Fed/State Project Number: NH-STIM(009) |
Project: 20249(11) |
Category: 0100/ROADWAY |
0001 |
CLEARING AND GRUBBING |
201 0102 |
LSUM |
1.000 |
1.000 |
|
0.600 |
$14,650.00 |
$0.00 |
$8,790.00 |
0002 |
UNCLASSIFIED EXCAVATION |
202(A) 0183 |
CY |
118,033.000 |
118,033.000 |
8,000.000 |
97,252.000 |
$3.75 |
$30,000.00 |
$364,695.00 |
0003 |
UNCLASSIFIED BORROW |
202(C) 0184 |
CY |
3,003.000 |
3,003.000 |
|
0.000 |
$7.10 |
$0.00 |
$0.00 |
0004 |
TYPE A-SALVAGED TOPSOIL |
205 4229 |
LSUM |
1.000 |
1.000 |
0.000 |
0.300 |
$22,220.00 |
$0.00 |
$6,666.00 |
0005 |
TEMPORARY SILT FENCE |
223 2801 |
LF |
2,490.000 |
2,490.000 |
|
601.000 |
$3.05 |
$0.00 |
$1,833.05 |
0006 |
TEMPORARY SEDIMENT FILTER |
224 2803 |
EA |
8.000 |
8.000 |
|
0.000 |
$303.00 |
$0.00 |
$0.00 |
0007 |
TEMPORARY SILT DIKE |
227 0100 |
LF |
1,000.000 |
1,000.000 |
|
938.000 |
$9.10 |
$0.00 |
$8,535.80 |
0008 |
SOLID SLAB SODDING |
230(A) 2806 |
SY |
84,834.000 |
84,834.000 |
0.000 |
34,800.000 |
$1.67 |
$0.00 |
$58,116.00 |
0009 |
WATERING |
230(F) 2812 |
MGAL |
3,394.000 |
3,394.000 |
|
0.000 |
$8.08 |
$0.00 |
$0.00 |
0010 |
SEEDING METHOD B |
232(B) 2814 |
AC |
34.740 |
34.740 |
|
0.000 |
$202.00 |
$0.00 |
$0.00 |
0011 |
VEGETATIVE MULCHING |
233(A) 2817 |
AC |
34.740 |
34.740 |
|
0.000 |
$101.00 |
$0.00 |
$0.00 |
0012 |
FERTILIZING (10-20-10) |
234(A) 2824 |
TON |
9.370 |
9.370 |
|
3.000 |
$990.00 |
$0.00 |
$2,970.00 |
0013 |
FERTILIZING (0-46-0) |
234(A) 4406 |
TON |
1.760 |
1.760 |
0.000 |
0.130 |
$618.00 |
$0.00 |
$77.25 |
0014 |
(PL)ROCK FILTER DAM, TYPE 1 |
235(A) 0100 |
CY |
27.000 |
27.000 |
|
0.000 |
$90.90 |
$0.00 |
$0.00 |
0015 |
MOWING |
241 2832 |
AC |
34.740 |
34.740 |
|
0.000 |
$101.00 |
$0.00 |
$0.00 |
0016 |
AGGREGATE BASE |
303 0192 |
CY |
12,223.000 |
12,223.000 |
0.000 |
3,095.000 |
$31.55 |
$0.00 |
$97,647.25 |
0017 |
SEPARATOR FABRIC |
325 5271 |
SY |
53,594.000 |
53,594.000 |
|
16,000.000 |
$1.33 |
$0.00 |
$21,280.00 |
0018 |
(SP)MODIFIED SUBGRADE |
327(J) 4290 |
SY |
58,593.000 |
58,593.000 |
|
0.000 |
$3.85 |
$0.00 |
$0.00 |
0019 |
TRAFFIC BOUND SURFACE COURSE TYPE E |
403(E) 0225 |
TON |
5,150.750 |
5,150.750 |
0.000 |
546.200 |
$15.25 |
$0.00 |
$8,329.56 |
0020 |
TACK COAT |
407 0250 |
GAL |
4,876.000 |
4,876.000 |
|
0.000 |
$3.45 |
$0.00 |
$0.00 |
0021 |
PRIME COAT |
408 5774 |
GAL |
19,546.000 |
19,546.000 |
|
0.000 |
$4.26 |
$0.00 |
$0.00 |
0022 |
(SP)ASPHALT CONCRETE TYPE S3(PG 70-28 OK) |
411(S3) 5940 |
TON |
5,415.000 |
5,415.000 |
|
0.000 |
$67.20 |
$0.00 |
$0.00 |
0023 |
(SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) |
411(S3) 5945 |
TON |
11,532.000 |
11,532.000 |
|
0.000 |
$59.50 |
$0.00 |
$0.00 |
0024 |
(SP)ASPHALT CONCRETE TYPE S4(PG 70-28 OK) |
411(S4) 5955 |
TON |
7,185.000 |
7,185.000 |
|
0.000 |
$69.30 |
$0.00 |
$0.00 |
0025 |
(SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) |
411(S4) 5960 |
TON |
2,117.000 |
2,117.000 |
|
0.000 |
$61.05 |
