00 | $0.00 | $5,000.00 | |
0060 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 1,948.000 | 1,948.000 | 1,948.000 | $3.72 | $0.00 | $7,246.56 | |
0061 | (PL)INLET AND BASIN | 535 6138 | EA | 11.000 | 11.000 | 11.000 | $20,000.00 | $0.00 | $220,000.00 | |
0062 | REMOVAL OF EXISTING BRIDGE STRUCTURE | 619(D) 1397 | LSUM | 1.000 | 1.000 | 1.000 | $787,500.00 | $0.00 | $787,500.00 | |
Subtotals For Category 0201/BRIDGE 19 IM-STIM(049) | $0.00 | $2,195,050.26 | ||||||||
Fed/State Project Number: IM-STIM(049) | Project: 24349(05) | Category: 0202/BRIDGE 21 IM-STIM(049) | ||||||||
0063 | CLSM BACKFILL | 501(G) 6309 | CY | 5.000 | 0.000 | 0.000 | $150.00 | $0.00 | $0.00 | |
0064 | APPROACH SLAB | 504(A) 1304 | SY | 180.200 | 180.200 | 180.200 | $175.00 | $0.00 | $31,535.00 | |
0065 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 127.150 | 127.150 | 127.150 | $285.00 | $0.00 | $36,237.75 | |
0066 | 42" F-SHAPED PARAPET | 504(F) 6190 | LF | 777.800 | 777.800 | 777.800 | $60.00 | $0.00 | $46,668.00 | |
0067 | STRUCTURAL STEEL | 506(A) 1322 | LB | 500.000 | 0.000 | 0.000 | $8.00 | $0.00 | $0.00 | |
0068 | CLASS AA CONCRETE | 509(A) 1326 | CY | 364.300 | 364.300 | 364.300 | $600.00 | $0.00 | $218,580.00 | |
0069 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 115,170.000 | 115,170.000 | 115,170.000 | $0.95 | $0.00 | $109,411.50 | |
0070 | PAINTING EXISTING STRUCTURES | 512(A) 1323 | LSUM | 1.000 | 1.000 | 1.000 | $50,000.00 | $0.00 | $50,000.00 | |
0071 | COLLECTION & HANDLING OF WASTE | 512(B) 6303 | LSUM | 1.000 | 1.000 | 1.000 | $2,500.00 | $0.00 | $2,500.00 | |
0072 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 623.000 | 623.000 | 623.000 | $3.75 | $0.00 | $2,336.25 | |
0073 | (PL)INLET AND BASIN | 535 6138 | EA | 1.000 | 1.000 | 1.000 | $20,000.00 | $0.00 | $20,000.00 | |
0074 | REMOVAL OF EXISTING BRIDGE STRUCTURE | 619(D) 1397 | LSUM | 1.000 | 1.000 | 1.000 | $200,000.00 | $0.00 | $200,000.00 | |
Subtotals For Category 0202/BRIDGE 21 IM-STIM(049) | $0.00 | $717,268.50 | ||||||||
Fed/State Project Number: IM-STIM(049) | Project: 24349(05) | Category: 0203/BRIDGE 22 IM-STIM(049) | ||||||||
0075 | CLSM BACKFILL | 501(G) 6309 | CY | 75.000 | 0.000 | 0.000 | $150.00 | $0.00 | $0.00 | |
0076 | APPROACH SLAB | 504(A) 1304 | SY | 225.500 | 225.500 | 225.500 | $175.00 | $0.00 | $39,462.50 | |
0077 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 192.690 | 192.690 | 192.690 | $285.00 | $0.00 | $54,916.65 | |
0078 | 42" F-SHAPED PARAPET | 504(F) 6190 | LF | 890.700 | 890.700 | 890.700 | $60.00 | $0.00 | $53,442.00 | |
0079 | STRUCTURAL STEEL | 506(A) 1322 | LB | 500.000 | 0.000 | 0.000 | $8.00 | $0.00 | $0.00 | |
0080 | CLASS AA CONCRETE | 509(A) 1326 | CY | 400.600 | 400.600 | 400.600 | $600.00 | $0.00 | $240,360.00 | |
0081 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 113,320.000 | 113,320.000 | 113,320.000 | $0.95 | $0.00 | $107,654.00 | |
0082 | PAINTING EXISTING STRUCTURES | 512(A) 1323 | LSUM | 1.000 | 1.000 | 1.000 | $50,000.00 | $0.00 | $50,000.00 | |
0083 | COLLECTION & HANDLING OF WASTE | 512(B) 6303 | LSUM | 1.000 | 1.000 | 1.000 | $2,500.00 | $0.00 | $2,500.00 | |
0084 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 750.000 | 750.000 | 750.000 | $3.75 | $0.00 | $2,812.50 | |
0085 | REMOVAL OF EXISTING BRIDGE STRUCTURE | 619(D) 1397 | LSUM | 1.000 | 1.000 | 1.000 | $225,000.00 | $0.00 | $225,000.00 | |
Subtotals For Category 0203/BRIDGE 22 IM-STIM(049) | $0.00 | $776,147.65 | ||||||||
Fed/State Project Number: IM-STIM(049) | Project: 24349(05) | Category: 0204/BRIDGE 24 IM-STIM(049) | ||||||||
0086 | CLSM BACKFILL | 501(G) 6309 | CY | 5.000 | 0.000 | 0.000 | $150.00 | $0.00 | $0.00 | |
0087 | APPROACH SLAB | 504(A) 1304 | SY | 367.700 | 367.700 | 367.700 | $175.00 | $0.00 | $64,347.50 | |
0088 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 167.470 | 167.470 | 167.470 | $285.00 | $0.00 | $47,728.95 | |
0089 | 42" F-SHAPED PARAPET | 504(F) 6190 | LF | 537.200 | 537.200 | 537.200 | $60.00 | $0.00 | $32,232.00 | |
0090 | STRUCTURAL STEEL | 506(A) 1322 | LB | 500.000 | 0.000 | 0.000 | $8.00 | $0.00 | $0.00 | |
0091 | CLASS AA CONCRETE | 509(A) 1326 | CY | 273.300 | 273.300 | 273.300 | $600.00 | $0.00 | $163,980.00 | |
0092 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 65,490.000 | 65,490.000 | 65,490.000 | $0.95 | $0.00 | $62,215.50 | |
0093 | PAINTING EXISTING STRUCTURES | 512(A) 1323 | LSUM | 1.000 | 1.000 | 1.000 | $40,000.00 | $0.00 | $40,000.00 | |
0094 | COLLECTION & HANDLING OF WASTE | 512(B) 6303 | LSUM | 1.000 | 1.000 | 1.000 | $1,500.00 | $0.00 | $1,500.00 | |
0095 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 395.000 | 395.000 | 395.000 | $3.75 | $0.00 | $1,481.25 | |
0096 | REMOVAL OF EXISTING BRIDGE STRUCTURE | 619(D) 1397 | LSUM | 1.000 | 1.000 | 1.000 | $165,000.00 | $0.00 | $165,000.00 | |
Subtotals For Category 0204/BRIDGE 24 IM-STIM(049) | $0.00 | $578,485.20 | ||||||||
Fed/State Project Number: IM-STIM(049) | Project: 24349(05) | Category: 0205/BRIDGE 26 IM-STIM(049) | ||||||||
0097 | CLSM BACKFILL | 501(G) 6309 | CY | 5.000 | 0.000 | 0.000 | $150.00 | $0.00 | $0.00 | |
0098 | APPROACH SLAB | 504(A) 1304 | SY | 504.400 | 504.400 | 504.400 | $175.00 | $0.00 | $88,270.00 | |
0099 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 93.310 | 93.310 | 93.310 | $285.00 | $0.00 | $26,593.35 | |
0100 | CONCRETE PARAPET | 504(F) 1381 | LF | 53.000 | 53.000 | 53.000 | $55.00 | $0.00 | $2,915.00 | |
0101 | 42" F-SHAPED PARAPET | 504(F) 6190 | LF | 169.900 | 169.900 | 169.900 | $60.00 | $0.00 | $10,194.00 | |
0102 | STRUCTURAL STEEL | 506(A) 1322 | LB | 500.000 | 0.000 | 0.000 | $8.00 | $0.00 | $0.00 | |
0103 | CLASS AA CONCRETE | 509(A) 1326 | CY | 178.400 | 178.400 | 178.400 | $600.00 | $0.00 | $107,040.00 | |
0104 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 44,070.000 | 44,070.000 | 44,070.000 | $0.95 | $0.00 | $41,866.50 | |
0105 | PAINTING EXISTING STRUCTURES | 512(A) 1323 | LSUM | 1.000 | 1.000 | 1.000 | $25,000.00 | $0.00 | $25,000.00 | |
0106 | COLLECTION & HANDLING OF WASTE | 512(B) 6303 | LSUM | 1.000 | 1.000 | 1.000 | $1,000.00 | $0.00 | $1,000.00 | |
0107 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 213.000 | 213.000 | 213.000 | $3.75 | $0.00 | $798.75 | |
0108 | REMOVAL OF EXISTING BRIDGE STRUCTURE | 619(D) 1397 | LSUM | 1.000 | 1.000 | 1.000 | $100,000.00 | $0.00 | $100,000.00 | |
Subtotals For Category 0205/BRIDGE 26 IM-STIM(049) | $0.00 | $403,677.60 | ||||||||
Fed/State Project Number: IM-STIM(049) | Project: 24349(05) | Category: 0206/BRIDGE 28 IM-STIM(049) | ||||||||
0109 | CLSM BACKFILL | 501(G) 6309 | CY | 5.000 | 0.000 | 0.000 | $150.00 | $0.00 | $0.00 | |
0110 | APPROACH SLAB | 504(A) 1304 | SY | 259.900 | 259.900 | 259.900 | $175.00 | $0.00 | $45,482.50 | |
0111 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 51.910 | 51.910 | 51.910 | $285.00 | $0.00 | $14,794.35 | |
0112 | CONCRETE PARAPET | 504(F) 1381 | LF | 124.700 | 124.700 | 124.700 | $55.00 | $0.00 | $6,858.50 | |
0113 | 42" F-SHAPED PARAPET | 504(F) 6190 | LF | 126.500 | 126.500 | 126.500 | $60.00 | $0.00 | $7,590.00 | |
0114 | STRUCTURAL STEEL | 506(A) 1322 | LB | 500.000 | 0.000 | 0.000 | $8.00 | $0.00 | $0.00 | |
0115 | CLASS AA CONCRETE | 509(A) 1326 | CY | 104.700 | 104.700 | 104.700 | $600.00 | $0.00 | $62,820.00 | |
0116 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 28,750.000 | 28,750.000 | 28,750.000 | $0.95 | $0.00 | $27,312.50 | |
0117 | PAINTING EXISTING STRUCTURES | 512(A) 1323 | LSUM | 1.000 | 1.000 | 1.000 | $25,000.00 | $0.00 | $25,000.00 | |
0118 | COLLECTION & HANDLING OF WASTE | 512(B) 6303 | LSUM | 1.000 | 1.000 | 1.000 | $1,000.00 | $0.00 | $1,000.00 | |
0119 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 164.000 | 164.000 | 164.000 | $3.75 | $0.00 | $615.00 | |
0120 | REMOVAL OF EXISTING BRIDGE STRUCTURE | 619(D) 1397 | LSUM | 1.000 | 1.000 | 1.000 | $60,000.00 | $0.00 | $60,000.00 | |
Subtotals For Category 0206/BRIDGE 28 IM-STIM(049) | $0.00 | $251,472.85 | ||||||||
Fed/State Project Number: IM-STIM(049) | Project: 24349(05) | Category: 0207/BRIDGE 30 IM-STIM(049) | ||||||||
0121 | CLSM BACKFILL | 501(G) 6309 | CY | 5.000 | 0.000 | 0.000 | $150.00 | $0.00 | $0.00 | |
0122 | APPROACH SLAB | 504(A) 1304 | SY | 299.900 | 299.900 | 299.900 | $175.00 | $0.00 | $52,482.50 | |
0123 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 60.610 | 60.610 | 60.610 | $285.00 | $0.00 | $17,273.85 | |
0124 | 42" F-SHAPED PARAPET | 504(F) 6190 | LF | 253.800 | 253.800 | 253.800 | $60.00 | $0.00 | $15,228.00 | |
0125 | STRUCTURAL STEEL | 506(A) 1322 | LB | 500.000 | 0.000 | 0.000 | $8.00 | $0.00 | $0.00 | |
0126 | CLASS AA CONCRETE | 509(A) 1326 | CY | 118.900 | 118.900 | 118.900 | $600.00 | $0.00 | $71,340.00 | |
0127 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 33,170.000 | 33,170.000 | 33,170.000 | $0.95 | $0.00 | $31,511.50 | |
0128 | PAINTING EXISTING STRUCTURES | 512(A) 1323 | LSUM | 1.000 | 1.000 | 1.000 | $25,000.00 | $0.00 | $25,000.00 | |
0129 | COLLECTION & HANDLING OF WASTE | 512(B) 6303 | LSUM | 1.000 | 1.000 | 1.000 | $1,000.00 | $0.00 | $1,000.00 | |
0130 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 180.000 | 180.000 | 180.000 | $3.75 | $0.00 | $675.00 | |
0131 | REMOVAL OF EXISTING BRIDGE STRUCTURE | 619(D) 1397 | LSUM | 1.000 | 1.000 | 1.000 | $65,000.00 | $0.00 | $65,000.00 | |
Subtotals For Category 0207/BRIDGE 30 IM-STIM(049) | $0.00 | $279,510.85 | ||||||||
Fed/State Project Number: IM-STIM(049) | Project: 24349(05) | Category: 0208/BRIDGE 32 IM-STIM(049) | ||||||||
0132 | CLSM BACKFILL | 501(G) 6309 | CY | 5.000 | 0.000 | 0.000 | $150.00 | $0.00 | $0.00 | |
0133 | APPROACH SLAB | 504(A) 1304 | SY | 318.200 | 318.200 | 318.200 | $175.00 | $0.00 | $55,685.00 | |
0134 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 64.100 | 64.100 | 64.100 | $285.00 | $0.00 | $18,268.50 | |
0135 | 42" F-SHAPED PARAPET | 504(F) 6190 | LF | 253.100 | 253.100 | 253.100 | $60.00 | $0.00 | $15,186.00 | |
0136 | STRUCTURAL STEEL | 506(A) 1322 | LB | 500.000 | 0.000 | 0.000 | $8.00 | $0.00 | $0.00 | |
0137 | CLASS AA CONCRETE | 509(A) 1326 | CY | 128.500 | 128.500 | 128.500 | $600.00 | $0.00 | $77,100.00 | |
0138 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 31,430.000 | 31,430.000 | 31,430.000 | $0.95 | $0.00 | $29,858.50 | |
0139 | PAINTING EXISTING STRUCTURES | 512(A) 1323 | LSUM | 1.000 | 1.000 | 1.000 | $25,000.00 | $0.00 | $25,000.00 | |
0140 | COLLECTION & HANDLING OF WASTE | 512(B) 6303 | LSUM | 1.000 | 1.000 | 1.000 | $1,000.00 | $0.00 | $1,000.00 | |
0141 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 172.000 | 172.000 | 172.000 | $3.75 | $0.00 | $645.00 | |
0142 | REMOVAL OF EXISTING BRIDGE STRUCTURE | 619(D) 1397 | LSUM | 1.000 | 1.000 | 1.000 | $71,000.00 | $0.00 | $71,000.00 | |
Subtotals For Category 0208/BRIDGE 32 IM-STIM(049) | $0.00 | $293,743.00 | ||||||||
Fed/State Project Number: IM-STIM(049) | Project: 24349(05) | Category: 0209/BRIDGE 33 IM-STIM(049) | ||||||||
0143 | CLSM BACKFILL | 501(G) 6309 | CY | 5.000 | 0.000 | 0.000 | $150.00 | $0.00 | $0.00 | |
0144 | APPROACH SLAB | 504(A) 1304 | SY | 82.400 | 82.400 | 82.400 | $175.00 | $0.00 | $14,420.00 | |
0145 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 21.500 | 21.500 | 21.500 | $285.00 | $0.00 | $6,127.50 | |
0146 | 42" F-SHAPED PARAPET | 504(F) 6190 | LF | 220.600 | 220.600 | 220.600 | $60.00 | $0.00 | $13,236.00 | |
0147 | STRUCTURAL STEEL | 506(A) 1322 | LB | 500.000 | 0.000 | 0.000 | $8.00 | $0.00 | $0.00 | |
0148 | CLASS AA CONCRETE | 509(A) 1326 | CY | 45.100 | 45.100 | 45.100 | $600.00 | $0.00 | $27,060.00 | |
0149 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 12,550.000 | 12,550.000 | 12,550.000 | $0.95 | $0.00 | $11,922.50 | |
0150 | PAINTING EXISTING STRUCTURES | 512(A) 1323 | LSUM | 1.000 | 1.000 | 1.000 | $25,000.00 | $0.00 | $25,000.00 | |
0151 | COLLECTION & HANDLING OF WASTE | 512(B) 6303 | LSUM | 1.000 | 1.000 | 1.000 | $1,000.00 | $0.00 | $1,000.00 | |
0152 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 181.000 | 181.000 | 181.000 | $3.75 | $0.00 | $678.75 | |
0153 | REMOVAL OF EXISTING BRIDGE STRUCTURE | 619(D) 1397 | LSUM | 1.000 | 1.000 | 1.000 | $25,000.00 | $0.00 | $25,000.00 | |
Subtotals For Category 0209/BRIDGE 33 IM-STIM(049) | $0.00 | $124,444.75 | ||||||||
Fed/State Project Number: IM-STIM(049) | Project: 24349(05) | Category: 0210/BRIDGE 34E IM-STIM(049) | ||||||||
0154 | CLSM BACKFILL | 501(G) 6309 | CY | 5.000 | 0.000 | 0.000 | $180.00 | $0.00 | $0.00 | |
0155 | APPROACH SLAB | 504(A) 1304 | SY | 368.800 | 368.800 | 368.800 | $225.00 | $0.00 | $82,980.00 | |
0156 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 71.300 | 71.300 | 71.300 | $380.00 | $0.00 | $27,094.00 | |
0157 | 42" F-SHAPED PARAPET | 504(F) 6190 | LF | 245.600 | 245.600 | 245.600 | $135.00 | $0.00 | $33,156.00 | |
0158 | STRUCTURAL STEEL | 506(A) 1322 | LB | 500.000 | 0.000 | 0.000 | $8.00 | $0.00 | $0.00 | |
