Fed/State Project Number: NH-STIM(039) |
Project: 20316(18) |
Category: 0100/ROADWAY |
0001 |
CLEARING AND GRUBBING |
201 0102 |
LSUM |
1.000 |
1.000 |
|
1.000 |
$110,000.00 |
$0.00 |
$110,000.00 |
0002 |
UNCLASSIFIED EXCAVATION |
202(A) 0183 |
CY |
39,323.300 |
39,323.300 |
|
38,211.000 |
$3.41 |
$0.00 |
$130,299.51 |
0003 |
UNCLASSIFIED BORROW |
202(C) 0184 |
CY |
199,834.500 |
199,834.500 |
|
179,851.050 |
$3.58 |
$0.00 |
$643,866.76 |
0004 |
TYPE A-SALVAGED TOPSOIL |
205 4229 |
LSUM |
1.000 |
1.000 |
|
0.750 |
$82,500.00 |
$0.00 |
$61,875.00 |
0005 |
TEMPORARY SILT FENCE |
223 2801 |
LF |
6,270.740 |
6,270.740 |
|
2,174.000 |
$2.20 |
$0.00 |
$4,782.80 |
0006 |
TEMPORARY SEDIMENT FILTER |
224 2803 |
EA |
2.000 |
2.000 |
|
0.000 |
$275.00 |
$0.00 |
$0.00 |
0007 |
TEMPORARY SEDIMENT BASIN |
225 2804 |
EA |
2.000 |
2.000 |
|
0.000 |
$1,100.00 |
$0.00 |
$0.00 |
0008 |
TEMPORARY SILT DIKE |
227 0100 |
LF |
308.000 |
308.000 |
|
350.000 |
$8.80 |
$0.00 |
$3,080.00 |
0009 |
DITCH LINER PROTECTION |
229 4318 |
LF |
1,100.000 |
1,100.000 |
|
0.000 |
$1.10 |
$0.00 |
$0.00 |
0010 |
SOLID SLAB SODDING |
230(A) 2806 |
SY |
86,089.420 |
86,089.420 |
|
0.000 |
$1.65 |
$0.00 |
$0.00 |
0011 |
SEEDING METHOD B |
232(B) 2814 |
AC |
17.790 |
17.790 |
|
0.000 |
$550.00 |
$0.00 |
$0.00 |
0012 |
VEGETATIVE MULCHING |
233(A) 2817 |
AC |
17.790 |
17.790 |
|
0.000 |
$275.00 |
$0.00 |
$0.00 |
0013 |
MOWING |
241 2832 |
AC |
44.500 |
44.500 |
|
0.000 |
$66.00 |
$0.00 |
$0.00 |
0014 |
SEPARATOR FABRIC |
325 5271 |
SY |
22,959.130 |
22,959.130 |
6,550.110 |
19,193.260 |
$2.20 |
$14,410.24 |
$42,225.17 |
0015 |
TRAFFIC BOUND SURFACE COURSE TYPE E |
403(E) 0225 |
TON |
300.000 |
300.000 |
|
228.670 |
$33.00 |
$0.00 |
$7,546.11 |
0016 |
TACK COAT |
407 0250 |
GAL |
1,380.140 |
1,380.140 |
|
650.000 |
$3.30 |
$0.00 |
$2,145.00 |
0017 |
PRIME COAT |
408 5774 |
GAL |
11,552.890 |
11,552.890 |
3,826.340 |
7,731.990 |
$6.60 |
$25,253.84 |
$51,031.13 |
0018 |
(SP)ASPHALT CONCRETE TYPE S3(PG 70-28 OK) |
411(S3) 5940 |
TON |
3,047.020 |
3,047.020 |
0.000 |
1,116.380 |
$74.80 |
$0.00 |
$83,505.23 |
0019 |
(SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) |
411(S3) 5945 |
TON |
4,758.460 |
4,758.460 |
1,803.420 |
3,779.650 |
$66.00 |
$119,025.72 |
$249,456.90 |
0020 |
(SP)ASPHALT CONCRETE TYPE S4(PG 70-28 OK) |
411(S4) 5955 |
TON |
1,538.480 |
1,538.480 |
0.000 |
547.410 |
$77.00 |
$0.00 |
$42,150.57 |
0021 |
RUMBLE STRIP-METHOD AC-CON |
413(A) 4861 |
LF |
1,600.000 |
1,600.000 |
|
0.000 |
$2.81 |
$0.00 |
$0.00 |
0022 |
(SP)DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) |
