|
SPList
|
List of Special Provisions - Print and include completed form with project submission.
|
07-23-2013
|
|
Submission
|
Project Submission Letter
|
05-03-2012
|
| QC/QA
|
QC/QA Request Form
|
N/A
|
| 102-4
|
A + B Bidding
|
01-01-2010
|
| 103-1
|
Bonding Requirements
|
N/A
|
| 104-1
|
Railroad Flagging (with pay item)
|
N/A
|
| 104-2
|
Railroad Flagging (without pay item)
|
N/A
|
| 107-8
|
Legal Relations and Responsibility to Public (Railroad Insurance)
|
N/A
|
| 107-12
|
Federal Aviation Regulations
|
08-24-2010
|
| 108-2
|
Administration and Extension of Contract Time (Winter Time Suspension)
|
09-27-2012
|
| 108-3
|
Contractors Critical Path Method (CPM) Schedule Requirements
|
N/A
|
| 108-5
|
Prosecution Progress (90 Days)
|
01-04-2010
|
| 108-6
|
Prosecution Progress (120 Days)
|
01-04-2010
|
| 108-23
|
Prosecution and Progress Flexible Start
|
01-04-2010
|
| 108-27
|
Delayed Notice to Proceed
|
01-04-2010
|
| 108-81
|
Disincentive for Exposed Cold-Milled Pavement
|
01-04-2010
|
| 108-182
|
Subletting of Contract (70%)
|
01-04-2010
|
| 109-3
|
Price Adjustment for Fuel
|
03-30-2011
|
| 109-7
|
Price Adjustment for Asphalt Binder
|
11-04-2011
|
| 201-1
|
Eastern Red Cedar Eradication
|
06-20-2013
|
| 202-2
|
Osage Nation Mineral Reservation Sandy Soil Mining Permit
|
01-04-2010
|
| 221-1
|
Temporary Fiber Log
|
02-27-2013
|
| 246-2
|
Geogrid Earth Reinforcement
|
N/A
|
| 303-1
|
Aggregate Base
|
11-09-2012
|
| 303-2
|
Aggregate Base (Plant Mixed)
|
11-09-2012
|
| 317-8
|
Cement Treated Base
|
02-05-2013
|
| 325-1
|
Moisture Barrier Membrane
|
N/A
|
| 407-2
|
Bonded Hot Mix Asphalt
|
N/A
|
| 410-1
|
Milled Hot Recycling of Bituminous Material (Partial Depth) 2" Surface Recycling
|
N/A
|
| 411-3QA
|
Quality Control and Acceptance Procedures for Plant Mix AC Pavement
|
N/A
|
| 411-12
|
Longitudinal Joint Density On Asphalt Concrete Pavement
|
01-04-2010
|
| 411-13
|
Warm Mix Asphalt
|
01-04-2010
|
| 411-14
|
Asphalt Safety Edge
|
02-27-2013
|
| 411-16
|
Hot Mix Asphalt (Lime)
|
09-27-2012
|
| 414-2QA
|
Quality Control and Acceptance Procedures
|
N/A
|
| 414-17
|
Longitudinal Finish
|
N/A
|
| 415-1
|
Bituminous (Fiber Fill) Crack Sealing
|
01-04-2010
|
| 430-2QA
|
Pavement and Bridge Deck Smoothness
|
11-17-2011
|
| 435-3
|
Fiber Reinforced, Bonded Portland Cement Concrete Overlay
|
01-04-2010
|
| 504-1
|
Bridge Decks, Approaches, Rails and Parapets
|
N/A
|
| 504-2
|
Finger Type Expansion Device
|
01-04-2010
|
| 504-4QA
|
Quality Control and Acceptance for Concrete Bridge Decks
|
N/A
|
| 504-6
|
Rail, Parapets, and Curbs
|
N/A
|
| 504-7
|
Bridge Deck Finish on County Bridges
|
02-16-2012
|
| 507-1
|
Bearing Assemblies
|
02-04-2011
|
| 513-1
|
Anodes
|
08-16-2011
|
| 516-1
|
Pulse-Echo Testing of Drilled Shafts
|
01-04-2010
|
| 524-3
|
Fiber Reinforced Polymer Material
|
10-28-2011
|
| 535-1
|
Corrosion Inhibitor (Surface-Applied)
|
10-06-2011
|
| 619-4
|
Plugging and Abandonment of Oil Wells
|
N/A
|
| 619-5
|
Oil Field Equipment Removal
|
N/A
|
| 643-6QA
|
Contractors Quality Control
|
N/A
|
| 648-1QA
|
Payment for Contractors Quality Control
|
N/A
|
| 656-4
|
American Burying Beetle (ABB)
|
06-20-2013
|
| 701-14
|
Optimized Gradation for Portland Cement Concrete Pavement
|
04-07-2011
|
| 708-22
|
Warm Mix Asphalt Material Requirements
|
04-26-2012
|
| 708-23
|
Hamburg Rut Testing of Hot Mix Asphalt
|
07-08-2011
|
>
| 708-26
|
Plant Mix Bituminous Bases and Surfaces (Superpave)
|
03-19-2012
|
>
| 708-27
|
Lime for Asphalt Mixtures
|
08-29-2012
|
>
| 711-1
|
Permanent Pavement Marking Tape
|
07-31-2012
|
| 724-1
|
Bridge Bearing Structural Steel
|
03-16-2011
|
| 726-1
|
Structural Steel Plate Pipe, Pipe Arches, and Arches
|
09-13-2010
|
| 733-1
|
Elastomeric Bearing Pads
|
10-04-2012
|
| 737-2
|
Anti-Graffiti Coating Systems
|
N/A
|
| 809-1
|
Bridge Navigation Lighting
|
01-04-2010
|
| 823-1
|
Temporary Traffic Signals
|
N/A
|
| 855-7
|
Traffic Stripe (Plastic)
|
04-09-2013
|
| 856-1
|
Traffic Stripe (Multi-polymer)
|
04-09-2013
|
| 857-2
|
Construction Zone Pavement Markings
|
03-19-2012
|
| 877-1
|
Portable Longitudinal Barrier
|
11-17-2011
|
| 880-1
|
Plastic Drums
|
08-16-11
|
| 880-6
|
Temporary Roadway Lighting Assembly
|
08-17-11
|
| 882-2
|
Smart Work Zone
|
N/A
|