0159 | CLASS AA CONCRETE | 509(A) 1326 | CY | 147.400 | 147.400 | 147.400 | $800.00 | $0.00 | $117,920.00 | |
0160 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 36,080.000 | 37,964.000 | 37,964.000 | $1.25 | $0.00 | $47,455.00 | |
0161 | PAINTING EXISTING STRUCTURES | 512(A) 1323 | LSUM | 1.000 | 1.000 | 1.000 | $25,000.00 | $0.00 | $25,000.00 | |
0162 | COLLECTION & HANDLING OF WASTE | 512(B) 6303 | LSUM | 1.000 | 1.000 | 1.000 | $1,000.00 | $0.00 | $1,000.00 | |
0163 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 171.000 | 171.000 | 171.000 | $3.75 | $0.00 | $641.25 | |
0164 | REMOVAL OF EXISTING BRIDGE STRUCTURE | 619(D) 1397 | LSUM | 1.000 | 1.000 | 1.000 | $70,000.00 | $0.00 | $70,000.00 | |
Subtotals For Category 0210/BRIDGE 34E IM-STIM(049) | $0.00 | $405,246.25 | ||||||||
Fed/State Project Number: IM-STIM(049) | Project: 24349(05) | Category: 0211/BRIDGE 35E IM-STIM(049) | ||||||||
0165 | CLSM BACKFILL | 501(G) 6309 | CY | 5.000 | 0.000 | 0.000 | $180.00 | $0.00 | $0.00 | |
0166 | APPROACH SLAB | 504(A) 1304 | SY | 336.100 | 336.100 | 336.100 | $225.00 | $0.00 | $75,622.50 | |
0167 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 69.700 | 69.700 | 69.700 | $380.00 | $0.00 | $26,486.00 | |
0168 | 42" F-SHAPED PARAPET | 504(F) 6190 | LF | 121.200 | 121.200 | 121.200 | $135.00 | $0.00 | $16,362.00 | |
0169 | STRUCTURAL STEEL | 506(A) 1322 | LB | 500.000 | 0.000 | 0.000 | $8.00 | $0.00 | $0.00 | |
0170 | CLASS AA CONCRETE | 509(A) 1326 | CY | 151.500 | 151.500 | 151.500 | $800.00 | $0.00 | $121,200.00 | |
0171 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 36,090.000 | 36,165.000 | 36,165.000 | $1.25 | $0.00 | $45,206.25 | |
0172 | PAINTING EXISTING STRUCTURES | 512(A) 1323 | LSUM | 1.000 | 1.000 | 1.000 | $25,000.00 | $0.00 | $25,000.00 | |
0173 | COLLECTION & HANDLING OF WASTE | 512(B) 6303 | LSUM | 1.000 | 1.000 | 1.000 | $1,000.00 | $0.00 | $1,000.00 | |
0174 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 200.000 | 200.000 | 200.000 | $3.75 | $0.00 | $750.00 | |
0175 | REMOVAL OF EXISTING BRIDGE STRUCTURE | 619(D) 1397 | LSUM | 1.000 | 1.000 | 1.000 | $70,000.00 | $0.00 | $70,000.00 | |
8800 | CONCRETE MEDIAN BARRIER, DESIGN 1 | 627(I) 4317 | LF | 0.000 | 121.100 | 121.100 | $135.00 | $0.00 | $16,348.50 | |
Subtotals For Category 0211/BRIDGE 35E IM-STIM(049) | $0.00 | $397,975.25 | ||||||||
Fed/State Project Number: IM-STIM(049) | Project: 24349(05) | Category: 0212/BRIDGE 36E IM-STIM(049) | ||||||||
0176 | CLSM BACKFILL | 501(G) 6309 | CY | 5.000 | 0.000 | 0.000 | $180.00 | $0.00 | $0.00 | |
0177 | APPROACH SLAB | 504(A) 1304 | SY | 329.000 | 329.000 | 329.000 | $225.00 | $0.00 | $74,025.00 | |
0178 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 70.300 | 70.300 | 70.300 | $380.00 | $0.00 | $26,714.00 | |
0179 | CONCRETE PARAPET | 504(F) 1381 | LF | 121.300 | 121.300 | 121.300 | $135.00 | $0.00 | $16,375.50 | |
0180 | STRUCTURAL STEEL | 506(A) 1322 | LB | 500.000 | 0.000 | 0.000 | $8.00 | $0.00 | $0.00 | |
0181 | CLASS AA CONCRETE | 509(A) 1326 | CY | 136.300 | 136.300 | 136.300 | $800.00 | $0.00 | $109,040.00 | |
0182 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 32,690.000 | 34,165.000 | 34,165.000 | $1.25 | $0.00 | $42,706.25 | |
0183 | PAINTING EXISTING STRUCTURES | 512(A) 1323 | LSUM | 1.000 | 1.000 | 1.000 | $25,000.00 | $0.00 | $25,000.00 | |
0184 | COLLECTION & HANDLING OF WASTE | 512(B) 6303 | LSUM | 1.000 | 1.000 | 1.000 | $1,000.00 | $0.00 | $1,000.00 | |
0185 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 49.000 | 49.000 | 49.000 | $3.75 | $0.00 | $183.75 | |
0186 | REMOVAL OF EXISTING BRIDGE STRUCTURE | 619(D) 1397 | LSUM | 1.000 | 1.000 | 1.000 | $70,000.00 | $0.00 | $70,000.00 | |
Subtotals For Category 0212/BRIDGE 36E IM-STIM(049) | $0.00 | $365,044.50 | ||||||||
Fed/State Project Number: IM-STIM(049) | Project: 24349(05) | Category: 0213/BRIDGE 38 IM-STIM(049) | ||||||||
0187 | CLSM BACKFILL | 501(G) 6309 | CY | 5.000 | 0.000 | 0.000 | $150.00 | $0.00 | $0.00 | |
0188 | APPROACH SLAB | 504(A) 1304 | SY | 185.500 | 185.500 | 185.500 | $175.00 | $0.00 | $32,462.50 | |
0189 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 99.240 | 99.240 | 99.240 | $285.00 | $0.00 | $28,283.40 | |
0190 | CONCRETE PARAPET | 504(F) 1381 | LF | 170.800 | 170.800 | 170.800 | $55.00 | $0.00 | $9,394.00 | |
0191 | 42" F-SHAPED PARAPET | 504(F) 6190 | LF | 176.800 | 176.800 | 176.800 | $60.00 | $0.00 | $10,608.00 | |
0192 | STRUCTURAL STEEL | 506(A) 1322 | LB | 500.000 | 244.000 | 244.000 | $8.00 | $0.00 | $1,952.00 | |
0193 | CLASS AA CONCRETE | 509(A) 1326 | CY | 182.100 | 182.100 | 182.100 | $600.00 | $0.00 | $109,260.00 | |
0194 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 44,960.000 | 44,960.000 | 44,960.000 | $0.95 | $0.00 | $42,712.00 | |
0195 | PAINTING EXISTING STRUCTURES | 512(A) 1323 | LSUM | 1.000 | 1.000 | 1.000 | $25,000.00 | $0.00 | $25,000.00 | |
0196 | COLLECTION & HANDLING OF WASTE | 512(B) 6303 | LSUM | 1.000 | 1.000 | 1.000 | $1,000.00 | $0.00 | $1,000.00 | |
0197 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 254.000 | 254.000 | 254.000 | $3.75 | $0.00 | $952.50 | |
0198 | (PL)REPAIR BRIDGE ITEM (TYPE B) | 540 4525 | EA | 13.000 | 13.000 | 13.000 | $425.23 | $0.00 | $5,527.99 | |
0199 | REMOVAL OF EXISTING BRIDGE STRUCTURE | 619(D) 1397 | LSUM | 1.000 | 1.000 | 1.000 | $100,000.00 | $0.00 | $100,000.00 | |
Subtotals For Category 0213/BRIDGE 38 IM-STIM(049) | $0.00 | $367,152.39 | ||||||||
Fed/State Project Number: IM-STIM(049) | Project: 24349(05) | Category: 0214/BRIDGE 43 IM-STIM(049) | ||||||||
0200 | CLSM BACKFILL | 501(G) 6309 | CY | 5.000 | 0.000 | 0.000 | $150.00 | $0.00 | $0.00 | |
0201 | APPROACH SLAB | 504(A) 1304 | SY | 267.000 | 267.000 | 267.000 | $175.00 | $0.00 | $46,725.00 | |
0202 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 114.720 | 114.720 | 114.720 | $285.00 | $0.00 | $32,695.20 | |
0203 | CONCRETE PARAPET | 504(F) 1381 | LF | 184.000 | 184.000 | 184.000 | $55.00 | $0.00 | $10,120.00 | |
0204 | 42" F-SHAPED PARAPET | 504(F) 6190 | LF | 182.400 | 182.400 | 182.400 | $60.00 | $0.00 | $10,944.00 | |
0205 | STRUCTURAL STEEL | 506(A) 1322 | LB | 500.000 | 0.000 | 0.000 | $8.00 | $0.00 | $0.00 | |
0206 | CLASS AA CONCRETE | 509(A) 1326 | CY | 189.000 | 189.000 | 189.000 | $600.00 | $0.00 | $113,400.00 | |
0207 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 47,990.000 | 47,990.000 | 47,990.000 | $0.95 | $0.00 | $45,590.50 | |
0208 | PAINTING EXISTING STRUCTURES | 512(A) 1323 | LSUM | 1.000 | 1.000 | 1.000 | $25,000.00 | $0.00 | $25,000.00 | |
0209 | COLLECTION & HANDLING OF WASTE | 512(B) 6303 | LSUM | 1.000 | 1.000 | 1.000 | $1,000.00 | $0.00 | $1,000.00 | |
0210 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 267.000 | 267.000 | 267.000 | $3.75 | $0.00 | $1,001.25 | |
0211 | REMOVAL OF EXISTING BRIDGE STRUCTURE | 619(D) 1397 | LSUM | 1.000 | 1.000 | 1.000 | $100,000.00 | $0.00 | $100,000.00 | |
Subtotals For Category 0214/BRIDGE 43 IM-STIM(049) | $0.00 | $386,475.95 | ||||||||
Fed/State Project Number: IM-STIM(049) | Project: 24349(05) | Category: 0300/TRAFFIC CONTROL IM-STIM(049) | ||||||||
0212 | SHEET ALUMINUM SIGNS | 850(A) 8110 | SF | 60.000 | 60.000 | 60.000 | $17.00 | $0.00 | $1,020.00 | |
0213 | EXTRUDED ALUMINUM PANEL SIGNS(OVERHEAD SIGNS) | 850(B) 8114 | SF | 1,800.250 | 1,800.250 | 1,800.250 | $23.50 | $0.00 | $42,305.88 | |
0214 | (PL)REPAIR OVHD.SN.STR.TYPE C-1 ALUM. | 852(K) 8772 | EA | 4.000 | 4.000 | 4.000 | $17,000.00 | $0.00 | $68,000.00 | |
0215 | (SP)TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 854(C) 8530 | LF | 24,617.000 | 26,642.000 | 26,642.000 | $0.55 | $0.00 | $14,653.10 | |
0216 | (SP)TRAFFIC STRIPE(MULTI-POLYMER)(6" WIDE) | 854(C) 8535 | LF | 8,066.000 | 10,865.000 | 10,865.000 | $0.80 | $0.00 | $8,692.00 | |
0217 | (SP)TRAFFIC STRIPE(MULTI-POLYMER)(8" WIDE) | 854(C) 8540 | LF | 6,289.000 | 8,415.000 | 8,415.000 | $1.95 | $0.00 | $16,409.25 | |
Subtotals For Category 0300/TRAFFIC CONTROL IM-STIM(049) | $0.00 | $151,080.23 | ||||||||
Fed/State Project Number: IM-STIM(049) | Project: 24349(05) | Category: 0301/LIGHTING IM-STIM(049) | ||||||||
0218 | CLASS AA CONCRETE | 509(A) 0319 | CY | 29.000 | 23.430 | 23.430 | $15,000.00 | $0.00 | $351,450.00 | |
0219 | (PL)REMOVE & RESET LIGHT POLE | 890A/B 8744 | EA | 41.000 | 57.000 | 57.000 | $8,000.00 | $0.00 | $456,000.00 | |
Subtotals For Category 0301/LIGHTING IM-STIM(049) | $0.00 | $807,450.00 | ||||||||
Fed/State Project Number: IM-STIM(049) | Project: 24349(05) | Category: 0850/Non ARRA Funding | ||||||||
8010 | (SP)CEMENTITIOUS STABILIZED SUBGRADE | 327(E) 4240 | SY | 0.000 | 51,191.650 | 51,191.650 | $6.65 | $0.00 | $340,424.46 | |
Subtotals For Category 0850/Non ARRA Funding | $0.00 | $340,424.46 | ||||||||
Subtotals For Project IM-STIM(049) /24349(05) | $0.00 | $15,616,361.18 |
Line Item Number | Item Description | Item Number | Units | Bid Qty | Current Quantity | Quantity Paid This Est. | Quantity Paid To Date | Unit Price | Amount Paid This Est. | Amount Paid To Date |
Fed/State Project Number: IM-STIM(050) | Project: 24349(06) | Category: 0100/ROADWAY IM-STIM(050) | ||||||||
0220 | CLEARING AND GRUBBING | 201 0102 | LSUM | 1.000 | 1.000 | 1.000 | $155,000.00 | $0.00 | $155,000.00 | |
0221 | UNCLASSIFIED EXCAVATION | 202(A) 0183 | CY | 25,978.000 | 25,978.000 | 25,978.000 | $15.00 | $0.00 | $389,670.00 | |
0222 | TYPE A-SALVAGED TOPSOIL | 205 4229 | LSUM | 1.000 | 1.000 | 1.000 | $20,000.00 | $0.00 | $20,000.00 | |
0223 | TEMPORARY SEDIMENT FILTER | 224 2803 | EA | 37.000 | 9.000 | 9.000 | $250.00 | $0.00 | $2,250.00 | |
0224 | DITCH LINER PROTECTION | 229 4318 | LF | 30.000 | 0.000 | 0.000 | $10.00 | $0.00 | $0.00 | |
0225 | SOLID SLAB SODDING | 230(A) 2806 | SY | 34,885.000 | 16,276.980 | 16,276.980 | $1.60 | $0.00 | $26,043.17 | |
0226 | VEGETATIVE MULCHING | 233(A) 2817 | AC | 7.000 | 0.000 | 0.000 | $450.00 | $0.00 | $0.00 | |
0227 | MOWING | 241 2832 | AC | 14.000 | 0.000 | 0.000 | $95.00 | $0.00 | $0.00 | |
0228 | (SP)GEOGRID EARTH REINFORCEMENT | 246(A) 7041 | SY | 1,000.000 | 0.000 | 0.000 | $6.25 | $0.00 | $0.00 | |
0229 | AGGREGATE BASE | 303 0192 | CY | 9,856.000 | 9,419.650 | 9,419.650 | $50.00 | $0.00 | $470,982.50 | |
0230 | (SP)CEMENT TREATED BASE | 317(F) 4270 | SY | 52,547.000 | 52,985.740 | 52,985.740 | $15.00 | $0.00 | $794,786.10 | |
0231 | SEPARATOR FABRIC | 325 5271 | SY | 56,134.000 | 64,690.850 | 64,690.850 | $2.00 | $0.00 | $129,381.70 | |
0232 | (SP)LIME | 327(D) 4230 | TON | 1,289.000 | 0.000 | 0.000 | $175.00 | $0.00 | $0.00 | |
0233 | (SP)LIME STABILIZED SUBGRADE | 327(H) 4270 | SY | 59,684.000 | 0.000 | 0.000 | $3.00 | $0.00 | $0.00 | |
0234 | (SP)P.C.CONCRETE PAVEMENT(PLACEMENT) | 414(A) 0210 | SY | 13,394.000 | 13,185.880 | 13,185.880 | $15.00 | $0.00 | $197,788.20 | |
0235 | 6" P.C. CONCRETE PAVEMENT | 414(A) 0258 | SY | 84.000 | 82.460 | 82.460 | $40.00 | $0.00 | $3,298.40 | |
0236 | (SP)DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 414(A1) 5725 | SY | 36,886.000 | 36,271.050 | 36,271.050 | $18.50 | $0.00 | $671,014.45 | |
0237 | (SP)P.C. CONCRETE FOR PAVEMENT | 414(P) 6000 | CY | 13,873.000 | 13,683.080 | 13,683.080 | $135.00 | $0.00 | $1,847,215.80 | |
0238 | COLD MILLING PAVEMENT | 417 5267 | SY | 64,390.000 | 42,880.400 | 42,880.400 | $1.50 | $0.00 | $64,320.60 | |
0239 | CLSM BACKFILL | 501(G) 6309 | CY | 2,443.000 | 2,693.850 | 2,693.850 | $150.00 | $0.00 | $404,077.50 | |
0240 | CONCRETE PARAPET | 504(F) 1381 | LF | 4,502.000 | 4,748.790 | 4,748.790 | $55.00 | $0.00 | $261,183.45 | |
0241 | 42" F-SHAPED PARAPET | 504(F) 6190 | LF | 9,096.000 | 9,910.640 | 9,910.640 | $60.00 | $0.00 | $594,638.40 | |
0242 | CLASS AA CONCRETE | 509(A) 0319 | CY | 290.000 | 290.000 | 290.000 | $1,000.00 | $0.00 | $290,000.00 | |
0243 | CLASS C CONCRETE | 509(D) 0325 | CY | 1.000 | 1.320 | 1.320 | $750.00 | $0.00 | $990.00 | |
0244 | EPOXY COATED REINFORCING STEEL | 511(B) 4269 | LB | 366,221.000 | 366,221.000 | 366,221.000 | $0.55 | $0.00 | $201,421.55 | |
0245 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 6,027.000 | 6,193.320 | 6,193.320 | $3.75 | $0.00 | $23,224.95 | |
0246 | CONCRETE CURB (6" MNTBLE-INTEGRAL) | 609(A) 0288 | LF | 1,612.000 | 1,506.330 | 1,506.330 | $5.00 | $0.00 | $7,531.65 | |
0247 | REMOVAL OF STRUCTURES & OBSTRUCTIONS | 619(A) 0920 | LSUM | 1.000 | 1.000 | 1.000 | $15,000.00 | $0.00 | $15,000.00 | |
0248 | REMOVAL OF CURB AND GUTTER | 619(B) 4726 | LF | 704.000 | 6,808.000 | 6,808.000 | $3.75 | $0.00 | $25,530.01 | |
0249 | REMOVAL OF CONCRETE PAVEMENT | 619(B) 4727 | SY | 44,115.000 | 36,858.180 | 36,858.180 | $5.00 | $0.00 | $184,290.90 | |
0250 | REMOVAL OF ASPHALT PAVEMENT | 619(B) 4728 | SY | 1,150.000 | 15,114.250 | 15,114.250 | $2.60 | $0.00 | $39,297.05 | |
0251 | REMOVAL OF GUARD RAIL | 619(B) 4780 | LF | 6,603.000 | 5,501.000 | 5,501.000 | $4.50 | $0.00 | $24,754.50 | |
