Contract ID: 090002   Estimate Number: 0004     Contract No: 411149
Residency: CLINTON (05100)   Estimate Type: Progressive     Account No: 400500

Project Number(s): IM-STIM(024)
Primary Job Piece No: 24372(05)
Contract Description: RESURFACE (ASPHALT) I-40: BEGIN AT MILE MARKER 25, EXTEND NORTHEAST TO MILE MARKER 33. PROJECT LENGTH = 7.93 MILES
Primary County: BECKHAM              
Name of Road: I-40              
Prime Contractor: THE CUMMINS CONSTRUCTION CO., INC.              
    P. O. BOX 748              
    ENID , OK   73702              
Surety Company: HARTFORD ACCIDENT & INDEMNITY COMPANY              

Date Let: 03/24/2009 NTP Effective Date: 04/27/2009 Pay Period: 06/12/2009  TO  06/30/2009
Date Awarded: 03/30/2009 Date Work Began: 05/01/2009 Original Contract Time: 270
Date Contract Executed: 04/13/2009 Date Time Stopped: Current Time Charged: 65.00
Date NTP Issued: 04/14/2009 Completion Date: Current Time Allowed: 279.00
General Liability Expires: 09/01/2009 Workman's Comp Expires: 01/01/1010 Percent Time Used: 23.30 %
Specification Year: 1999     Date Approved:

Current Contract Amount: $14,083,370.82 Total to Date Prev to Date This Estimate
Bid Amount: $14,083,370.82 Participating: $1,508,257.17 $696,910.63 $811,346.54
Percent Complete: 15.35 % Non Participating: $0.00 $0.00 $0.00
Funds Available: $11,922,062.85 Total Earnings: $1,508,257.17 $696,910.63 $811,346.54
Unearned Balance: $11,922,062.85 Stockpiled Materials: $652,980.81 $717,832.62 $-64,851.81
Gross Earnings: $2,161,237.98 $1,414,743.25 $746,494.73
Other Adjustments: $69.99 $69.99 $0.00
Liq Dam/Disincentive: $0.00 $0.00 $0.00
TOTAL: $2,161,307.97 $1,414,813.24 $746,494.73

Estimate Adjustment Detail

Contract ID: 090002   Estimate Number: 0004     Primary JP: 24372(05)



CHANGE ORDER HISTORY
Change Order Nbr. Change Order Description Status Approval Date Contract Time Adjustment Total Change Order Amount
001 Replacing special provision 108-STIM01(a-f) 99 Approved 05/21/2009 0.0 $0.00


STOCKPILE PAYMENT HISTORY
Project Line Nbr Stockpile Description Adjustment Type Estimate Nbr Adjusted Amount
24372(05) 0014 ASCO MIX-S37628OK Stockpiled Material Initial Payment 0003 $558,251.15
24372(05) 0015 ASCO MIX-S36422OK Stockpiled Material Initial Payment 0003 $32,704.10
24372(05) 0015 ASCO MIX-S36422OK Stockpiled Material Adjustment 0004 $-32,704.10
24372(05) 0016 ASCO MIX-S47628OK Stockpiled Material Initial Payment 0003 $94,729.66
24372(05) 0017 ASCO MIX-S46422OK Stockpiled Material Adjustment 0004 $-32,147.71
24372(05) 0017 ASCO MIX-S46422OK Stockpiled Material Initial Payment 0003 $32,147.71
Subtotals For Stockpile Payments $652,980.81


LIQUIDATED DAMAGES HISTORY
Adjustment Description Estimate Nbr Time Units Rate Adjustment Amount
No liquidated damages have been assessed on this contract.