414(A1) 5725 |
SY |
7,709.420 |
7,709.420 |
1,317.330 |
4,542.890 |
$22.00 |
$28,981.26 |
$99,943.58 |
0023 |
(SP)P.C. CONCRETE FOR PAVEMENT |
414(P) 6000 |
CY |
1,713.200 |
1,713.200 |
292.890 |
1,010.050 |
$99.00 |
$28,996.11 |
$99,994.95 |
0024 |
STRUCTURAL EXCAVATION UNCLASSIFIED |
501(A) 0313 |
CY |
302.000 |
302.000 |
|
302.000 |
$11.00 |
$0.00 |
$3,322.00 |
0025 |
CLASS AA CONCRETE |
509(A) 0319 |
CY |
663.800 |
663.800 |
|
663.800 |
$412.50 |
$0.00 |
$273,817.50 |
0026 |
CLASS C CONCRETE |
509(D) 0325 |
CY |
60.000 |
60.000 |
|
0.000 |
$330.00 |
$0.00 |
$0.00 |
0027 |
REINFORCING STEEL |
511(A) 0332 |
LB |
80,720.000 |
80,720.000 |
|
80,720.000 |
$0.77 |
$0.00 |
$62,154.40 |
0028 |
TYPE I-A PLAIN RIPRAP |
601(A-1)0536 |
TON |
60.000 |
60.000 |
|
66.140 |
$41.80 |
$0.00 |
$2,764.65 |
0029 |
TYPE I-A FILTER BLANKET |
601(A-2)0538 |
TON |
18.000 |
18.000 |
|
22.720 |
$41.80 |
$0.00 |
$949.70 |
0030 |
1'-8" COMB. CURB & GUTTER (6" MNTBLE) |
609(B) 1501 |
LF |
1,058.000 |
1,058.000 |
|
628.000 |
$19.80 |
$0.00 |
$12,434.40 |
0031 |
2'-8" COMB. CURB & GUTTER (6" BARRIER) |
609(B) 1525 |
LF |
3,096.000 |
3,096.000 |
|
2,430.000 |
$22.00 |
$0.00 |
$53,460.00 |
0032 |
6" CONCRETE DRIVEWAY (H.E.S.) |
610(B) 0399 |
SY |
186.900 |
186.900 |
|
457.880 |
$66.00 |
$0.00 |
$30,220.08 |
0033 |
INLET CICI DES. 2 (STD) |
611(E) 5112 |
EA |
3.000 |
3.000 |
0.000 |
3.000 |
$2,640.00 |
$0.00 |
$7,920.00 |
0034 |
INLET (SMD-TYPE 1) |
611(E) 6000 |
EA |
2.000 |
2.000 |
0.000 |
2.000 |
$1,320.00 |
$0.00 |
$2,640.00 |
0035 |
INLET FRM&GRT (SSIF-FRM,CIG-GRT-VG-F) |
611(G) 4488 |
EA |
6.000 |
6.000 |
0.000 |
6.000 |
$275.00 |
$0.00 |
$1,650.00 |
0036 |
24" R.C.PIPE CLASS III |
613(B) 0492 |
LF |
343.000 |
343.000 |
|
341.000 |
$96.80 |
$0.00 |
$33,008.80 |
0037 |
42" R.C.PIPE CLASS III |
613(B) 0495 |
LF |
74.000 |
74.000 |
|
72.000 |
$114.40 |
$0.00 |
$8,236.80 |
0038 |
48" R.C.PIPE CLASS III |
613(B) 0496 |
LF |
169.000 |
169.000 |
|
169.000 |
$140.80 |
$0.00 |
$23,795.20 |
0039 |
30" R.C.PIPE CLASS IV |
613(B) 0584 |
LF |
206.000 |
206.000 |
|
206.000 |
$161.70 |
$0.00 |
$33,310.20 |
0040 |
TYPE A4 CULVERT END TREATMENT |
613(CC) 7186 |
EA |
4.000 |
4.000 |
|
2.000 |
$737.00 |
$0.00 |
$1,474.00 |
0041 |
TYPE B4 CULVERT END TREATMENT |
613(CC) 7187 |
EA |
5.000 |
5.000 |
|
5.000 |
$825.00 |
$0.00 |
$4,125.00 |
0042 |
TYPE C4 CULVERT END TREATMENT |
613(CC) 7188 |
EA |
2.000 |
2.000 |
|
2.000 |
$1,793.00 |
$0.00 |
$3,586.00 |
0043 |
TYPE D4 CULVERT END TREATMENT |
613(CC) 7189 |
EA |
1.000 |
1.000 |
|
1.000 |
$2,233.00 |
