Fed/State Project Number: IM-STIM(001) |
Project: 20900(05) |
Category: 0100/ROADWAY |
0001 |
EARTHWORK |
202(G) 0185 |
LSUM |
1.000 |
1.000 |
|
0.200 |
$1,750,000.00 |
$0.00 |
$350,000.00 |
0002 |
TYPE A-SALVAGED TOPSOIL |
205 4229 |
LSUM |
1.000 |
1.000 |
0.000 |
0.250 |
$49,721.00 |
$0.00 |
$12,430.25 |
0003 |
TEMPORARY BALE BARRIER |
222 2801 |
LF |
2,648.000 |
2,648.000 |
|
66.000 |
$2.13 |
$0.00 |
$140.58 |
0004 |
TEMPORARY SILT FENCE |
223 2801 |
LF |
10,000.000 |
10,000.000 |
|
4,980.000 |
$1.28 |
$0.00 |
$6,374.40 |
0005 |
TEMPORARY SEDIMENT FILTER |
224 2803 |
EA |
10.000 |
10.000 |
|
10.000 |
$53.25 |
$0.00 |
$532.50 |
0006 |
TEMPORARY SILT DIKE |
227 0100 |
LF |
2,648.000 |
2,648.000 |
|
203.000 |
$6.39 |
$0.00 |
$1,297.17 |
0007 |
SOLID SLAB SODDING |
230(A) 2806 |
SY |
226,250.000 |
226,250.000 |
|
0.000 |
$1.38 |
$0.00 |
$0.00 |
0008 |
SEEDING METHOD B |
232(B) 2814 |
AC |
46.770 |
46.770 |
|
0.000 |
$106.50 |
$0.00 |
$0.00 |
0009 |
VEGETATIVE MULCHING |
233(A) 2817 |
AC |
46.770 |
46.770 |
|
0.000 |
$266.25 |
$0.00 |
$0.00 |
0010 |
MOWING |
241 2832 |
AC |
460.000 |
460.000 |
|
63.320 |
$31.95 |
$0.00 |
$2,023.07 |
0011 |
AGGREGATE BASE |
303 0192 |
CY |
68,650.000 |
68,650.000 |
|
0.000 |
$25.00 |
$0.00 |
$0.00 |
0012 |
(SP)CEMENT TREATED BASE |
317(F) 4270 |
SY |
344,828.000 |
344,828.000 |
|
0.000 |
$9.25 |
$0.00 |
$0.00 |
0013 |
SEPARATOR FABRIC |
325 5271 |
SY |
344,560.000 |
344,560.000 |
|
0.000 |
$1.12 |
$0.00 |
$0.00 |
0014 |
(SP)FLY ASH |
327(A) 4200 |
TON |
17,627.100 |
17,627.100 |
1,707.890 |
3,045.840 |
$43.18 |
$73,746.69 |
$131,519.37 |
0015 |
(SP)LIME |
327(D) 4230 |
TON |
2,570.600 |
2,570.600 |
|
17.010 |
$158.08 |
$0.00 |
$2,688.94 |
0016 |
(SP)CEMENTITIOUS STABILIZED SUBGRADE |
327(E) 4240 |
SY |
408,037.000 |
408,037.000 |
40,558.650 |
77,889.310 |
$1.95 |
$79,089.37 |
$151,884.17 |
0017 |
(SP)LIME STABILIZED SUBGRADE |
327(H) 4270 |
SY |
142,814.000 |
142,814.000 |
|
1,330.670 |
$0.75 |
$0.00 |
$998.00 |
0018 |
TRAFFIC BOUND SURFACE COURSE TYPE E |
403(E) 0225 |
TON |
37,098.000 |
37,098.000 |
|
0.000 |
$17.78 |
$0.00 |
$0.00 |
0019 |
PRIME COAT |
408 5774 |
GAL |
133,157.000 |
133,157.000 |
|
2,781.210 |
$1.00 |
$0.00 |
$2,781.21 |
0020 |
(SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) |
411(S4) 5960 |
TON |
1,277.700 |
1,277.700 |
|
0.000 |
$63.90 |
$0.00 |
$0.00 |
0021 |
(SP)RUMBLE STRIP-METHOD PCC-CON |
413(D) 4868 |
LF |
105,267.000 |
105,267.000 |
|
0.000 |
$0.28 |
$0.00 |
$0.00 |
0022 |
(SP)P.C.CONCRETE PAVEMENT(PLACEMENT) |
414(A) 0210 |