CONTRACT ADJUSTMENTS HISTORY
Adjustment Description Estimate Nbr Adjustment Amount
No general contract adjustments have been created on this contract.
Subtotals For Contract Adjustments $0.00


LINE ITEM ADJUSTMENT HISTORY
Project Item Nbr Line Item Description Adjustment Type Estimate Nbr Adj Quantity Unit Price Adjusted Amount
24372(05) 0017 (SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) Asphalt Binder Adjustment 0001 0.00 $0.00 $69.99
Subtotals For Line Item Adjustments $69.99


MILESTONE ADJUSTMENTS
Milestone Number Milestone Description Time Allowed Time Used Rate Total
01 TIME 'B' BID 270.00 0.00 $5,000.00 $0.00

Line Item Detail

Contract ID: 090002   Estimate Number: 0004     Primary JP: 24372(05)



Line Item Number Item Description Item Number Units Bid Qty Current Quantity Quantity Paid This Est. Quantity Paid To Date Unit Price Amount Paid This Est. Amount Paid To Date
Fed/State Project Number:    IM-STIM(024) Project:    24372(05) Category:    0100/ROADWAY IM-STIM(024)
0001 UNCLASSIFIED EXCAVATION 202(A) 0183 CY 1,667.000 1,667.000   0.000 $6.40 $0.00 $0.00
0002 UNCLASSIFIED BORROW 202(C) 0184 CY 10,505.000 10,505.000   0.000 $5.30 $0.00 $0.00
0003 TYPE A-SALVAGED TOPSOIL 205 4229 LSUM 1.000 1.000   0.000 $54,500.00 $0.00 $0.00
0004 TEMPORARY SILT FENCE 223 2801 LF 2,200.000 2,200.000   0.000 $2.25 $0.00 $0.00
0005 TEMPORARY SEDIMENT FILTER 224 2803 EA 30.000 30.000   0.000 $186.35 $0.00 $0.00
0006 SOLID SLAB SODDING 230(A) 2806 SY 293,867.000 293,867.000   0.000 $1.40 $0.00 $0.00
0007 VEGETATIVE MULCHING 233(A) 2817 AC 61.000 61.000   0.000 $157.85 $0.00 $0.00
0008 MOWING 241 2832 AC 61.000 61.000 30.500 30.500 $103.50 $3,156.75 $3,156.75
0009 (SP)FLY ASH 327(A) 4200 TON 676.000 676.000 331.590 331.590 $64.75 $21,470.45 $21,470.45
0010 (SP)CEMENTITIOUS STABILIZED SUBGRADE 327(E) 4240 SY 12,518.440 12,518.440 2,192.910 2,192.910 $4.15 $9,100.58 $9,100.58
0011 (SP)PERMEABLE FRICTION COURSE 406 5200 TON 20,513.940 20,513.940   0.000 $78.45 $0.00 $0.00
0012 TACK COAT 407 0250 GAL 73,451.910 73,451.910 4,600.000 5,300.000 $2.70 $12,420.00 $14,310.00
0013 PRIME COAT 408 5774 GAL 2,628.870 2,628.870   0.000 $5.05 $0.00 $0.00
0014 (SP)ASPHALT CONCRETE TYPE S3(PG 76-28 OK) 411(S3) 5935 TON 61,163.290 61,163.290   0.000 $58.50 $0.00 $0.00
0015 (SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) 411(S3) 5945 TON 30,039.670 30,039.670 4,458.220 4,458.220 $51.45 $229,375.42 $229,375.42
0016 (SP)ASPHALT CONCRETE TYPE S4(PG 76-28 OK) 411(S4) 5950 TON 33,833.340 33,833.340   0.000 $63.05 $0.00 $0.00
0017 (SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) 411(S4) 5960 TON 11,477.500 11,477.500 3,486.450 4,427.200 $54.55 $190,185.85 $241,503.76