$0.00 |
$0.00 |
0026 |
RUMBLE STRIP-METHOD AC-CON |
413(A) 4861 |
LF |
18,040.000 |
18,040.000 |
|
0.000 |
$0.25 |
$0.00 |
$0.00 |
0027 |
STRUCTURAL EXCAVATION UNCLASSIFIED |
501(A) 0313 |
CY |
203.000 |
203.000 |
|
318.080 |
$25.25 |
$0.00 |
$8,031.52 |
0028 |
CLASS AA CONCRETE |
509(A) 0319 |
CY |
474.450 |
474.450 |
0.000 |
360.500 |
$333.30 |
$0.00 |
$120,154.65 |
0029 |
CLASS C CONCRETE |
509(D) 0325 |
CY |
832.510 |
832.510 |
102.000 |
512.000 |
$257.55 |
$26,270.10 |
$131,865.60 |
0030 |
REINFORCING STEEL |
511(A) 0332 |
LB |
60,994.140 |
60,994.140 |
|
50,294.900 |
$0.74 |
$0.00 |
$37,218.23 |
0031 |
TYPE I-A PLAIN RIPRAP |
601A-1 0536 |
TON |
280.000 |
280.000 |
579.700 |
771.030 |
$54.90 |
$31,825.53 |
$42,329.55 |
0032 |
MANHOLE (4' DIAMETER) |
611(A) 2657 |
EA |
3.000 |
3.000 |
|
0.000 |
$3,030.00 |
$0.00 |
$0.00 |
0033 |
ADD'L.DEPTH IN MANHOLE (4' DIAMETER) |
611(B) 2680 |
VF |
10.000 |
10.000 |
|
0.000 |
$135.00 |
$0.00 |
$0.00 |
0034 |
MANHOLE FRAME & COVER |
611(D) 4215 |
EA |
3.000 |
3.000 |
|
0.000 |
$455.00 |
$0.00 |
$0.00 |
0035 |
INLET (SMD-TYPE 2) |
611(E) 6002 |
EA |
8.000 |
8.000 |
0.000 |
6.000 |
$2,225.00 |
$0.00 |
$13,350.00 |
0036 |
18" R.C.PIPE CLASS III |
613(B) 0491 |
LF |
614.000 |
614.000 |
0.000 |
428.000 |
$26.80 |
$0.00 |
$11,470.40 |
0037 |
24" R.C.PIPE CLASS III |
613(B) 0492 |
LF |
78.000 |
78.000 |
|
80.000 |
$36.00 |
$0.00 |
$2,880.00 |
0038 |
36" R.C.PIPE CLASS III |
613(B) 0494 |
LF |
168.000 |
168.000 |
|
196.000 |
$63.30 |
$0.00 |
$12,406.80 |
0039 |
TYPE A6 CULVERT END TREATMENT |
613(CC) 7196 |
EA |
26.000 |
26.000 |
10.000 |
10.000 |
$1,010.00 |
$10,100.00 |
$10,100.00 |
0040 |
TYPE B6 CULVERT END TREATMENT |
613(CC) 7197 |
EA |
6.000 |
6.000 |
4.000 |
4.000 |
$1,162.00 |
$4,648.00 |
$4,648.00 |
0041 |
18" CORR. GALV. STEEL PIPE |
613(D) 0689 |
LF |
2,173.000 |
2,173.000 |
|
678.000 |
$18.30 |
$0.00 |
$12,407.40 |
0042 |
24" CORR. GALV. STEEL PIPE |
613(D) 0690 |
LF |
302.000 |
302.000 |
|
80.000 |
$22.40 |
$0.00 |
$1,792.00 |
0043 |
21" X 15" CORR. GALV. STEEL PIPE ARCH |
613(D) 4527 |
LF |
133.000 |
133.000 |
|
0.000 |
$19.45 |
$0.00 |
$0.00 |
0044 |
18" PREFAB. CULVERT END SECTION, ROUND |
613(M) 5726 |
EA |
7.000 |
7.000 |
|
5.000 |
$430.00 |
$0.00 |
$2,150.00 |
0045 |
24" PREFAB. CULVERT END SECTION, ROUND |
613(M) 5730 |
EA |
1.000 |
1.000 |
|
1.000 |
$520.00 |
$0.00 |
$520.00 |
0046 |
36" PREFAB. CULVERT END SECTION, ROUND |
613(M) 5734 |
EA |
1.000 |
1.000 |
|
3.000 |
$565.00 |
$0.00 |
$1,695.00 |
0047 |
8" PERFORATED PIPE UNDERDRAIN ROUND |
613(P) 1092 |
LF |
682.000 |
682.000 |
|
0.000 |
$7.50 |
$0.00 |
$0.00 |
0048 |
8" NON-PERF.PIPE UNDERDRAIN RND. |
613(Q) 1097 |
LF |
227.000 |
227.000 |
|
0.000 |
$7.50 |
$0.00 |
$0.00 |
0049 |
PIPE UNDERDRAIN COVER MAT'L. |
613(R) 1100 |
CY |
204.000 |
204.000 |
|
23.870 |
$35.35 |
$0.00 |
$843.80 |
0050 |
TRENCH EXCAVATION |
613(S) 1180 |
CY |
359.000 |
359.000 |
|