SY |
141,888.000 |
141,888.000 |
|
51,522.820 |
$10.50 |
$0.00 |
$540,989.62 |
0023 |
(SP)DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) |
414(A1) 5725 |
SY |
187,609.000 |
187,609.000 |
|
0.000 |
$13.00 |
$0.00 |
$0.00 |
0024 |
H.E.S. CONCRETE (FULL DEPTH PATCHING) |
414(B) 5913 |
SY |
3,500.000 |
3,500.000 |
|
3,868.390 |
$135.00 |
$0.00 |
$522,232.65 |
0025 |
(SP)P.C. CONCRETE FOR PAVEMENT (ONLY) |
414(I) 5270 |
CY |
91,327.300 |
91,327.300 |
|
13,317.170 |
$75.00 |
$0.00 |
$998,787.75 |
0026 |
COLD MILLING PAVEMENT |
417 5267 |
SY |
16,883.000 |
16,883.000 |
|
10,977.630 |
$3.10 |
$0.00 |
$34,030.65 |
0027 |
STRUCTURAL EXCAVATION UNCLASSIFIED |
501(A) 0313 |
CY |
18.000 |
18.000 |
|
0.000 |
$15.98 |
$0.00 |
$0.00 |
0028 |
CLASS A CONCRETE |
509(B) 0321 |
CY |
9.500 |
9.500 |
|
0.000 |
$585.75 |
$0.00 |
$0.00 |
0029 |
CLASS C CONCRETE |
509(D) 0325 |
CY |
173.700 |
173.700 |
|
0.000 |
$292.88 |
$0.00 |
$0.00 |
0030 |
REINFORCING STEEL |
511(A) 0332 |
LB |
1,160.000 |
1,160.000 |
|
0.000 |
$2.27 |
$0.00 |
$0.00 |
0031 |
18" CORR. GALV. STEEL PIPE |
613(D) 0689 |
LF |
3,120.000 |
3,120.000 |
|
2,863.000 |
$16.00 |
$0.00 |
$45,808.00 |
0032 |
24" CORR. GALV. STEEL PIPE |
613(D) 0690 |
LF |
416.000 |
416.000 |
|
402.000 |
$20.25 |
$0.00 |
$8,140.50 |
0033 |
48" CORR. GALV. STEEL PIPE |
613(D) 0694 |
LF |
18.000 |
18.000 |
|
18.000 |
$42.53 |
$0.00 |
$765.54 |
0034 |
60" CORR. GALV. STEEL PIPE |
613(D) 0696 |
LF |
216.000 |
216.000 |
|
176.000 |
$54.06 |
$0.00 |
$9,514.56 |
0035 |
21" X 15" CORR. GALV. STEEL PIPE ARCH |
613(D) 4527 |
LF |
1,827.000 |
1,827.000 |
|
1,373.000 |
$16.34 |
$0.00 |
$22,434.82 |
0036 |
6" PERFORATED PIPE UNDERDRAIN ROUND |
613(P) 1091 |
LF |
5,900.000 |
5,900.000 |
|
0.000 |
$4.00 |
$0.00 |
$0.00 |
0037 |
6" NON-PERF.PIPE UNDERDRAIN RND. |
613(Q) 1096 |
LF |
2,500.000 |
2,500.000 |
|
0.000 |
$4.00 |
$0.00 |
$0.00 |
0038 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS |
619(A) 0920 |
LSUM |
1.000 |
1.000 |
0.200 |
0.250 |
$35,000.00 |
$7,000.00 |
$8,750.00 |
0039 |
REMOVAL OF CONCRETE PAVEMENT |
619(B) 4727 |
SY |
227,546.000 |
227,546.000 |
10,175.120 |
72,624.680 |
$1.23 |
$12,515.40 |
$89,328.37 |
0040 |
REMOVAL OF ASPHALT PAVEMENT |
619(B) 4728 |
SY |
88,705.000 |
88,705.000 |
1,572.940 |
45,823.220 |
$2.69 |
$4,231.21 |
$123,264.47 |
0041 |
REMOVAL OF GUARD RAIL |
619(B) 4780 |
LF |
5,645.000 |
5,645.000 |
|
3,791.000 |
$1.70 |
$0.00 |
$6,444.70 |
0042 |
SAWING PAVEMENT |
619(C) 0924 |
LF |
5,772.000 |
5,772.000 |
|
383.000 |
$1.50 |