0018 RUMBLE STRIP-METHOD AC-CON 413(A) 4861 LF 165,163.780 165,163.780   0.000 $0.10 $0.00 $0.00
0019 COLD MILLING PAVEMENT 417 5267 SY 383,705.980 383,705.980   0.000 $1.13 $0.00 $0.00
0020 6" PERFORATED PIPE UNDERDRAIN ROUND 613(P) 1091 LF 500.000 500.000 125.000 125.000 $4.45 $556.25 $556.25
0021 6" NON-PERF.PIPE UNDERDRAIN RND. 613(Q) 1096 LF 100.000 100.000 35.000 35.000 $7.00 $245.00 $245.00
0022 REMOVAL OF ASPHALT PAVEMENT 619(B) 4728 SY 5,235.560 5,235.560 2,192.910 2,192.910 $4.00 $8,771.64 $8,771.64
0023 REMOVAL OF GUARD RAIL 619(B) 4780 LF 4,870.000 4,870.000   0.000 $1.80 $0.00 $0.00
0024 BEAM GUARD RAIL-W-BEAM-SINGLE 623(A) 0932 LF 4,125.000 4,125.000   0.000 $14.25 $0.00 $0.00
0025 THRIE BEAM BRIDGE CONNECTION-TYPE A 623(E) 7114 EA 12.000 12.000   0.000 $1,218.60 $0.00 $0.00
0026 GUARD RAIL ANCHOR UNIT (TYPE B) 623(F) 4447 EA 6.000 6.000   0.000 $517.70 $0.00 $0.00
0027 (SP)G.E.T. GUARD RAIL END SECTION 623(H) 8571 EA 14.000 14.000   0.000 $2,070.70 $0.00 $0.00
Subtotals For Category     0100/ROADWAY IM-STIM(024)    $475,281.94 $528,489.85
Fed/State Project Number:    IM-STIM(024) Project:    24372(05) Category:    0200/BRIDGE 'A' IM-STIM(024)
0028 CLSM BACKFILL 501(G) 6309 CY 28.900 28.900 0.000 33.500 $258.85 $0.00 $8,671.48
0029 APPROACH SLAB 504(A) 1304 SY 173.200 173.200 0.000 86.600 $258.85 $0.00 $22,416.41
0030 CONCRETE PARAPET 504(F) 1381 LF 28.000 28.000 0.000 34.000 $155.30 $0.00 $5,280.20
0031 RAPID CURE JOINT SEALANT 504(H) 6390 LF 140.000 140.000   0.000 $25.90 $0.00 $0.00
0032 CLASS B BRIDGE DECK REPAIR 505(B) 6019 SY 45.000 45.000   0.000 $310.60 $0.00 $0.00
0033 CLASS C BRIDGE DECK REPAIR 505(C) 6020 SY 10.000 10.000   0.000 $414.15 $0.00 $0.00
0034 (SP)MULTIPLE LAYER POLYMER CONCRETE OVERLAY 505(D) 6090 SY 1,063.200 1,063.200   0.000 $41.40 $0.00 $0.00
0035 STRUCTURAL STEEL 506(A) 1322 LB 80.000 80.000   0.000 $31.05 $0.00 $0.00
0036 CLASS C CONCRETE 509(D) 1331 CY 5.000 5.000   0.000 $983.60 $0.00 $0.00
0037 WATER REPELLENT (VISUALLY INSPECTED) 515(A) 6013 SY 36.000 36.000   0.000 $4.15 $0.00 $0.00
0038 PREPARATION OF CRACKS ABOVE WATER 520(A) 6058 LF 20.000 20.000   0.000 $31.05 $0.00 $0.00
0039 EPOXY RESIN ABOVE WATER 520(C) 6060 GAL 0.500 0.500   0.000 $93.20 $0.00 $0.00
0040 PNEUMATICALLY PLACED MORTAR 521(A) 6210 SY 5.000 5.000   0.000 $569.45 $0.00 $0.00
0041 (PL)REPAIR BRIDGE ITEM (TYPE A) 540 4515 EA 2.000 2.000 1.000 1.000 $12,425.00 $12,425.00 $12,425.00
0042 (PL)REPAIR BRIDGE ITEM (TYPE B) 540 4525 EA 2.000 2.000   0.000 $3,625.00 $0.00 $0.00
Subtotals For Category     0200/BRIDGE 'A' IM-STIM(024)    $12,425.00 $48,793.09