0252 | REMOVAL OF CONCRETE MEDIAN BARRIER | 619(B) 4915 | LF | 1,601.000 | 758.000 | 758.000 | $10.00 | $0.00 | $7,580.00 | |
0253 | REMOVAL OF EXISTING PARAPET | 619(B) 6252 | LF | 2,958.000 | 4,223.320 | 4,223.320 | $10.00 | $0.00 | $42,233.20 | |
0254 | THRIE BEAM BRIDGE CONNECTION-TYPE A | 623(E) 7114 | EA | 7.000 | 5.000 | 5.000 | $2,000.00 | $0.00 | $10,000.00 | |
0255 | CONCRETE MEDIAN BARRIER, DESIGN 1 | 627(I) 4317 | LF | 742.000 | 0.000 | 0.000 | $100.00 | $0.00 | $0.00 | |
0256 | EDGE DRAIN CONDUIT-PERFORATED | 653(A) 5915 | LF | 12,162.000 | 8,137.460 | 8,137.460 | $7.25 | $0.00 | $58,996.59 | |
0257 | EDGE DRAIN OUTLET LATERAL-NONPERFORATED | 653(B) 5916 | LF | 682.000 | 522.000 | 522.000 | $15.00 | $0.00 | $7,830.00 | |
0258 | OUTLET LATERAL HEADWALL | 653(C) 5946 | EA | 32.000 | 22.000 | 22.000 | $275.00 | $0.00 | $6,050.00 | |
0259 | (PL)IMPACT ATTENUATOR | 871 8325 | EA | 6.000 | 6.000 | 6.000 | $27,500.00 | $0.00 | $165,000.00 | |
8904 | PAVEMENT/BRIDGE SMOOTHNESS ADJUSTMENT | 430 5010 | LSUM | 0.000 | 1.000 | 1.000 | $28,226.60 | $0.00 | $28,226.60 | |
Subtotals For Category 0100/ROADWAY IM-STIM(050) | $0.00 | $7,169,607.27 | ||||||||
Fed/State Project Number: IM-STIM(050) | Project: 24349(06) | Category: 0200/BRIDGE 17 IM-STIM(050) | ||||||||
0260 | CLSM BACKFILL | 501(G) 6309 | CY | 5.000 | 0.000 | 0.000 | $150.00 | $0.00 | $0.00 | |
0261 | APPROACH SLAB | 504(A) 1304 | SY | 102.100 | 102.100 | 102.100 | $175.00 | $0.00 | $17,867.50 | |
0262 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 40.810 | 40.810 | 40.810 | $285.00 | $0.00 | $11,630.85 | |
0263 | CONCRETE PARAPET | 504(F) 1381 | LF | 208.900 | 208.900 | 208.900 | $55.00 | $0.00 | $11,489.50 | |
0264 | 42" F-SHAPED PARAPET | 504(F) 6190 | LF | 199.600 | 199.600 | 199.600 | $60.00 | $0.00 | $11,976.00 | |
0265 | STRUCTURAL STEEL | 506(A) 1322 | LB | 500.000 | 1,303.000 | 1,303.000 | $8.00 | $0.00 | $10,424.00 | |
0266 | CLASS AA CONCRETE | 509(A) 1326 | CY | 93.600 | 93.600 | 93.600 | $600.00 | $0.00 | $56,160.00 | |
0267 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 27,310.000 | 31,814.000 | 31,814.000 | $0.95 | $0.00 | $30,223.30 | |
0268 | PAINTING EXISTING STRUCTURES | 512(A) 1323 | LSUM | 1.000 | 1.000 | 1.000 | $25,000.00 | $0.00 | $25,000.00 | |
0269 | COLLECTION & HANDLING OF WASTE | 512(B) 6303 | LSUM | 1.000 | 1.000 | 1.000 | $1,000.00 | $0.00 | $1,000.00 | |
0270 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 280.000 | 280.000 | 280.000 | $3.75 | $0.00 | $1,050.00 | |
0271 | (PL)REPAIR BRIDGE ITEM (TYPE B) | 540 4525 | EA | 8.000 | 8.000 | 8.000 | $20,000.00 | $0.00 | $160,000.00 | |
0272 | REMOVAL OF EXISTING BRIDGE STRUCTURE | 619(D) 1397 | LSUM | 1.000 | 1.000 | 1.000 | $100,000.00 | $0.00 | $100,000.00 | |
Subtotals For Category 0200/BRIDGE 17 IM-STIM(050) | $0.00 | $436,821.15 | ||||||||
Fed/State Project Number: IM-STIM(050) | Project: 24349(06) | Category: 0201/BRIDGE 18 IM-STIM(050) | ||||||||
0273 | CLSM BACKFILL | 501(G) 6309 | CY | 5.000 | 0.000 | 0.000 | $150.00 | $0.00 | $0.00 | |
0274 | APPROACH SLAB | 504(A) 1304 | SY | 122.600 | 122.600 | 122.600 | $175.00 | $0.00 | $21,455.00 | |
0275 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 55.270 | 55.270 | 55.270 | $285.00 | $0.00 | $15,751.95 | |
0276 | CONCRETE PARAPET | 504(F) 1381 | LF | 185.800 | 185.800 | 185.800 | $55.00 | $0.00 | $10,219.00 | |
0277 | 42" F-SHAPED PARAPET | 504(F) 6190 | LF | 187.100 | 187.100 | 187.100 | $60.00 | $0.00 | $11,226.00 | |
0278 | STRUCTURAL STEEL | 506(A) 1322 | LB | 500.000 | 553.000 | 553.000 | $8.00 | $0.00 | $4,424.00 | |
0279 | CLASS AA CONCRETE | 509(A) 1326 | CY | 79.600 | 79.600 | 79.600 | $600.00 | $0.00 | $47,760.00 | |
0280 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 24,660.000 | 30,352.000 | 30,352.000 | $0.95 | $0.00 | $28,834.40 | |
0281 | PAINTING EXISTING STRUCTURES | 512(A) 1323 | LSUM | 1.000 | 1.000 | 1.000 | $25,000.00 | $0.00 | $25,000.00 | |
0282 | COLLECTION & HANDLING OF WASTE | 512(B) 6303 | LSUM | 1.000 | 1.000 | 1.000 | $1,000.00 | $0.00 | $1,000.00 | |
0283 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 266.000 | 266.000 | 266.000 | $3.75 | $0.00 | $997.50 | |
0284 | (PL)REPAIR BRIDGE ITEM (TYPE B) | 540 4525 | EA | 3.000 | 3.000 | 3.000 | $20,000.00 | $0.00 | $60,000.00 | |
0285 | REMOVAL OF EXISTING BRIDGE STRUCTURE | 619(D) 1397 | LSUM | 1.000 | 1.000 | 1.000 | $75,000.00 | $0.00 | $75,000.00 | |
Subtotals For Category 0201/BRIDGE 18 IM-STIM(050) | $0.00 | $301,667.85 | ||||||||
Fed/State Project Number: IM-STIM(050) | Project: 24349(06) | Category: 0202/BRIDGE 20 IM-STIM(050) | ||||||||
0286 | CLSM BACKFILL | 501(G) 6309 | CY | 5.000 | 0.000 | 0.000 | $150.00 | $0.00 | $0.00 | |
0287 | APPROACH SLAB | 504(A) 1304 | SY | 306.400 | 306.400 | 306.400 | $175.00 | $0.00 | $53,620.00 | |
0288 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 590.420 | 545.850 | 545.850 | $285.00 | $0.00 | $155,567.25 | |
0289 | CONCRETE PARAPET | 504(F) 1381 | LF | 418.700 | 418.700 | 418.700 | $55.00 | $0.00 | $23,028.50 | |
0290 | 42" F-SHAPED PARAPET | 504(F) 6190 | LF | 3,623.600 | 3,623.600 | 3,623.600 | $60.00 | $0.00 | $217,416.00 | |
0291 | STRUCTURAL STEEL | 506(A) 1322 | LB | 500.000 | 0.000 | 0.000 | $8.00 | $0.00 | $0.00 | |
0292 | CLASS AA CONCRETE | 509(A) 1326 | CY | 1,959.200 | 2,015.300 | 2,015.300 | $500.00 | $0.00 | $1,007,650.00 | |
0293 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 563,290.000 | 581,658.670 | 581,658.670 | $0.90 | $0.00 | $523,492.80 | |
0294 | PAINTING EXISTING STRUCTURES | 512(A) 1323 | LSUM | 1.000 | 1.000 | 1.000 | $200,000.00 | $0.00 | $200,000.00 | |
0295 | COLLECTION & HANDLING OF WASTE | 512(B) 6303 | LSUM | 1.000 | 1.000 | 1.000 | $5,000.00 | $0.00 | $5,000.00 | |
0296 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 3,357.000 | 3,357.000 | 3,357.000 | $3.75 | $0.00 | $12,588.75 | |
0297 | (PL)INLET AND BASIN | 535 6138 | EA | 7.000 | 7.000 | 7.000 | $15,000.00 | $0.00 | $105,000.00 | |
0298 | REMOVAL OF EXISTING BRIDGE STRUCTURE | 619(D) 1397 | LSUM | 1.000 | 1.000 | 1.000 | $2,187,500.00 | $0.00 | $2,187,500.00 | |
Subtotals For Category 0202/BRIDGE 20 IM-STIM(050) | $0.00 | $4,490,863.30 | ||||||||
Fed/State Project Number: IM-STIM(050) | Project: 24349(06) | Category: 0203/BRIDGE 23 IM-STIM(050) | ||||||||
0299 | CLSM BACKFILL | 501(G) 6309 | CY | 5.000 | 0.000 | 0.000 | $150.00 | $0.00 | $0.00 | |
0300 | APPROACH SLAB | 504(A) 1304 | SY | 260.500 | 260.500 | 260.500 | $175.00 | $0.00 | $45,587.50 | |
0301 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 153.340 | 153.340 | 153.340 | $285.00 | $0.00 | $43,701.90 | |
0302 | 42" F-SHAPED PARAPET | 504(F) 6190 | LF | 417.100 | 417.100 | 417.100 | $60.00 | $0.00 | $25,026.00 | |
0303 | STRUCTURAL STEEL | 506(A) 1322 | LB | 500.000 | 0.000 | 0.000 | $8.00 | $0.00 | $0.00 | |
0304 | CLASS AA CONCRETE | 509(A) 1326 | CY | 213.600 | 213.600 | 213.600 | $600.00 | $0.00 | $128,160.00 | |
0305 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 51,150.000 | 51,150.000 | 51,150.000 | $0.95 | $0.00 | $48,592.50 | |
0306 | PAINTING EXISTING STRUCTURES | 512(A) 1323 | LSUM | 1.000 | 1.000 | 1.000 | $40,000.00 | $0.00 | $40,000.00 | |
0307 | COLLECTION & HANDLING OF WASTE | 512(B) 6303 | LSUM | 1.000 | 1.000 | 1.000 | $1,500.00 | $0.00 | $1,500.00 | |
0308 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 299.000 | 299.000 | 299.000 | $3.75 | $0.00 | $1,121.25 | |
0309 | REMOVAL OF EXISTING BRIDGE STRUCTURE | 619(D) 1397 | LSUM | 1.000 | 1.000 | 1.000 | $200,000.00 | $0.00 | $200,000.00 | |
Subtotals For Category 0203/BRIDGE 23 IM-STIM(050) | $0.00 | $533,689.15 | ||||||||
Fed/State Project Number: IM-STIM(050) | Project: 24349(06) | Category: 0204/BRIDGE 25 IM-STIM(050) | ||||||||
0310 | CLSM BACKFILL | 501(G) 6309 | CY | 5.000 | 0.000 | 0.000 | $150.00 | $0.00 | $0.00 | |
0311 | APPROACH SLAB | 504(A) 1304 | SY | 603.800 | 603.800 | 603.800 | $175.00 | $0.00 | $105,665.00 | |
0312 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 99.920 | 99.920 | 99.920 | $285.00 | $0.00 | $28,477.20 | |
0313 | CONCRETE PARAPET | 504(F) 1381 | LF | 160.900 | 160.900 | 160.900 | $55.00 | $0.00 | $8,849.50 | |
0314 | 42" F-SHAPED PARAPET | 504(F) 6190 | LF | 185.100 | 185.100 | 185.100 | $60.00 | $0.00 | $11,106.00 | |
0315 | STRUCTURAL STEEL | 506(A) 1322 | LB | 500.000 | 0.000 | 0.000 | $8.00 | $0.00 | $0.00 | |
0316 | CLASS AA CONCRETE | 509(A) 1326 | CY | 197.200 | 197.200 | 197.200 | $600.00 | $0.00 | $118,320.00 | |
0317 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 48,010.000 | 48,010.000 | 48,010.000 | $0.95 | $0.00 | $45,609.50 | |
0318 | PAINTING EXISTING STRUCTURES | 512(A) 1323 | LSUM | 1.000 | 1.000 | 1.000 | $25,000.00 | $0.00 | $25,000.00 | |
0319 | COLLECTION & HANDLING OF WASTE | 512(B) 6303 | LSUM | 1.000 | 1.000 | 1.000 | $1,000.00 | $0.00 | $1,000.00 | |
0320 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 212.000 | 212.000 | 212.000 | $3.75 | $0.00 | $795.00 | |
0321 | REMOVAL OF EXISTING BRIDGE STRUCTURE | 619(D) 1397 | LSUM | 1.000 | 1.000 | 1.000 | $1,750,000.00 | $0.00 | $1,750,000.00 | |
Subtotals For Category 0204/BRIDGE 25 IM-STIM(050) | $0.00 | $2,094,822.20 | ||||||||
Fed/State Project Number: IM-STIM(050) | Project: 24349(06) | Category: 0205/BRIDGE 27 IM-STIM(050) | ||||||||
0322 | CLSM BACKFILL | 501(G) 6309 | CY | 5.000 | 0.000 | 0.000 | $150.00 | $0.00 | $0.00 | |
0323 | APPROACH SLAB | 504(A) 1304 | SY | 280.600 | 280.600 | 280.600 | $175.00 | $0.00 | $49,105.00 | |
0324 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 52.770 | 52.770 | 52.770 | $285.00 | $0.00 | $15,039.45 | |
0325 | CONCRETE PARAPET | 504(F) 1381 | LF | 129.200 | 129.200 | 129.200 | $55.00 | $0.00 | $7,106.00 | |
0326 | 42" F-SHAPED PARAPET | 504(F) 6190 | LF | 133.700 | 133.700 | 133.700 | $60.00 | $0.00 | $8,022.00 | |
0327 | STRUCTURAL STEEL | 506(A) 1322 | LB | 500.000 | 0.000 | 0.000 | $8.00 | $0.00 | $0.00 | |
0328 | CLASS AA CONCRETE | 509(A) 1326 | CY | 107.900 | 107.900 | 107.900 | $600.00 | $0.00 | $64,740.00 | |
0329 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 29,480.000 | 29,480.000 | 29,480.000 | $0.95 | $0.00 | $28,006.00 | |
0330 | PAINTING EXISTING STRUCTURES | 512(A) 1323 | LSUM | 1.000 | 1.000 | 1.000 | $25,000.00 | $0.00 | $25,000.00 | |
0331 | COLLECTION & HANDLING OF WASTE | 512(B) 6303 | LSUM | 1.000 | 1.000 | 1.000 | $1,000.00 | $0.00 | $1,000.00 | |
0332 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 170.000 | 170.000 | 170.000 | $3.75 | $0.00 | $637.50 | |
0333 | REMOVAL OF EXISTING BRIDGE STRUCTURE | 619(D) 1397 | LSUM | 1.000 | 1.000 | 1.000 | $100,000.00 | $0.00 | $100,000.00 | |
Subtotals For Category 0205/BRIDGE 27 IM-STIM(050) | $0.00 | $298,655.95 | ||||||||
Fed/State Project Number: IM-STIM(050) | Project: 24349(06) | Category: 0206/BRIDGE 29 IM-STIM(050) | ||||||||
0334 | CLSM BACKFILL | 501(G) 6309 | CY | 5.000 | 0.000 | 0.000 | $150.00 | $0.00 | $0.00 | |
0335 | APPROACH SLAB | 504(A) 1304 | SY | 215.100 | 215.100 | 215.100 | $175.00 | $0.00 | $37,642.50 | |
0336 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 50.490 | 50.490 | 50.490 | $285.00 | $0.00 | $14,389.65 | |
0337 | CONCRETE PARAPET | 504(F) 1381 | LF | 113.700 | 113.700 | 113.700 | $55.00 | $0.00 | $6,253.50 | |
0338 | 42" F-SHAPED PARAPET | 504(F) 6190 | LF | 117.600 | 117.600 | 117.600 | $60.00 | $0.00 | $7,056.00 | |
0339 | STRUCTURAL STEEL | 506(A) 1322 | LB | 500.000 | 0.000 | 0.000 | $8.00 | $0.00 | $0.00 | |
0340 | CLASS AA CONCRETE | 509(A) 1326 | CY | 102.000 | 102.000 | 102.000 | $600.00 | $0.00 | $61,200.00 | |
0341 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 27,900.000 | 27,900.000 | 27,900.000 | $0.95 | $0.00 | $26,505.00 | |
0342 | PAINTING EXISTING STRUCTURES | 512(A) 1323 | LSUM | 1.000 | 1.000 | 1.000 | $25,000.00 | $0.00 | $25,000.00 | |
0343 | COLLECTION & HANDLING OF WASTE | 512(B) 6303 | LSUM | 1.000 | 1.000 | 1.000 | $1,000.00 | $0.00 | $1,000.00 | |
0344 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 153.000 | 153.000 | 153.000 | $3.75 | $0.00 | $573.75 | |
0345 | REMOVAL OF EXISTING BRIDGE STRUCTURE | 619(D) 1397 | LSUM | 1.000 | 1.000 | 1.000 | $100,000.00 | $0.00 | $100,000.00 | |
Subtotals For Category 0206/BRIDGE 29 IM-STIM(050) | $0.00 | $279,620.40 | ||||||||
Fed/State Project Number: IM-STIM(050) | Project: 24349(06) | Category: 0207/BRIDGE 31 IM-STIM(050) | ||||||||
0346 | CLSM BACKFILL | 501(G) 6309 | CY | 5.000 | 0.000 | 0.000 | $150.00 | $0.00 | $0.00 | |
0347 | APPROACH SLAB | 504(A) 1304 | SY | 361.900 | 361.900 | 361.900 | $175.00 | $0.00 | $63,332.50 | |
0348 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 68.200 | 68.200 | 68.200 | $285.00 | $0.00 | $19,437.00 | |
0349 | 42" F-SHAPED PARAPET | 504(F) 6190 | LF | 221.400 | 221.400 | 221.400 | $60.00 | $0.00 | $13,284.00 | |
0350 | STRUCTURAL STEEL | 506(A) 1322 | LB | 500.000 | 0.000 | 0.000 | $8.00 | $0.00 | $0.00 | |