$0.00 |
$574.50 |
0043 |
BEAM GUARD RAIL-W-BEAM-SINGLE |
623(A) 0932 |
LF |
5,987.500 |
5,987.500 |
|
0.000 |
$15.18 |
$0.00 |
$0.00 |
0044 |
THRIE BEAM BRIDGE CONNECTION-TYPE A |
623(E) 7114 |
EA |
12.000 |
12.000 |
|
0.000 |
$1,597.50 |
$0.00 |
$0.00 |
0045 |
GUARD RAIL ANCHOR UNIT (TYPE B) |
623(F) 4447 |
EA |
7.000 |
7.000 |
|
0.000 |
$745.50 |
$0.00 |
$0.00 |
0046 |
GUARD RAIL ANCHOR UNIT (TYPE D-BF) |
623(F) 5686 |
EA |
5.000 |
5.000 |
|
0.000 |
$1,597.50 |
$0.00 |
$0.00 |
0047 |
(SP)G.E.T. GUARD RAIL END SECTION |
623(H) 8571 |
EA |
14.000 |
14.000 |
|
0.000 |
$2,662.50 |
$0.00 |
$0.00 |
0048 |
FENCE-STYLE WWF |
624(A) 4281 |
LF |
49,248.000 |
49,248.000 |
|
0.000 |
$6.88 |
$0.00 |
$0.00 |
0049 |
OUTLET LATERAL HEADWALL |
653(C) 5946 |
EA |
6.000 |
6.000 |
|
0.000 |
$300.00 |
$0.00 |
$0.00 |
Subtotals For Category 0100/ROADWAY |
$176,582.67 |
$3,073,735.79 |
|
Fed/State Project Number: IM-STIM(001) |
Project: 20900(05) |
Category: 0101/ROADWAY ADD ALT |
0050 |
EARTHWORK |
202(G) 0185 |
LSUM |
1.000 |
1.000 |
|
0.300 |
$280,865.00 |
$0.00 |
$84,259.50 |
0051 |
TYPE A-SALVAGED TOPSOIL |
205 4229 |
LSUM |
1.000 |
1.000 |
0.000 |
0.250 |
$25,000.00 |
$0.00 |
$6,250.00 |
0052 |
TEMPORARY BALE BARRIER |
222 2801 |
LF |
336.000 |
336.000 |
|
63.000 |
$2.13 |
$0.00 |
$134.19 |
0053 |
TEMPORARY SEDIMENT FILTER |
224 2803 |
EA |
2.000 |
2.000 |
|
2.000 |
$53.25 |
$0.00 |
$106.50 |
0054 |
TEMPORARY SILT DIKE |
227 0100 |
LF |
336.000 |
336.000 |
|
28.000 |
$6.39 |
$0.00 |
$178.92 |
0055 |
SOLID SLAB SODDING |
230(A) 2806 |
SY |
37,900.000 |
37,900.000 |
|
0.000 |
$1.38 |
$0.00 |
$0.00 |
0056 |
SEEDING METHOD B |
232(B) 2814 |
AC |
7.840 |
7.840 |
|
0.000 |
$106.50 |
$0.00 |
$0.00 |
0057 |
VEGETATIVE MULCHING |
233(A) 2817 |
AC |
7.840 |
7.840 |
|
0.000 |
$266.25 |
$0.00 |
$0.00 |
0058 |
MOWING |
241 2832 |
AC |
130.000 |
130.000 |
|
16.720 |
$31.95 |
$0.00 |
$534.20 |
0059 |
AGGREGATE BASE |
303 0192 |
CY |
19,248.400 |
19,248.400 |
|
0.000 |
$25.89 |
$0.00 |
$0.00 |
0060 |
(SP)CEMENT TREATED BASE |
317(F) 4270 |
SY |
77,906.000 |
77,906.000 |
|
0.000 |
$8.93 |
$0.00 |
$0.00 |
0061 |
SEPARATOR FABRIC |
325 5271 |
SY |
96,390.000 |
96,390.000 |
|
0.000 |
$1.12 |
$0.00 |
$0.00 |
0062 |
(SP)FLY ASH |
327(A) 4200 |
TON |
4,035.400 |
4,035.400 |
355.300 |
1,620.020 |
$43.18 |
$15,341.85 |
$69,952.46 |
0063 |
(SP)LIME |
327(D) 4230 |
TON |
588.400 |
588.400 |
|
0.000 |
$158.08 |
$0.00 |
$0.00 |
0064 |
(SP)CEMENTITIOUS STABILIZED SUBGRADE |
327(E) 4240 |
SY |
93,412.000 |
93,412.000 |
8,402.130 |