Fed/State Project Number:    IM-STIM(024) Project:    24372(05) Category:    0201/BRIDGE 'B' IM-STIM(024)
0043 CLSM BACKFILL 501(G) 6309 CY 28.900 28.900   0.000 $310.60 $0.00 $0.00
0044 APPROACH SLAB 504(A) 1304 SY 173.200 173.200   0.000 $284.75 $0.00 $0.00
0045 SEALED EXPANSION JOINT 504(C) 6250 LF 78.000 78.000 35.000 35.000 $362.37 $12,682.95 $12,682.95
0046 42" F-SHAPED PARAPET 504(F) 6190 LF 448.000 448.000   0.000 $129.50 $0.00 $0.00
0047 RAPID CURE JOINT SEALANT 504(H) 6390 LF 40.000 40.000   0.000 $25.90 $0.00 $0.00
0048 STRUCTURAL STEEL 506(A) 1322 LB 2,090.000 2,090.000   0.000 $12.45 $0.00 $0.00
0049 CLASS AA CONCRETE 509(A) 1326 CY 218.300 218.300 80.000 80.000 $931.80 $74,544.00 $74,544.00
0050 CLASS C CONCRETE 509(D) 1331 CY 5.000 5.000   0.000 $1,035.35 $0.00 $0.00
0051 EPOXY COATED REINFORCING STEEL 511(B) 6010 LB 64,000.000 64,000.000 32,000.000 32,000.000 $1.65 $52,800.00 $52,800.00
0052 PAINTING EXISTING STRUCTURES 512(A) 1323 LSUM 1.000 1.000 0.500 0.500 $36,250.00 $18,125.00 $18,125.00
0053 COLLECTION & HANDLING OF WASTE 512(B) 6303 LSUM 1.000 1.000 0.500 0.500 $1,553.00 $776.50 $776.50
0054 WATER REPELLENT (VISUALLY INSPECTED) 515(A) 6013 SY 302.300 302.300   0.000 $4.15 $0.00 $0.00
0055 PREPARATION OF CRACKS ABOVE WATER 520(A) 6058 LF 10.000 10.000   0.000 $31.05 $0.00 $0.00
0056 EPOXY RESIN ABOVE WATER 520(C) 6060 GAL 0.500 0.500   0.000 $93.15 $0.00 $0.00
0057 PNEUMATICALLY PLACED MORTAR 521(A) 6210 SY 5.000 5.000   0.000 $621.25 $0.00 $0.00
0058 (PL)REPAIR BRIDGE ITEM (TYPE B) 540 4525 EA 2.000 2.000   0.000 $5,695.00 $0.00 $0.00
0059 (PL)REMOVAL OF BRIDGE ITEMS 619(B) 2500 LSUM 1.000 1.000   0.500 $93,181.00 $0.00 $46,590.50
Subtotals For Category     0201/BRIDGE 'B' IM-STIM(024)    $158,928.45 $205,518.95
Fed/State Project Number:    IM-STIM(024) Project:    24372(05) Category:    0202/BRIDGE 'C' IM-STIM(024)
0060 CLSM BACKFILL 501(G) 6309 CY 90.000 90.000 16.000 61.000 $258.85 $4,141.60 $15,789.85
0061 APPROACH SLAB 504(A) 1304 SY 533.000 533.000   0.000 $258.85 $0.00 $0.00
0062 RAPID CURE JOINT SEALANT 504(H) 6390 LF 140.000 140.000   0.000 $25.90 $0.00 $0.00
0063 CLASS B BRIDGE DECK REPAIR 505(B) 6019 SY 45.000 45.000   0.000 $310.65 $0.00 $0.00
0064 CLASS C BRIDGE DECK REPAIR 505(C) 6020 SY 10.000 10.000   0.000 $414.15 $0.00 $0.00
0065 (SP)MULTIPLE LAYER POLYMER CONCRETE OVERLAY 505(D) 6090 SY 1,400.000 1,400.000   0.000 $41.45 $0.00 $0.00
0066 STRUCTURAL STEEL 506(A) 1322 LB 80.000 80.000   0.000 $31.05 $0.00 $0.00
0067 CLASS C CONCRETE 509(D) 1331 CY 5.000 5.000   0.000 $983.60 $0.00 $0.00