0351 | CLASS AA CONCRETE | 509(A) 1326 | CY | 146.700 | 146.700 | 146.700 | $600.00 | $0.00 | $88,020.00 | |
0352 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 35,680.000 | 35,680.000 | 35,680.000 | $0.95 | $0.00 | $33,896.00 | |
0353 | PAINTING EXISTING STRUCTURES | 512(A) 1323 | LSUM | 1.000 | 1.000 | 1.000 | $25,000.00 | $0.00 | $25,000.00 | |
0354 | COLLECTION & HANDLING OF WASTE | 512(B) 6303 | LSUM | 1.000 | 1.000 | 1.000 | $1,000.00 | $0.00 | $1,000.00 | |
0355 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 170.000 | 170.000 | 170.000 | $3.75 | $0.00 | $637.50 | |
0356 | REMOVAL OF EXISTING BRIDGE STRUCTURE | 619(D) 1397 | LSUM | 1.000 | 1.000 | 1.000 | $150,000.00 | $0.00 | $150,000.00 | |
Subtotals For Category 0207/BRIDGE 31 IM-STIM(050) | $0.00 | $394,607.00 | ||||||||
Fed/State Project Number: IM-STIM(050) | Project: 24349(06) | Category: 0208/BRIDGE 34W IM-STIM(050) | ||||||||
0357 | CLSM BACKFILL | 501(G) 6309 | CY | 5.000 | 0.000 | 0.000 | $180.00 | $0.00 | $0.00 | |
0358 | APPROACH SLAB | 504(A) 1304 | SY | 300.600 | 300.600 | 300.600 | $225.00 | $0.00 | $67,635.00 | |
0359 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 69.700 | 69.700 | 69.700 | $380.00 | $0.00 | $26,486.00 | |
0360 | 42" F-SHAPED PARAPET | 504(F) 6190 | LF | 233.900 | 233.900 | 233.900 | $135.00 | $0.00 | $31,576.50 | |
0361 | STRUCTURAL STEEL | 506(A) 1322 | LB | 500.000 | 0.000 | 0.000 | $8.00 | $0.00 | $0.00 | |
0362 | CLASS AA CONCRETE | 509(A) 1326 | CY | 138.000 | 138.000 | 138.000 | $800.00 | $0.00 | $110,400.00 | |
0363 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 34,450.000 | 36,930.000 | 36,930.000 | $1.25 | $0.00 | $46,162.50 | |
0364 | PAINTING EXISTING STRUCTURES | 512(A) 1323 | LSUM | 1.000 | 1.000 | 1.000 | $25,000.00 | $0.00 | $25,000.00 | |
0365 | COLLECTION & HANDLING OF WASTE | 512(B) 6303 | LSUM | 1.000 | 1.000 | 1.000 | $1,000.00 | $0.00 | $1,000.00 | |
0366 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 175.000 | 175.000 | 175.000 | $3.75 | $0.00 | $656.25 | |
0367 | REMOVAL OF EXISTING BRIDGE STRUCTURE | 619(D) 1397 | LSUM | 1.000 | 1.000 | 1.000 | $70,000.00 | $0.00 | $70,000.00 | |
Subtotals For Category 0208/BRIDGE 34W IM-STIM(050) | $0.00 | $378,916.25 | ||||||||
Fed/State Project Number: IM-STIM(050) | Project: 24349(06) | Category: 0209/BRIDGE 35W IM-STIM(050) | ||||||||
0368 | CLSM BACKFILL | 501(G) 6309 | CY | 5.000 | 0.000 | 0.000 | $180.00 | $0.00 | $0.00 | |
0369 | APPROACH SLAB | 504(A) 1304 | SY | 326.700 | 326.700 | 326.700 | $225.00 | $0.00 | $73,507.50 | |
0370 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 70.200 | 70.200 | 70.200 | $380.00 | $0.00 | $26,676.00 | |
0371 | 42" F-SHAPED PARAPET | 504(F) 6190 | LF | 121.100 | 121.100 | 121.100 | $135.00 | $0.00 | $16,348.50 | |
0372 | STRUCTURAL STEEL | 506(A) 1322 | LB | 500.000 | 0.000 | 0.000 | $8.00 | $0.00 | $0.00 | |
0373 | CLASS AA CONCRETE | 509(A) 1326 | CY | 136.300 | 136.300 | 136.300 | $800.00 | $0.00 | $109,040.00 | |
0374 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 32,600.000 | 32,600.000 | 32,600.000 | $1.25 | $0.00 | $40,750.00 | |
0375 | PAINTING EXISTING STRUCTURES | 512(A) 1323 | LSUM | 1.000 | 1.000 | 1.000 | $25,000.00 | $0.00 | $25,000.00 | |
0376 | COLLECTION & HANDLING OF WASTE | 512(B) 6303 | LSUM | 1.000 | 1.000 | 1.000 | $1,000.00 | $0.00 | $1,000.00 | |
0377 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 85.000 | 85.000 | 85.000 | $3.75 | $0.00 | $318.75 | |
0378 | REMOVAL OF EXISTING BRIDGE STRUCTURE | 619(D) 1397 | LSUM | 1.000 | 1.000 | 1.000 | $70,000.00 | $0.00 | $70,000.00 | |
Subtotals For Category 0209/BRIDGE 35W IM-STIM(050) | $0.00 | $362,640.75 | ||||||||
Fed/State Project Number: IM-STIM(050) | Project: 24349(06) | Category: 0210/BRIDGE 36W IM-STIM(050) | ||||||||
0379 | CLSM BACKFILL | 501(G) 6309 | CY | 5.000 | 0.000 | 0.000 | $180.00 | $0.00 | $0.00 | |
0380 | APPROACH SLAB | 504(A) 1304 | SY | 415.100 | 415.100 | 415.100 | $225.00 | $0.00 | $93,397.50 | |
0381 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 84.500 | 84.500 | 84.500 | $380.00 | $0.00 | $32,110.00 | |
0382 | 42" F-SHAPED PARAPET | 504(F) 6190 | LF | 124.300 | 124.300 | 124.300 | $135.00 | $0.00 | $16,780.50 | |
0383 | STRUCTURAL STEEL | 506(A) 1322 | LB | 500.000 | 0.000 | 0.000 | $8.00 | $0.00 | $0.00 | |
0384 | CLASS AA CONCRETE | 509(A) 1326 | CY | 185.300 | 185.300 | 185.300 | $800.00 | $0.00 | $148,240.00 | |
0385 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 41,720.000 | 44,278.000 | 44,278.000 | $1.25 | $0.00 | $55,347.50 | |
0386 | PAINTING EXISTING STRUCTURES | 512(A) 1323 | LSUM | 1.000 | 1.000 | 1.000 | $25,000.00 | $0.00 | $25,000.00 | |
0387 | COLLECTION & HANDLING OF WASTE | 512(B) 6303 | LSUM | 1.000 | 1.000 | 1.000 | $1,000.00 | $0.00 | $1,000.00 | |
0388 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 274.000 | 274.000 | 274.000 | $3.75 | $0.00 | $1,027.50 | |
0389 | REMOVAL OF EXISTING BRIDGE STRUCTURE | 619(D) 1397 | LSUM | 1.000 | 1.000 | 1.000 | $70,000.00 | $0.00 | $70,000.00 | |
8900 | CONCRETE MEDIAN BARRIER, DESIGN 1 | 627(I) 4317 | LF | 0.000 | 123.800 | 123.800 | $246.00 | $0.00 | $30,454.80 | |
Subtotals For Category 0210/BRIDGE 36W IM-STIM(050) | $0.00 | $473,357.80 | ||||||||
Fed/State Project Number: IM-STIM(050) | Project: 24349(06) | Category: 0211/BRIDGE 37 IM-STIM(050) | ||||||||
0390 | CLSM BACKFILL | 501(G) 6309 | CY | 5.000 | 0.000 | 0.000 | $150.00 | $0.00 | $0.00 | |
0391 | APPROACH SLAB | 504(A) 1304 | SY | 285.300 | 285.300 | 285.300 | $175.00 | $0.00 | $49,927.50 | |
0392 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 138.280 | 138.280 | 138.280 | $285.00 | $0.00 | $39,409.80 | |
0393 | CONCRETE PARAPET | 504(F) 1381 | LF | 177.800 | 177.800 | 177.800 | $55.00 | $0.00 | $9,779.00 | |
0394 | 42" F-SHAPED PARAPET | 504(F) 6190 | LF | 177.700 | 177.700 | 177.700 | $60.00 | $0.00 | $10,662.00 | |
0395 | STRUCTURAL STEEL | 506(A) 1322 | LB | 500.000 | 0.000 | 0.000 | $8.00 | $0.00 | $0.00 | |
0396 | CLASS AA CONCRETE | 509(A) 1326 | CY | 247.000 | 247.000 | 247.000 | $600.00 | $0.00 | $148,200.00 | |
0397 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 61,940.000 | 61,940.000 | 61,940.000 | $0.95 | $0.00 | $58,843.00 | |
0398 | PAINTING EXISTING STRUCTURES | 512(A) 1323 | LSUM | 1.000 | 1.000 | 1.000 | $25,000.00 | $0.00 | $25,000.00 | |
0399 | COLLECTION & HANDLING OF WASTE | 512(B) 6303 | LSUM | 1.000 | 1.000 | 1.000 | $1,000.00 | $0.00 | $1,000.00 | |
0400 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 250.000 | 250.000 | 250.000 | $3.75 | $0.00 | $937.50 | |
0401 | REMOVAL OF EXISTING BRIDGE STRUCTURE | 619(D) 1397 | LSUM | 1.000 | 1.000 | 1.000 | $225,000.00 | $0.00 | $225,000.00 | |
Subtotals For Category 0211/BRIDGE 37 IM-STIM(050) | $0.00 | $568,758.80 | ||||||||
Fed/State Project Number: IM-STIM(050) | Project: 24349(06) | Category: 0212/BRIDGE 39 IM-STIM(050) | ||||||||
0402 | CLSM BACKFILL | 501(G) 6309 | CY | 5.000 | 0.000 | 0.000 | $150.00 | $0.00 | $0.00 | |
0403 | APPROACH SLAB | 504(A) 1304 | SY | 80.600 | 80.600 | 80.600 | $175.00 | $0.00 | $14,105.00 | |
0404 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 48.580 | 48.580 | 48.580 | $285.00 | $0.00 | $13,845.30 | |
0405 | 42" F-SHAPED PARAPET | 504(F) 6190 | LF | 356.600 | 356.600 | 356.600 | $60.00 | $0.00 | $21,396.00 | |
0406 | STRUCTURAL STEEL | 506(A) 1322 | LB | 500.000 | 0.000 | 0.000 | $8.00 | $0.00 | $0.00 | |
0407 | CLASS AA CONCRETE | 509(A) 1326 | CY | 93.600 | 93.600 | 93.600 | $600.00 | $0.00 | $56,160.00 | |
0408 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 21,460.000 | 21,460.000 | 21,460.000 | $0.95 | $0.00 | $20,387.00 | |
0409 | PAINTING EXISTING STRUCTURES | 512(A) 1323 | LSUM | 1.000 | 1.000 | 1.000 | $25,000.00 | $0.00 | $25,000.00 | |
0410 | COLLECTION & HANDLING OF WASTE | 512(B) 6303 | LSUM | 1.000 | 1.000 | 1.000 | $1,000.00 | $0.00 | $1,000.00 | |
0411 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 278.000 | 278.000 | 278.000 | $3.75 | $0.00 | $1,042.50 | |
0412 | REMOVAL OF EXISTING BRIDGE STRUCTURE | 619(D) 1397 | LSUM | 1.000 | 1.000 | 1.000 | $100,000.00 | $0.00 | $100,000.00 | |
Subtotals For Category 0212/BRIDGE 39 IM-STIM(050) | $0.00 | $252,935.80 | ||||||||
Fed/State Project Number: IM-STIM(050) | Project: 24349(06) | Category: 0300/TRAFFIC CONTROL IM-STIM(050) | ||||||||
0413 | (SP)TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 854(C) 8530 | LF | 25,989.000 | 22,049.500 | 22,049.500 | $0.55 | $0.00 | $12,127.22 | |
0414 | (SP)TRAFFIC STRIPE(MULTI-POLYMER)(6" WIDE) | 854(C) 8535 | LF | 9,214.000 | 8,022.000 | 8,022.000 | $0.80 | $0.00 | $6,417.60 | |
0415 | (SP)TRAFFIC STRIPE(MULTI-POLYMER)(8" WIDE) | 854(C) 8540 | LF | 6,445.000 | 4,238.000 | 4,238.000 | $1.95 | $0.00 | $8,264.10 | |
Subtotals For Category 0300/TRAFFIC CONTROL IM-STIM(050) | $0.00 | $26,808.92 | ||||||||
Fed/State Project Number: IM-STIM(050) | Project: 24349(06) | Category: 0301/TRAFFIC LIGHTING IM-STIM(050) | ||||||||
0416 | CLASS AA CONCRETE | 509(A) 0319 | CY | 23.000 | 20.590 | 20.590 | $1,500.00 | $0.00 | $30,885.00 | |
0417 | SHEET ALUMINUM SIGNS | 850(A) 8110 | SF | 40.000 | 40.000 | 40.000 | $17.00 | $0.00 | $680.00 | |
0418 | EXTRUDED ALUMINUM PANEL SIGNS(OVERHEAD SIGNS) | 850(B) 8114 | SF | 1,211.700 | 1,868.700 | 1,868.700 | $23.50 | $0.00 | $43,914.45 | |
0419 | (PL)REPAIR OVHD.SN.STR.TYPE C-1 ALUM. | 852(K) 8772 | EA | 3.000 | 3.000 | 3.000 | $17,000.00 | $0.00 | $51,000.00 | |
0420 | (PL)REMOVE & RESET LIGHT POLE | 890A/B 8744 | EA | 32.000 | 60.000 | 60.000 | $8,000.00 | $0.00 | $480,000.00 | |
Subtotals For Category 0301/TRAFFIC LIGHTING IM-STIM(050) | $0.00 | $606,479.45 | ||||||||
Fed/State Project Number: IM-STIM(050) | Project: 24349(06) | Category: 0850/Non ARRA Funding | ||||||||
1111 | CONSTRUCTION MISCELLANEOUS | 104 0600 | EA | 0.000 | 6,882.000 | 6,882.000 | $16.00 | $0.00 | $110,112.00 | |
2222 | CONSTRUCTION MISCELLANEOUS | 104 0600 | EA | 0.000 | 478.000 | 478.000 | $97.50 | $0.00 | $46,605.00 | |
3333 | 1/C NO.4 ELECT.COND. | 811 8038 | LF | 0.000 | 57,918.000 | 57,918.000 | $2.35 | $0.00 | $136,107.30 | |
4444 | CONSTRUCTION MISCELLANEOUS | 104 0600 | EA | 0.000 | 6.000 | 6.000 | $2,525.00 | $0.00 | $15,150.00 | |
8020 | (SP)CEMENTITIOUS STABILIZED SUBGRADE | 327(E) 4240 | SY | 0.000 | 60,097.740 | 60,097.740 | $6.65 | $0.00 | $399,649.97 | |
8050 | (PL)REPAIR BRIDGE ITEMS | 540 4500 | LSUM | 0.000 | 1.000 | 1.000 | $48,787.98 | $0.00 | $48,787.98 | |
9300 | SUBSTRUCTURE EXCAVATION COMMON | 501(B) 1307 | CY | 0.000 | 117.340 | 117.340 | $200.00 | $0.00 | $23,468.00 | |
9310 | (PL)FALSEWORK JACKING | 502 6116 | LSUM | 0.000 | 1.000 | 1.000 | $72,500.00 | $0.00 | $72,500.00 | |
9320 | CLASS AA CONCRETE | 509(A) 0319 | CY | 0.000 | 46.000 | 46.000 | $1,100.00 | $0.00 | $50,600.00 | |
9330 | REINFORCING STEEL | 511(A) 1332 | LB | 0.000 | 10,530.000 | 10,530.000 | $1.25 | $0.00 | $13,162.50 | |
9340 | STRUCTURAL STEEL | 506(A) 1322 | LB | 0.000 | 1,960.000 | 1,960.000 | $10.00 | $0.00 | $19,600.00 | |
9350 | (PL)REMOVAL OF BRIDGE ITEM (TYPE A) | 619(B) 2510 | LSUM | 0.000 | 1.000 | 1.000 | $15,000.00 | $0.00 | $15,000.00 | |
9360 | REMOVAL OF CONCRETE PAVEMENT | 619(B) 4727 | SY | 0.000 | 92.500 | 92.500 | $32.25 | $0.00 | $2,983.13 | |
9370 | REMOVAL OF EXISTING PARAPET | 619(B) 6252 | LF | 0.000 | 40.000 | 40.000 | $125.00 | $0.00 | $5,000.00 | |
9380 | 42" F-SHAPED PARAPET | 504(F) 6190 | LF | 0.000 | 70.000 | 70.000 | $175.00 | $0.00 | $12,250.00 | |
9390 | FULL DEPTH P.C.C. PATCH(PLACEMENT ONLY) | 414(A) 0225 | SY | 0.000 | 92.500 | 92.500 | $93.30 | $0.00 | $8,630.25 | |
9400 | P.C. CONCRETE FOR PAVEMENT | 414(I) 5275 | CY | 0.000 | 25.950 | 25.950 | $113.92 | $0.00 | $2,956.23 | |
9410 | AGGREGATE BASE | 303 0192 | CY | 0.000 | 85.000 | 85.000 | $67.50 | $0.00 | $5,737.50 | |
9420 | IMPACT ATTEN.MODULE(REPLACEMENT) | 870(B) 8012 | EA | 0.000 | 1.000 | 1.000 | $39,150.00 | $0.00 | $39,150.00 | |
9430 | MOBILIZATION | 641 1399 | LSUM | 0.000 | 1.000 | 1.000 | $5,000.00 | $0.00 | $5,000.00 | |
9440 | CONSTRUCTION MISCELLANEOUS | 104 0700 | LSUM | 0.000 | 1.000 | 1.000 | $6,000.00 | $0.00 | $6,000.00 | |
Subtotals For Category 0850/Non ARRA Funding | $0.00 | $1,038,449.86 | ||||||||
Subtotals For Project IM-STIM(050) /24349(06) | $0.00 | $19,708,701.90 |
Line Item Number | Item Description | Item Number | Units | Bid Qty | Current Quantity | Quantity Paid This Est. | Quantity Paid To Date | Unit Price | Amount Paid This Est. | Amount Paid To Date |
Fed/State Project Number: IM-STIM(047) | Project: 26362(04) | Category: 0100/ROADWAY IM-STIM(047) | ||||||||
0421 | CLEARING AND GRUBBING | 201 0102 | LSUM | 1.000 | 1.000 | 1.000 | $20,000.00 | $0.00 | $20,000.00 | |
0422 | UNCLASSIFIED EXCAVATION | 202(A) 0183 | CY | 16,700.000 | 13,050.000 | 13,050.000 | $15.00 | $0.00 | $195,750.00 | |
0423 | TYPE A-SALVAGED TOPSOIL | 205 4229 | LSUM | 1.000 | 1.000 | 1.000 | $10,000.00 | $0.00 | $10,000.00 | |