38,347.210 |
$1.95 |
$16,384.15 |
$74,777.06 |
0065 |
(SP)LIME STABILIZED SUBGRADE |
327(H) 4270 |
SY |
32,694.000 |
32,694.000 |
|
0.000 |
$0.75 |
$0.00 |
$0.00 |
0066 |
TRAFFIC BOUND SURFACE COURSE TYPE E |
403(E) 0225 |
TON |
9,868.000 |
9,868.000 |
|
0.000 |
$17.78 |
$0.00 |
$0.00 |
0067 |
PRIME COAT |
408 5774 |
GAL |
34,075.000 |
34,075.000 |
|
0.000 |
$1.00 |
$0.00 |
$0.00 |
0068 |
(SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) |
411(S4) 5960 |
TON |
178.300 |
178.300 |
|
0.000 |
$63.90 |
$0.00 |
$0.00 |
0069 |
(SP)RUMBLE STRIP-METHOD PCC-CON |
413(D) 4868 |
LF |
29,742.000 |
29,742.000 |
|
0.000 |
$0.28 |
$0.00 |
$0.00 |
0070 |
(SP)P.C.CONCRETE PAVEMENT(PLACEMENT) |
414(A) 0210 |
SY |
20,494.000 |
20,494.000 |
|
2,791.110 |
$10.50 |
$0.00 |
$29,306.66 |
0071 |
(SP)DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) |
414(A1) 5725 |
SY |
53,012.000 |
53,012.000 |
|
0.000 |
$13.00 |
$0.00 |
$0.00 |
0072 |
H.E.S. CONCRETE (FULL DEPTH PATCHING) |
414(B) 5913 |
SY |
500.000 |
500.000 |
|
112.110 |
$135.00 |
$0.00 |
$15,134.85 |
0073 |
(SP)P.C. CONCRETE FOR PAVEMENT (ONLY) |
414(I) 5270 |
CY |
21,685.800 |
21,685.800 |
|
581.480 |
$75.00 |
$0.00 |
$43,611.00 |
0074 |
COLD MILLING PAVEMENT |
417 5267 |
SY |
2,500.000 |
2,500.000 |
|
2,791.110 |
$3.10 |
$0.00 |
$8,652.44 |
0075 |
CLASS C CONCRETE |
509(D) 0325 |
CY |
50.200 |
50.200 |
|
0.000 |
$292.88 |
$0.00 |
$0.00 |
0076 |
24" CORR. GALV. STEEL PIPE |
613(D) 0690 |
LF |
640.000 |
640.000 |
|
0.000 |
$20.25 |
$0.00 |
$0.00 |
0077 |
21" X 15" CORR. GALV. STEEL PIPE ARCH |
613(D) 4527 |
LF |
100.000 |
100.000 |
|
0.000 |
$16.34 |
$0.00 |
$0.00 |
0078 |
6" PERFORATED PIPE UNDERDRAIN ROUND |
613(P) 1091 |
LF |
1,800.000 |
1,800.000 |
|
0.000 |
$5.00 |
$0.00 |
$0.00 |
0079 |
6" NON-PERF.PIPE UNDERDRAIN RND. |
613(Q) 1096 |
LF |
700.000 |
700.000 |
|
0.000 |
$5.00 |
$0.00 |
$0.00 |
0080 |
REMOVAL OF CONCRETE PAVEMENT |
619(B) 4727 |
SY |
47,297.000 |
47,297.000 |
|
18,877.080 |
$1.23 |
$0.00 |
$23,218.81 |
0081 |
REMOVAL OF ASPHALT PAVEMENT |
619(B) 4728 |
SY |
24,176.000 |
24,176.000 |
|
12,417.950 |
$2.69 |
$0.00 |
$33,404.28 |
0082 |
REMOVAL OF GUARD RAIL |
619(B) 4780 |
LF |
750.000 |
750.000 |
|
620.000 |
$1.70 |
$0.00 |
$1,054.00 |
0083 |
SAWING PAVEMENT |
619(C) 0924 |
LF |
500.000 |
500.000 |
|
45.000 |
$2.00 |
$0.00 |
$90.00 |
0084 |
BEAM GUARD RAIL-W-BEAM-SINGLE |
623(A) 0932 |
LF |
775.000 |
775.000 |
|
0.000 |
$15.18 |
$0.00 |
$0.00 |
0085 |
GUARD RAIL ANCHOR UNIT (TYPE B) |
623(F) 4447 |
EA |
1.000 |
1.000 |
|
0.000 |