$0.00 |
$2,233.00 |
0044 |
TYPE E4 CULVERT END TREATMENT |
613(CC) 7190 |
EA |
2.000 |
2.000 |
|
2.000 |
$2,750.00 |
$0.00 |
$5,500.00 |
0045 |
18" CORR. GALV. STEEL PIPE |
613(D) 0689 |
LF |
60.000 |
60.000 |
|
75.000 |
$35.20 |
$0.00 |
$2,640.00 |
0046 |
21" X 15" CORR. GALV. STEEL PIPE ARCH |
613(D) 4527 |
LF |
50.000 |
50.000 |
|
50.000 |
$35.20 |
$0.00 |
$1,760.00 |
0047 |
8" PERFORATED PIPE UNDERDRAIN ROUND |
613(P) 1092 |
LF |
3,150.000 |
3,150.000 |
0.000 |
2,150.000 |
$6.60 |
$0.00 |
$14,190.00 |
0048 |
8" NON-PERF.PIPE UNDERDRAIN RND. |
613(Q) 1097 |
LF |
250.000 |
250.000 |
|
100.000 |
$6.60 |
$0.00 |
$660.00 |
0049 |
TRENCH EXCAVATION |
613(S) 1180 |
CY |
1,364.500 |
1,364.500 |
|
560.400 |
$11.00 |
$0.00 |
$6,164.40 |
0050 |
STANDARD BEDDING MATERIAL |
613(T) 1181 |
CY |
463.500 |
463.500 |
|
455.800 |
$30.80 |
$0.00 |
$14,038.64 |
0051 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS |
619(A) 0920 |
LSUM |
1.000 |
1.000 |
|
1.000 |
$55,000.00 |
$0.00 |
$55,000.00 |
0052 |
REMOVAL OF CONCRETE PAVEMENT |
619(B) 4727 |
SY |
7,200.000 |
7,200.000 |
|
7,031.100 |
$6.60 |
$0.00 |
$46,405.26 |
0053 |
REMOVAL OF ASPHALT PAVEMENT |
619(B) 4728 |
SY |
2,900.000 |
2,900.000 |
|
1,643.830 |
$5.50 |
$0.00 |
$9,041.07 |
0054 |
REMOVAL OF CURB |
619(B) 4791 |
LF |
4,400.000 |
4,400.000 |
|
4,370.000 |
$1.10 |
$0.00 |
$4,807.00 |
0055 |
SAWING PAVEMENT |
619(C) 0924 |
LF |
2,265.200 |
2,265.200 |
|
3,216.000 |
$4.40 |
$0.00 |
$14,150.40 |
0056 |
BEAM GUARD RAIL-W-BEAM-SINGLE |
623(A) 0932 |
LF |
325.000 |
325.000 |
|
0.000 |
$18.15 |
$0.00 |
$0.00 |
0057 |
THRIE BEAM BRIDGE CONNECTION-TYPE A |
623(E) 7114 |
EA |
2.000 |
2.000 |
|
0.000 |
$1,595.00 |
$0.00 |
$0.00 |
0058 |
GUARD RAIL ANCHOR UNIT (TYPE I) |
623(F) 6032 |
EA |
1.000 |
1.000 |
|
0.000 |
$1,870.00 |
$0.00 |
$0.00 |
0059 |
(SP)G.E.T. GUARD RAIL END SECTION |
623(H) 8571 |
EA |
3.000 |
3.000 |
|
0.000 |
$2,365.00 |
$0.00 |
$0.00 |
0060 |
(SP)FENCE-STYLE SWF (4 BARBED WIRE) |
624(C) 4458 |
LF |
1,076.400 |
1,076.400 |
|
1,096.000 |
$3.64 |
$0.00 |
$3,989.44 |
0061 |
(SP)FENCE-STYLE SWF (5 BARBED WIRE) |
624(C) 4459 |
LF |
1,486.000 |
1,486.000 |
|
1,509.000 |
$3.80 |
$0.00 |
$5,734.20 |
0062 |
MAILBOX INSTALLATION-SINGLE |
629(A) 4958 |
EA |
4.000 |
4.000 |
|
0.000 |
$82.50 |
$0.00 |
$0.00 |
0063 |
MAILBOX |
629(C) 4960 |
EA |
4.000 |
4.000 |
|
0.000 |
$22.00 |
$0.00 |
$0.00 |
0064 |
REMOVAL OF MAILBOX INSTALLATION |
629(D) 4961 |
EA |
4.000 |
4.000 |
|
3.000 |
$11.00 |
$0.00 |
$33.00 |
0065 |
OUTLET LATERAL HEADWALL |
653(C) 5946 |
EA |
4.000 |
4.000 |
2.000 |