0068 WATER REPELLENT (VISUALLY INSPECTED) 515(A) 6013 SY 36.000 36.000   0.000 $4.15 $0.00 $0.00
0069 PREPARATION OF CRACKS ABOVE WATER 520(A) 6058 LF 90.000 90.000   0.000 $31.05 $0.00 $0.00
0070 EPOXY RESIN ABOVE WATER 520(C) 6060 GAL 2.500 2.500   0.000 $93.20 $0.00 $0.00
0071 PNEUMATICALLY PLACED MORTAR 521(A) 6210 SY 5.000 5.000   0.000 $569.45 $0.00 $0.00
0072 (PL)REPAIR BRIDGE ITEM (TYPE A) 540 4515 EA 2.000 2.000   0.000 $27,954.40 $0.00 $0.00
0073 (PL)REPAIR BRIDGE ITEM (TYPE B) 540 4525 EA 4.000 4.000   0.000 $7,765.10 $0.00 $0.00
Subtotals For Category     0202/BRIDGE 'C' IM-STIM(024)    $4,141.60 $15,789.85
Fed/State Project Number:    IM-STIM(024) Project:    24372(05) Category:    0203/BRIDGE 'D' IM-STIM(024)
0074 CLSM BACKFILL 501(G) 6309 CY 28.100 28.100   0.000 $310.60 $0.00 $0.00
0075 (PL)BRIDGE TRAFFIC RAIL 504 6179 LF 224.000 224.000   0.000 $129.50 $0.00 $0.00
0076 APPROACH SLAB 504(A) 1304 SY 168.200 168.200   0.000 $284.75 $0.00 $0.00
0077 SEALED EXPANSION JOINT 504(C) 6250 LF 78.000 78.000   0.000 $362.40 $0.00 $0.00
0078 RAPID CURE JOINT SEALANT 504(H) 6390 LF 40.000 40.000   0.000 $25.90 $0.00 $0.00
0079 STRUCTURAL STEEL 506(A) 1322 LB 10,240.000 10,240.000 10,275.000 10,275.000 $6.25 $64,218.75 $64,218.75
0080 CLASS AA CONCRETE 509(A) 1326 CY 104.600 104.600   0.000 $931.85 $0.00 $0.00
0081 CLASS C CONCRETE 509(D) 1331 CY 5.000 5.000   0.000 $1,035.35 $0.00 $0.00
0082 EPOXY COATED REINFORCING STEEL 511(B) 6010 LB 40,320.000 40,320.000   0.000 $1.65 $0.00 $0.00
0083 PAINTING EXISTING STRUCTURES 512(A) 1323 LSUM 1.000 1.000 0.500 0.500 $36,237.20 $18,118.60 $18,118.60
0084 COLLECTION & HANDLING OF WASTE 512(B) 6303 LSUM 1.000 1.000 0.500 0.500 $1,553.00 $776.50 $776.50
0085 WATER REPELLENT (VISUALLY INSPECTED) 515(A) 6013 SY 136.000 136.000   0.000 $4.15 $0.00 $0.00
0086 PREPARATION OF CRACKS ABOVE WATER 520(A) 6058 LF 70.000 70.000   0.000 $31.05 $0.00 $0.00
0087 EPOXY RESIN ABOVE WATER 520(C) 6060 GAL 2.000 2.000   0.000 $93.20 $0.00 $0.00
0088 PNEUMATICALLY PLACED MORTAR 521(A) 6210 SY 5.000 5.000   0.000 $673.00 $0.00 $0.00
0089 (PL)REPAIR BRIDGE ITEM (TYPE B) 540 4525 EA 4.000 4.000   0.000 $5,694.40 $0.00 $0.00
0090 (PL)REMOVAL OF BRIDGE ITEMS 619(B) 2500 LSUM 1.000 1.000   0.200 $62,121.00 $0.00 $12,424.20
Subtotals For Category     0203/BRIDGE 'D' IM-STIM(024)    $83,113.85 $95,538.05
Fed/State Project Number:    IM-STIM(024) Project:    24372(05) Category:    0204/BRIDGE 'E' IM-STIM(024)
0091 CLSM BACKFILL 501(G) 6309 CY 28.100 28.100   0.000 $310.65 $0.00 $0.00
0092 (PL)BRIDGE TRAFFIC RAIL 504 6179 LF 224.000 224.000   0.000 $129.45 $0.00 $0.00
0093 APPROACH SLAB 504(A) 1304 SY 168.200 168.200   0.000 $284.75 $0.00 $0.00