$745.50 |
$0.00 |
$0.00 |
0086 |
GUARD RAIL ANCHOR UNIT (TYPE D-BF) |
623(F) 5686 |
EA |
3.000 |
3.000 |
|
0.000 |
$1,597.50 |
$0.00 |
$0.00 |
0087 |
(SP)G.E.T. GUARD RAIL END SECTION |
623(H) 8571 |
EA |
2.000 |
2.000 |
|
0.000 |
$2,662.50 |
$0.00 |
$0.00 |
0088 |
FENCE-STYLE WWF |
624(A) 4281 |
LF |
15,986.000 |
15,986.000 |
|
0.000 |
$6.88 |
$0.00 |
$0.00 |
0089 |
OUTLET LATERAL HEADWALL |
653(C) 5946 |
EA |
2.000 |
2.000 |
|
0.000 |
$300.00 |
$0.00 |
$0.00 |
Subtotals For Category 0101/ROADWAY ADD ALT |
$31,726.00 |
$390,664.87 |
|
Fed/State Project Number: IM-STIM(001) |
Project: 20900(05) |
Category: 0204/BRIDGE "E" |
0112 |
SUBSTRUCTURE EXCAVATION COMMON |
501(B) 1307 |
CY |
224.000 |
224.000 |
|
0.000 |
$15.98 |
$0.00 |
$0.00 |
0113 |
CLSM BACKFILL |
501(G) 6309 |
CY |
178.400 |
178.400 |
|
0.000 |
$143.78 |
$0.00 |
$0.00 |
0114 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) |
503(A) 1313 |
LF |
1,594.800 |
1,594.800 |
|
0.000 |
$216.20 |
$0.00 |
$0.00 |
0115 |
APPROACH SLAB |
504(A) 1304 |
SY |
273.400 |
273.400 |
|
0.000 |
$145.91 |
$0.00 |
$0.00 |
0116 |
SEALED EXPANSION JOINT |
504(C) 6250 |
LF |
84.000 |
84.000 |
|
0.000 |
$283.29 |
$0.00 |
$0.00 |
0117 |
42" F-SHAPED PARAPET |
504(F) 6190 |
LF |
922.800 |
922.800 |
|
0.000 |
$64.97 |
$0.00 |
$0.00 |
0118 |
STRUCTURAL STEEL |
506(A) 1322 |
LB |
1,920.000 |
1,920.000 |
|
0.000 |
$2.56 |
$0.00 |
$0.00 |
0119 |
CLASS AA CONCRETE |
509(A) 1326 |
CY |
455.800 |
455.800 |
|
0.000 |
$521.85 |
$0.00 |
$0.00 |
0120 |
CLASS A CONCRETE |
509(B) 1328 |
CY |
297.600 |
297.600 |
|
0.000 |
$516.53 |
$0.00 |
$0.00 |
0121 |
REINFORCING STEEL |
511(A) 1332 |
LB |
2,810.000 |
2,810.000 |
|
0.000 |
$1.17 |
$0.00 |
$0.00 |
0122 |
EPOXY COATED REINFORCING STEEL |
511(B) 6010 |
LB |
141,290.000 |
141,290.000 |
|
0.000 |
$1.07 |
$0.00 |
$0.00 |
0123 |
PILES, FURNISHED (HP 12X53) |
514(A) 6011 |
LF |
657.000 |
657.000 |
|
0.000 |
$42.60 |
$0.00 |
$0.00 |
0124 |
PILES, DRIVEN (HP 12X53) |
514(B) 6294 |
LF |
657.000 |
657.000 |
|
0.000 |
$15.98 |
$0.00 |
$0.00 |
0125 |
PILE LOAD TEST (DYNAMIC) |
514(F) 6354 |
EA |
14.000 |
14.000 |
|
0.000 |
$841.35 |
$0.00 |
$0.00 |
0126 |
WATER REPELLENT (VISUALLY INSPECTED) |
515(A) 6013 |
SY |
2,583.000 |
2,583.000 |
|
0.000 |
$3.73 |
$0.00 |
$0.00 |
0127 |
DRILLED SHAFTS 60" DIAMETER |
516(A) 6096 |
LF |
303.000 |
303.000 |
|
0.000 |
$718.88 |
$0.00 |
$0.00 |
0128 |
(SP) SEALER CRACK PREPARATION |
523(A) 6550 |
LF |
38.000 |
38.000 |
|
0.000 |
$5.33 |
$0.00 |
$0.00 |
0129 |
(SP) SEALER RESIN |
523(B) 6560 |