0424 | TEMPORARY SILT FENCE | 223 2801 | LF | 11,161.000 | 790.000 | 790.000 | $2.90 | $0.00 | $2,291.00 | |
0425 | TEMPORARY SILT DIKE | 227 0100 | LF | 210.000 | 40.000 | 40.000 | $7.75 | $0.00 | $310.00 | |
0426 | SOLID SLAB SODDING | 230(A) 2806 | SY | 12,616.000 | 6,560.730 | 6,560.730 | $1.60 | $0.00 | $10,497.17 | |
0427 | VEGETATIVE MULCHING | 233(A) 2817 | AC | 2.610 | 0.000 | 0.000 | $450.00 | $0.00 | $0.00 | |
0428 | MOWING | 241 2832 | AC | 5.250 | 0.000 | 0.000 | $95.00 | $0.00 | $0.00 | |
0429 | AGGREGATE BASE | 303 0192 | CY | 7,100.000 | 4,948.330 | 4,948.330 | $50.00 | $0.00 | $247,416.50 | |
0430 | (SP)CEMENT TREATED BASE | 317(F) 4270 | SY | 37,600.000 | 27,779.790 | 27,779.790 | $15.00 | $0.00 | $416,696.85 | |
0431 | SEPARATOR FABRIC | 325 5271 | SY | 50,800.000 | 36,600.130 | 36,600.130 | $2.00 | $0.00 | $73,200.26 | |
0432 | (SP)LIME | 327(D) 4230 | TON | 940.000 | 0.000 | 0.000 | $175.00 | $0.00 | $0.00 | |
0433 | (SP)LIME STABILIZED SUBGRADE | 327(H) 4270 | SY | 42,500.000 | 0.000 | 0.000 | $3.00 | $0.00 | $0.00 | |
0434 | (SP)GEOSYNTHETIC SUBGRADE REINFORCEMENT | 328 2600 | SY | 2,000.000 | 0.000 | 0.000 | $6.25 | $0.00 | $0.00 | |
0435 | TRAFFIC BOUND SURFACE COURSE TYPE E | 403(E) 0225 | TON | 5,500.000 | 2,530.880 | 2,530.880 | $20.00 | $0.00 | $50,617.60 | |
0436 | PRIME COAT | 408 5774 | GAL | 14,900.000 | 0.000 | 0.000 | $5.25 | $0.00 | $0.00 | |
0437 | (SP)P.C.CONCRETE PAVEMENT(PLACEMENT) | 414(A) 0210 | SY | 9,300.000 | 8,121.610 | 8,121.610 | $15.00 | $0.00 | $121,824.15 | |
0438 | (SP)DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 414(A1) 5725 | SY | 20,800.000 | 18,093.630 | 18,093.630 | $18.50 | $0.00 | $334,732.17 | |
0439 | (SP)P.C. CONCRETE FOR PAVEMENT | 414(P) 6000 | CY | 10,100.000 | 7,252.880 | 7,252.880 | $135.00 | $0.00 | $979,138.80 | |
0440 | CLSM BACKFILL | 501(G) 6315 | CY | 25.000 | 0.000 | 0.000 | $200.00 | $0.00 | $0.00 | |
0441 | CONCRETE PARAPET | 504(F) 1381 | LF | 320.000 | 0.000 | 0.000 | $55.00 | $0.00 | $0.00 | |
0442 | 42" F-SHAPED PARAPET | 504(F) 6190 | LF | 9,250.000 | 6,712.130 | 6,712.130 | $60.00 | $0.00 | $402,727.80 | |
0443 | CLASS C CONCRETE | 509(D) 0325 | CY | 5.000 | 113.500 | 113.500 | $750.00 | $0.00 | $85,125.00 | |
0444 | SLOPE WALL (4") | 510(C) 6134 | SY | 40.000 | 22.220 | 22.220 | $95.00 | $0.00 | $2,110.90 | |
0445 | EPOXY COATED REINFORCING STEEL | 511(B) 4269 | LB | 237,257.000 | 211,121.630 | 211,121.630 | $0.55 | $0.00 | $116,116.90 | |
0446 | CONCRETE CURB (6" MNTBLE-INTEGRAL) | 609(A) 0288 | LF | 1,300.000 | 1,084.560 | 1,084.560 | $5.00 | $0.00 | $5,422.80 | |
0447 | CONCRETE CURB (6" BARRIER-INTEGRAL) | 609(A) 0300 | LF | 500.000 | 460.000 | 460.000 | $5.00 | $0.00 | $2,300.00 | |
0448 | INLET FRM&GRT (SSIF-FRM,CIG-GRT-VG-F) | 611(G) 4488 | EA | 3.000 | 6.000 | 6.000 | $425.00 | $0.00 | $2,550.00 | |
0449 | CAST IRON CURB INLETS | 611(K) 4488 | EA | 3.000 | 6.000 | 6.000 | $325.00 | $0.00 | $1,950.00 | |
0450 | MANHOLES ADJUST TO GRADE | 612(A) 0641 | EA | 2.000 | 0.000 | 0.000 | $725.00 | $0.00 | $0.00 | |
0451 | INLETS ADJUST TO GRADE | 612(E) 0645 | EA | 6.000 | 6.000 | 6.000 | $1,700.00 | $0.00 | $10,200.00 | |
0452 | REMOVAL OF CURB AND GUTTER | 619(B) 4726 | LF | 3,308.000 | 3,933.000 | 3,933.000 | $3.75 | $0.00 | $14,748.75 | |
0453 | REMOVAL OF CONCRETE PAVEMENT | 619(B) 4727 | SY | 25,040.000 | 20,314.690 | 20,314.690 | $5.00 | $0.00 | $101,573.45 | |
0454 | REMOVAL OF ASPHALT PAVEMENT | 619(B) 4728 | SY | 7,692.000 | 7,915.770 | 7,915.770 | $2.60 | $0.00 | $20,581.00 | |
0455 | REMOVAL OF GUARD RAIL | 619(B) 4780 | LF | 8,319.000 | 7,236.000 | 7,236.000 | $4.50 | $0.00 | $32,562.00 | |
0456 | REMOVAL OF CONCRETE SLOPE PROTECTION | 619(B) 4821 | SY | 75.000 | 0.000 | 0.000 | $15.00 | $0.00 | $0.00 | |
0457 | REMOVAL OF CONCRETE MEDIAN BARRIER | 619(B) 4915 | LF | 1,639.000 | 1,325.190 | 1,325.190 | $10.00 | $0.00 | $13,251.90 | |
0458 | REMOVAL OF 6" CONCRETE DIVIDING STRIP | 619(B) 6132 | SY | 209.000 | 132.280 | 132.280 | $3.50 | $0.00 | $462.98 | |
0459 | THRIE BEAM BRIDGE CONNECTION-TYPE A | 623(E) 7114 | EA | 2.000 | 3.000 | 3.000 | $2,000.00 | $0.00 | $6,000.00 | |
0460 | EDGE DRAIN CONDUIT-PERFORATED | 653(A) 5915 | LF | 13,500.000 | 6,996.180 | 6,996.180 | $7.25 | $0.00 | $50,722.31 | |
0461 | EDGE DRAIN OUTLET LATERAL-NONPERFORATED | 653(B) 5916 | LF | 1,220.000 | 286.000 | 286.000 | $15.00 | $0.00 | $4,290.00 | |
0462 | OUTLET LATERAL HEADWALL | 653(C) 5946 | EA | 70.000 | 15.000 | 15.000 | $275.00 | $0.00 | $4,125.00 | |
0463 | (PL)IMPACT ATTENUATOR | 871 8325 | EA | 7.000 | 5.000 | 5.000 | $27,500.00 | $0.00 | $137,500.00 | |
8090 | (SP)ASPH.CONC.,TYPE S5(PG 64-22 OK) | 411(S5) 5975 | TON | 0.000 | 0.000 | 0.000 | $125.00 | $0.00 | $0.00 | |
8901 | PAVEMENT/BRIDGE SMOOTHNESS ADJUSTMENT | 430 5010 | LSUM | 0.000 | 1.000 | 1.000 | $24,314.55 | $0.00 | $24,314.55 | |
9000 | COLD MILLING PAVEMENT | 417 5267 | SY | 0.000 | 0.000 | 0.000 | $6.50 | $0.00 | $0.00 | |
9200 | MILESTONE INCENTIVE COMPENSATION | 644 7215 | LSUM | 0.000 | 1.000 | 1.000 | $780,000.00 | $0.00 | $780,000.00 | |
9500 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 0.000 | 3,107.030 | 3,107.030 | $3.75 | $0.00 | $11,651.36 | |
Subtotals For Category 0100/ROADWAY IM-STIM(047) | $0.00 | $4,292,761.20 | ||||||||
Fed/State Project Number: IM-STIM(047) | Project: 26362(04) | Category: 0200/BRIDGE NO. 4 IM-STIM(047) | ||||||||
0464 | CLSM BACKFILL | 501(G) 6309 | CY | 5.000 | 0.000 | 0.000 | $150.00 | $0.00 | $0.00 | |
0465 | APPROACH SLAB | 504(A) 1304 | SY | 277.200 | 277.200 | 277.200 | $175.00 | $0.00 | $48,510.00 | |
0466 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 97.500 | 97.500 | 97.500 | $285.00 | $0.00 | $27,787.50 | |
0467 | CONCRETE PARAPET | 504(F) 1381 | LF | 388.000 | 388.000 | 388.000 | $55.00 | $0.00 | $21,340.00 | |
0468 | 42" F-SHAPED PARAPET | 504(F) 6190 | LF | 407.600 | 407.600 | 407.600 | $60.00 | $0.00 | $24,456.00 | |
0469 | STRUCTURAL STEEL | 506(A) 1322 | LB | 500.000 | 0.000 | 0.000 | $8.00 | $0.00 | $0.00 | |
0470 | CLASS AA CONCRETE | 509(A) 1326 | CY | 347.500 | 347.500 | 347.500 | $600.00 | $0.00 | $208,500.00 | |
0471 | CLASS A CONCRETE | 509(B) 1328 | CY | 16.200 | 16.200 | 16.200 | $2,500.00 | $0.00 | $40,500.00 | |
0472 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 117,730.000 | 117,730.000 | 117,730.000 | $0.95 | $0.00 | $111,843.50 | |
0473 | PAINTING EXISTING STRUCTURES | 512(A) 1323 | LSUM | 1.000 | 1.000 | 1.000 | $50,000.00 | $0.00 | $50,000.00 | |
0474 | COLLECTION & HANDLING OF WASTE | 512(B) 6303 | LSUM | 1.000 | 1.000 | 1.000 | $2,500.00 | $0.00 | $2,500.00 | |
0475 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 997.000 | 997.000 | 997.000 | $3.75 | $0.00 | $3,738.75 | |
0476 | (SP) SEALER CRACK PREPARATION | 523(A) 6550 | LF | 199.400 | 199.400 | 199.400 | $5.00 | $0.00 | $997.00 | |
0477 | (SP) SEALER RESIN | 523(B) 6560 | GAL | 2.700 | 2.700 | 2.700 | $200.00 | $0.00 | $540.00 | |
0478 | (SP)FIBER-REINFORCED EPOXY COMPOSITE MATERIAL | 524 6410 | SF | 963.800 | 967.200 | 967.200 | $80.00 | $0.00 | $77,376.00 | |
0479 | (SP)CORROSION INHIBITOR(SURFACE APPLIED) | 535 6130 | SY | 170.300 | 171.730 | 171.730 | $20.00 | $0.00 | $3,434.60 | |
0480 | (PL)INSTALLATION OF BRIDGE ITEMS | 542 4600 | LSUM | 1.000 | 1.000 | 1.000 | $10,000.00 | $0.00 | $10,000.00 | |
0481 | (PL)REMOVAL OF BRIDGE ITEMS | 619(B) 2500 | LSUM | 1.000 | 1.000 | 1.000 | $262,500.00 | $0.00 | $262,500.00 | |
0482 | (PL)REMOVE & RESET LIGHT POLE | 890A/B 8744 | EA | 1.000 | 2.000 | 2.000 | $20,000.00 | $0.00 | $40,000.00 | |
Subtotals For Category 0200/BRIDGE NO. 4 IM-STIM(047) | $0.00 | $934,023.35 | ||||||||
Fed/State Project Number: IM-STIM(047) | Project: 26362(04) | Category: 0201/BRIDGE NO. 40 IM-STIM(047) | ||||||||
0483 | COLD MILLING BITUMINOUS PAVEMENT | 417 4267 | SY | 822.300 | 822.300 | 822.300 | $1.20 | $0.00 | $986.76 | |
0484 | CLSM BACKFILL | 501(G) 6309 | CY | 5.000 | 0.000 | 0.000 | $150.00 | $0.00 | $0.00 | |
0485 | APPROACH SLAB | 504(A) 1304 | SY | 164.100 | 164.100 | 164.100 | $175.00 | $0.00 | $28,717.50 | |
0486 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 81.700 | 81.700 | 81.700 | $285.00 | $0.00 | $23,284.50 | |
0487 | CONCRETE PARAPET | 504(F) 1381 | LF | 189.600 | 189.600 | 189.600 | $55.00 | $0.00 | $10,428.00 | |
0488 | 42" F-SHAPED PARAPET | 504(F) 6190 | LF | 201.000 | 201.000 | 201.000 | $60.00 | $0.00 | $12,060.00 | |
0489 | STRUCTURAL STEEL | 506(A) 1322 | LB | 500.000 | 0.000 | 0.000 | $8.00 | $0.00 | $0.00 | |
0490 | CLASS AA CONCRETE | 509(A) 1326 | CY | 164.300 | 164.300 | 164.300 | $600.00 | $0.00 | $98,580.00 | |
0491 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 51,340.000 | 51,340.000 | 51,340.000 | $0.95 | $0.00 | $48,773.00 | |
0492 | PAINTING EXISTING STRUCTURES | 512(A) 1323 | LSUM | 1.000 | 1.000 | 1.000 | $25,000.00 | $0.00 | $25,000.00 | |
0493 | COLLECTION & HANDLING OF WASTE | 512(B) 6303 | LSUM | 1.000 | 1.000 | 1.000 | $1,000.00 | $0.00 | $1,000.00 | |
0494 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 404.800 | 404.800 | 404.800 | $3.75 | $0.00 | $1,518.00 | |
0495 | (PL)FIXED BEARING ASSEMBLY | 535 6164 | EA | 3.000 | 3.000 | 3.000 | $15,000.00 | $0.00 | $45,000.00 | |
0496 | (PL)REMOVAL OF BRIDGE ITEMS | 619(B) 2500 | LSUM | 1.000 | 1.000 | 1.000 | $120,000.00 | $0.00 | $120,000.00 | |
0497 | (PL)REMOVE & RESET LIGHT POLE | 890A/B 8744 | EA | 1.000 | 1.000 | 1.000 | $10,000.00 | $0.00 | $10,000.00 | |
8001 | DEDUCTION FOR FAILING MATERIAL | 105 2100 | LSUM | 0.000 | 1.000 | 1.000 | $-5,372.50 | $0.00 | $-5,372.50 | |
Subtotals For Category 0201/BRIDGE NO. 40 IM-STIM(047) | $0.00 | $419,975.26 | ||||||||
Fed/State Project Number: IM-STIM(047) | Project: 26362(04) | Category: 0202/BRIDGE NO. 41 IM-STIM(047) | ||||||||
0498 | CLSM BACKFILL | 501(G) 6309 | CY | 5.000 | 0.000 | 0.000 | $150.00 | $0.00 | $0.00 | |
0499 | APPROACH SLAB | 504(A) 1304 | SY | 217.100 | 217.100 | 217.100 | $175.00 | $0.00 | $37,992.50 | |
0500 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 130.500 | 130.500 | 130.500 | $285.00 | $0.00 | $37,192.50 | |
0501 | 42" F-SHAPED PARAPET | 504(F) 6190 | LF | 803.900 | 803.900 | 803.900 | $60.00 | $0.00 | $48,234.00 | |
0502 | STRUCTURAL STEEL | 506(A) 1322 | LB | 500.000 | 0.000 | 0.000 | $8.00 | $0.00 | $0.00 | |
0503 | CLASS AA CONCRETE | 509(A) 1326 | CY | 369.300 | 369.300 | 369.300 | $600.00 | $0.00 | $221,580.00 | |
0504 | CLASS A CONCRETE | 509(B) 1328 | CY | 32.900 | 32.900 | 32.900 | $2,500.00 | $0.00 | $82,250.00 | |
0505 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 128,090.000 | 128,090.000 | 128,090.000 | $0.95 | $0.00 | $121,685.50 | |
0506 | PAINTING EXISTING STRUCTURES | 512(A) 1323 | LSUM | 1.000 | 1.000 | 1.000 | $50,000.00 | $0.00 | $50,000.00 | |
0507 | COLLECTION & HANDLING OF WASTE | 512(B) 6303 | LSUM | 1.000 | 1.000 | 1.000 | $2,500.00 | $0.00 | $2,500.00 | |
0508 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 1,238.900 | 1,238.900 | 1,238.900 | $3.75 | $0.00 | $4,645.88 | |
0509 | (SP)FIBER-REINFORCED EPOXY COMPOSITE MATERIAL | 524 6410 | SF | 291.400 | 292.770 | 292.770 | $80.00 | $0.00 | $23,421.60 | |
0510 | (SP)CORROSION INHIBITOR(SURFACE APPLIED) | 535 6130 | SY | 150.200 | 156.980 | 156.980 | $20.00 | $0.00 | $3,139.60 | |
0511 | (PL)EXPANSION BEARING ASSEMBLY | 535 6165 | EA | 2.000 | 2.000 | 2.000 | $15,000.00 | $0.00 | $30,000.00 | |
0512 | (PL)REMOVAL OF BRIDGE ITEMS | 619(B) 2500 | LSUM | 1.000 | 1.000 | 1.000 | $235,000.00 | $0.00 | $235,000.00 | |
0513 | (PL)REMOVE & RESET LIGHT POLE | 890A/B 8744 | EA | 1.000 | 2.000 | 2.000 | $20,000.00 | $0.00 | $40,000.00 | |
Subtotals For Category 0202/BRIDGE NO. 41 IM-STIM(047) | $0.00 | $937,641.58 | ||||||||
Fed/State Project Number: IM-STIM(047) | Project: 26362(04) | Category: 0203/BRIDGE NO.45 IM-STIM(047) | ||||||||
0514 | CLSM BACKFILL | 501(G) 6309 | CY | 5.000 | 0.000 | 0.000 | $150.00 | $0.00 | $0.00 | |
0515 | APPROACH SLAB | 504(A) 1304 | SY | 512.000 | 512.000 | 512.000 | $175.00 | $0.00 | $89,600.00 | |
0516 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 140.600 | 140.600 | 140.600 | $285.00 | $0.00 | $40,071.00 | |
0517 | 42" F-SHAPED PARAPET | 504(F) 6190 | LF | 552.200 | 552.200 | 552.200 | $60.00 | $0.00 | $33,132.00 | |
0518 | STRUCTURAL STEEL | 506(A) 1322 | LB | 500.000 | 0.000 | 0.000 | $8.00 | $0.00 | $0.00 | |
0519 | CLASS AA CONCRETE | 509(A) 1326 | CY | 220.600 | 220.600 | 220.600 | $600.00 | $0.00 | $132,360.00 | |
0520 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 64,284.000 | 64,284.000 | 64,284.000 | $0.95 | $0.00 | $61,069.80 | |
0521 | PAINTING EXISTING STRUCTURES | 512(A) 1323 | LSUM | 1.000 | 1.000 | 1.000 | $25,000.00 | $0.00 | $25,000.00 | |
0522 | COLLECTION & HANDLING OF WASTE | 512(B) 6303 | LSUM | 1.000 | 1.000 | 1.000 | $1,000.00 | $0.00 | $1,000.00 | |
0523 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 556.400 | 556.400 | 556.400 | $3.75 | $0.00 | $2,086.50 | |