2.000 |
$550.00 |
$1,100.00 |
$1,100.00 |
Subtotals For Category 0100/ROADWAY |
$217,767.17 |
$2,378,217.85 |
|
Fed/State Project Number: NH-STIM(039) |
Project: 20316(18) |
Category: 0200/BRIDGE 'G' |
0066 |
SUBSTRUCTURE EXCAVATION COMMON |
501(B) 1307 |
CY |
130.000 |
130.000 |
|
130.000 |
$16.50 |
$0.00 |
$2,145.00 |
0067 |
GRANULAR BACKFILL |
501(F) 6352 |
CY |
162.000 |
162.000 |
0.000 |
162.000 |
$65.00 |
$0.00 |
$10,530.00 |
0068 |
(PL)FALSEWORK JACKING |
502 6116 |
LSUM |
1.000 |
1.000 |
|
1.000 |
$8,250.00 |
$0.00 |
$8,250.00 |
0069 |
(PL)BRIDGE TRAFFIC RAIL |
504 6179 |
LF |
643.400 |
643.400 |
|
643.400 |
$67.00 |
$0.00 |
$43,107.80 |
0070 |
APPROACH SLAB |
504(A) 1304 |
SY |
586.300 |
586.300 |
0.000 |
586.300 |
$165.00 |
$0.00 |
$96,739.50 |
0071 |
STRUCTURAL STEEL |
506(A) 1322 |
LB |
469,770.000 |
469,770.000 |
|
469,770.000 |
$1.58 |
$0.00 |
$742,236.60 |
0072 |
CLASS AA CONCRETE |
509(A) 1326 |
CY |
590.300 |
590.300 |
|
590.300 |
$468.00 |
$0.00 |
$276,260.40 |
0073 |
CLASS A CONCRETE |
509(B) 1328 |
CY |
371.800 |
371.800 |
|
371.800 |
$460.00 |
$0.00 |
$171,028.00 |
0074 |
SLOPE WALL (5") |
510(C) 6138 |
SY |
1,054.000 |
1,054.000 |
|
1,054.000 |
$65.00 |
$0.00 |
$68,510.00 |
0075 |
REINFORCING STEEL |
511(A) 1332 |
LB |
3,270.000 |
3,270.000 |
|
3,270.000 |
$0.91 |
$0.00 |
$2,975.70 |
0076 |
EPOXY COATED REINFORCING STEEL |
511(B) 6010 |
LB |
239,620.000 |
239,620.000 |
|
239,620.000 |
$0.90 |
$0.00 |
$215,658.00 |
0077 |
PILES, FURNISHED (HP 10X42) |
514(A) 6010 |
LF |
603.000 |
603.000 |
|
603.000 |
$30.30 |
$0.00 |
$18,270.90 |
0078 |
PILES, DRIVEN (HP 10X42) |
514(B) 6292 |
LF |
603.000 |
603.000 |
|
516.570 |
$16.50 |
$0.00 |
$8,523.41 |
0079 |
PILE LOAD TEST (DYNAMIC) |
514(F) 6354 |
EA |
18.000 |
18.000 |
|
18.000 |
$705.00 |
$0.00 |
$12,690.00 |
0080 |
WATER REPELLENT (VISUALLY INSPECTED) |
515(A) 6013 |
SY |
1,031.000 |
1,031.000 |
1,031.000 |
1,031.000 |
$3.30 |
$3,402.30 |
$3,402.30 |
0081 |
DRILLED SHAFTS 60" DIAMETER |
516(A) 6096 |
LF |
302.000 |
302.000 |
|
302.000 |
$710.00 |
$0.00 |
$214,420.00 |
0082 |
(PL)FIXED BEARING ASSEMBLY |
535 6164 |
EA |
16.000 |
16.000 |
|
16.000 |
$510.00 |
$0.00 |
$8,160.00 |
0083 |
(PL)EXPANSION BEARING ASSEMBLY |
535 6165 |
EA |
48.000 |
48.000 |
|
48.000 |
$1,385.00 |
$0.00 |
$66,480.00 |
0084 |
6" PERFORATED PIPE UNDERDRAIN ROUND |
613(P) 6204 |
LF |
332.000 |
332.000 |
|
332.000 |
$33.00 |
$0.00 |
$10,956.00 |
0085 |
6" NON-PERF.PIPE UNDERDRAIN RND. |
613(Q) 6207 |
LF |
36.000 |
36.000 |
|
0.000 |
$33.00 |
$0.00 |
$0.00 |
Subtotals For Category 0200/BRIDGE 'G' |