GAL |
0.400 |
0.400 |
|
0.000 |
$266.25 |
$0.00 |
$0.00 |
0130 |
(PL)FIXED BEARING ASSEMBLY |
535 6164 |
EA |
16.000 |
16.000 |
|
0.000 |
$1,049.03 |
$0.00 |
$0.00 |
0131 |
(PL)EXPANSION BEARING ASSEMBLY |
535 6165 |
EA |
16.000 |
16.000 |
|
0.000 |
$1,049.03 |
$0.00 |
$0.00 |
0132 |
TYPE I-A PLAIN RIPRAP |
601(A-1)1353 |
TON |
2,300.000 |
2,300.000 |
|
0.000 |
$44.73 |
$0.00 |
$0.00 |
0133 |
TYPE I-A FILTER BLANKET |
601(A-2)1355 |
TON |
492.000 |
492.000 |
|
0.000 |
$34.08 |
$0.00 |
$0.00 |
0134 |
6" PERFORATED PIPE UNDERDRAIN ROUND |
613(P) 6204 |
LF |
84.000 |
84.000 |
|
0.000 |
$22.37 |
$0.00 |
$0.00 |
0135 |
6" NON-PERF.PIPE UNDERDRAIN RND. |
613(Q) 6207 |
LF |
60.000 |
60.000 |
|
0.000 |
$22.37 |
$0.00 |
$0.00 |
0136 |
REMOVAL OF EXISTING BRIDGE STRUCTURE |
619(D) 1397 |
LSUM |
1.000 |
1.000 |
|
0.000 |
$106,500.00 |
$0.00 |
$0.00 |
Subtotals For Category 0204/BRIDGE "E" |
$0.00 |
$0.00 |
|
Fed/State Project Number: IM-STIM(001) |
Project: 20900(05) |
Category: 0205/BRIDGE "F" |
0137 |
SUBSTRUCTURE EXCAVATION COMMON |
501(B) 1307 |
CY |
224.000 |
224.000 |
|
224.000 |
$15.98 |
$0.00 |
$3,579.52 |
0138 |
CLSM BACKFILL |
501(G) 6309 |
CY |
178.400 |
178.400 |
|
0.000 |
$149.10 |
$0.00 |
$0.00 |
0139 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) |
503(A) 1313 |
LF |
1,594.800 |
1,594.800 |
|
0.000 |
$218.33 |
$0.00 |
$0.00 |
0140 |
APPROACH SLAB |
504(A) 1304 |
SY |
273.400 |
273.400 |
|
0.000 |
$146.97 |
$0.00 |
$0.00 |
0141 |
SEALED EXPANSION JOINT |
504(C) 6250 |
LF |
84.000 |
84.000 |
|
0.000 |
$284.36 |
$0.00 |
$0.00 |
0142 |
42" F-SHAPED PARAPET |
504(F) 6190 |
LF |
922.800 |
922.800 |
|
0.000 |
$66.03 |
$0.00 |
$0.00 |
0143 |
STRUCTURAL STEEL |
506(A) 1322 |
LB |
1,920.000 |
1,920.000 |
|
0.000 |
$2.66 |
$0.00 |
$0.00 |
0144 |
CLASS AA CONCRETE |
509(A) 1326 |
CY |
455.800 |
455.800 |
|
0.000 |
$532.50 |
$0.00 |
$0.00 |
0145 |
CLASS A CONCRETE |
509(B) 1328 |
CY |
297.600 |
297.600 |
|
0.000 |
$527.18 |
$0.00 |
$0.00 |
0146 |
REINFORCING STEEL |
511(A) 1332 |
LB |
2,810.000 |
2,810.000 |
|
0.000 |
$1.17 |
$0.00 |
$0.00 |
0147 |
EPOXY COATED REINFORCING STEEL |
511(B) 6010 |
LB |
141,290.000 |
141,290.000 |
|
0.000 |
$1.07 |
$0.00 |
$0.00 |
0148 |
PILES, FURNISHED (HP 12X53) |
514(A) 6011 |
LF |
796.500 |
796.500 |
|
0.000 |
$42.60 |
$0.00 |
$0.00 |
0149 |
PILES, DRIVEN (HP 12X53) |
514(B) 6294 |
LF |
796.500 |
796.500 |
|
0.000 |
$15.98 |
$0.00 |
$0.00 |
0150 |
PILE LOAD TEST (DYNAMIC) |
514(F) 6354 |
EA |
14.000 |
14.000 |
|
0.000 |
$841.35 |
$0.00 |
$0.00 |
0151 |