0524 | (PL)EXPANSION BEARING ASSEMBLY | 535 6165 | EA | 1.000 | 1.000 | 1.000 | $15,000.00 | $0.00 | $15,000.00 | |
0525 | (PL)REMOVAL OF BRIDGE ITEMS | 619(B) 2500 | LSUM | 1.000 | 1.000 | 1.000 | $175,000.00 | $0.00 | $175,000.00 | |
0526 | (PL)REMOVE & RESET LIGHT POLE | 890A/B 8744 | EA | 1.000 | 1.000 | 1.000 | $10,000.00 | $0.00 | $10,000.00 | |
Subtotals For Category 0203/BRIDGE NO.45 IM-STIM(047) | $0.00 | $584,319.30 | ||||||||
Fed/State Project Number: IM-STIM(047) | Project: 26362(04) | Category: 0204/BRIDGE NO. 46 IM-STIM(047) | ||||||||
0527 | CLSM BACKFILL | 501(G) 6309 | CY | 5.000 | 0.000 | 0.000 | $150.00 | $0.00 | $0.00 | |
0528 | APPROACH SLAB | 504(A) 1304 | SY | 319.000 | 319.000 | 319.000 | $175.00 | $0.00 | $55,825.00 | |
0529 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 102.900 | 102.900 | 102.900 | $285.00 | $0.00 | $29,326.50 | |
0530 | 42" F-SHAPED PARAPET | 504(F) 6190 | LF | 446.300 | 446.300 | 446.300 | $60.00 | $0.00 | $26,778.00 | |
0531 | STRUCTURAL STEEL | 506(A) 1322 | LB | 500.000 | 0.000 | 0.000 | $8.00 | $0.00 | $0.00 | |
0532 | CLASS AA CONCRETE | 509(A) 1326 | CY | 156.500 | 156.500 | 156.500 | $600.00 | $0.00 | $93,900.00 | |
0533 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 47,723.000 | 47,723.000 | 47,723.000 | $0.95 | $0.00 | $45,336.85 | |
0534 | PAINTING EXISTING STRUCTURES | 512(A) 1323 | LSUM | 1.000 | 1.000 | 1.000 | $25,000.00 | $0.00 | $25,000.00 | |
0535 | COLLECTION & HANDLING OF WASTE | 512(B) 6303 | LSUM | 1.000 | 1.000 | 1.000 | $1,000.00 | $0.00 | $1,000.00 | |
0536 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 456.500 | 456.500 | 456.500 | $3.75 | $0.00 | $1,711.88 | |
0537 | (PL)EXPANSION BEARING ASSEMBLY | 535 6165 | EA | 1.000 | 1.000 | 1.000 | $15,000.00 | $0.00 | $15,000.00 | |
0538 | (PL)REMOVAL OF BRIDGE ITEMS | 619(B) 2500 | LSUM | 1.000 | 1.000 | 1.000 | $120,000.00 | $0.00 | $120,000.00 | |
0539 | (PL)REMOVE & RESET LIGHT POLE | 890A/B 8744 | EA | 1.000 | 1.000 | 1.000 | $10,000.00 | $0.00 | $10,000.00 | |
Subtotals For Category 0204/BRIDGE NO. 46 IM-STIM(047) | $0.00 | $423,878.23 | ||||||||
Fed/State Project Number: IM-STIM(047) | Project: 26362(04) | Category: 0205/BRIDGE NO. 49 NB IM-STIM(047) | ||||||||
0540 | COLD MILLING BITUMINOUS PAVEMENT | 417 4267 | SY | 1,127.000 | 1,127.000 | 1,127.000 | $1.20 | $0.00 | $1,352.40 | |
0541 | CLSM BACKFILL | 501(G) 6309 | CY | 5.000 | 12.140 | 12.140 | $180.00 | $0.00 | $2,185.20 | |
0542 | APPROACH SLAB | 504(A) 1304 | SY | 513.300 | 513.300 | 513.300 | $225.00 | $0.00 | $115,492.50 | |
0543 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 140.000 | 140.000 | 140.000 | $380.00 | $0.00 | $53,200.00 | |
0544 | 42" F-SHAPED PARAPET | 504(F) 6190 | LF | 368.900 | 368.900 | 368.900 | $135.00 | $0.00 | $49,801.50 | |
0545 | STRUCTURAL STEEL | 506(A) 1322 | LB | 500.000 | 3,315.000 | 3,315.000 | $8.00 | $0.00 | $26,520.00 | |
0546 | CLASS AA CONCRETE | 509(A) 1326 | CY | 206.500 | 206.500 | 206.500 | $800.00 | $0.00 | $165,200.00 | |
0547 | CLASS A CONCRETE | 509(B) 1328 | CY | 38.400 | 38.400 | 38.400 | $1,100.00 | $0.00 | $42,240.00 | |
0548 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 71,360.000 | 72,278.000 | 72,278.000 | $1.27 | $0.00 | $91,793.06 | |
0549 | PAINTING EXISTING STRUCTURES | 512(A) 1323 | LSUM | 1.000 | 1.000 | 1.000 | $25,000.00 | $0.00 | $25,000.00 | |
0550 | COLLECTION & HANDLING OF WASTE | 512(B) 6303 | LSUM | 1.000 | 1.000 | 1.000 | $1,000.00 | $0.00 | $1,000.00 | |
0551 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 627.100 | 627.100 | 627.100 | $3.75 | $0.00 | $2,351.63 | |
0552 | (SP)CORROSION INHIBITOR(SURFACE APPLIED) | 535 6130 | SY | 142.600 | 147.360 | 147.360 | $20.00 | $0.00 | $2,947.20 | |
0553 | (PL)FIXED BEARING ASSEMBLY | 535 6164 | EA | 20.000 | 20.000 | 20.000 | $2,300.00 | $0.00 | $46,000.00 | |
0554 | (PL)REMOVAL OF BRIDGE ITEMS | 619(B) 2500 | LSUM | 1.000 | 1.000 | 1.000 | $85,000.00 | $0.00 | $85,000.00 | |
0555 | FENCE-STYLE CLF (8'HIGH, CLASS A) | 624(D) 4294 | LF | 10.000 | 0.000 | 0.000 | $250.00 | $0.00 | $0.00 | |
0556 | (PL)REMOVE & RESET LIGHT POLE | 890A/B 8744 | EA | 1.000 | 1.000 | 1.000 | $10,000.00 | $0.00 | $10,000.00 | |
Subtotals For Category 0205/BRIDGE NO. 49 NB IM-STIM(047) | $0.00 | $720,083.49 | ||||||||
Fed/State Project Number: IM-STIM(047) | Project: 26362(04) | Category: 0206/BRIDGE NO. 50 IM-STIM(047) | ||||||||
0557 | CLSM BACKFILL | 501(G) 6309 | CY | 10.000 | 10.000 | 10.000 | $180.00 | $0.00 | $1,800.00 | |
0558 | APPROACH SLAB | 504(A) 1304 | SY | 400.000 | 400.000 | 400.000 | $225.00 | $0.00 | $90,000.00 | |
0559 | 42" F-SHAPED PARAPET | 504(F) 6190 | LF | 350.000 | 350.000 | 350.000 | $135.00 | $0.00 | $47,250.00 | |
0560 | RAPID CURE JOINT SEALANT | 504(H) 6390 | LF | 139.000 | 139.000 | 139.000 | $22.00 | $0.00 | $3,058.00 | |
0561 | CLASS A BRIDGE DECK REPAIR | 505(A) 6018 | SY | 28.800 | 26.520 | 26.520 | $100.00 | $0.00 | $2,652.00 | |
0562 | CLASS B BRIDGE DECK REPAIR | 505(B) 6019 | SY | 28.800 | 73.160 | 73.160 | $200.00 | $0.00 | $14,632.00 | |
0563 | HYDRODEMOLITION | 505(G) 1000 | SY | 959.600 | 959.590 | 959.590 | $85.00 | $0.00 | $81,565.15 | |
0564 | CLASS AA CONCRETE | 509(A) 1326 | CY | 140.400 | 140.400 | 140.400 | $400.00 | $0.00 | $56,160.00 | |
0565 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 21,984.000 | 21,984.000 | 21,984.000 | $1.25 | $0.00 | $27,480.00 | |
0566 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 175.000 | 175.000 | 175.000 | $3.75 | $0.00 | $656.25 | |
0567 | (PL)REMOVAL OF BRIDGE ITEMS | 619(B) 2500 | LSUM | 1.000 | 1.000 | 1.000 | $15,000.00 | $0.00 | $15,000.00 | |
0568 | (PL)REMOVE & RESET LIGHT POLE | 890A/B 8744 | EA | 1.000 | 1.000 | 1.000 | $10,000.00 | $0.00 | $10,000.00 | |
Subtotals For Category 0206/BRIDGE NO. 50 IM-STIM(047) | $0.00 | $350,253.40 | ||||||||
Fed/State Project Number: IM-STIM(047) | Project: 26362(04) | Category: 0207/BRIDGE NO. 52 IM-STIM(047) | ||||||||
0569 | CLSM BACKFILL | 501(G) 6309 | CY | 30.000 | 50.000 | 50.000 | $150.00 | $0.00 | $7,500.00 | |
0570 | APPROACH SLAB | 504(A) 1304 | SY | 256.900 | 256.900 | 256.900 | $175.00 | $0.00 | $44,957.50 | |
0571 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 220.500 | 220.500 | 220.500 | $285.00 | $0.00 | $62,842.50 | |
0572 | 42" F-SHAPED PARAPET | 504(F) 6190 | LF | 1,964.200 | 1,964.200 | 1,964.200 | $60.00 | $0.00 | $117,852.00 | |
0573 | STRUCTURAL STEEL | 506(A) 1322 | LB | 500.000 | 0.000 | 0.000 | $8.00 | $0.00 | $0.00 | |
0574 | CLASS AA CONCRETE | 509(A) 1326 | CY | 1,336.000 | 1,336.000 | 1,336.000 | $500.00 | $0.00 | $668,000.00 | |
0575 | CLASS A CONCRETE | 509(B) 1328 | CY | 52.600 | 52.600 | 52.600 | $2,500.00 | $0.00 | $131,500.00 | |
0576 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 420,240.000 | 420,240.000 | 420,240.000 | $0.95 | $0.00 | $399,228.00 | |
0577 | PAINTING EXISTING STRUCTURES | 512(A) 1323 | LSUM | 1.000 | 1.000 | 1.000 | $125,000.00 | $0.00 | $125,000.00 | |
0578 | COLLECTION & HANDLING OF WASTE | 512(B) 6303 | LSUM | 1.000 | 1.000 | 1.000 | $3,000.00 | $0.00 | $3,000.00 | |
0579 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 2,757.100 | 2,757.100 | 2,757.100 | $3.75 | $0.00 | $10,339.13 | |
0580 | (SP)CORROSION INHIBITOR(SURFACE APPLIED) | 535 6130 | SY | 189.800 | 155.800 | 155.800 | $20.00 | $0.00 | $3,116.00 | |
0581 | (PL)REMOVAL OF BRIDGE ITEMS | 619(B) 2500 | LSUM | 1.000 | 1.000 | 1.000 | $937,500.00 | $0.00 | $937,500.00 | |
0582 | (PL)REMOVE & RESET LIGHT POLE | 890A/B 8744 | EA | 1.000 | 1.000 | 1.000 | $40,000.00 | $0.00 | $40,000.00 | |
Subtotals For Category 0207/BRIDGE NO. 52 IM-STIM(047) | $0.00 | $2,550,835.13 | ||||||||
Fed/State Project Number: IM-STIM(047) | Project: 26362(04) | Category: 0300/TRAFFIC IM-STIM(047) | ||||||||
0583 | SHEET ALUMINUM SIGNS | 850(A) 8110 | SF | 315.000 | 284.930 | 284.930 | $17.00 | $0.00 | $4,843.81 | |
0584 | 2 1/4" SQUARE TUBE POST | 851(C) 8327 | LF | 325.000 | 395.000 | 395.000 | $23.50 | $0.00 | $9,282.50 | |
0585 | (SP)TRAFFIC STRIPE (MULTI-POLYMER)(SYMBOLS, WORDS. ETC.) | 854(C) 8525 | EA | 9.000 | 5.000 | 5.000 | $212.50 | $0.00 | $1,062.50 | |
0586 | (SP)TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 854(C) 8530 | LF | 23,075.000 | 17,017.000 | 17,017.000 | $0.55 | $0.00 | $9,359.35 | |
0587 | (SP)TRAFFIC STRIPE(MULTI-POLYMER)(6" WIDE) | 854(C) 8535 | LF | 10,865.000 | 6,478.000 | 6,478.000 | $0.80 | $0.00 | $5,182.40 | |
0588 | (SP)TRAFFIC STRIPE(MULTI-POLYMER)(8" WIDE) | 854(C) 8540 | LF | 7,477.000 | 7,818.000 | 7,818.000 | $1.95 | $0.00 | $15,245.10 | |
0589 | (PL)REMOVAL OF EXISTING SIGNS | 890(A) 8724 | EA | 33.000 | 30.000 | 30.000 | $150.00 | $0.00 | $4,500.00 | |
Subtotals For Category 0300/TRAFFIC IM-STIM(047) | $0.00 | $49,475.66 | ||||||||
Fed/State Project Number: IM-STIM(047) | Project: 26362(04) | Category: 0301/SIGNING IM-STIM(047) | ||||||||
0590 | EXTRUDED ALUMINUM PANEL SIGNS(OVERHEAD SIGNS) | 850(B) 8114 | SF | 1,806.500 | 1,806.500 | 1,806.500 | $23.50 | $0.00 | $42,452.75 | |
0591 | (PL)REPAIR OVHD.SN.STR.TYPE C-1 ALUM. | 852(K) 8772 | EA | 3.000 | 3.000 | 3.000 | $17,000.00 | $0.00 | $51,000.00 | |
0592 | (PL)REMOVE & RESET LIGHT POLE | 890A/B 8744 | EA | 41.000 | 33.000 | 33.000 | $8,000.00 | $0.00 | $264,000.00 | |
Subtotals For Category 0301/SIGNING IM-STIM(047) | $0.00 | $357,452.75 | ||||||||
Fed/State Project Number: IM-STIM(047) | Project: 26362(04) | Category: 0850/Non ARRA Funding | ||||||||
8000 | EARTHWORK | 202(G) 0185 | LSUM | 0.000 | 1.000 | 1.000 | $26,589.50 | $0.00 | $26,589.50 | |
8011 | (SP)ASPH.CONC.,TYPE S3(PATCH)(PG64-22OK) | 411(S3) 6210 | TON | 0.000 | 0.000 | 0.000 | $388.53 | $0.00 | $0.00 | |
8012 | CLASS A CONCRETE | 509(B) 0321 | CY | 0.000 | 1.710 | 1.710 | $750.00 | $0.00 | $1,282.50 | |
8013 | 18" R.C.PIPE CLASS III | 613(B) 0491 | LF | 0.000 | 225.000 | 225.000 | $63.34 | $0.00 | $14,251.50 | |
8014 | CONSTRUCTION MISCELLANEOUS | 104 0700 | LSUM | 0.000 | 1.000 | 1.000 | $4,204.68 | $0.00 | $4,204.68 | |
8015 | PRECAST CONC. MEDIAN BARRIER, PORT. TYPE | 627(E) 4314 | LF | 0.000 | 522.500 | 522.500 | $45.46 | $0.00 | $23,752.85 | |
8016 | BEAM GUARD RAIL-W-BEAM-SINGLE | 623(A) 0932 | LF | 0.000 | 1,933.000 | 1,933.000 | $25.00 | $0.00 | $48,325.00 | |
8017 | (SP)G.E.T. GUARD RAIL END SECTION | 623(H) 8571 | EA | 0.000 | 3.000 | 3.000 | $2,500.00 | $0.00 | $7,500.00 | |
8030 | (SP)CEMENTITIOUS STABILIZED SUBGRADE | 327(E) 4240 | SY | 0.000 | 31,983.520 | 31,983.520 | $6.65 | $0.00 | $212,690.42 | |
9010 | (SP)ASPH.CONC.,TYPE S5(PG 64-22 OK) | 411(S5) 5975 | TON | 0.000 | 2,974.820 | 2,974.820 | $125.00 | $0.00 | $371,852.50 | |
9030 | (PL)REMOVE & RESET LIGHT POLE | 890A/B 8744 | EA | 0.000 | 3.500 | 3.500 | $15,000.00 | $0.00 | $52,500.00 | |
9060 | (SP)ASPH.CONC.,TYPE S4(PG 76-28 OK) | 411(S4) 5950 | TON | 0.000 | 149.170 | 149.170 | $118.63 | $0.00 | $17,696.04 | |
9070 | COLD MILLING PAVEMENT | 417 5267 | SY | 0.000 | 26,742.940 | 26,742.940 | $6.50 | $0.00 | $173,829.11 | |
Subtotals For Category 0850/Non ARRA Funding | $0.00 | $954,474.10 | ||||||||
Subtotals For Project IM-STIM(047) /26362(04) | $0.00 | $12,575,173.45 |
Line Item Number | Item Description | Item Number | Units | Bid Qty | Current Quantity | Quantity Paid This Est. | Quantity Paid To Date | Unit Price | Amount Paid This Est. | Amount Paid To Date |
Fed/State Project Number: IM-STIM(048) | Project: 26362(05) | Category: 0100/ROADWAY IM-STIM(048) | ||||||||
0593 | CLEARING AND GRUBBING | 201 0102 | LSUM | 1.000 | 1.000 | 1.000 | $145,000.00 | $0.00 | $145,000.00 | |
0594 | UNCLASSIFIED EXCAVATION | 202(A) 0183 | CY | 13,800.000 | 13,800.000 | 13,800.000 | $15.00 | $0.00 | $207,000.00 | |
0595 | TYPE A-SALVAGED TOPSOIL | 205 4229 | LSUM | 1.000 | 1.000 | 1.000 | $10,000.00 | $0.00 | $10,000.00 | |
0596 | TEMPORARY SILT FENCE | 223 2801 | LF | 9,069.000 | 1,198.000 | 1,198.000 | $2.90 | $0.00 | $3,474.20 | |
0597 | TEMPORARY SILT DIKE | 227 0100 | LF | 120.000 | 140.000 | 140.000 | $7.75 | $0.00 | $1,085.00 | |
0598 | SOLID SLAB SODDING | 230(A) 2806 | SY | 7,970.000 | 1,866.090 | 1,866.090 | $1.60 | $0.00 | $2,985.74 | |
0599 | VEGETATIVE MULCHING | 233(A) 2817 | AC | 2.000 | 0.000 | 0.000 | $450.00 | $0.00 | $0.00 | |
0600 | MOWING | 241 2832 | AC | 4.000 | 0.000 | 0.000 | $95.00 | $0.00 | $0.00 | |
0601 | AGGREGATE BASE | 303 0192 | CY | 7,000.000 | 6,674.100 | 6,674.100 | $50.00 | $0.00 | $333,705.00 | |
0602 | (SP)CEMENT TREATED BASE | 317(F) 4270 | SY | 31,700.000 | 30,968.090 | 30,968.090 | $15.00 | $0.00 | $464,521.35 | |
0603 | SEPARATOR FABRIC | 325 5271 | SY | 41,500.000 | 39,905.920 | 39,905.920 | $2.00 | $0.00 | $79,811.84 | |
0604 | (SP)LIME | 327(D) 4230 | TON | 1,100.000 | 0.000 | 0.000 | $175.00 | $0.00 | $0.00 | |
0605 | (SP)LIME STABILIZED SUBGRADE | 327(H) 4270 | SY | 35,600.000 | 0.000 | 0.000 | $3.00 | $0.00 | $0.00 | |