0094 SEALED EXPANSION JOINT 504(C) 6250 LF 78.000 78.000   0.000 $362.40 $0.00 $0.00
0095 RAPID CURE JOINT SEALANT 504(H) 6390 LF 40.000 40.000   0.000 $25.90 $0.00 $0.00
0096 STRUCTURAL STEEL 506(A) 1322 LB 80.000 80.000   0.000 $31.05 $0.00 $0.00
0097 CLASS AA CONCRETE 509(A) 1326 CY 104.600 104.600   0.000 $931.85 $0.00 $0.00
0098 CLASS C CONCRETE 509(D) 1331 CY 5.000 5.000   0.000 $1,035.00 $0.00 $0.00
0099 EPOXY COATED REINFORCING STEEL 511(B) 6010 LB 40,320.000 40,320.000   0.000 $1.55 $0.00 $0.00
0100 PAINTING EXISTING STRUCTURES 512(A) 1323 LSUM 1.000 1.000   0.000 $36,237.20 $0.00 $0.00
0101 COLLECTION & HANDLING OF WASTE 512(B) 6303 LSUM 1.000 1.000   0.000 $1,554.00 $0.00 $0.00
0102 WATER REPELLENT (VISUALLY INSPECTED) 515(A) 6013 SY 136.000 136.000   0.000 $4.14 $0.00 $0.00
0103 PREPARATION OF CRACKS ABOVE WATER 520(A) 6058 LF 50.000 50.000   0.000 $31.05 $0.00 $0.00
0104 EPOXY RESIN ABOVE WATER 520(C) 6060 GAL 1.500 1.500   0.000 $93.20 $0.00 $0.00
0105 PNEUMATICALLY PLACED MORTAR 521(A) 6210 SY 5.000 5.000   0.000 $673.00 $0.00 $0.00
0106 (PL)REPAIR BRIDGE ITEM (TYPE B) 540 4525 EA 4.000 4.000   0.000 $5,694.50 $0.00 $0.00
0107 (PL)REMOVAL OF BRIDGE ITEMS 619(B) 2500 LSUM 1.000 1.000   0.000 $62,121.00 $0.00 $0.00
Subtotals For Category     0204/BRIDGE 'E' IM-STIM(024)    $0.00 $0.00
Fed/State Project Number:    IM-STIM(024) Project:    24372(05) Category:    0310/TRAFFIC SIGNING AND STRIPING IM-STIM(024)
0108 TRAFFIC STRIPE(PLASTIC)(4" WIDE) 855(A) 8812 LF 187,176.000 187,176.000   0.000 $0.45 $0.00 $0.00
0109 TRAFFIC STRIPE(PLASTIC)(6" WIDE) 855(A) 8813 LF 22,809.600 22,809.600   0.000 $0.60 $0.00 $0.00
Subtotals For Category     0310/TRAFFIC SIGNING AND STRIPING IM-STIM(024)    $0.00 $0.00
Fed/State Project Number:    IM-STIM(024) Project:    24372(05) Category:    0330/TRAFFIC CONTROL IM-STIM(024)
0110 RELOCATION OF RENTED PORTABLE TYPE PRECAST CONCRETE MEDIAN 627(O) 4410 LF 3,125.000 3,125.000 460.000 460.000 $10.85 $4,991.00 $4,991.00
0111 RENTED PORTABLE TYPE PRECAST CONCRETE MEDIAN BARRIER 627(P) 4425 LF 2,168.000 2,168.000 648.000 2,626.000 $46.95 $30,423.60 $123,290.70
0112 DELINEATORS(TYPE 1, CODE 1) 853 9024 EA 178.000 178.000   0.000 $23.75 $0.00 $0.00
0113 DELINEATORS(TYPE 1, CODE 2) 853 9027 EA 40.000 40.000   0.000 $24.75 $0.00 $0.00
0114 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) 856(A) 8839 LF 45,619.200 45,619.200   21,812.000 $0.25 $0.00 $5,453.00
0115 (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 856(G) 8887 EA 2,000.000 2,000.000   300.000 $0.50 $0.00 $150.00