WATER REPELLENT (VISUALLY INSPECTED) |
515(A) 6013 |
SY |
2,583.000 |
2,583.000 |
|
0.000 |
$3.73 |
$0.00 |
$0.00 |
0152 |
DRILLED SHAFTS 60" DIAMETER |
516(A) 6096 |
LF |
285.000 |
285.000 |
26.000 |
26.000 |
$734.85 |
$19,106.10 |
$19,106.10 |
0153 |
(SP) SEALER CRACK PREPARATION |
523(A) 6550 |
LF |
38.000 |
38.000 |
|
0.000 |
$5.33 |
$0.00 |
$0.00 |
0154 |
(SP) SEALER RESIN |
523(B) 6560 |
GAL |
0.400 |
0.400 |
|
0.000 |
$266.25 |
$0.00 |
$0.00 |
0155 |
(PL)FIXED BEARING ASSEMBLY |
535 6164 |
EA |
16.000 |
16.000 |
|
0.000 |
$1,102.28 |
$0.00 |
$0.00 |
0156 |
(PL)EXPANSION BEARING ASSEMBLY |
535 6165 |
EA |
16.000 |
16.000 |
|
0.000 |
$1,054.35 |
$0.00 |
$0.00 |
0157 |
6" PERFORATED PIPE UNDERDRAIN ROUND |
613(P) 6204 |
LF |
84.000 |
84.000 |
|
0.000 |
$26.63 |
$0.00 |
$0.00 |
0158 |
6" NON-PERF.PIPE UNDERDRAIN RND. |
613(Q) 6207 |
LF |
60.000 |
60.000 |
|
0.000 |
$26.63 |
$0.00 |
$0.00 |
0159 |
REMOVAL OF EXISTING BRIDGE STRUCTURE |
619(D) 1397 |
LSUM |
1.000 |
1.000 |
0.500 |
1.000 |
$106,500.00 |
$53,250.00 |
$106,500.00 |
Subtotals For Category 0205/BRIDGE "F" |
$72,356.10 |
$129,185.62 |
|
Fed/State Project Number: IM-STIM(001) |
Project: 20900(05) |
Category: 0300/TRAFFIC |
0160 |
RELOCATION OF RENTED PORTABLE TYPE PRECAST CONCRETE MEDIAN |
627(O) 4410 |
LF |
32,400.000 |
32,400.000 |
|
0.000 |
$1.91 |
$0.00 |
$0.00 |
0161 |
RENTED PORTABLE TYPE PRECAST CONCRETE MEDIAN BARRIER |
627(P) 4425 |
LF |
32,400.000 |
32,400.000 |
|
22,179.600 |
$8.30 |
$0.00 |
$184,090.68 |
0162 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) |
856(A) 8839 |
LF |
444,000.000 |
444,000.000 |
|
122,573.000 |
$0.16 |
$0.00 |
$19,611.68 |
0163 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) |
856(C) 8851 |
LF |
100,000.000 |
100,000.000 |
|
0.000 |
$0.16 |
$0.00 |
$0.00 |
0164 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 |
856(G) 8887 |
EA |
100,000.000 |
100,000.000 |
|
330.000 |
$0.37 |
$0.00 |
$122.10 |
0165 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) |
859(A) 8006 |
LF |
310,000.000 |
310,000.000 |
|
32,480.000 |
$0.11 |
$0.00 |
$3,572.80 |
0166 |
(PL)TRUCK MOUNTED ATTENUATOR |
876(C) 8482 |
SD |
510.000 |
510.000 |
16.000 |
100.000 |
$5.33 |
$85.28 |
$533.00 |
0167 |
MODULAR GLARE SCREEN |
878(C) 8487 |
SD |
300,000.000 |
300,000.000 |
1,920.000 |
16,000.000 |
$0.21 |
$403.20 |
$3,360.00 |
0168 |
ARROW DISPLAY(TYPE C) |
880(A) 8812 |
SD |
1,020.000 |
1,020.000 |
32.000 |
323.000 |
$10.65 |
$340.80 |
$3,439.95 |
0169 |
CONSTRUCTION SIGNS 0 TO 6.25 SF |
880(B) 8818 |