0606 | (SP)GEOSYNTHETIC SUBGRADE REINFORCEMENT | 328 2600 | SY | 2,000.000 | 0.000 | 0.000 | $6.25 | $0.00 | $0.00 | |
0607 | TRAFFIC BOUND SURFACE COURSE TYPE E | 403(E) 0225 | TON | 3,600.000 | 1,740.450 | 1,740.450 | $20.00 | $0.00 | $34,809.00 | |
0608 | PRIME COAT | 408 5774 | GAL | 13,200.000 | 0.000 | 0.000 | $5.25 | $0.00 | $0.00 | |
0609 | (SP)P.C.CONCRETE PAVEMENT(PLACEMENT) | 414(A) 0210 | SY | 7,400.000 | 7,832.060 | 7,832.060 | $15.00 | $0.00 | $117,480.90 | |
0610 | (SP)DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 414(A1) 5725 | SY | 20,200.000 | 21,025.070 | 21,025.070 | $18.50 | $0.00 | $388,963.81 | |
0611 | H.E.S. CONCRETE (FULL DEPTH PATCHING) | 414(B) 5913 | SY | 6,000.000 | 7,419.300 | 7,419.300 | $200.00 | $0.00 | $1,483,860.00 | |
0612 | (SP)P.C. CONCRETE FOR PAVEMENT | 414(P) 6000 | CY | 8,100.000 | 10,076.790 | 10,076.790 | $135.00 | $0.00 | $1,360,366.65 | |
0613 | COLD MILLING BITUMINOUS PAVEMENT | 417 4267 | SY | 27,849.000 | 27,849.000 | 27,849.000 | $1.20 | $0.00 | $33,418.80 | |
0614 | CLSM BACKFILL | 501(G) 6315 | CY | 25.000 | 0.000 | 0.000 | $200.00 | $0.00 | $0.00 | |
0615 | CONCRETE PARAPET | 504(F) 1381 | LF | 516.000 | 499.990 | 499.990 | $55.00 | $0.00 | $27,499.45 | |
0616 | 42" F-SHAPED PARAPET | 504(F) 6190 | LF | 5,389.000 | 5,628.390 | 5,628.390 | $60.00 | $0.00 | $337,703.40 | |
0617 | CLASS A CONCRETE | 509(B) 0321 | CY | 60.000 | 20.790 | 20.790 | $750.00 | $0.00 | $15,592.50 | |
0618 | CLASS A CONCRETE (MEDIAN BARRIER, DES.1-A) | 509(B) 4153 | CY | 42.000 | 33.810 | 33.810 | $600.00 | $0.00 | $20,286.00 | |
0619 | CLASS C CONCRETE | 509(D) 0325 | CY | 5.000 | 238.160 | 238.160 | $750.00 | $0.00 | $178,620.00 | |
0620 | SLOPE WALL (4") | 510(C) 6134 | SY | 40.000 | 0.000 | 0.000 | $350.00 | $0.00 | $0.00 | |
0621 | REINFORCING STEEL | 511(A) 0332 | LB | 897.000 | 4,939.260 | 4,939.260 | $1.25 | $0.00 | $6,174.08 | |
0622 | EPOXY COATED REINFORCING STEEL | 511(B) 4269 | LB | 165,035.000 | 194,211.090 | 194,211.090 | $0.55 | $0.00 | $106,816.10 | |
0623 | CONCRETE CURB (6" MNTBLE-INTEGRAL) | 609(A) 0288 | LF | 1,550.000 | 2,279.500 | 2,279.500 | $5.00 | $0.00 | $11,397.50 | |
0624 | 4" CONCRETE DIVIDING STRIP | 610(C) 0608 | SY | 140.000 | 178.330 | 178.330 | $45.00 | $0.00 | $8,024.85 | |
0625 | INLET FRM&GRT (SSIF-FRM,CIG-GRT-VG-F) | 611(G) 4488 | EA | 3.000 | 29.000 | 29.000 | $425.00 | $0.00 | $12,325.00 | |
0626 | CAST IRON CURB INLETS | 611(K) 4488 | EA | 3.000 | 3.000 | 3.000 | $325.00 | $0.00 | $975.00 | |
0627 | MANHOLES ADJUST TO GRADE | 612(A) 0641 | EA | 1.000 | 0.000 | 0.000 | $725.00 | $0.00 | $0.00 | |
0628 | INLETS ADJUST TO GRADE | 612(E) 0645 | EA | 13.000 | 36.000 | 36.000 | $1,700.00 | $0.00 | $61,200.00 | |
0629 | REMOVAL OF CURB AND GUTTER | 619(B) 4726 | LF | 2,249.000 | 3,426.000 | 3,426.000 | $3.75 | $0.00 | $12,847.50 | |
0630 | REMOVAL OF CONCRETE PAVEMENT | 619(B) 4727 | SY | 19,444.000 | 19,164.660 | 19,164.660 | $5.00 | $0.00 | $95,823.30 | |
0631 | REMOVAL OF ASPHALT PAVEMENT | 619(B) 4728 | SY | 7,116.000 | 6,831.280 | 6,831.280 | $2.60 | $0.00 | $17,761.32 | |
0632 | REMOVAL OF GUARD RAIL | 619(B) 4780 | LF | 6,288.000 | 6,236.000 | 6,236.000 | $4.50 | $0.00 | $28,062.00 | |
0633 | REMOVAL OF CONCRETE MEDIAN BARRIER | 619(B) 4915 | LF | 293.000 | 461.000 | 461.000 | $10.00 | $0.00 | $4,610.00 | |
0634 | REMOVAL OF 6" CONCRETE DIVIDING STRIP | 619(B) 6132 | SY | 306.000 | 433.440 | 433.440 | $3.50 | $0.00 | $1,517.05 | |
0635 | BEAM GUARD RAIL-W-BEAM-SINGLE | 623(A) 0932 | LF | 123.000 | 2,675.000 | 2,675.000 | $25.00 | $0.00 | $66,875.00 | |
0636 | THRIE BEAM BRIDGE CONNECTION-TYPE A | 623(E) 7114 | EA | 4.000 | 2.000 | 2.000 | $2,000.00 | $0.00 | $4,000.00 | |
0637 | (SP)G.E.T. GUARD RAIL END SECTION | 623(H) 8571 | EA | 1.000 | 3.000 | 3.000 | $2,750.00 | $0.00 | $8,250.00 | |
0638 | CONCRETE MEDIAN BARRIER, DESIGN 1 | 627(I) 4317 | LF | 106.000 | 0.000 | 0.000 | $100.00 | $0.00 | $0.00 | |
0639 | EDGE DRAIN CONDUIT-PERFORATED | 653(A) 5915 | LF | 9,200.000 | 8,013.000 | 8,013.000 | $7.25 | $0.00 | $58,094.25 | |
0640 | EDGE DRAIN OUTLET LATERAL-NONPERFORATED | 653(B) 5916 | LF | 920.000 | 560.000 | 560.000 | $15.00 | $0.00 | $8,400.00 | |
0641 | OUTLET LATERAL HEADWALL | 653(C) 5946 | EA | 52.000 | 15.000 | 15.000 | $275.00 | $0.00 | $4,125.00 | |
0642 | (PL)IMPACT ATTENUATOR | 871 8325 | EA | 9.000 | 9.000 | 9.000 | $27,500.00 | $0.00 | $247,500.00 | |
8801 | MILESTONE INCENTIVE COMPENSATION | 644 7215 | LSUM | 0.000 | 1.000 | 1.000 | $35,000.00 | $0.00 | $35,000.00 | |
8902 | PAVEMENT/BRIDGE SMOOTHNESS ADJUSTMENT | 430 5010 | LSUM | 0.000 | 1.000 | 1.000 | $35,209.88 | $0.00 | $35,209.88 | |
9510 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 0.000 | 2,790.170 | 2,790.170 | $3.75 | $0.00 | $10,463.14 | |
Subtotals For Category 0100/ROADWAY IM-STIM(048) | $0.00 | $6,091,634.61 | ||||||||
Fed/State Project Number: IM-STIM(048) | Project: 26362(05) | Category: 0200/BRIDGE 3 IM-STIM(048) | ||||||||
0643 | CLSM BACKFILL | 501(G) 6309 | CY | 35.000 | 30.000 | 30.000 | $150.00 | $0.00 | $4,500.00 | |
0644 | APPROACH SLAB | 504(A) 1304 | SY | 238.500 | 238.500 | 238.500 | $175.00 | $0.00 | $41,737.50 | |
0645 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 139.700 | 139.700 | 139.700 | $285.00 | $0.00 | $39,814.50 | |
0646 | CONCRETE PARAPET | 504(F) 1381 | LF | 496.700 | 496.700 | 496.700 | $55.00 | $0.00 | $27,318.50 | |
0647 | 42" F-SHAPED PARAPET | 504(F) 6190 | LF | 521.900 | 521.900 | 521.900 | $60.00 | $0.00 | $31,314.00 | |
0648 | STRUCTURAL STEEL | 506(A) 1322 | LB | 500.000 | 2,570.000 | 2,570.000 | $8.00 | $0.00 | $20,560.00 | |
0649 | CLASS AA CONCRETE | 509(A) 1326 | CY | 470.400 | 470.400 | 470.400 | $600.00 | $0.00 | $282,240.00 | |
0650 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 153,210.000 | 164,144.000 | 164,144.000 | $0.95 | $0.00 | $155,936.80 | |
0651 | PAINTING EXISTING STRUCTURES | 512(A) 1323 | LSUM | 1.000 | 1.000 | 1.000 | $50,000.00 | $0.00 | $50,000.00 | |
0652 | COLLECTION & HANDLING OF WASTE | 512(B) 6303 | LSUM | 1.000 | 1.000 | 1.000 | $2,500.00 | $0.00 | $2,500.00 | |
0653 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 1,212.100 | 1,212.100 | 1,212.100 | $3.75 | $0.00 | $4,545.38 | |
0654 | (SP) SEALER CRACK PREPARATION | 523(A) 6550 | LF | 386.000 | 386.000 | 386.000 | $5.00 | $0.00 | $1,930.00 | |
0655 | (SP) SEALER RESIN | 523(B) 6560 | GAL | 5.200 | 5.200 | 5.200 | $200.00 | $0.00 | $1,040.00 | |
0656 | (SP)FIBER-REINFORCED EPOXY COMPOSITE MATERIAL | 524 6410 | SF | 564.100 | 597.730 | 597.730 | $80.00 | $0.00 | $47,818.40 | |
0657 | (SP)CORROSION INHIBITOR(SURFACE APPLIED) | 535 6130 | SY | 62.700 | 66.410 | 66.410 | $20.00 | $0.00 | $1,328.20 | |
0658 | (PL)INSTALLATION OF BRIDGE ITEMS | 542 4600 | LSUM | 1.000 | 1.000 | 1.000 | $25,000.00 | $0.00 | $25,000.00 | |
0659 | (PL)REMOVAL OF BRIDGE ITEMS | 619(B) 2500 | LSUM | 1.000 | 1.000 | 1.000 | $400,000.00 | $0.00 | $400,000.00 | |
0660 | (PL)REMOVE & RESET LIGHT POLE | 890A/B 8744 | EA | 1.000 | 2.000 | 2.000 | $20,000.00 | $0.00 | $40,000.00 | |
5555 | CLASS A CONCRETE | 509(B) 1328 | CY | 0.000 | 7.500 | 7.500 | $2,500.00 | $0.00 | $18,750.00 | |
Subtotals For Category 0200/BRIDGE 3 IM-STIM(048) | $0.00 | $1,196,333.28 | ||||||||
Fed/State Project Number: IM-STIM(048) | Project: 26362(05) | Category: 0201/BRIDGE 44 IM-STIM(048) | ||||||||
0661 | COLD MILLING BITUMINOUS PAVEMENT | 417 4267 | SY | 2,436.300 | 2,436.300 | 2,436.300 | $1.20 | $0.00 | $2,923.56 | |
0662 | CLSM BACKFILL | 501(G) 6309 | CY | 5.000 | 0.000 | 0.000 | $150.00 | $0.00 | $0.00 | |
0663 | APPROACH SLAB | 504(A) 1304 | SY | 364.700 | 364.700 | 364.700 | $175.00 | $0.00 | $63,822.50 | |
0664 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 231.500 | 231.500 | 231.500 | $285.00 | $0.00 | $65,977.50 | |
0665 | CONCRETE PARAPET | 504(F) 1381 | LF | 457.400 | 457.400 | 457.400 | $55.00 | $0.00 | $25,157.00 | |
0666 | 42" F-SHAPED PARAPET | 504(F) 6190 | LF | 483.000 | 483.000 | 483.000 | $60.00 | $0.00 | $28,980.00 | |
0667 | STRUCTURAL STEEL | 506(A) 1322 | LB | 500.000 | 0.000 | 0.000 | $8.00 | $0.00 | $0.00 | |
0668 | CLASS AA CONCRETE | 509(A) 1326 | CY | 504.400 | 504.400 | 504.400 | $600.00 | $0.00 | $302,640.00 | |
0669 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 154,010.000 | 164,181.000 | 164,181.000 | $0.95 | $0.00 | $155,971.95 | |
0670 | PAINTING EXISTING STRUCTURES | 512(A) 1323 | LSUM | 1.000 | 1.000 | 1.000 | $50,000.00 | $0.00 | $50,000.00 | |
0671 | COLLECTION & HANDLING OF WASTE | 512(B) 6303 | LSUM | 1.000 | 1.000 | 1.000 | $2,500.00 | $0.00 | $2,500.00 | |
0672 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 1,017.500 | 1,017.500 | 1,017.500 | $3.75 | $0.00 | $3,815.63 | |
0673 | (PL)REMOVAL OF BRIDGE ITEMS | 619(B) 2500 | LSUM | 1.000 | 1.000 | 1.000 | $375,000.00 | $0.00 | $375,000.00 | |
0674 | (PL)REMOVE & RESET LIGHT POLE | 890A/B 8744 | EA | 1.000 | 1.000 | 1.000 | $10,000.00 | $0.00 | $10,000.00 | |
Subtotals For Category 0201/BRIDGE 44 IM-STIM(048) | $0.00 | $1,086,788.14 | ||||||||
Fed/State Project Number: IM-STIM(048) | Project: 26362(05) | Category: 0202/BRIDGE 47 IM-STIM(048) | ||||||||
0675 | COLD MILLING BITUMINOUS PAVEMENT | 417 4267 | SY | 1,031.400 | 1,031.400 | 1,031.400 | $1.20 | $0.00 | $1,237.68 | |
0676 | CLSM BACKFILL | 501(G) 6309 | CY | 5.000 | 0.000 | 0.000 | $150.00 | $0.00 | $0.00 | |
0677 | APPROACH SLAB | 504(A) 1304 | SY | 178.000 | 178.000 | 178.000 | $175.00 | $0.00 | $31,150.00 | |
0678 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 94.900 | 94.900 | 94.900 | $285.00 | $0.00 | $27,046.50 | |
0679 | 42" F-SHAPED PARAPET | 504(F) 6190 | LF | 411.900 | 411.900 | 411.900 | $60.00 | $0.00 | $24,714.00 | |
0680 | STRUCTURAL STEEL | 506(A) 1322 | LB | 500.000 | 425.000 | 425.000 | $8.00 | $0.00 | $3,400.00 | |
0681 | CLASS AA CONCRETE | 509(A) 1326 | CY | 207.700 | 207.700 | 207.700 | $600.00 | $0.00 | $124,620.00 | |
0682 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 61,000.000 | 67,154.000 | 67,154.000 | $0.95 | $0.00 | $63,796.30 | |
0683 | PAINTING EXISTING STRUCTURES | 512(A) 1323 | LSUM | 1.000 | 1.000 | 1.000 | $25,000.00 | $0.00 | $25,000.00 | |
0684 | COLLECTION & HANDLING OF WASTE | 512(B) 6303 | LSUM | 1.000 | 1.000 | 1.000 | $1,000.00 | $0.00 | $1,000.00 | |
0685 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 489.000 | 489.000 | 489.000 | $3.75 | $0.00 | $1,833.75 | |
0686 | (PL)EXPANSION BEARING ASSEMBLY | 535 6165 | EA | 2.000 | 2.000 | 2.000 | $15,000.00 | $0.00 | $30,000.00 | |
0687 | (PL)REPAIR BRIDGE ITEM (TYPE B) | 540 4520 | LSUM | 1.000 | 1.000 | 1.000 | $75,000.00 | $0.00 | $75,000.00 | |
0688 | (PL)REMOVAL OF BRIDGE ITEMS | 619(B) 2500 | LSUM | 1.000 | 1.000 | 1.000 | $160,000.00 | $0.00 | $160,000.00 | |
0689 | (PL)REMOVE & RESET LIGHT POLE | 890A/B 8744 | EA | 1.000 | 1.000 | 1.000 | $10,000.00 | $0.00 | $10,000.00 | |
Subtotals For Category 0202/BRIDGE 47 IM-STIM(048) | $0.00 | $578,798.23 | ||||||||
Fed/State Project Number: IM-STIM(048) | Project: 26362(05) | Category: 0203/BRIDGE 48 IM-STIM(048) | ||||||||
0690 | CLSM BACKFILL | 501(G) 6309 | CY | 5.000 | 0.000 | 0.000 | $150.00 | $0.00 | $0.00 | |
0691 | APPROACH SLAB | 504(A) 1304 | SY | 365.300 | 365.300 | 365.300 | $175.00 | $0.00 | $63,927.50 | |
0692 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 194.900 | 194.900 | 194.900 | $285.00 | $0.00 | $55,546.50 | |
0693 | CONCRETE PARAPET | 504(F) 1381 | LF | 225.100 | 225.100 | 225.100 | $55.00 | $0.00 | $12,380.50 | |
0694 | 42" F-SHAPED PARAPET | 504(F) 6190 | LF | 268.600 | 268.600 | 268.600 | $60.00 | $0.00 | $16,116.00 | |
0695 | STRUCTURAL STEEL | 506(A) 1322 | LB | 500.000 | 0.000 | 0.000 | $8.00 | $0.00 | $0.00 | |
0696 | CLASS AA CONCRETE | 509(A) 1326 | CY | 190.900 | 190.900 | 190.900 | $600.00 | $0.00 | $114,540.00 | |
0697 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 65,410.000 | 65,410.000 | 65,410.000 | $0.95 | $0.00 | $62,139.50 | |
0698 | PAINTING EXISTING STRUCTURES | 512(A) 1323 | LSUM | 1.000 | 1.000 | 1.000 | $25,000.00 | $0.00 | $25,000.00 | |
0699 | COLLECTION & HANDLING OF WASTE | 512(B) 6303 | LSUM | 1.000 | 1.000 | 1.000 | $1,000.00 | $0.00 | $1,000.00 | |
0700 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 555.000 | 555.000 | 555.000 | $3.75 | $0.00 | $2,081.25 | |
0701 | (PL)FIXED BEARING ASSEMBLY | 535 6164 | EA | 2.000 | 2.000 | 2.000 | $15,000.00 | $0.00 | $30,000.00 | |
0702 | (PL)REMOVAL OF BRIDGE ITEMS | 619(B) 2500 | LSUM | 1.000 | 1.000 | 1.000 | $175,000.00 | $0.00 | $175,000.00 | |
0703 | (PL)REMOVE & RESET LIGHT POLE | 890A/B 8744 | EA | 1.000 | 2.000 | 2.000 | $10,000.00 | $0.00 | $20,000.00 | |
Subtotals For Category 0203/BRIDGE 48 IM-STIM(048) | $0.00 | $577,731.25 | ||||||||
Fed/State Project Number: IM-STIM(048) | Project: 26362(05) | Category: 0204/BRIDGE 49 IM-STIM(048) | ||||||||
0704 | COLD MILLING BITUMINOUS PAVEMENT | 417 4267 | SY | 1,282.500 | 1,282.500 | 1,282.500 | $1.20 | $0.00 | $1,539.00 | |