$3,402.30 |
$1,980,343.61 |
|
Fed/State Project Number: NH-STIM(039) |
Project: 20316(18) |
Category: 0300/TRAFFIC |
0086 |
SHEET ALUMINUM SIGNS |
850(A) 8110 |
SF |
183.860 |
183.860 |
|
0.000 |
$38.50 |
$0.00 |
$0.00 |
0087 |
EXTRUDED ALUMINUM PANEL SIGNS |
850(B) 8112 |
SF |
330.000 |
330.000 |
|
0.000 |
$79.20 |
$0.00 |
$0.00 |
0088 |
DELINEATORS(TYPE 1, CODE 1, FLEXIBLE) |
853 9042 |
EA |
24.000 |
24.000 |
|
0.000 |
$33.00 |
$0.00 |
$0.00 |
0089 |
DELINEATORS(TYPE 1, CODE 2, FLEXIBLE) |
853 9045 |
EA |
25.000 |
25.000 |
|
0.000 |
$33.00 |
$0.00 |
$0.00 |
0090 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) |
855(A) 8812 |
LF |
52,260.000 |
52,260.000 |
|
0.000 |
$0.66 |
$0.00 |
$0.00 |
0091 |
TRAFFIC STRIPE(PLASTIC)(ARROWS) |
855(B) 8818 |
EA |
2.000 |
2.000 |
|
0.000 |
$93.50 |
$0.00 |
$0.00 |
0092 |
CONSTRUCTION TRAFFIC CONTROL |
880(J) 8905 |
LSUM |
1.000 |
1.000 |
|
0.750 |
$40,700.00 |
$0.00 |
$30,525.00 |
0093 |
PORT.CHANGEABLE MESSAGE SIGN |
882(B) 8306 |
SD |
540.000 |
540.000 |
20.000 |
249.000 |
$22.00 |
$440.00 |
$5,478.00 |
Subtotals For Category 0300/TRAFFIC |
$440.00 |
$36,003.00 |
|
Fed/State Project Number: NH-STIM(039) |
Project: 20316(18) |
Category: 0301/HIGHWAY LIGHTING |
0094 |
1 1/4" GALV. STEEL ELECTRICAL CONDUIT EXPOSED |
802(A) 8306 |
LF |
315.000 |
315.000 |
|
0.000 |
$12.10 |
$0.00 |
$0.00 |
0095 |
2" PVC SCH.40 PLASTIC CONDUIT TRENCHED |
802(B) 8342 |
LF |
600.000 |
600.000 |
|
0.000 |
$4.46 |
$0.00 |
$0.00 |
0096 |
JUNCTION BOX(8" X 8" X 6") |
802(D) 8372 |
EA |
2.000 |
2.000 |
|
0.000 |
$638.00 |
$0.00 |
$0.00 |
0097 |
PULL BOX(SIZE I) |
803 8065 |
EA |
3.000 |
3.000 |
|
0.000 |
$357.50 |
$0.00 |
$0.00 |
0098 |
STRUCTURAL CONCRETE |
804(A) 2915 |
CY |
2.320 |
2.320 |
|
0.000 |
$522.50 |
$0.00 |
$0.00 |
0099 |
REINFORCING STEEL |
804(B) 2916 |
LB |
133.600 |
133.600 |
|
0.000 |
$1.38 |
$0.00 |
$0.00 |
0100 |
40' MTG & 10' HLMA(G.STL.) |
806(C) 8924 |
EA |
5.000 |
5.000 |
|
0.000 |
$1,861.20 |
$0.00 |
$0.00 |
0101 |
BREAKAWAY BASE (DES. B) |
807 8092 |
EA |
3.000 |
3.000 |
|
0.000 |
$456.50 |
$0.00 |
$0.00 |
0102 |
(PL)ROADWAY LUMINAIRE |
809(A) 8090 |
EA |
5.000 |
5.000 |
|
0.000 |
$517.00 |
$0.00 |
$0.00 |
0103 |
SERVICE POLE |
810(A) 3118 |
EA |
1.000 |
1.000 |
|
0.000 |
$4,378.00 |
$0.00 |
$0.00 |
0104 |
1/C NO.4 ELECTRICAL CONDUCTOR |
811 8038 |
LF |
2,160.000 |
2,160.000 |
|
0.000 |
$1.21 |
$0.00 |
$0.00 |
0105 |
1/C NO.12 ELECTRICAL CONDUCTOR |
811 8046 |
LF |
700.000 |
700.000 |
|
0.000 |
$0.58 |
$0.00 |
$0.00 |
Subtotals For Category 0301/HIGHWAY LIGHTING |
$0.00 |
$0.00 |
|