SD |
54,120.000 |
54,120.000 |
2,640.000 |
22,607.000 |
$0.05 |
$132.00 |
$1,130.35 |
0170 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF |
880(B) 8821 |
SD |
47,880.000 |
47,880.000 |
1,984.000 |
19,192.000 |
$0.80 |
$1,587.20 |
$15,353.60 |
0171 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF |
880(B) 8824 |
SD |
21,120.000 |
21,120.000 |
1,373.000 |
12,558.000 |
$2.13 |
$2,924.49 |
$26,748.54 |
0172 |
BARRICADES(TYPE II) |
880(C) 8836 |
SD |
1,980.000 |
1,980.000 |
|
0.000 |
$0.27 |
$0.00 |
$0.00 |
0173 |
BARRICADES(TYPE III) |
880(C) 8842 |
SD |
38,520.000 |
38,520.000 |
896.000 |
11,385.000 |
$0.27 |
$241.92 |
$3,073.95 |
0174 |
WING BARRICADES |
880(C) 8848 |
SD |
2,040.000 |
2,040.000 |
64.000 |
420.000 |
$1.07 |
$68.48 |
$449.40 |
0175 |
VERTICAL PANELS |
880(D) 8854 |
SD |
129,870.000 |
129,870.000 |
3,776.000 |
15,316.000 |
$0.16 |
$604.16 |
$2,450.56 |
0176 |
WARNING LIGHTS(TYPE A) |
880(E) 8860 |
SD |
92,580.000 |
92,580.000 |
2,288.000 |
27,189.000 |
$0.11 |
$251.68 |
$2,990.79 |
0177 |
WARNING LIGHTS(TYPE C) |
880(E) 8872 |
SD |
520,590.000 |
520,590.000 |
8,080.000 |
52,537.000 |
$0.03 |
$242.40 |
$1,576.11 |
0178 |
DRUMS |
880(F) 8878 |
SD |
390,720.000 |
390,720.000 |
5,584.000 |
82,094.000 |
$0.11 |
$614.24 |
$9,030.34 |
0179 |
PORT.CHANGEABLE MESSAGE SIGN |
882(B) 8306 |
SD |
1,020.000 |
1,020.000 |
32.000 |
197.000 |
$26.63 |
$852.16 |
$5,246.11 |
Subtotals For Category 0300/TRAFFIC |
$8,348.01 |
$282,779.96 |
|
Fed/State Project Number: IM-STIM(001) |
Project: 20900(05) |
Category: 0301/SIGNING AND STRIPING |
0180 |
(PL)BRIDGE-GUARD RAIL CONNECTION-TYPE B |
623(I) 8680 |
EA |
4.000 |
4.000 |
|
0.000 |
$1,065.00 |
$0.00 |
$0.00 |
0181 |
DELINEATORS(TYPE 1, CODE 1) |
853 9024 |
EA |
118.000 |
118.000 |
|
0.000 |
$19.17 |
$0.00 |
$0.00 |
0182 |
(SP)TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) |
854(C) 8530 |
LF |
117,450.000 |
117,450.000 |
|
0.000 |
$0.45 |
$0.00 |
$0.00 |
0183 |
(SP)TRAFFIC STRIPE(MULTI-POLYMER)(6" WIDE) |
854(C) 8535 |
LF |
34,690.000 |
34,690.000 |
|
0.000 |
$0.61 |
$0.00 |
$0.00 |
0184 |
(SP)TRAFFIC STRIPE(MULTI-POLYMER)(8" WIDE) |
854(C) 8540 |
LF |
21,350.000 |
21,350.000 |
|
0.000 |
$0.77 |
$0.00 |
$0.00 |
0185 |
(PL)REMOVE & RESET EXISTING SIGNS |
890A/B 8756 |
EA |
20.000 |
20.000 |
|
13.000 |
$213.00 |
$0.00 |
$2,769.00 |
0186 |
(PL)REMOVE & RESET GROUND MOUNTED SIGN |
890A/B 8760 |
EA |
10.000 |
10.000 |
|
5.000 |
$1,597.50 |
$0.00 |
$7,987.50 |
Subtotals For Category 0301/SIGNING AND STRIPING |
$0.00 |
$10,756.50 |
|