0116 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) 859(A) 8006 LF 45,619.200 45,619.200   0.000 $0.15 $0.00 $0.00
0117 (PL)SAND FILLED IMPACT ATTENUATION SYSTEM 870(A) 8490 SD 270.000 270.000 10.000 120.000 $12.40 $124.00 $1,488.00
0118 ARROW DISPLAY(TYPE C) 880(A) 8812 SD 1,080.000 1,080.000 58.000 158.000 $1.05 $60.90 $165.90
0119 CONSTRUCTION SIGNS 0 TO 6.25 SF 880(B) 8818 SD 43,740.000 43,740.000 3,000.000 6,778.000 $0.02 $60.00 $135.56
0120 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF 880(B) 8821 SD 17,550.000 17,550.000 724.000 1,878.000 $0.02 $14.48 $37.56
0121 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF 880(B) 8824 SD 7,020.000 7,020.000 1,130.000 2,957.000 $0.02 $22.60 $59.14
0122 CONSTRUCTION SIGNS 33.0 SF & OVER 880(B) 8827 SD 90.000 90.000   0.000 $0.02 $0.00 $0.00
0123 BARRICADES(TYPE III) 880(C) 8842 SD 10,260.000 10,260.000 319.000 829.000 $0.02 $6.38 $16.58
0124 WING BARRICADES 880(C) 8848 SD 2,160.000 2,160.000 60.000 244.000 $0.02 $1.20 $4.88
0125 WARNING LIGHTS(TYPE A) 880(E) 8860 SD 27,540.000 27,540.000 761.000 2,729.000 $0.02 $15.22 $54.58
0126 WARNING LIGHTS(TYPE C) 880(E) 8872 SD 87,750.000 87,750.000 3,895.000 10,328.000 $0.65 $2,531.75 $6,713.20
0127 DRUMS 880(F) 8878 SD 87,750.000 87,750.000 5,233.500 11,691.500 $0.65 $3,401.78 $7,599.48
0128 TRAFFIC SURVEILLANCE, POLICE 880(L) 8911 HOUR 200.000 200.000   0.000 $62.15 $0.00 $0.00
0129 PORT.CHANGEABLE MESSAGE SIGN 882(B) 8306 SD 1,350.000 1,350.000 30.000 115.000 $1.05 $31.50 $120.75
0130 (PL)REMOVE & RESET EXISTING SIGNS 890A/B 8756 EA 16.000 16.000   0.000 $155.30 $0.00 $0.00
Subtotals For Category     0330/TRAFFIC CONTROL IM-STIM(024)    $41,684.41 $150,280.33
Fed/State Project Number:    IM-STIM(024) Project:    24372(05) Category:    0600/STAKING IM-STIM(024)
0131 STAKING 642 0098 LSUM 1.000 1.000 0.250 0.250 $10,353.50 $2,588.38 $2,588.38
Subtotals For Category     0600/STAKING IM-STIM(024)    $2,588.38 $2,588.38
Fed/State Project Number:    IM-STIM(024) Project:    24372(05) Category:    0640/CONSTRUCTION IM-STIM(024)
0132 (SP)SWPPP DOCUMENTATION AND MANAGEMENT 220 2800 LSUM 1.000 1.000 0.250 0.250 $51,767.40 $12,941.85 $12,941.85
0133 MOBILIZATION 641 1552 LSUM 1.000 1.000   0.750 $570,767.68 $0.00 $428,075.76
0134 (SP)CONTRACTORS QUALITY CONTROL 643 0087 LSUM 1.000 1.000 0.250 0.250 $80,964.25 $20,241.06 $20,241.06
Subtotals For Category     0640/CONSTRUCTION IM-STIM(024)    $33,182.91 $461,258.67
Fed/State Project Number:    IM-STIM(024) Project:    24372(05) Category:    0850/Non ARRA Funding
Subtotals For Category     0850/Non ARRA Funding    $0.00 $0.00
Subtotals For Project IM-STIM(024) /24372(05) $811,346.54 $1,508,257.17