0705 | CLSM BACKFILL | 501(G) 6309 | CY | 5.000 | 0.000 | 0.000 | $180.00 | $0.00 | $0.00 | |
0706 | APPROACH SLAB | 504(A) 1304 | SY | 695.600 | 695.600 | 695.600 | $225.00 | $0.00 | $156,510.00 | |
0707 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 150.900 | 150.900 | 150.900 | $380.00 | $0.00 | $57,342.00 | |
0708 | 42" F-SHAPED PARAPET | 504(F) 6190 | LF | 401.600 | 401.600 | 401.600 | $135.00 | $0.00 | $54,216.00 | |
0709 | STRUCTURAL STEEL | 506(A) 1322 | LB | 500.000 | 4,430.000 | 4,430.000 | $8.00 | $0.00 | $35,440.00 | |
0710 | CLASS AA CONCRETE | 509(A) 1326 | CY | 230.000 | 230.000 | 230.000 | $800.00 | $0.00 | $184,000.00 | |
0711 | CLASS A CONCRETE | 509(B) 1328 | CY | 41.500 | 41.500 | 41.500 | $1,100.00 | $0.00 | $45,650.00 | |
0712 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 78,160.000 | 79,561.000 | 79,561.000 | $1.27 | $0.00 | $101,042.47 | |
0713 | PAINTING EXISTING STRUCTURES | 512(A) 1323 | LSUM | 1.000 | 1.000 | 1.000 | $25,000.00 | $0.00 | $25,000.00 | |
0714 | COLLECTION & HANDLING OF WASTE | 512(B) 6303 | LSUM | 1.000 | 1.000 | 1.000 | $1,000.00 | $0.00 | $1,000.00 | |
0715 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 643.000 | 643.000 | 643.000 | $3.75 | $0.00 | $2,411.25 | |
0716 | (SP)CORROSION INHIBITOR(SURFACE APPLIED) | 535 6130 | SY | 154.700 | 152.170 | 152.170 | $20.00 | $0.00 | $3,043.40 | |
0717 | (PL)FIXED BEARING ASSEMBLY | 535 6164 | EA | 22.000 | 22.000 | 22.000 | $2,300.00 | $0.00 | $50,600.00 | |
0718 | (PL)REMOVAL OF BRIDGE ITEMS | 619(B) 2500 | LSUM | 1.000 | 1.000 | 1.000 | $85,000.00 | $0.00 | $85,000.00 | |
0719 | FENCE-STYLE CLF (8'HIGH, CLASS A) | 624(D) 4294 | LF | 10.000 | 0.000 | 0.000 | $250.00 | $0.00 | $0.00 | |
0720 | (PL)REMOVE & RESET LIGHT POLE | 890A/B 8744 | EA | 1.000 | 1.000 | 1.000 | $8,000.00 | $0.00 | $8,000.00 | |
Subtotals For Category 0204/BRIDGE 49 IM-STIM(048) | $0.00 | $810,794.12 | ||||||||
Fed/State Project Number: IM-STIM(048) | Project: 26362(05) | Category: 0205/BRIDGE 51 IM-STIM(048) | ||||||||
0721 | CLSM BACKFILL | 501(G) 6309 | CY | 10.000 | 0.000 | 0.000 | $180.00 | $0.00 | $0.00 | |
0722 | APPROACH SLAB | 504(A) 1304 | SY | 315.600 | 315.600 | 315.600 | $225.00 | $0.00 | $71,010.00 | |
0723 | 42" F-SHAPED PARAPET | 504(F) 6190 | LF | 325.600 | 325.600 | 325.600 | $135.00 | $0.00 | $43,956.00 | |
0724 | RAPID CURE JOINT SEALANT | 504(H) 6390 | LF | 137.700 | 137.700 | 137.700 | $22.00 | $0.00 | $3,029.40 | |
0725 | CLASS A BRIDGE DECK REPAIR | 505(A) 6018 | SY | 28.500 | 0.000 | 0.000 | $100.00 | $0.00 | $0.00 | |
0726 | CLASS B BRIDGE DECK REPAIR | 505(B) 6019 | SY | 28.500 | 68.770 | 68.770 | $200.00 | $0.00 | $13,754.00 | |
0727 | HYDRODEMOLITION | 505(G) 1000 | SY | 949.100 | 949.100 | 949.100 | $85.00 | $0.00 | $80,673.50 | |
0728 | CLASS AA CONCRETE | 509(A) 1326 | CY | 138.400 | 138.400 | 138.400 | $400.00 | $0.00 | $55,360.00 | |
0729 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 21,763.000 | 21,763.000 | 21,763.000 | $1.25 | $0.00 | $27,203.75 | |
0730 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 162.800 | 162.800 | 162.800 | $3.75 | $0.00 | $610.50 | |
0731 | (PL)REMOVAL OF BRIDGE ITEMS | 619(B) 2500 | LSUM | 1.000 | 1.000 | 1.000 | $15,000.00 | $0.00 | $15,000.00 | |
0732 | (PL)REMOVE & RESET LIGHT POLE | 890A/B 8744 | EA | 1.000 | 0.000 | 0.000 | $10,000.00 | $0.00 | $0.00 | |
Subtotals For Category 0205/BRIDGE 51 IM-STIM(048) | $0.00 | $310,597.15 | ||||||||
Fed/State Project Number: IM-STIM(048) | Project: 26362(05) | Category: 0206/BRIDGE 53 IM-STIM(048) | ||||||||
0733 | COLD MILLING BITUMINOUS PAVEMENT | 417 4267 | SY | 6,578.600 | 6,578.600 | 6,578.600 | $1.20 | $0.00 | $7,894.32 | |
0734 | CLSM BACKFILL | 501(G) 6309 | CY | 35.000 | 0.000 | 0.000 | $150.00 | $0.00 | $0.00 | |
0735 | APPROACH SLAB | 504(A) 1304 | SY | 321.400 | 321.400 | 321.400 | $175.00 | $0.00 | $56,245.00 | |
0736 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 286.500 | 286.500 | 286.500 | $285.00 | $0.00 | $81,652.50 | |
0737 | 42" F-SHAPED PARAPET | 504(F) 6190 | LF | 2,183.500 | 2,183.500 | 2,183.500 | $60.00 | $0.00 | $131,010.00 | |
0738 | STRUCTURAL STEEL | 506(A) 1322 | LB | 500.000 | 150.000 | 150.000 | $8.00 | $0.00 | $1,200.00 | |
0739 | CLASS AA CONCRETE | 509(A) 1326 | CY | 1,493.400 | 1,493.400 | 1,493.400 | $540.00 | $0.00 | $806,436.00 | |
0740 | CLASS A CONCRETE | 509(B) 1328 | CY | 258.500 | 258.500 | 258.500 | $1,500.00 | $0.00 | $387,750.00 | |
0741 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 482,910.000 | 491,872.000 | 491,872.000 | $0.90 | $0.00 | $442,684.80 | |
0742 | PAINTING EXISTING STRUCTURES | 512(A) 1323 | LSUM | 1.000 | 1.000 | 1.000 | $100,000.00 | $0.00 | $100,000.00 | |
0743 | COLLECTION & HANDLING OF WASTE | 512(B) 6303 | LSUM | 1.000 | 1.000 | 1.000 | $2,650.00 | $0.00 | $2,650.00 | |
0744 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 3,714.000 | 3,714.000 | 3,714.000 | $3.75 | $0.00 | $13,927.50 | |
0745 | (SP)CORROSION INHIBITOR(SURFACE APPLIED) | 535 6130 | SY | 883.800 | 854.840 | 854.840 | $20.00 | $0.00 | $17,096.80 | |
0746 | (PL)INSTALLATION OF BRIDGE ITEMS | 542 4600 | LSUM | 1.000 | 1.000 | 1.000 | $10,000.00 | $0.00 | $10,000.00 | |
0747 | (PL)REMOVAL OF BRIDGE ITEMS | 619(B) 2500 | LSUM | 1.000 | 1.000 | 1.000 | $2,187,500.00 | $0.00 | $2,187,500.00 | |
0748 | (PL)REMOVE & RESET LIGHT POLE | 890A/B 8744 | EA | 1.000 | 1.000 | 1.000 | $40,000.00 | $0.00 | $40,000.00 | |
Subtotals For Category 0206/BRIDGE 53 IM-STIM(048) | $0.00 | $4,286,046.92 | ||||||||
Fed/State Project Number: IM-STIM(048) | Project: 26362(05) | Category: 0207/BRIDGE 1 IM-STIM(048) | ||||||||
0749 | CLASS A CONCRETE | 509(B) 1328 | CY | 47.700 | 47.700 | 47.700 | $2,500.00 | $0.00 | $119,250.00 | |
0750 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 3,520.000 | 3,520.000 | 3,520.000 | $5.00 | $0.00 | $17,600.00 | |
0751 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 162.400 | 162.400 | 162.400 | $3.75 | $0.00 | $609.00 | |
0752 | (PL)REPAIR BRIDGE ITEM (TYPE A) | 540 4515 | EA | 32.000 | 29.000 | 29.000 | $150.00 | $0.00 | $4,350.00 | |
Subtotals For Category 0207/BRIDGE 1 IM-STIM(048) | $0.00 | $141,809.00 | ||||||||
Fed/State Project Number: IM-STIM(048) | Project: 26362(05) | Category: 0300/TRAFFIC IM-STIM(048) | ||||||||
0753 | RELOCATION OF RENTED PORTABLE TYPE PRECAST CONCRETE MEDIAN | 627(O) 4410 | LF | 31,875.000 | 4,855.000 | 4,855.000 | $5.00 | $0.00 | $24,275.00 | |
0754 | RENTED PORTABLE TYPE PRECAST CONCRETE MEDIAN BARRIER | 627(P) 4425 | LF | 13,200.000 | 5,986.000 | 5,986.000 | $22.50 | $0.00 | $134,685.00 | |
0755 | SHEET ALUMINUM SIGNS | 850(A) 8110 | SF | 139.000 | 139.000 | 139.000 | $17.00 | $0.00 | $2,363.00 | |
0756 | 2 1/4" SQUARE TUBE POST | 851(C) 8327 | LF | 192.000 | 228.000 | 228.000 | $10.65 | $0.00 | $2,428.20 | |
0757 | (SP)TRAFFIC STRIPE (MULTI-POLYMER)(SYMBOLS, WORDS. ETC.) | 854(C) 8525 | EA | 16.000 | 14.000 | 14.000 | $212.50 | $0.00 | $2,975.00 | |
0758 | (SP)TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 854(C) 8530 | LF | 17,294.000 | 62,402.000 | 62,402.000 | $0.55 | $0.00 | $34,321.10 | |
0759 | (SP)TRAFFIC STRIPE(MULTI-POLYMER)(6" WIDE) | 854(C) 8535 | LF | 12,196.000 | 39,780.000 | 39,780.000 | $0.80 | $0.00 | $31,824.00 | |
0760 | (SP)TRAFFIC STRIPE(MULTI-POLYMER)(8" WIDE) | 854(C) 8540 | LF | 3,842.000 | 47,644.000 | 47,644.000 | $1.95 | $0.00 | $92,905.80 | |
0761 | REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 856(C) 8851 | LF | 89,477.000 | 48,362.290 | 48,362.290 | $0.43 | $0.00 | $20,795.78 | |
0762 | PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 859(A) 8006 | LF | 5,000.000 | 121,598.000 | 121,598.000 | $1.10 | $0.00 | $133,757.80 | |
0763 | SAND FILLED IMPACT ATTENUATION MODULE | 870(A) 8485 | SD | 2,954.000 | 1,544.000 | 1,544.000 | $21.25 | $0.00 | $32,810.00 | |
0764 | (PL)CONST.ZONE IMPACT ATTEN. | 871 8705 | SD | 456.000 | 825.000 | 825.000 | $53.00 | $0.00 | $43,725.00 | |
0765 | ARROW DISPLAY(TYPE C) | 880(A) 8812 | SD | 5,336.000 | 3,909.000 | 3,909.000 | $2.65 | $0.00 | $10,358.85 | |
0766 | CONSTRUCTION SIGNS 0 TO 6.25 SF | 880(B) 8818 | SD | 32,648.000 | 161,417.000 | 161,417.000 | $1.60 | $0.00 | $258,267.20 | |
0767 | CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 880(B) 8821 | SD | 21,014.000 | 153,186.000 | 153,186.000 | $2.15 | $0.00 | $329,349.90 | |
0768 | CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 880(B) 8824 | SD | 45,472.000 | 138,939.000 | 138,939.000 | $3.20 | $0.00 | $444,604.80 | |
0769 | CONSTRUCTION SIGNS 33.0 SF & OVER | 880(B) 8827 | SD | 30,552.000 | 38,189.000 | 38,189.000 | $8.25 | $0.00 | $315,059.25 | |
0770 | BARRICADES(TYPE III) | 880(C) 8842 | SD | 20,024.000 | 114,181.000 | 114,181.000 | $1.05 | $0.00 | $119,890.05 | |
0771 | VERTICAL PANELS | 880(D) 8854 | SD | 35,762.000 | 0.000 | 0.000 | $0.17 | $0.00 | $0.00 | |
0772 | WARNING LIGHTS(TYPE A) | 880(E) 8860 | SD | 31,830.000 | 292,096.000 | 292,096.000 | $0.55 | $0.00 | $160,652.80 | |
0773 | WARNING LIGHTS(TYPE C) | 880(E) 8872 | SD | 87,254.000 | 298,894.000 | 298,894.000 | $0.27 | $0.00 | $80,701.38 | |
0774 | DRUMS | 880(F) 8878 | SD | 162,958.000 | 660,848.000 | 660,848.000 | $0.27 | $0.00 | $178,428.96 | |
0775 | TRAFFIC SURVEILLANCE, POLICE | 880(L) 8911 | HOUR | 4,212.000 | 923.000 | 923.000 | $67.50 | $0.00 | $62,302.50 | |
0776 | (SP)SMART WORK ZONE SYSTEM-PORTABLE CHANGEABLE MESSAGE SIGN | 882 8370 | SD | 4,662.000 | 19,896.000 | 19,896.000 | $37.25 | $0.00 | $741,126.00 | |
0777 | (SP)SMART WORK ZONE SYSTEM-PORTABLE TRAFFIC SENSOR (PTS) | 882 8372 | SD | 6,378.000 | 12,620.000 | 12,620.000 | $31.85 | $0.00 | $401,947.00 | |
0778 | (SP)SMART WORK ZONE SYSTEM-PAN-TILT-ZOOM CAMERA (PTZC) | 882 8374 | SD | 6,378.000 | 2,915.000 | 2,915.000 | $2.15 | $0.00 | $6,267.25 | |
0779 | (SP)SMART WORK ZONE SYSTEM-WEBSITE SYSTEM | 882 8376 | SD | 580.000 | 679.000 | 679.000 | $5.50 | $0.00 | $3,734.50 | |
0780 | (PL)REMOVAL OF EXISTING SIGNS | 890(A) 8724 | EA | 16.000 | 16.000 | 16.000 | $106.50 | $0.00 | $1,704.00 | |
Subtotals For Category 0300/TRAFFIC IM-STIM(048) | $0.00 | $3,671,260.12 | ||||||||
Fed/State Project Number: IM-STIM(048) | Project: 26362(05) | Category: 0301/SIGNING IM-STIM(048) | ||||||||
0781 | SHEET ALUMINUM SIGNS | 850(A) 8110 | SF | 40.000 | 40.000 | 40.000 | $17.00 | $0.00 | $680.00 | |
0782 | EXTRUDED ALUMINUM PANEL SIGNS(OVERHEAD SIGNS) | 850(B) 8114 | SF | 3,364.550 | 3,382.500 | 3,382.500 | $23.25 | $0.00 | $78,643.13 | |
0783 | (PL)REPAIR OVHD.SN.STR.TYPE C-1 ALUM. | 852(K) 8772 | EA | 6.000 | 6.000 | 6.000 | $17,000.00 | $0.00 | $102,000.00 | |
0784 | (PL)REPAIR OVHD.SN.STR.TYPE E-1 ALUM. | 852(K) 8781 | EA | 1.000 | 1.000 | 1.000 | $12,500.00 | $0.00 | $12,500.00 | |
0785 | (PL)REMOVE & RESET LIGHT POLE | 890A/B 8744 | EA | 27.000 | 33.000 | 33.000 | $5,500.00 | $0.00 | $181,500.00 | |
Subtotals For Category 0301/SIGNING IM-STIM(048) | $0.00 | $375,323.13 | ||||||||
Fed/State Project Number: IM-STIM(048) | Project: 26362(05) | Category: 0600/STAKING IM-STIM(048) | ||||||||
0786 | STAKING | 642 0098 | LSUM | 1.000 | 1.000 | 1.000 | $250,000.00 | $0.00 | $250,000.00 | |
Subtotals For Category 0600/STAKING IM-STIM(048) | $0.00 | $250,000.00 | ||||||||
Fed/State Project Number: IM-STIM(048) | Project: 26362(05) | Category: 0640/CONSTRUCTION IM-STIM(048) | ||||||||
0787 | RAILROAD FLAGGING | 104 0900 | HOUR | 1,904.000 | 1,795.910 | 1,795.910 | $250.00 | $0.00 | $448,977.50 | |
0788 | FIELD OFFICE | 640 1426 | EA | 1.000 | 1.000 | 1.000 | $40,000.00 | $0.00 | $40,000.00 | |
0789 | MOBILIZATION | 641 1552 | LSUM | 1.000 | 1.000 | 1.000 | $2,650,000.00 | $0.00 | $2,650,000.00 | |
0790 | (SP)CONTRACTORS QUALITY CONTROL | 643 0087 | LSUM | 1.000 | 1.000 | 1.000 | $400,000.00 | $0.00 | $400,000.00 | |
Subtotals For Category 0640/CONSTRUCTION IM-STIM(048) | $0.00 | $3,538,977.50 | ||||||||
Fed/State Project Number: IM-STIM(048) | Project: 26362(05) | Category: 0850/Non ARRA Funding | ||||||||
8040 | (SP)CEMENTITIOUS STABILIZED SUBGRADE | 327(E) 4240 | SY | 0.000 | 34,747.910 | 34,747.910 | $6.65 | $0.00 | $231,073.60 | |
8060 | (PL)REMOVAL OF BRIDGE ITEMS | 619(B) 2500 | LSUM | 0.000 | 1.000 | 1.000 | $7,500.00 | $0.00 | $7,500.00 | |
8070 | APPROACH SLAB | 504(A) 1304 | SY | 0.000 | 114.890 | 114.890 | $175.00 | $0.00 | $20,105.75 | |
8080 | AGGREGATE BASE | 303 0192 | CY | 0.000 | 0.000 | 0.000 | $50.00 | $0.00 | $0.00 | |
9020 | (PL)REMOVE & RESET LIGHT POLE | 890A/B 8744 | EA | 0.000 | 5.000 | 5.000 | $15,000.00 | $0.00 | $75,000.00 | |
9040 | MILESTONE INCENTIVE COMPENSATION | 644 7215 | LSUM | 0.000 | 1.000 | 1.000 | $160,000.00 | $0.00 | $160,000.00 | |
9041 | MILESTONE INCENTIVE COMPENSATION | 644 7215 | LSUM | 0.000 | 1.000 | 1.000 | $140,000.00 | $0.00 | $140,000.00 | |
Subtotals For Category 0850/Non ARRA Funding | $0.00 | $633,679.35 | ||||||||
Subtotals For Project IM-STIM(048) /26362(05) | $0.00 | $23,549,772.80 |