550.840 |
$25.25 |
$0.00 |
$13,908.71 |
0051 |
STANDARD BEDDING MATERIAL |
613(T) 1181 |
CY |
172.000 |
172.000 |
|
314.240 |
$30.30 |
$0.00 |
$9,521.47 |
0052 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS |
619(A) 0920 |
LSUM |
1.000 |
1.000 |
|
1.000 |
$15,150.00 |
$0.00 |
$15,150.00 |
0053 |
REMOVAL OF HEADWALL |
619(B) 0291 |
EA |
3.000 |
3.000 |
|
0.000 |
$505.00 |
$0.00 |
$0.00 |
0054 |
REMOVAL OF ASPHALT PAVEMENT |
619(B) 4728 |
SY |
19,862.000 |
19,862.000 |
|
15,933.890 |
$1.05 |
$0.00 |
$16,730.58 |
0055 |
SAWING PAVEMENT |
619(C) 0924 |
LF |
2,632.000 |
2,632.000 |
|
0.000 |
$3.20 |
$0.00 |
$0.00 |
0056 |
MAILBOX INSTALLATION-SINGLE |
629(A) 4958 |
EA |
1.000 |
1.000 |
|
0.000 |
$75.75 |
$0.00 |
$0.00 |
0057 |
MAILBOX INSTALLATION-MULTIPLE |
629(B) 4959 |
EA |
1.000 |
1.000 |
|
0.000 |
$177.00 |
$0.00 |
$0.00 |
0058 |
MAILBOX |
629(C) 4960 |
EA |
4.000 |
4.000 |
|
0.000 |
$35.35 |
$0.00 |
$0.00 |
0059 |
REMOVAL OF MAILBOX INSTALLATION |
629(D) 4961 |
EA |
2.000 |
2.000 |
|
0.000 |
$25.25 |
$0.00 |
$0.00 |
0060 |
OUTLET LATERAL HEADWALL |
653(C) 5946 |
EA |
3.000 |
3.000 |
|
0.000 |
$606.00 |
$0.00 |
$0.00 |
Subtotals For Category 0100/ROADWAY |
$102,843.63 |
$1,048,113.62 |
|
Fed/State Project Number: NH-STIM(009) |
Project: 20249(11) |
Category: 0300/TRAFFIC CONTROL |
0061 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) |
856(A) 8839 |
LF |
9,000.000 |
9,000.000 |
|
0.000 |
$0.40 |
$0.00 |
$0.00 |
0062 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 |
856(G) 8890 |
EA |
2,320.000 |
2,320.000 |
|
0.000 |
$0.40 |
$0.00 |
$0.00 |
0063 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) |
859(A) 8006 |
LF |
2,000.000 |
2,000.000 |
|
0.000 |
$0.40 |
$0.00 |
$0.00 |
0064 |
CONSTRUCTION SIGNS 0 TO 6.25 SF |
880(B) 8818 |
SD |
10,965.000 |
10,965.000 |
150.000 |
2,330.000 |
$0.20 |
$30.00 |
$466.00 |
0065 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF |
880(B) 8821 |
SD |
12,495.000 |
12,495.000 |
195.000 |
2,802.000 |
$0.25 |
$48.75 |
$700.50 |
0066 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF |
880(B) 8824 |
SD |
3,315.000 |
3,315.000 |
195.000 |
2,741.000 |
$3.05 |
$594.75 |
$8,360.05 |
0067 |
BARRICADES(TYPE III) |
880(C) 8842 |
SD |
11,985.000 |
11,985.000 |
180.000 |
2,095.000 |
$0.30 |
$54.00 |
$628.50 |
0068 |
WING BARRICADES |
880(C) 8848 |
SD |
1,020.000 |
1,020.000 |
60.000 |
932.000 |
$0.51 |
$30.60 |
$475.32 |
0069 |
WARNING LIGHTS(TYPE A) |
880(E) 8860 |
SD |
27,285.000 |
27,285.000 |
150.000 |
2,330.000 |
$0.05 |
$7.50 |
$116.50 |
0070 |
WARNING LIGHTS(TYPE C) |
880(E) 8872 |
SD |
42,330.000 |
42,330.000 |
|
0.000 |
$0.05 |
$0.00 |
$0.00 |
0071 |
DRUMS |
880(F) 8878 |
SD |
42,330.000 |
42,330.000 |
|
0.000 |
$0.10 |
$0.00 |
$0.00 |
0072 |
PORT.CHANGEABLE MESSAGE SIGN |
882(B) 8306 |
SD |
30.000 |
30.000 |
|
0.000 |
$50.50 |
$0.00 |
$0.00 |
Subtotals For Category 0300/TRAFFIC CONTROL |
$765.60 |
$10,746.87 |
|